    Thursday

  • 138425 05/31/07 23:49 A. Puckett end of shift target snapshots
  • 138424 05/31/07 22:57 jmaxwell Shift Checklist, May 31
  • 138423 05/31/07 22:26 cdaq Run 63470: Production- Carbon
  • 138422 05/31/07 22:23 A. Puckett target: moved to Carbon
  • 138421 05/31/07 21:02 horn run ends with dipole problems and target IOC reboot
  • 138420 05/31/07 21:01 A. Puckett target: Lifter Status "error"
  • 138419 05/31/07 21:00 A. Puckett target: Alarm Setpoint Changes
  • 138418 05/31/07 20:54 horn HMS dipole communication errors
  • 138417 05/31/07 20:49 A. Puckett Ballast Pressure issue: H vs. D?
  • 138416 05/31/07 20:47 jmaxwell BCM/BPM grabs
  • 138415 05/31/07 20:45 A. Puckett Red Alarms, Alarm Handler, funky limits after target IOC reboot
  • 138414 05/31/07 20:26 cdaq Run 63469: Production- Copper
  • 138413 05/31/07 19:23 cdaq Run 63468: Production- Copper
  • 138412 05/31/07 19:21 A. Puckett target: moved to Copper
  • 138411 05/31/07 16:54 saw vmec18 is back too (HMS Quad hall probes)
  • 138410 05/31/07 16:43 M JOnes SOS Quad is down
  • 138409 05/31/07 16:42 M Jones SOS vmec19 back
  • 138408 05/31/07 16:04 cdaq Beam Time Accounting
  • 138407 05/31/07 15:55 Solvignon Shift summary
  • 138406 05/31/07 15:11 Lassiter HMS DIpole lost communication
  • 138405 05/31/07 14:52 dunne Target: Position FSD restored
  • 138404 05/31/07 14:26 cdaq Run 63467: Cosmic run
  • 138403 05/31/07 14:24 M Jones Epics values for HMS Quad set current
  • 138402 05/31/07 11:53 M JOnes SOS vmec19 not responding
  • 138401 05/31/07 11:52 horn HMS magnet information in start run scripts
  • 138400 05/31/07 11:43 M Jones SOS and tracker work
  • 138399 05/31/07 11:36 horn run 63466 is a cosmic run
  • 138398 05/31/07 11:31 cdaq Run 63466: Production- Dummy
  • 138397 05/31/07 09:42 Fowler Dipole NMR Comm Error
  • 138396 05/31/07 09:36 Solvignon Hall C in controlled access
  • 138395 05/31/07 08:38 cdaq Run 63465: Production- Dummy
  • 138394 05/31/07 08:29 smithg Target: tgt operator notification
  • 138393 05/31/07 08:25 cdaq Run 63464: Production- Dummy
  • 138392 05/31/07 08:19 cdaq Beam Time Accounting
  • 138391 05/31/07 08:00 dalton Shift Summary
  • 138390 05/31/07 07:57 vahe Target status GUI, end of shift
  • 138389 05/31/07 07:39 mahbub Shift checklist
  • 138388 05/31/07 06:48 mahbub BPm BCM screens
  • 138387 05/31/07 06:44 cdaq Run 63463: Production- Dummy
  • 138386 05/31/07 06:41 vahe Change target to 4 cm Dummy
  • 138385 05/31/07 06:08 cdaq Run 63462: Production- LD2
  • 138384 05/31/07 04:27 cdaq Run 63461: Production- LD2
  • 138383 05/31/07 04:04 cdaq Run 63460: Production- LD2
  • 138382 05/31/07 03:05 cdaq Run 63459: Production- LD2
  • 138381 05/31/07 02:31 cdaq Run 63458: Production- LD2
  • 138380 05/31/07 02:25 vahe Move target to LD2
  • 138379 05/31/07 02:01 cdaq Run 63457: Production- Dummy
  • 138378 05/31/07 02:01 dunne EPICS archiver
  • 138377 05/31/07 01:57 vahe Change target to 4 cm Dummy
  • 138376 05/31/07 01:45 vahe Move target to Iron
  • 138375 05/31/07 01:14 dunne Target: New procedure for target motion
  • 138374 05/31/07 01:03 cdaq Run 63456: Production- Fe
  • 138373 05/31/07 00:35 cdaq Run 63455: Production- C
  • 138372 05/31/07 00:01 vahe Start of shift, Target status GUI
  • 138371 05/31/07 00:01 cdaq Beam Time Accounting
  • 138370 05/31/07 00:00 horn Swing Shift Summary
  • Wednesday

  • 138369 05/30/07 23:52 A. Puckett End-of-shift target snapshots:
  • 138368 05/30/07 23:20 jmaxwell Shift Checklist, May 30
  • 138367 05/30/07 23:16 jmaxwell BCM/BPM grabs
  • 138366 05/30/07 22:50 A. Puckett target: Moved to Carbon
  • 138365 05/30/07 22:31 cdaq Run 63454: Production- Carbon
  • 138363 05/30/07 20:44 A. Puckett target: moved to dummy
  • 138362 05/30/07 20:43 cdaq Run 63453: Production- Dummy
  • 138361 05/30/07 19:57 cdaq Run 63452: Production- LD2
  • 138360 05/30/07 19:13 cdaq Run 63451: Production- LD2
  • 138359 05/30/07 18:41 horn beam off for Hall A BCM calibration
  • 138358 05/30/07 18:29 A. Puckett target: moved to LD2
  • 138357 05/30/07 18:08 smithg Target: new administrative control
  • 138356 05/30/07 16:56 A. Puckett target: Moved to Copper
  • 138355 05/30/07 16:46 cdaq Run 63450: Production- Cu
  • 138354 05/30/07 16:30 A. Puckett target: moved to BeO
  • 138353 05/30/07 16:02 cdaq Beam Time Accounting
  • 138352 05/30/07 15:52 hamlet Day shift summary, 30 May 2007
  • 138351 05/30/07 14:59 hamlet No Beam due to Hall B study, Controlled Access for target FSD
  • 138350 05/30/07 14:39 hamlet Have problem to put Fe target in correct position
  • 138349 05/30/07 13:51 cdaq Run 63449: Production- LD2
  • 138348 05/30/07 13:36 cdaq Run 63448: Production- LD2
  • 138347 05/30/07 13:29 cdaq Run 63447: Production- LD2
  • 138346 05/30/07 12:50 beaufait sos dipole trip
  • 138345 05/30/07 12:47 cdaq Run 63446: Production- Dummy
  • 138344 05/30/07 12:25 hamlet Controlled Access for SOS magnets
  • 138343 05/30/07 11:21 cdaq Run 63445: Production- C (During beam study)
  • 138342 05/30/07 10:41 cdaq Run 63444: Production- C (during MCC beam study)
  • 138341 05/30/07 09:37 hamlet Beam OFF for Hall A BCM calibration
  • 138340 05/30/07 09:12 cdaq Run 63443: Production- C
  • 138339 05/30/07 08:15 cdaq Beam Time Accounting
  • 138338 05/30/07 08:09 dalton Owl Shift Summary
  • 138337 05/30/07 08:09 dalton Owl Shift Summary
  • 138336 05/30/07 07:58 cdaq Run 63442: Production- Cu
  • 138335 05/30/07 07:57 vahe Target lifter comunication problem
  • 138334 05/30/07 06:22 cdaq Run 63441: Production- Carbon
  • 138333 05/30/07 06:18 vahe Change target to Carbon
  • 138332 05/30/07 05:17 cdaq Run 63440: Production- Dummy
  • 138331 05/30/07 04:21 cdaq Run 63439: Production- Dummy
  • 138330 05/30/07 04:17 vahe Change target to Dummy
  • 138329 05/30/07 04:17 vahe Change Target to LD2 (late log)
  • 138328 05/30/07 04:16 vahe Change target to Dummy (Late log)
  • 138327 05/30/07 03:49 dalton Magnet control confusion
  • 138326 05/30/07 03:20 cdaq Run 63438: Production- LD2
  • 138325 05/30/07 02:36 cdaq Run 63437: Production- LD2
  • 138324 05/30/07 01:34 cdaq Run 63436: Production- LD2
  • 138323 05/30/07 00:54 cdaq Run 63435: Production- Dummy
  • 138322 05/30/07 00:12 cdaq Run 63434: Production- Cu
  • 138321 05/30/07 00:10 vahe Target status start of shift
  • 138320 05/30/07 00:06 cdaq Beam Time Accounting
  • 138319 05/30/07 00:03 horn Swing Shift Summary
  • Tuesday

  • 138318 05/29/07 23:56 saw Photo of "Bender"
  • 138317 05/29/07 23:50 A. Puckett end-of-shift target snapshots, pt. 1
  • 138316 05/29/07 23:48 cdaq Run 63433: Production- Cu
  • 138315 05/29/07 23:25 dunne Target: Target lifter problem resolved
  • 138314 05/29/07 22:41 cdaq Run 63432: Production- Cu
  • 138313 05/29/07 22:28 jmaxwell Shift Checklist, May 29
  • 138312 05/29/07 22:25 A. Puckett target: moved to Copper
  • 138311 05/29/07 21:59 jmaxwell BPM, BCM Screen Grab
  • 138310 05/29/07 21:32 cdaq Run 63431: Production- Carbon
  • 138309 05/29/07 21:18 cdaq Run 63430: Production- Carbon
  • 138308 05/29/07 21:13 cdaq Run 63429: Production- Carbon
  • 138307 05/29/07 20:50 horn DAQ problems - resolved
  • 138306 05/29/07 20:22 cdaq Run 63428: Production- Carbon
  • 138305 05/29/07 20:13 cdaq Run 63427: Trigger Test
  • 138304 05/29/07 20:08 cdaq Run 63426: Trigger Test
  • 138303 05/29/07 20:00 cdaq Run 63425: Trigger Test
  • 138302 05/29/07 19:56 cdaq Run 63424: Trigger Test
  • 138301 05/29/07 19:48 cdaq Run 63423: Trigger Test
  • 138300 05/29/07 19:43 cdaq Run 63422: Trigger Test
  • 138299 05/29/07 19:39 cdaq Run 63421: Test
  • 138298 05/29/07 19:36 cdaq Run 63420: Tests
  • 138297 05/29/07 19:34 cdaq Run 63419: Production- LH2 4cm Q2=5.76 GeV2
  • 138296 05/29/07 19:05 A. Puckett target: moved to Carbon
  • 138295 05/29/07 18:49 cdaq Beam Time Accounting
  • 138294 05/29/07 18:39 horn Kinematics setup
  • 138293 05/29/07 18:37 M JOnes SOS D1 faults on "InpCur"
  • 138292 05/29/07 18:30 M Jones SOS s1y2- had overvoltage problem, moved to channel 8 in crate 13
  • 138291 05/29/07 17:47 cdaq Run 63418: Cosmic run SOS
  • 138290 05/29/07 16:21 kenyon A can pump controller bad
  • 138289 05/29/07 16:02 kenyon Shaft seal leak on BL turbo fore pump
  • 138288 05/29/07 16:00 kenyon Be window chiller H20 level ok
  • 138287 05/29/07 16:00 kenyon HMS, BL, and SOS vacuum status
  • 138286 05/29/07 15:55 kenyon SOS door problem and operation reminder
  • 138285 05/29/07 15:11 cdaq Run 63417: Cosmics- Empty
  • 138284 05/29/07 15:08 Solvignon HMS HVs are now on
  • 138283 05/29/07 14:29 Solvignon Moved target to empty for MCC beam tests
  • 138282 05/29/07 14:26 Solvignon Target is ready
  • 138281 05/29/07 14:17 E. Christy HMS trigger change from p -> e- running
  • 138280 05/29/07 14:17 E. Christy HMS trigger change from p -> e- running
  • 138279 05/29/07 12:05 hamlet SHMS "Bender prototype" back in pivot
  • 138278 05/29/07 12:01 hamlet HMS Aerogel moved out
  • 138277 05/29/07 10:23 beaufait camera on nmr
  • Monday

  • 138276 05/28/07 21:22 cdaq Beam Time Accounting
  • 138275 05/28/07 20:32 ent swing shift summary
  • 138274 05/28/07 20:27 bruell Target: moved to C target
  • 138273 05/28/07 20:19 cdaq Run 63416: Production- Carbon Q2=5.76 GeV2
  • 138272 05/28/07 19:56 cdaq Run 63415: Production- LH2 4cm Q2=5.76 GeV2
  • 138271 05/28/07 18:37 cdaq Run 63414: Production- LH2 4cm Q2=5.76 GeV2
  • 138270 05/28/07 18:31 bruell Beam: no beam for 20 minutes
  • 138269 05/28/07 18:10 cdaq Run 63413: Production- LH2 4cm Q2=5.76 GeV2
  • 138268 05/28/07 16:17 cdaq Run 63412: Production- LH2 4cm Q2=5.76 GeV2
  • 138267 05/28/07 16:08 cdaq Beam Time Accounting
  • 138266 05/28/07 16:03 hamlet Day shift summary, 28 May 2007
  • 138265 05/28/07 15:45 cdaq Run 63411: Production- LH2 4cm Q2=5.76 GeV2
  • 138264 05/28/07 15:28 Solvignon Moved target from Dummy to LH2
  • 138263 05/28/07 14:53 cdaq Run 63410: Production- Dummy 4cm Q2=4.25 GeV2
  • 138262 05/28/07 14:52 Solvignon Target screens
  • 138261 05/28/07 14:49 Solvignon Target moved from LH2 to Dummy
  • 138260 05/28/07 13:42 cdaq Run 63409: Production- LH2 4cm Q2=4.25 GeV2
  • 138259 05/28/07 12:34 cdaq Run 63408: Production- LH2 4cm Q2=4.25 GeV2
  • 138258 05/28/07 11:49 hamlet Beam OFF since 11:20
  • 138257 05/28/07 10:47 cdaq Run 63407: Production- LH2 4cm Q2=4.25 GeV2
  • 138256 05/28/07 10:11 Solvignon Move target from carbon to LH2
  • 138255 05/28/07 10:05 cdaq Run 63406: Production- Carbon 4cm Q2=5.08 GeV2
  • 138254 05/28/07 10:03 Solvignon Move target from dummy to carbon
  • 138253 05/28/07 09:17 cdaq Run 63405: Production- Dummy 4cm Q2=5.08 GeV2
  • 138252 05/28/07 09:15 hamlet Beam OFF since 09:00
  • 138251 05/28/07 08:58 Solvignon Problem encountered moving the target: now fine
  • 138250 05/28/07 08:54 cdaq Run 63404: Production- Dummy 4cm Q2=5.08 GeV2
  • 138249 05/28/07 08:54 Solvignon Move to dummy
  • 138248 05/28/07 08:01 K. Hafidi Owl shift summary
  • 138247 05/28/07 08:01 cdaq Beam Time Accounting
  • 138246 05/28/07 06:35 cdaq Run 63403: Production- LH2 4cm Q2=5.08 GeV2
  • 138245 05/28/07 05:43 Hafidi BPM and BCM scans
  • 138244 05/28/07 04:31 Danagoulian Target: TgtIOC reboot
  • 138243 05/28/07 04:28 cdaq Run 63402: Production- LH2 4cm Q2=5.08 GeV2
  • 138242 05/28/07 02:54 cdaq Run 63401: Production- LH2 4cm Q2=5.08 GeV2
  • 138241 05/28/07 01:11 cdaq Run 63400: Production- LH2 4cm Q2=5.08 GeV2
  • 138240 05/28/07 00:09 cdaq Beam Time Accounting
  • 138239 05/28/07 00:03 Danagoulian Target: Target status
  • 138238 05/28/07 00:02 Danagoulian Target: Target status
  • Sunday

  • 138237 05/27/07 23:51 ent swing shift summary
  • 138236 05/27/07 23:51 ent Q^2 = 5.08 kinematics
  • 138235 05/27/07 23:44 cdaq Run 63399: Production- LH2 4cm Q2=5.08 GeV2
  • 138234 05/27/07 23:39 bruell Target: moved to LH2 target
  • 138233 05/27/07 23:25 bruell Target: moved to Carbon target
  • 138232 05/27/07 23:25 cdaq Run 63398: Production- Carbon 4cm Q2=5.76 GeV2
  • 138231 05/27/07 22:55 cdaq Run 63397: Production- Dummy 4cm Q2=5.76 GeV2
  • 138230 05/27/07 22:29 ent general plan until tomorrow
  • 138229 05/27/07 22:27 bruell target screen
  • 138228 05/27/07 22:23 cdaq Run 63396: Production- Dummy 4cm Q2=5.76 GeV2
  • 138227 05/27/07 22:23 bruell Target: moved to dummy target
  • 138226 05/27/07 21:41 cdaq Run 63395: Production- LH2 4cm Q2=5.76 GeV2
  • 138225 05/27/07 20:24 cdaq Run 63394: Production- LH2 4cm Q2=5.76 GeV2
  • 138224 05/27/07 20:07 bruell Beam: vacuum valve problems
  • 138223 05/27/07 19:05 cdaq Run 63393: Production- LH2 4cm Q2=5.76 GeV2
  • 138222 05/27/07 17:55 cdaq Run 63392: Production- LH2 4cm Q2=5.76 GeV2
  • 138221 05/27/07 16:37 cdaq Run 63391: Production- LH2 4cm Q2=5.76 GeV2
  • 138220 05/27/07 16:06 cdaq Beam Time Accounting
  • 138219 05/27/07 15:45 Reimer Day shift summary
  • 138218 05/27/07 15:37 Reimer Q^2=5.76 kinematics
  • 138217 05/27/07 15:37 cdaq Run 63390: Production- LH2 4cm Q2=5.76 GeV2
  • 138216 05/27/07 15:29 adaniel Target: changed from Carbon to LH2
  • 138215 05/27/07 15:13 adaniel Target: changed from Dummy to Carbon
  • 138214 05/27/07 15:12 cdaq Run 63389: Production- Carbon 4cm Q2=0.5 GeV2
  • 138213 05/27/07 14:58 adaniel Target: changed from LH2 to Dummy
  • 138212 05/27/07 14:58 cdaq Run 63388: Production- Dummy 4cm Q2=0.5 GeV2
  • 138211 05/27/07 14:56 cdaq Run 63387: Production- Dummy 4cm Q2=0.5 GeV2
  • 138210 05/27/07 14:41 cdaq Run 63386: Production- LH2 4cm Q2=0.983 GeV2
  • 138209 05/27/07 14:27 cdaq Run 63385: Production- LH2 4cm Q2=0.983 GeV2
  • 138208 05/27/07 14:19 cdaq Run 63384: Production- LH2 4cm Q2=0.983 GeV2
  • 138207 05/27/07 14:13 adaniel Target: changed from Carbon to LH2
  • 138206 05/27/07 14:01 cdaq Run 63383: Production- Carbon 4cm Q2=0.983 GeV2
  • 138205 05/27/07 14:01 adaniel Target: changed from Dummy to Carbon
  • 138204 05/27/07 13:51 cdaq Run 63382: Production- Dummy 4cm Q2=0.983 GeV2
  • 138203 05/27/07 13:36 cdaq Run 63381: Production- Dummy 4cm Q2=0.983 GeV2
  • 138202 05/27/07 13:31 Reimer BPM BCM
  • 138201 05/27/07 13:29 cdaq Run 63380: Production- Dummy 4cm Q2=0.983 GeV2
  • 138200 05/27/07 12:58 Reimer Beam off
  • 138199 05/27/07 12:57
  • 138198 05/27/07 12:42 adaniel Target: changed from LH2 to dummy
  • 138197 05/27/07 12:24 cdaq Run 63379: Production- LH2 4cm Q2=0.983 GeV2
  • 138196 05/27/07 12:04 cdaq Run 63378: Production- LH2 4cm Q2=0.983 GeV2
  • 138195 05/27/07 11:54 Fowler Dipole communication reset
  • 138194 05/27/07 11:41 adaniel Target: Alarm
  • 138193 05/27/07 11:08 Reimer HMS communication error--Hall access
  • 138192 05/27/07 10:43 Reimer HMS communication error
  • 138191 05/27/07 09:46 adaniel Target: target alarm
  • 138190 05/27/07 08:43 Reimer Accelerator down for LCW leak fix
  • 138189 05/27/07 08:41 Reimer PS1 = 2 for runs 63374-63377
  • 138188 05/27/07 08:37 cdaq Run 63377: Production- LH2 4cm Q2=0.983 GeV2
  • 138187 05/27/07 08:27 cdaq Run 63376: Production- LH2 4cm Q2=0.983 GeV2
  • 138186 05/27/07 08:26 adaniel Target: target gui
  • 138185 05/27/07 08:19 cdaq Run 63375: Production- LH2 4cm Q2=0.983 GeV2
  • 138184 05/27/07 08:12 K. Hafidi Owl shift summary
  • 138183 05/27/07 08:08 cdaq Beam Time Accounting
  • 138182 05/27/07 08:06 cdaq Run 63374: Production- LH2 4cm Q2=0.983 GeV2
  • 138181 05/27/07 07:59 cdaq Run 63373: Production- LH2 4cm Q2=0.983 GeV2
  • 138180 05/27/07 07:58 Danagoulian Target: Hydrogen target, 7:57 a.m.
  • 138179 05/27/07 07:40 Danagoulian Target: Carbon, 7:40 a.m.
  • 138178 05/27/07 07:40 cdaq Run 63372: Production- Carbon Q2=3.61 GeV2
  • 138177 05/27/07 07:16 cdaq Run 63371: Production- Dummy 4cm Q2=3.61 GeV2
  • 138176 05/27/07 06:56 cdaq Run 63370: Production- Dummy 4cm Q2=3.61 GeV2
  • 138175 05/27/07 06:31 cdaq Run 63369: Production- Dummy 4cm Q2=3.61 GeV2
  • 138174 05/27/07 06:27 Danagoulain Target: Target moved to dummy
  • 138173 05/27/07 06:27 Danagoulain Target: Target moved to dummy
  • 138172 05/27/07 05:17 Danagoulian Target: Alarm at 5:09 a.m.
  • 138171 05/27/07 05:13 cdaq Run 63368: Production- LH2 4cm Q2=3.61 GeV2
  • 138170 05/27/07 04:10 cdaq Run 63367: Production- LH2 4cm Q2=3.61 GeV2
  • 138169 05/27/07 04:01 HAFIDI BPM and BCM SNAPSHOTS
  • 138168 05/27/07 03:09 cdaq Run 63366: Production- LH2 4cm Q2=3.61 GeV2
  • 138167 05/27/07 02:04 cdaq Run 63365: Production- LH2 4cm Q2=3.61 GeV2
  • 138166 05/27/07 00:57 cdaq Run 63364: Production- LH2 4cm Q2=3.61 GeV2
  • 138165 05/27/07 00:05 cdaq Beam Time Accounting
  • 138164 05/27/07 00:04 Danagoulian Target: Target, 5-27-07 night
  • 138163 05/27/07 00:02 bruell swing shift summary
  • Saturday

  • 138162 05/26/07 23:54 cdaq Run 63363: Production- LH2 4cm Q2=3.61 GeV2
  • 138161 05/26/07 23:47 bruell Target: moved to LH2 target
  • 138160 05/26/07 23:32 bruell Target: moved to Carbon target
  • 138159 05/26/07 23:32 cdaq Run 63362: Production- Carbon 4cm Q2=4.25 GeV2
  • 138158 05/26/07 23:12 cdaq Run 63361: Production- Dummy 4cm Q2=4.25 GeV2
  • 138157 05/26/07 22:31 bruell target screen
  • 138156 05/26/07 22:30 steinman Run 63360 is dummy
  • 138155 05/26/07 22:29 bruell Target: moved to dummy target
  • 138154 05/26/07 22:28 cdaq Run 63360: Production- LH2 4cm Q2=4.25 GeV2
  • 138153 05/26/07 22:21 bruell BPM+BCM screens
  • 138152 05/26/07 21:16 cdaq Run 63359: Production- LH2 4cm Q2=4.25 GeV2
  • 138151 05/26/07 20:15 cdaq Run 63358: Production- LH2 4cm Q2=4.25 GeV2
  • 138150 05/26/07 19:12 cdaq Run 63357: Production- LH2 4cm Q2=4.25 GeV2
  • 138149 05/26/07 18:11 cdaq Run 63356: Production- LH2 4cm Q2=4.25 GeV2
  • 138148 05/26/07 17:12 cdaq Run 63355: Production- LH2 4cm Q2=4.25 GeV2
  • 138147 05/26/07 16:44 bruell Beam: no beam for 30 minutes
  • 138146 05/26/07 16:03 cdaq Beam Time Accounting
  • 138145 05/26/07 15:55 hamlet Day shift summary, 26 May 2007
  • 138144 05/26/07 15:42 cdaq Run 63354: Production- LH2 4cm Q2=4.25 GeV2
  • 138143 05/26/07 15:31 hamlet MCC Energy measurement
  • 138142 05/26/07 14:26 Reimer Target: Change to LH2 target
  • 138141 05/26/07 14:15 cdaq Run 63353: Production- Carbon 4cm Q2=5.08 GeV2
  • 138140 05/26/07 14:12 Reimer Target: Carbon target
  • 138139 05/26/07 13:42 cdaq Run 63352: Production- Dummy 4cm Q2=5.08 GeV2
  • 138138 05/26/07 13:14 cdaq Run 63351: Production- Dummy 4cm Q2=5.08 GeV2
  • 138137 05/26/07 13:00 cdaq Run 63350: Production- Dummy 4cm Q2=5.08 GeV2
  • 138136 05/26/07 12:58 Reimer Target: 4 cm dummy
  • 138135 05/26/07 12:12 cdaq Run 63349: Production- LH2 4cm Q2=5.08 GeV2
  • 138134 05/26/07 11:30 cdaq Run 63348: Production- LH2 4cm Q2=5.08 GeV2
  • 138133 05/26/07 10:51 cdaq Run 63347: Production- LH2 4cm Q2=5.08 GeV2
  • 138132 05/26/07 10:36 hamlet Beam OFF since 10:20
  • 138131 05/26/07 09:56 cdaq Run 63346: Production- LH2 4cm Q2=5.08 GeV2
  • 138130 05/26/07 09:12 cdaq Run 63345: Production- LH2 4cm Q2=5.08 GeV2
  • 138129 05/26/07 08:30 Reimer Target: Screen shot
  • 138128 05/26/07 08:06 Hafidi Shift summary
  • 138127 05/26/07 08:05 cdaq Beam Time Accounting
  • 138126 05/26/07 08:04 cdaq Run 63344: junk
  • 138125 05/26/07 07:02 cdaq Run 63342: Production- LH2 4cm Q2=5.08 GeV2
  • 138124 05/26/07 06:33 Danagoulian Thresholds
  • 138123 05/26/07 06:25 Danagoulian Lucite test
  • 138122 05/26/07 06:09 cdaq Run 63341: Production- LH2 4cm Q2=5.08 GeV2
  • 138121 05/26/07 05:07 cdaq Run 63340: Production- LH2 4cm Q2=5.08 GeV2
  • 138120 05/26/07 04:12 cdaq Run 63339: Production- LH2 4cm Q2=5.08 GeV2
  • 138119 05/26/07 04:10 cdaq Run 63338: Production- LH2 4cm Q2=5.08 GeV2
  • 138118 05/26/07 03:25 Hafidi BPM and BCM Snapshots
  • 138117 05/26/07 03:15 cdaq Run 63337: Production- LH2 4cm Q2=5.08 GeV2
  • 138116 05/26/07 02:20 Danagoulian Target: C12 Target was set after dummy
  • 138115 05/26/07 02:19 cdaq Run 63336: Production- LH2 4cm Q2=5.08 GeV2
  • 138114 05/26/07 02:18 Danagoulian Target: Target is back to H2
  • 138113 05/26/07 01:56 cdaq Run 63335: Production- carbon Q2=5.76 GeV2
  • 138112 05/26/07 01:07 cdaq Run 63334: Production- Dummy 4cm Q2=5.76 GeV2
  • 138111 05/26/07 00:32 cdaq Run 63333: Production- Dummy 4cm Q2=5.76 GeV2
  • 138110 05/26/07 00:30 Danagoulian Target: Target moved to dummy
  • 138109 05/26/07 00:09 Danagoulian Target: Target, 5-26-07night
  • 138108 05/26/07 00:01 cdaq Beam Time Accounting
  • Friday

  • 138107 05/25/07 23:54 ent swing shift summary
  • 138106 05/25/07 23:53 Perdrisat Tracker HV change
  • 138105 05/25/07 23:52 cdaq Run 63332: Production- LH2 4cm Q2=5.76 GeV2
  • 138104 05/25/07 23:43 Perdrisat BPM screen shot
  • 138103 05/25/07 22:44 cdaq Run 63331: Production- LH2 4cm Q2=5.76 GeV2
  • 138102 05/25/07 21:44 cdaq Run 63330: Production- LH2 4cm Q2=5.76 GeV2
  • 138101 05/25/07 20:40 cdaq Run 63329: Production- LH2 4cm Q2=.8
  • 138100 05/25/07 19:33 cdaq Run 63328: Production- LH2 4cm Q2=.8
  • 138099 05/25/07 18:47 Reimer SOS HV s1y8- trip
  • 138098 05/25/07 18:13 cdaq Run 63327: Test - LH2 4cm Q2=.8
  • 138097 05/25/07 17:14 cdaq Run 63326: Test - LH2 4cm Q2=.8
  • 138096 05/25/07 17:04 cdaq Run 63325: Test - LH2 4cm Q2=.8
  • 138095 05/25/07 17:01 frw stand-by shifts on Monday/Tuesday
  • 138094 05/25/07 16:19 Reimer Target: Target: Moved to LH2 target
  • 138093 05/25/07 16:08 Reimer Target: target gui
  • 138092 05/25/07 16:04 cdaq Beam Time Accounting
  • 138091 05/25/07 16:03 ioana shift summary
  • 138090 05/25/07 15:17 cdaq Run 63324: Production - Carbon Q2=5.76
  • 138089 05/25/07 14:31 johna Raster was still set for 1 GeV, but readout said 5 GeV
  • 138088 05/25/07 14:16 Rondon Target: Moved to C at ~11:50
  • 138087 05/25/07 14:15 ioana HMS dipole interlock
  • 138086 05/25/07 14:13 Rondon Targtet: strange excursion of HPH
  • 138085 05/25/07 13:41 Rondon Target: restarted Loop1 power strip chart
  • 138084 05/25/07 12:32 ioana pass change
  • 138083 05/25/07 11:57 cdaq Run 63323: Production - Carbon 4cm Q2=.8
  • 138082 05/25/07 11:42 cdaq Run 63322: Production - Dummy 4cm Q2=.8
  • 138081 05/25/07 11:37 cdaq Run 63321: Production - Dummy 4cm Q2=.8
  • 138080 05/25/07 11:36 Rondon Target: moved to dummy
  • 138079 05/25/07 11:18 cdaq Run 63320: Production - LH2 4cm Q2=.8
  • 138078 05/25/07 11:04 cdaq Run 63319: Production - LH2 4cm Q2=.8
  • 138077 05/25/07 10:54 frw Beam: energy measurement: 1076.184 MeV
  • 138076 05/25/07 10:42 cdaq Run 63318: Production - LH2 4cm Q2=.8
  • 138075 05/25/07 10:33 Rondon Target: moved to LH2
  • 138074 05/25/07 10:32 ioana changed kinematics
  • 138073 05/25/07 10:31 Rondon Target: moved to C target
  • 138072 05/25/07 10:31 cdaq Run 63317: Production - LH2 4cm Q2=.8
  • 138071 05/25/07 10:26 steinman Run 63315 is Dummy
  • 138070 05/25/07 10:19 cdaq Run 63316: Production - Carbon 4cm Q2=.983
  • 138069 05/25/07 10:14 Rondon Target: moved to 4 cm dummy
  • 138068 05/25/07 10:03 cdaq Run 63315: Production - LH2 4cm Q2=.983
  • 138067 05/25/07 09:58 steinman Remember: Update Runlist
  • 138066 05/25/07 09:38 cdaq Run 63314: Production - LH2 4cm Q2=.983
  • 138065 05/25/07 09:37 kenyon Changed argon and ethane
  • 138064 05/25/07 09:36 mack small angle beam pipe?
  • 138063 05/25/07 09:25 ioana Would be nice to have a camera on the dipole NMR
  • 138062 05/25/07 09:23 ioana HMS dipole ok
  • 138061 05/25/07 09:20 cdaq Run 63313: Production - LH2 4cm Q2=.983
  • 138060 05/25/07 09:12 ioana HMS dipole NMR communication problem
  • 138059 05/25/07 09:02 cdaq Run 63312: Production - LH2 4cm Q2=.983
  • 138058 05/25/07 08:47 cdaq Run 63311: Production - LH2 4cm Q2=.983
  • 138057 05/25/07 08:28 cdaq Run 63310: Production - LH2 4cm Q2=.983
  • 138056 05/25/07 08:15 Rondon Target: Start of shift GUI
  • 138055 05/25/07 08:10 cdaq Beam Time Accounting
  • 138054 05/25/07 08:04 cdaq Run 63309: Production - LH2 4cm Q2=.983
  • 138053 05/25/07 08:03 A. Puckett LH2 in place, ready for beam
  • 138052 05/25/07 07:57 Donal Target
  • 138051 05/25/07 07:52 Donal Target
  • 138050 05/25/07 07:52 A. Puckett Owl Shift Summary
  • 138049 05/25/07 07:48 Donal Target
  • 138048 05/25/07 07:30 Donal Target
  • 138047 05/25/07 07:21 Donal Target
  • 138046 05/25/07 07:20 Lassiter Communication problems
  • 138045 05/25/07 07:11 Donal Target
  • 138044 05/25/07 06:40 Donal Target
  • 138043 05/25/07 05:43 A. Puckett requested controlled access to fix magnets
  • 138042 05/25/07 05:19 A. Puckett HMS Dipole communications down, waiting for tech
  • 138041 05/25/07 05:11 J Mulholland Waiting
  • 138040 05/25/07 05:10 A. Puckett BCM and BPM snapshots
  • 138039 05/25/07 04:52 J Mulholland HMS Dipole Communication Hung
  • 138038 05/25/07 04:39 Donal Target
  • 138037 05/25/07 03:13 cdaq Run 63308: Production - Carbon Q2=1.340
  • 138036 05/25/07 03:07 Donal Target
  • 138035 05/25/07 02:41 cdaq Run 63307: Production - Dummy Q2=1.340
  • 138034 05/25/07 02:22 A. Puckett Back to data taking on dummy tgt.
  • 138033 05/25/07 02:20 Donal target
  • 138032 05/25/07 02:18 cdaq Run 63306: Production - Dummy Q2=1.340
  • 138031 05/25/07 01:57 A. Puckett Status Update--beam steering optimization
  • 138030 05/25/07 01:19 johna update on ion chamber trips
  • 138029 05/25/07 01:08 A. Puckett I meant "pion" collimator
  • 138028 05/25/07 00:51 A. Puckett switched to "large" collimator
  • 138027 05/25/07 00:45 donal Target
  • 138026 05/25/07 00:27 cdaq Run 63305: Production - Carbon Q2=1.340
  • 138025 05/25/07 00:25 Reimer Swing Shift Summary
  • 138024 05/25/07 00:22 Reimer Sieve Slits/access
  • 138023 05/25/07 00:10 cdaq Beam Time Accounting
  • 138022 05/25/07 00:06 Perdrisat Beam: Sieve slit remote does not respond
  • Thursday

  • 138021 05/24/07 23:01 Punjabi Target Move
  • 138020 05/24/07 22:46 Reimer Vacuum ok
  • 138019 05/24/07 22:32 Reimer Beam Dump Ion chamger
  • 138018 05/24/07 20:25 cdaq Run 63304: Production -dummy Q2=1.340
  • 138017 05/24/07 20:02 cdaq Run 63303: Production - LH2 Q2=1.340
  • 138016 05/24/07 19:45 cdaq Run 63302: Production - LH2 Q2=1.340
  • 138015 05/24/07 19:32 cdaq Run 63301: Production - LH2 Q2=1.340
  • 138014 05/24/07 19:10 cdaq Run 63300: Production - LH2 Q2=1.340
  • 138013 05/24/07 18:55 cdaq Run 63299: Production - LH2 Q2=1.340
  • 138012 05/24/07 18:36 cdaq Run 63298: Production - LH2 Q2=1.340
  • 138011 05/24/07 18:24 Reimer Beam Returns
  • 138010 05/24/07 18:18 cdaq Run 63297: Production - LH2 Q2=1.340
  • 138009 05/24/07 16:33 Reimer MCC stops beam for Hall B tuning
  • 138008 05/24/07 16:11 ioana shift summary
  • 138007 05/24/07 16:06 cdaq Beam Time Accounting
  • 138006 05/24/07 16:03 cdaq Run 63296: Production - LH2 Q2=1.340
  • 138005 05/24/07 15:56 Holt screenshot target
  • 138004 05/24/07 15:45 cdaq Run 63295: Production - LH2 Q2=1.340
  • 138003 05/24/07 15:26 cdaq Run 63294: Production - LH2 Q2=1.340
  • 138002 05/24/07 15:02 Fowler Dipole NMR
  • 138001 05/24/07 14:59 johna HMS Quad cycling (new procedure)
  • 138000 05/24/07 14:45 cdaq Run 63293: Production - LH2 Q2=1.340
  • 137999 05/24/07 14:30 cdaq Run 63292: Production - LH2 Q2=1.340
  • 137998 05/24/07 13:59 cdaq Run 63291: Production - LH2 Q2=1.340
  • 137997 05/24/07 13:37 cdaq Run 63290: Production - LH2 Q2=1.340
  • 137996 05/24/07 13:18 cdaq Run 63289: Production - LH2 Q2=1.340
  • 137995 05/24/07 13:01 cdaq Run 63288: Production - LH2 Q2=1.340
  • 137994 05/24/07 12:41 cdaq Run 63287: Production - LH2 Q2=1.340
  • 137993 05/24/07 12:18 cdaq Run 63286: Production - LH2 Q2=1.340
  • 137992 05/24/07 12:08 Holt H2 target in beam
  • 137991 05/24/07 11:45 Holt Moved C target in beam
  • 137990 05/24/07 11:08 hcf GAS SHED PROCEDURE CHANGE -- SHIFT-TAKERS PLEASE READ
  • 137989 05/24/07 10:00 frw DC gas shut off??!
  • 137988 05/24/07 09:25 ioana HMS angle setting
  • 137987 05/24/07 09:22 cdaq Run 63285: Production - Dummy Q2=1.882
  • 137986 05/24/07 08:08 cdaq Beam Time Accounting
  • 137985 05/24/07 08:06 Danagoulian Shift Summary
  • 137984 05/24/07 08:02 cdaq Run 63284: Cosmic run. No beam. Continuation of the run 63283
  • 137983 05/24/07 07:49 Fowler LHe Level for Q3
  • 137982 05/24/07 07:46 Holt target screenshot
  • 137981 05/24/07 07:39 J Mulholland Quad 3 helium level low
  • 137980 05/24/07 00:02 cdaq Beam Time Accounting
  • 137979 05/24/07 00:01 vahe Target: start of shift
  • Wednesday

  • 137978 05/23/07 22:36 reimer shift check list
  • 137977 05/23/07 21:01 G Mbianda Run63269 after calibration
  • 137976 05/23/07 19:10 cdaq Run 63283: cosmics test
  • 137975 05/23/07 19:07 cdaq Run 63282: cosmics test
  • 137974 05/23/07 19:06 cdaq Run 63281: cosmics test
  • 137973 05/23/07 18:01 M Jones SOS HV crate 13
  • 137972 05/23/07 17:12 frw Beam: significant delay
  • 137971 05/23/07 16:26 Rondon Target: Start of shift GUI
  • 137970 05/23/07 16:08 frw weekly RC report
  • 137969 05/23/07 16:05 cdaq Beam Time Accounting
  • 137968 05/23/07 15:29 ioana beam time reporting
  • 137967 05/23/07 12:21 Holt screenshot of target parameters
  • 137966 05/23/07 08:51 Lassiter On Call Backup
  • 137965 05/23/07 08:48 ioana beam off
  • 137964 05/23/07 08:21 cdaq Run 63280: Production - Dummy Q2=1.882
  • 137963 05/23/07 08:07 cdaq Run 63279: Production - Dummy 4cm Q2=1.882
  • 137962 05/23/07 08:06 Holt target position is now 4 cm dummy
  • 137961 05/23/07 08:04 cdaq Beam Time Accounting
  • 137960 05/23/07 08:03 VM Rodriguez Owl shift summary
  • 137959 05/23/07 07:48 vahe Target end of shift status
  • 137958 05/23/07 07:48 cdaq Run 63278: Production - LH2 4cm Q2=1.882
  • 137957 05/23/07 07:42 J Mulholland Correction to Run # 63277
  • 137956 05/23/07 07:39 cdaq Run 63277: Production - LH2 4cm Q2=1.882
  • 137955 05/23/07 07:33 J. Mulhollan Owl Shift BCM BPM screenshots
  • 137954 05/23/07 07:27 cdaq Run 63276: Production - LH2 4cm Q2=1.177
  • 137953 05/23/07 07:10 cdaq Run 63275: Production - LH2 4cm Q2=1.882
  • 137952 05/23/07 07:08 Vm Rodriguez Kinematics Change
  • 137951 05/23/07 06:39 VM Rodriguez No beam for a few minutes. We are changing kinematics.
  • 137950 05/23/07 06:35 vahe Target moved to LH2
  • 137949 05/23/07 06:35 J Mulholland Error message from Run End Error
  • 137948 05/23/07 06:29 cdaq Run 63274: Production - Dummy Q2=1.177
  • 137947 05/23/07 06:27 vahe Target moved to Dummy
  • 137946 05/23/07 06:22 J Mulholland End Run Failed #63273 6:19
  • 137945 05/23/07 06:13 cdaq Run 63273: Production - LH2 4cm Q2=1.177
  • 137944 05/23/07 06:13 VM Rodriguez Change kinematics
  • 137943 05/23/07 06:10 J Mulholland Run #63272 is Junk
  • 137942 05/23/07 06:09 cdaq Run 63272: Production - Dummy Q2=1.177
  • 137941 05/23/07 05:56 J Mulholland End Failed run #63271 5:44am
  • 137940 05/23/07 05:48 vahe Target moved to LH2
  • 137939 05/23/07 05:42 cdaq Run 63271: Production - Dummy Q2=1.177
  • 137938 05/23/07 05:40 vahe Target moved to Dummy
  • 137937 05/23/07 05:37 J Mulholland End Failed run 63270 5:35
  • 137936 05/23/07 05:29 cdaq Run 63270: Production - LH2 4cm Q2=1.177
  • 137935 05/23/07 05:22 VM Rodriguez Change of Kinematics
  • 137934 05/23/07 05:15 vahe Target moved to LH2
  • 137933 05/23/07 05:12 Mulholland End Failed run 63269 5:08
  • 137932 05/23/07 05:11 Mulholland End Failed run 63266 4:30
  • 137931 05/23/07 05:03 cdaq Run 63269: Production - Dummy Q2=.855
  • 137930 05/23/07 05:01 vahe Target moved to 4 cm Dummy
  • 137929 05/23/07 04:46 cdaq Run 63268: Production - LH2 4cm Q2=.855
  • 137928 05/23/07 04:45 VM Rodriguez Run 63266 HMS angle is 12.5
  • 137927 05/23/07 04:37 cdaq Run 63267: Production - LH2 4cm Q2=.855
  • 137926 05/23/07 04:27 cdaq Run 63266: Production - LH2 4cm Q2=.855
  • 137925 05/23/07 04:16 VM Rodriguez Change of kinematics
  • 137924 05/23/07 03:48 VM Rodriguez Q1 Computer rebooted
  • 137923 05/23/07 03:29 vahe IOC reboot
  • 137922 05/23/07 03:29 cdaq Run 63265: Production - Carbon Q2=5.08
  • 137921 05/23/07 02:47 Mulholland Roc4 error
  • 137920 05/23/07 02:45 cdaq Run 63264: Production - Dummy Q2=5.08
  • 137919 05/23/07 02:35 cdaq Run 63263: Production - Dummy Q2=5.08
  • 137918 05/23/07 02:30 vahe Move to 4 cm Dummy target
  • 137917 05/23/07 01:22 cdaq Run 63262: Production - LH2 Q2=5.08
  • 137916 05/23/07 00:18 cdaq Run 63261: Production - LH2 Q2=5.08
  • 137915 05/23/07 00:09 VM Rodriguez HMS Quad 1 Power Supply Comm, Error
  • 137914 05/23/07 00:03 vahe Target: start of shift
  • 137913 05/23/07 00:02 cdaq Beam Time Accounting
  • Tuesday

  • 137912 05/22/07 23:58 Reimer Swing Shift Summary
  • 137911 05/22/07 23:49 Rondon Target: move to LH2
  • 137910 05/22/07 23:38 melissa checklist
  • 137909 05/22/07 23:36 cdaq Run 63260: Production - C Q2=4.25
  • 137908 05/22/07 23:35 Rondon Target: moved to C
  • 137907 05/22/07 23:30 Reimer HMS Q1 Comm error
  • 137906 05/22/07 23:16 cdaq Run 63259: Production - Dummy Q2=4.25
  • 137905 05/22/07 22:54 melissa bpm bcm screenshot
  • 137904 05/22/07 22:05 cdaq Run 63258: Production - Dummy Q2=4.25
  • 137903 05/22/07 21:40 cdaq Run 63257: Production - Dummy Q2=4.25
  • 137902 05/22/07 21:30 Reimer Expect beam in 15 min
  • 137901 05/22/07 21:08 Rondon Target: Move to dummy target
  • 137900 05/22/07 20:48 cdaq Run 63256: Production - LH2 Q2=4.25
  • 137899 05/22/07 20:33 Reimer Beam lost again
  • 137898 05/22/07 20:19 cdaq Run 63255: Production - LH2 Q2=4.25
  • 137897 05/22/07 19:49 M Jones SOS HV crate 13
  • 137896 05/22/07 19:30 Reimer Vacuum Problems--beam down
  • 137895 05/22/07 19:13 melissa no beam
  • 137894 05/22/07 19:09 Rondon Target: closed JT valve 1 step
  • 137893 05/22/07 18:54 Reimer HV shower counter tripped run 63253
  • 137892 05/22/07 18:49 cdaq Run 63254: Production - LH2 Q2=4.25
  • 137891 05/22/07 18:36 cdaq Run 63253: Production - LH2 Q2=4.25
  • 137890 05/22/07 18:00 cdaq Run 63252: Production - LH2 Q2=4.25
  • 137889 05/22/07 17:22 cdaq Run 63251: Production - LH2 Q2=4.25
  • 137888 05/22/07 16:42 cdaq Run 63250: Production - LH2 Q2=4.25
  • 137887 05/22/07 16:24 Rondon Target: chamber vacuum GUI needs correct units
  • 137886 05/22/07 16:11 Rondon Target: start of shift GUI grab
  • 137885 05/22/07 16:03 cdaq Beam Time Accounting
  • 137884 05/22/07 15:57 ioana shift summary
  • 137883 05/22/07 15:54 manly bcm-bpm screenshots
  • 137882 05/22/07 15:35 Holt target screen snapshot
  • 137881 05/22/07 15:14 cdaq Run 63249: Production - LH2 Q2=4.25
  • 137880 05/22/07 14:37 Fowler HMS: GUI Restart
  • 137879 05/22/07 12:20 hamlet SHMS "bender prototype" temporary out from Hall
  • 137878 05/22/07 11:18 M Jones Access to SOS hut
  • 137877 05/22/07 10:56 Holt target gui snapshot
  • 137876 05/22/07 10:53 beaufait sos power
  • 137875 05/22/07 09:13 Holt Re-started target strip charts
  • 137874 05/22/07 09:05 ioana beam off
  • 137873 05/22/07 08:37 cdaq Run 63248: Production - LH2 Q2=4.25
  • 137872 05/22/07 08:02 cdaq Beam Time Accounting
  • 137871 05/22/07 07:59 Solvignon Shift summary
  • 137870 05/22/07 07:50 cdaq Run 63247: Production - LH2 Q2=4.25
  • 137869 05/22/07 07:48 Solvignon HMS rotation problem
  • 137868 05/22/07 07:47 vahe target: end of shift screenshot
  • 137867 05/22/07 07:16 vahe Moving to 4 cm LH2
  • 137866 05/22/07 07:09 cdaq Run 63246: Production - C Q2=3.61
  • 137865 05/22/07 07:06 vahe Moving to Carbon target
  • 137864 05/22/07 06:25 cdaq Run 63245: Production - Dummy Q2=3.61
  • 137863 05/22/07 06:07 I. Albayrak BPM and BCM screen snapshots
  • 137862 05/22/07 05:40 cdaq Run 63244: Production - Dummy Q2=3.61
  • 137861 05/22/07 05:38 vahe Target moved to 4 cm Dummy
  • 137860 05/22/07 05:00 cdaq Run 63243: Production - LH2 Q2=3.61
  • 137859 05/22/07 04:01 cdaq Run 63242: Production - LH2 Q2=3.61
  • 137858 05/22/07 03:02 cdaq Run 63241: Production - LH2 Q2=3.61
  • 137857 05/22/07 02:01 cdaq Run 63240: Production - LH2 Q2=3.61
  • 137856 05/22/07 01:01 cdaq Run 63239: Production - LH2 Q2=3.61
  • 137855 05/22/07 00:10 cdaq Beam Time Accounting
  • 137854 05/22/07 00:08 Reimer Shift Summary
  • 137853 05/22/07 00:06 cdaq Run 63238: Production - LH2 Q2=3.61
  • 137852 05/22/07 00:02 cdaq Run 63237: Production - LH2 Q2=3.61
  • Monday

  • 137851 05/21/07 23:56 melissa target: end of shift screenshot
  • 137850 05/21/07 23:53 melissa target: moved to H
  • 137849 05/21/07 23:44 melissa target: moved to H
  • 137848 05/21/07 23:41 cdaq Run 63236: Production - Carbon Q2=0.80
  • 137847 05/21/07 23:40 melissa target: moved to C
  • 137846 05/21/07 23:35 melissa target: moved to dummy
  • 137845 05/21/07 23:29 cdaq Run 63235: Production - Dummy Q2=0.80
  • 137844 05/21/07 23:19 cdaq Run 63234: Production - Dummy Q2=0.80
  • 137843 05/21/07 23:08 Reimer Shift Checklist
  • 137842 05/21/07 23:01 cdaq Run 63233: Production - LH2 Q2=0.80
  • 137841 05/21/07 22:56 Reimer bpm and bcp
  • 137840 05/21/07 22:49 cdaq Run 63232: Production - LH2 Q2=0.80
  • 137839 05/21/07 22:38 cdaq Run 63231: Production - LH2 Q2=0.80
  • 137838 05/21/07 22:35 cdaq Run 63230: Production - LH2 Q2=0.80
  • 137837 05/21/07 22:14 melissa target: moved to H
  • 137836 05/21/07 21:18 cdaq Run 63229: Production - dummy Q2=5.76
  • 137835 05/21/07 20:49 melissa target: ioc reboot
  • 137834 05/21/07 20:35 cdaq Run 63228: Production - dummy Q2=5.76
  • 137833 05/21/07 19:44 cdaq Run 63227: Production - Dummy Q2=5.76
  • 137832 05/21/07 19:43 melissa target: moved to dummy cell
  • 137831 05/21/07 19:43 melissa target: won't move
  • 137830 05/21/07 18:30 Reimer Linac problems
  • 137829 05/21/07 18:28 cdaq Run 63226: Production - LH2 Q2=5.76
  • 137828 05/21/07 18:08 cdaq Run 63225: Production - LH2 Q2=5.76
  • 137827 05/21/07 17:49 cdaq Run 63224: Production - LH2 Q2=5.76
  • 137826 05/21/07 17:07 cdaq Run 63223: Production - LH2 Q2=5.76
  • 137825 05/21/07 16:26 cdaq Run 63222: Production - LH2 Q2=5.76
  • 137824 05/21/07 16:23 M Jones Sane tracker in SOS
  • 137823 05/21/07 16:16 melissa c target: start of shift screenshot
  • 137822 05/21/07 16:08 M Jones SOS HV crate 13 is not working
  • 137821 05/21/07 16:07 cdaq Beam Time Accounting
  • 137820 05/21/07 16:06 smithg Target: Borrowed an AC powered DVM
  • 137819 05/21/07 15:52 VM Rodriguez BCM BPM Screenshot
  • 137818 05/21/07 15:48 A. Puckett Day Shift Summary
  • 137817 05/21/07 15:42 M JOnes Set SOS Quad,D1 and D2 by current
  • 137816 05/21/07 15:41 cdaq Run 63221: Production - LH2 Q2=5.76
  • 137815 05/21/07 14:43 seva target: screenshot
  • 137814 05/21/07 14:38 seva target: rebooted target IOC
  • 137813 05/21/07 14:37 cdaq Run 63220: Production - LH2 Q2=5.76
  • 137812 05/21/07 13:34 cdaq Run 63219: Production - LH2 Q2=5.76
  • 137811 05/21/07 13:26 seva target: chnaged from carbon to H2
  • 137810 05/21/07 13:26 A. Puckett MCC: Pass change completed, moving back to LH2
  • 137809 05/21/07 13:18 A. Puckett MCC asks to send 40 uA CW
  • 137808 05/21/07 12:48 A. Puckett MCC asks to send a few uA CW
  • 137807 05/21/07 12:32 A. Puckett MCC requests to send tune beam
  • 137806 05/21/07 12:18 A. Puckett Down for Hall A pass change
  • 137805 05/21/07 11:03 cdaq Run 63218: Production - Carbon Q2=5.76
  • 137804 05/21/07 10:14 cdaq Run 63217: Production - Dummy Q2=5.76
  • 137803 05/21/07 09:50 cdaq Run 63216: Production - LH2 Q2=5.76
  • 137802 05/21/07 09:11 cdaq Run 63215: Production - LH2 Q2=5.76
  • 137801 05/21/07 08:33 cdaq Run 63214: Production - LH2 Q2=5.76
  • 137800 05/21/07 08:03 cdaq Beam Time Accounting
  • 137799 05/21/07 08:03 vahe BPM & BCM screen
  • 137798 05/21/07 07:56 cdaq Run 63213: Production - LH2 Q2=5.76
  • 137797 05/21/07 07:50 Dutta Owl Shift Summary (05/21/07)
  • 137796 05/21/07 07:45 Dutta Last two HMS Momentum changes
  • 137795 05/21/07 07:42 Dutta HMS rotation: Encoder error
  • 137794 05/21/07 07:19 cdaq Run 63212: Production - LH2 Q2=5.76
  • 137793 05/21/07 06:55 jamesj Target: Changed from Carbon to Hydrogen
  • 137792 05/21/07 06:45 cdaq Run 63211: Production - Carbon Q2=5.08
  • 137791 05/21/07 06:44 jamesj Target: Changed from Dummy to Carbon
  • 137790 05/21/07 05:49 cdaq Run 63210: Production - Dummy Q2=5.08
  • 137789 05/21/07 05:47 jamesj Target: Changed from Hydrogen to Dummy
  • 137788 05/21/07 05:03 cdaq Run 63209: Production - LH2 Q2=5.08
  • 137787 05/21/07 04:00 cdaq Run 63208: Production - LH2 Q2=5.08
  • 137786 05/21/07 02:44 cdaq Run 63207: Production - LH2 Q2=5.08
  • 137785 05/21/07 01:40 cdaq Run 63206: Production - LH2 Q2=5.08
  • 137784 05/21/07 00:44 cdaq Run 63205: Production - LH2 Q2=5.08
  • 137783 05/21/07 00:22 jamesj Target: Changed from Carbon to Hydrogen
  • 137782 05/21/07 00:14 cdaq Run 63204: Production - Carbon Q2=0.983
  • 137781 05/21/07 00:13 jamesj Target: Target changed from Dummy to Carbon
  • 137780 05/21/07 00:10 cdaq Beam Time Accounting
  • 137779 05/21/07 00:04 cdaq Run 63203: Production - Dummy Q2=0.983
  • 137778 05/21/07 00:03 adaniel target changed from LH2 to 4cm Dummy
  • 137777 05/21/07 00:01 Reimer Shift Summary (w better format)
  • Sunday

  • 137776 05/20/07 23:59 Reimer Shift Summary
  • 137775 05/20/07 23:47 cdaq Run 63202: Production - LH2 Q2=0.983
  • 137774 05/20/07 23:41 Reimer Feedback on for Hall A
  • 137773 05/20/07 23:38 Reimer shift check list
  • 137772 05/20/07 23:36 adaniel Target screenshot
  • 137771 05/20/07 23:36 cdaq Run 63201: Production - LH2 Q2=0.983
  • 137770 05/20/07 23:31 Reimer Beam energy lock
  • 137769 05/20/07 23:25 cdaq Run 63200: Production - LH2 Q2=0.983
  • 137768 05/20/07 23:14 cdaq Run 63199: Production - LH2 Q2=0.983
  • 137767 05/20/07 22:59 adaniel target changed from Carbon to LH2
  • 137766 05/20/07 22:47 reimer bpm &bcm screen
  • 137765 05/20/07 22:46 cdaq Run 63197: Production - Carbon Q2=2.284
  • 137764 05/20/07 22:45 adaniel target changed from 4cm Dummy to Carbon
  • 137763 05/20/07 22:22 cdaq Run 63196: Production - Dummy Q2=2.284
  • 137762 05/20/07 22:21 adaniel target changed from LH2 to 4cm Dummy
  • 137761 05/20/07 21:57 cdaq Run 63195: Production - LH2 Q2=2.284
  • 137760 05/20/07 21:25 cdaq Run 63194: Production - LH2 Q2=2.284
  • 137759 05/20/07 20:52 cdaq Run 63193: Production - LH2 Q2=2.284
  • 137758 05/20/07 20:19 cdaq Run 63192: Production - LH2 Q2=2.284
  • 137757 05/20/07 19:46 cdaq Run 63191: Production - LH2 Q2=2.284
  • 137756 05/20/07 19:44 adaniel target changed from Carbon to LH2
  • 137755 05/20/07 19:30 cdaq Run 63190: Production - Carbon Q2=4.25
  • 137754 05/20/07 19:30 adaniel target changed from 4cm Dummy to Carbon
  • 137753 05/20/07 18:42 cdaq Run 63189: Production - Dummy Q2=4.25
  • 137752 05/20/07 17:58 adaniel target changed from LH2 to 4cm Dummy
  • 137751 05/20/07 17:58 cdaq Run 63188: Production - Dummy Q2=4.25
  • 137750 05/20/07 17:12 cdaq Run 63187: Production - LH2 Q2=4.25
  • 137749 05/20/07 17:00 cdaq Run 63186: Production - LH2 Q2=4.25
  • 137748 05/20/07 16:46 cdaq Run 63185: Production - LH2 Q2=4.25
  • 137747 05/20/07 16:05 seva target: screenshot
  • 137746 05/20/07 16:01 cdaq Beam Time Accounting
  • 137745 05/20/07 16:01 VM Rodriguez Day Shift Summary
  • 137744 05/20/07 15:51 cdaq Run 63184: Production - LH2 Q2=4.25
  • 137743 05/20/07 15:21 cdaq Run 63183: Production - LH2 Q2=4.25
  • 137742 05/20/07 15:20 seva target: D2 low pressure alarm gave a sound , called Greg, nothing to worry about (alarm is silenced)
  • 137741 05/20/07 14:50 cdaq Run 63182: Production - LH2 Q2=4.25
  • 137740 05/20/07 14:30 VM Rodriguez Day Shift BPM and BCM screenshots
  • 137739 05/20/07 14:21 cdaq Run 63181: Production - LH2 Q2=4.25
  • 137738 05/20/07 13:53 cdaq Run 63180: Production - LH2 Q2=4.25
  • 137737 05/20/07 13:22 cdaq Run 63179: Production - LH2 Q2=4.25
  • 137736 05/20/07 13:09 VM Rodriguez Q1 communication problem
  • 137735 05/20/07 13:01 cdaq Run 63178: Production - LH2 Q2=4.25
  • 137734 05/20/07 12:58 seva target: changed to H2
  • 137733 05/20/07 12:52 VM Rodriguez Kinematics change to HMS angle of 17.64 and momentum 3.896 Q2=5.76
  • 137732 05/20/07 11:54 VM Rodriguez Asked MCC for an Energy measurement
  • 137731 05/20/07 11:45 cdaq Run 63177: Production - Carbon Q2=4.25
  • 137730 05/20/07 11:11 cdaq Run 63176: Production - Dummy Q2=4.25
  • 137729 05/20/07 10:44 steinman Run 63175 is Dummy and NOT Carbon
  • 137728 05/20/07 10:41 cdaq Run 63175: Production - Carbon Q2=4.25
  • 137727 05/20/07 10:37 seva target: changed to dummy
  • 137726 05/20/07 10:03 cdaq Run 63174: Production - LH2 Q2=4.25
  • 137725 05/20/07 09:33 cdaq Run 63173: Production - LH2 Q2=4.25
  • 137724 05/20/07 09:03 cdaq Run 63172: Production - LH2 Q2=4.25
  • 137723 05/20/07 08:34 cdaq Run 63171: Production - LH2 Q2=4.25
  • 137722 05/20/07 08:02 cdaq Beam Time Accounting
  • 137721 05/20/07 08:02 cdaq Run 63170: Production - LH2 Q2=4.25
  • 137720 05/20/07 07:58 Dutta Owl Shift Summary (05/20/07)
  • 137719 05/20/07 07:51 Dutta Owl Shift Summary (05/20/07)
  • 137718 05/20/07 07:33 cdaq Run 63169: Production - LH2 Q2=4.25
  • 137717 05/20/07 07:11 Solvignon Target screenshot
  • 137716 05/20/07 07:06 solvignon BPM and BCM screenshots
  • 137715 05/20/07 07:01 cdaq Run 63168: Production - LH2 Q2=4.25
  • 137714 05/20/07 06:19 cdaq Run 63167: Production - LH2 Q2=4.25
  • 137713 05/20/07 05:48 Dutta HMS Dipole
  • 137712 05/20/07 05:27 cdaq Run 63166: Production - LH2 Q2=4.25
  • 137711 05/20/07 05:23 Dutta HMS dipole problem
  • 137710 05/20/07 03:43 cdaq Run 63165: Production - Dummy Q2=0.60
  • 137709 05/20/07 03:42 cdaq Run 63164: Production - Dummy Q2=0.60
  • 137708 05/20/07 03:37 Solvignon Target to dummy
  • 137707 05/20/07 03:22 cdaq Run 63163: Production - LH2 Q2=0.60
  • 137706 05/20/07 03:07 cdaq Run 63162: Production - LH2 Q2=0.60
  • 137705 05/20/07 02:50 Dutta Raster was too small
  • 137704 05/20/07 02:45 cdaq Run 63161: Production - LH2 Q2=0.60
  • 137703 05/20/07 02:39 cdaq Run 63160: Production - LH2 Q2=0.60
  • 137702 05/20/07 02:33 Solvignon Target to LH2
  • 137701 05/20/07 02:28 cdaq Run 63159: Production - carbon Q2=0.60
  • 137700 05/20/07 02:14 Dutta Beam back and update
  • 137699 05/20/07 01:56 cdaq Run 63158: Production - carbon Q2=0.60
  • 137698 05/20/07 00:02 cdaq Beam Time Accounting
  • Saturday

  • 137697 05/19/07 23:55 Reimer Swing Shift Summary
  • 137696 05/19/07 23:22 Reimer Shift check
  • 137695 05/19/07 20:24 cdaq Run 63157: Production - carbon Q2=0.60
  • 137694 05/19/07 20:23 L.Pentchev carbon target
  • 137693 05/19/07 20:12 cdaq Run 63156: Production - dummy Q2=0.60
  • 137692 05/19/07 20:10 L.Pentchev target screen
  • 137691 05/19/07 20:08 L.Pentchev dummy target
  • 137690 05/19/07 20:08 cdaq Run 63155: Production - dummy Q2=0.60
  • 137689 05/19/07 20:02 L.Pentchev LH target
  • 137688 05/19/07 19:51 cdaq Run 63154: Production - CH2 Q2=0.60
  • 137687 05/19/07 19:42 cdaq Run 63153: Production - CH2 Q2=0.60
  • 137686 05/19/07 19:34 cdaq Run 63152: Production - CH2 Q2=0.60
  • 137685 05/19/07 19:17 L.Pentchev carbon target
  • 137684 05/19/07 19:15 cdaq Run 63151: Production - carbon Q2=0.800
  • 137683 05/19/07 19:04 L.Pentchev dummy target
  • 137682 05/19/07 19:02 cdaq Run 63150: Production - dummy Q2=0.800
  • 137681 05/19/07 18:54 cdaq Run 63149: Production - dummy Q2=0.800
  • 137680 05/19/07 18:41 saw Switch reboot worked
  • 137679 05/19/07 18:31 cdaq Run 63148: Production - LH2 Q2=0.800
  • 137678 05/19/07 18:18 cdaq Run 63147: Production - LH2 Q2=0.800
  • 137677 05/19/07 18:10 Network in H Network in Hall C
  • 137676 05/19/07 18:10 Reimer HMS Hall Probes
  • 137675 05/19/07 18:07 Reimer HMS Q3 OK
  • 137674 05/19/07 18:04 L.Pentchev changed limits on chamber vacuum
  • 137673 05/19/07 18:03 cdaq Run 63146: Production - LH2 Q2=0.800
  • 137672 05/19/07 17:49 L.Pentchev target IOC reboot
  • 137671 05/19/07 17:48 cdaq Run 63145: Production - LH2 Q2=0.800
  • 137670 05/19/07 17:37 L.Pentchev vacuum pressure reading problem
  • 137669 05/19/07 17:28 cdaq Run 63144: Production - LH2 Q2=0.800
  • 137668 05/19/07 16:52 cdaq Run 63143: Production - carbon Q2=0.983
  • 137667 05/19/07 16:39 cdaq Run 63142: Production - dummy Q2=0.983
  • 137666 05/19/07 16:38 Reimer HMS Magnets and hall probes
  • 137665 05/19/07 16:17 cdaq Run 63141: Production - dummy Q2=0.983
  • 137664 05/19/07 16:08 cdaq Beam Time Accounting
  • 137663 05/19/07 16:07 VM Rodriguez Day Shift Summary
  • 137662 05/19/07 15:58 VM Rodriguez BCM BPM Screenshots
  • 137661 05/19/07 15:50 cdaq Run 63140: Production - LH2 Q2=0.983
  • 137660 05/19/07 15:39 cdaq Run 63139: Production - LH2 Q2=0.983
  • 137659 05/19/07 15:29 cdaq Run 63138: Production - LH2 Q2=0.983
  • 137658 05/19/07 15:18 cdaq Run 63137: Production - LH2 Q2=0.983
  • 137657 05/19/07 15:09 cdaq Run 63136: Production - LH2 Q2=0.983
  • 137656 05/19/07 14:55 seva target:changed target to H2
  • 137655 05/19/07 14:47 cdaq Run 63135: Production - Carbon Q2=2.284
  • 137654 05/19/07 14:45 seva target:changed target to carbon
  • 137653 05/19/07 14:37 frw Beam: energy measurement
  • 137652 05/19/07 14:32 cdaq Run 63134: Production - Dummy Q2=2.284
  • 137651 05/19/07 14:23 cdaq Run 63133: Production - Dummy Q2=2.284
  • 137650 05/19/07 14:14 G Mbianda HMS angle checks
  • 137649 05/19/07 14:11 cdaq Run 63132: Production - Dummy Q2=2.284
  • 137648 05/19/07 14:01 cdaq Run 63131: Production - Dummy Q2=2.284
  • 137647 05/19/07 13:58 G Mbianda tof calibration
  • 137646 05/19/07 13:51 cdaq Run 63130: Production - Dummy Q2=2.284
  • 137645 05/19/07 13:44 VM Rodriguez Run 63129 is a dummy target run
  • 137644 05/19/07 13:41 cdaq Run 63129: Production - LH2 Q2=2.284
  • 137643 05/19/07 13:38 seva target:changed target to dummy
  • 137642 05/19/07 13:19 saw Network in Hall C
  • 137641 05/19/07 12:56 VM Rodriguez We are ready for beam energy measurement
  • 137640 05/19/07 12:45 seva target: we are back on, changed target to empty
  • 137639 05/19/07 12:43 johna Target IOC "fix" - network problems in the hall
  • 137638 05/19/07 11:52 VM Rodriguez Reboot VME create didn't fixed the problem Dave Meekins will come
  • 137637 05/19/07 11:43 VM Rodriguez Dutta and Seva went into the Hall to reboot VME4
  • 137636 05/19/07 11:35 VM Rodriguez Ask for Controlled Access to reboot VME create for target
  • 137635 05/19/07 11:29 VM Rodriguez IOC can not reboot
  • 137634 05/19/07 11:24 seva target: IOC is stuck, reboot did not work, paged Dave Meekins
  • 137633 05/19/07 11:00 cdaq Run 63128: Production - LH2 Q2=2.284
  • 137632 05/19/07 10:48 cdaq Run 63127: Production - LH2 Q2=2.284
  • 137631 05/19/07 10:36 cdaq Run 63126: Production - LH2 Q2=2.284
  • 137630 05/19/07 10:19 cdaq Run 63125: Production - LH2 Q2=2.284
  • 137629 05/19/07 10:07 cdaq Run 63124: Production - LH2 Q2=2.284
  • 137628 05/19/07 09:54 cdaq Run 63123: Production - LH2 Q2=2.284
  • 137627 05/19/07 09:43 cdaq Run 63122: Production - LH2 Q2=2.284
  • 137626 05/19/07 09:29 cdaq Run 63121: Production - LH2 Q2=2.284
  • 137625 05/19/07 09:16 cdaq Run 63120: Production - LH2 Q2=2.284
  • 137624 05/19/07 09:04 cdaq Run 63119: Production - LH2 Q2=2.284
  • 137623 05/19/07 08:47 cdaq Run 63118: Production - LH2 Q2=2.284
  • 137622 05/19/07 08:34 cdaq Run 63117: Production - LH2 Q2=2.284
  • 137621 05/19/07 08:31 cdaq Run 63116: Production - LH2 Q2=2.284
  • 137620 05/19/07 08:13 cdaq Run 63115: Production - LH2 Q2=2.284
  • 137619 05/19/07 08:03 cdaq Beam Time Accounting
  • 137618 05/19/07 08:00 cdaq Run 63114: Production - LH2 Q2=2.284
  • 137617 05/19/07 07:55 hamlet Qwl shift summary, 19 May 2007
  • 137616 05/19/07 07:52 cdaq Run 63113: Production - LH2 Q2=2.284
  • 137615 05/19/07 07:38 cdaq Run 63112: Production - LH2 Q2=2.284
  • 137614 05/19/07 07:24 cdaq Run 63111: Production - LH2 Q2=2.284
  • 137613 05/19/07 07:05 cdaq Run 63110: Production - LH2 Q2=2.284
  • 137612 05/19/07 06:46 cdaq Run 63109: Production - LH2 Q2=2.284
  • 137611 05/19/07 06:28 cdaq Run 63108: Production - LH2 Q2=2.284
  • 137610 05/19/07 06:08 cdaq Run 63107: Production - LH2 Q2=2.284
  • 137609 05/19/07 05:43 cdaq Run 63106: Production - LH2 Q2=2.284
  • 137608 05/19/07 05:23 cdaq Run 63105: Production - LH2 Q2=2.284
  • 137607 05/19/07 05:06 cdaq Run 63104: Production - LH2 Q2=2.284
  • 137606 05/19/07 04:39 Dutta Target: Moved to LH2
  • 137605 05/19/07 04:39 Dutta Target: Moved to Carbon
  • 137604 05/19/07 04:24 cdaq Run 63103: Production - Carbon Q2=1.34
  • 137603 05/19/07 04:10 cdaq Run 63102: Production - Dummy Q2=1.34
  • 137602 05/19/07 04:07 Dutta Target: Moved to 4cm Dummy
  • 137601 05/19/07 04:00 Dutta Target: Back to normal operation
  • 137600 05/19/07 03:55 hamlet ps factors for run 63094-63099
  • 137599 05/19/07 03:48 cdaq Run 63101: Production - LH2 Q2=1.34
  • 137598 05/19/07 03:46 cdaq Run 63100: Production - LH2 Q2=1.34
  • 137597 05/19/07 03:44 hamlet We cannot keep SOS BMO1 ON
  • 137596 05/19/07 03:43 cdaq Run 63099: Production - LH2 Q2=1.34
  • 137595 05/19/07 03:34 cdaq Run 63098: Production - LH2 Q2=1.34
  • 137594 05/19/07 03:24 cdaq Run 63097: Production - LH2 Q2=1.34
  • 137593 05/19/07 03:15 cdaq Run 63096: Production - LH2 Q2=1.34
  • 137592 05/19/07 03:13 cdaq Run 63095: Production - LH2 Q2=1.34
  • 137591 05/19/07 03:05 cdaq Run 63094: Production - LH2 Q2=1.34
  • 137590 05/19/07 02:53 hamlet Ready for beam
  • 137589 05/19/07 01:29 hamlet Controlled access for target
  • 137588 05/19/07 00:50 Dutta Target: Cannot move to Loop 1
  • 137587 05/19/07 00:46 hamlet Problem to put LH2 target
  • 137586 05/19/07 00:34 hamlet harp scan results
  • 137585 05/19/07 00:17 Dutta Target: Screen shot
  • 137584 05/19/07 00:15 cdaq Beam Time Accounting
  • Friday

  • 137583 05/18/07 23:38 Reimer checklist scanned
  • 137582 05/18/07 22:21 dunne Target: Target screen shot
  • 137581 05/18/07 19:50 I. Albayrak BCM Calibration results
  • 137580 05/18/07 18:27 Danagoulian Lucite signals amplified
  • 137579 05/18/07 17:19 Reimer SOS magnets on
  • 137578 05/18/07 17:11 saw Current settings for SOS
  • 137577 05/18/07 17:02 dunne Increased He flow
  • 137576 05/18/07 16:19 Reimer SOS magnets turned on
  • 137575 05/18/07 16:07 VM Rodriguez Day Shift Summary
  • 137574 05/18/07 16:06 VM Rodriguez Day Shift Summary
  • 137573 05/18/07 16:06 cdaq Beam Time Accounting
  • 137572 05/18/07 16:06 VM Rodriguez No Sound in HV Alarm
  • 137571 05/18/07 14:58 VM Rodriguez Low He Flow and Presurre
  • 137570 05/18/07 14:27 Bosted Target to carbon
  • 137569 05/18/07 12:58 smithg Target: Pid thermometer fix
  • 137568 05/18/07 12:44 Bosted Targeet: changed limits on vacuum to reflect new units
  • 137567 05/18/07 12:03 hamlet SHMS "Bender Prototype' taken out from pivot
  • 137566 05/18/07 12:03 VM Rodriguez All people working in the Hall are out.
  • 137565 05/18/07 11:53 Bosted Target IOC rreboot
  • 137564 05/18/07 11:29 smithg Target: BDS noise work. PID thermometer noisy too.
  • 137563 05/18/07 11:22 V.M. Rodrigu HMS angle moved to 37.28 and momentum to 1.360 GeV
  • 137562 05/18/07 11:19 Bosted Loop 1 temperature unstable
  • 137561 05/18/07 11:10 M Jones Checked SANE tracker connection in SOS hut
  • 137560 05/18/07 10:47 beaufait sos quad ground fault
  • 137559 05/18/07 10:44 saw SOS scalers fixed
  • 137558 05/18/07 10:40 Bosted Target heater power dropped to zero
  • 137557 05/18/07 09:37 seva target: IOC reboot
  • 137556 05/18/07 08:52 Lassiter PLC Software correction
  • 137555 05/18/07 08:39 cdaq Beam Time Accounting
  • 137554 05/18/07 08:31 Danagoulian SOS lucite
  • 137553 05/18/07 08:20 Victor M. Ro Hall in controlled access at 8:15
  • 137552 05/18/07 08:16 Danagoulian SOS Lucite data
  • 137551 05/18/07 07:56 L.Pentchev target doesn't move
  • 137550 05/18/07 07:22 cdaq Run 63092: Production - LH2 2=0.6
  • 137549 05/18/07 06:51 cdaq Run 63091: Production - LH2 2=0.6
  • 137548 05/18/07 06:24 cdaq Run 63090: Production - LH2 2=0.6
  • 137547 05/18/07 06:19 L.Pentchev targetIOC reboot
  • 137546 05/18/07 06:11 cdaq Run 63089: Production - LH2 2=0.6
  • 137545 05/18/07 05:45 cdaq Run 63088: Production - LH2 2=0.6
  • 137544 05/18/07 05:40 L.Pentchev LH target
  • 137543 05/18/07 05:33 L.Pentchev carbon target
  • 137542 05/18/07 05:29 cdaq Run 63087: Production - Carbon 2=0.6
  • 137541 05/18/07 05:06 cdaq Run 63086: Production - Dummy 2=0.6
  • 137540 05/18/07 04:48 cdaq Run 63085: Production - Dummy 2=0.6
  • 137539 05/18/07 04:29 cdaq Run 63084: Production - Dummy 2=0.6
  • 137538 05/18/07 04:28 L.Pentchev dummy target
  • 137537 05/18/07 04:05 cdaq Run 63083: Production - LH2 2=0.6
  • 137536 05/18/07 04:01 L.Pentchev target screen
  • 137535 05/18/07 03:52 cdaq Run 63082: Production - LH2 2=0.6
  • 137534 05/18/07 03:38 cdaq Run 63081: Production - LH2 2=0.6
  • 137533 05/18/07 03:25 cdaq Run 63080: Production - LH2 2=0.6
  • 137532 05/18/07 03:10 cdaq Run 63079: Production - LH2 2=0.6
  • 137531 05/18/07 02:56 cdaq Run 63078: Production - LH2 2=0.6
  • 137530 05/18/07 02:42 cdaq Run 63077: Production - LH2 2=0.6
  • 137529 05/18/07 02:28 cdaq Run 63076: Production - LH2 2=0.6
  • 137528 05/18/07 02:15 cdaq Run 63075: Production - LH2 2=0.6
  • 137527 05/18/07 02:01 cdaq Run 63074: Production - LH2 2=0.6
  • 137526 05/18/07 01:46 cdaq Run 63073: Production - LH2 2=0.6
  • 137525 05/18/07 01:30 cdaq Run 63072: Production - LH2 2=0.6
  • 137524 05/18/07 01:18 cdaq Run 63071: Production - LH2 2=0.6
  • 137523 05/18/07 01:03 cdaq Run 63070: Production - LH2 2=0.6
  • 137522 05/18/07 00:56 cdaq Run 63069: Production - LH2 2=0.6
  • 137521 05/18/07 00:06 cdaq Beam Time Accounting
  • Thursday

  • 137520 05/17/07 23:53 dunne Runs 63056 - 63068 were not production runs
  • 137519 05/17/07 23:46 dunne BCM calibration
  • 137518 05/17/07 22:25 dunne Current change during end of last beam scan on LH2
  • 137517 05/17/07 22:20 cdaq Run 63068: Production - LH2 2=0.6
  • 137516 05/17/07 22:03 dunne beam scan on LH2: -3.5
  • 137515 05/17/07 22:00 cdaq Run 63067: Production - LH2 2=0.6
  • 137514 05/17/07 21:52 dunne beam scan on LH2: -3.3
  • 137513 05/17/07 21:52 cdaq Run 63066: Production - LH2 2=0.6
  • 137512 05/17/07 21:43 cdaq Run 63065: Production - LH2 2=0.6
  • 137511 05/17/07 21:43 dunne beam scan on LH2: -1.2
  • 137510 05/17/07 21:34 cdaq Run 63064: Production - LH2 2=0.6
  • 137509 05/17/07 21:34 dunne beam scan on LH2: +6.8
  • 137508 05/17/07 21:26 cdaq Run 63063: Production - LH2 2=0.6
  • 137507 05/17/07 21:26 dunne beam scan on LH2: +4.9
  • 137506 05/17/07 21:18 cdaq Run 63062: Production - LH2 2=0.6
  • 137505 05/17/07 21:18 dunne beam scan: +2.8
  • 137504 05/17/07 21:08 dunne Horz. beam scan on LH2: +0.78
  • 137503 05/17/07 21:07 cdaq Run 63061: Production - LH2 2=0.6
  • 137502 05/17/07 21:03 dunne Target: moved to LH2
  • 137501 05/17/07 20:52 cdaq Run 63060: Production - Dummy 2=0.6
  • 137500 05/17/07 20:52 dunne beam scan: -2.4
  • 137499 05/17/07 20:48 cdaq Run 63059: Production - Dummy 2=0.6
  • 137498 05/17/07 20:44 dunne beam scan: -1.2
  • 137497 05/17/07 20:44 cdaq Run 63058: Production - Dummy 2=0.6
  • 137496 05/17/07 20:39 cdaq Run 63057: Production - Dummy 2=0.6
  • 137495 05/17/07 20:37 dunne beam scan +4.79
  • 137494 05/17/07 20:34 dunne beam scan: +2.88 horz
  • 137493 05/17/07 20:33 cdaq Run 63056: Production - Dummy 2=0.6
  • 137492 05/17/07 20:24 cdaq Run 63055: Production - Dummy 2=0.6
  • 137491 05/17/07 20:19 dunne Target: moved to dummy target
  • 137490 05/17/07 20:16 cdaq Run 63054: Production - Carbon 2=0.6
  • 137489 05/17/07 20:12 dunne Target: moved to carbon target
  • 137488 05/17/07 19:59 cdaq Run 63053: Production - Dummy 2=0.6
  • 137487 05/17/07 19:55 dunne Target: Moved to Dummy target
  • 137486 05/17/07 19:49 cdaq Run 63052: Production - Dummy 2=0.6
  • 137485 05/17/07 19:22 cdaq Run 63051: Production - LH2 2=0.6
  • 137484 05/17/07 18:59 cdaq Run 63050: Production - LH2 2=0.6
  • 137483 05/17/07 18:41 cdaq Run 63049: Production - LH2 2=0.6
  • 137482 05/17/07 18:24 cdaq Run 63048: Production - LH2 2=0.6
  • 137481 05/17/07 18:17 M JOnes Investigated SOS tracker tdc
  • 137480 05/17/07 18:16 johna Updated SOS thresholds
  • 137479 05/17/07 18:00 cdaq Run 63047: Production - LH2 2=0.6
  • 137478 05/17/07 17:56 cdaq Run 63046: Production - LH2 2=0.6
  • 137477 05/17/07 17:46 dunne Target: Moved to LH2 target
  • 137476 05/17/07 17:40 cdaq Run 63045: Production - Carbon 2=0.6
  • 137475 05/17/07 17:36 dunne Target: Moved to carbon target
  • 137474 05/17/07 17:24 cdaq Run 63044: Production - Dummy 2=0.6
  • 137473 05/17/07 17:12 cdaq Run 63043: Production - Dummy 2=0.6
  • 137472 05/17/07 17:11 dunne Target: Moved to dummy target
  • 137471 05/17/07 16:40 cdaq Run 63042: Production - LH2 Q2=0.6
  • 137470 05/17/07 16:16 cdaq Run 63041: Production - LH2 Q2=0.6
  • 137469 05/17/07 16:15 dunne Target screen shot
  • 137468 05/17/07 16:02 cdaq Beam Time Accounting
  • 137467 05/17/07 15:51 cdaq Run 63040: Production - LH2 Q2=0.6
  • 137466 05/17/07 15:32 Danagoulian Helium flow
  • 137465 05/17/07 15:27 cdaq Run 63039: Production - LH2 Q2=0.6
  • 137464 05/17/07 15:13 Bosted Changed target to LH2
  • 137463 05/17/07 15:12 Bosted Changed target to Carbon
  • 137462 05/17/07 15:09 cdaq Run 63038: Production - carbon Q2=0.8
  • 137461 05/17/07 14:49 cdaq Run 63037: Production - Dummy Q2=0.8
  • 137460 05/17/07 14:44 cdaq Run 63036: Production - Dummy Q2=0.8
  • 137459 05/17/07 14:35 cdaq Run 63035: Production - Dummy Q2=0.8
  • 137458 05/17/07 14:35 saw Data disk deleting fixed
  • 137457 05/17/07 14:32 cdaq Run 63034: Production - Dummy Q2=0.8
  • 137456 05/17/07 14:29 Bosted Changed target to 4cm dummy
  • 137455 05/17/07 14:09 cdaq Run 63033: Production - LH2 Q2=0.8
  • 137454 05/17/07 13:55 cdaq Run 63032: Production - LH2 Q2=0.8
  • 137453 05/17/07 13:47 cdaq Run 63031: Production - LH2 Q2=0.8
  • 137452 05/17/07 13:30 cdaq Run 63030: Production - LH2 Q2=0.8
  • 137451 05/17/07 13:25 cdaq Run 63029: Production - LH2 Q2=0.8
  • 137450 05/17/07 13:23 cdaq Run 63028: Production - LH2 Q2=0.8
  • 137449 05/17/07 13:11 cdaq Run 63027: Production - LH2 Q2=0.8
  • 137448 05/17/07 12:54 Bosted Target moved to LH2 at 12:20 while HMS angle, momentum being changed
  • 137447 05/17/07 12:54 cdaq Run 63026: Production - LH2 Q2=0.8
  • 137446 05/17/07 12:53 M Jones Lowered SOS threshold on S2X+ and S2X- to 15mV
  • 137445 05/17/07 12:53 Bosted Target moved to carbon at noon
  • 137444 05/17/07 12:37 cdaq Run 63025: Production - LH2 Q2=0.8
  • 137443 05/17/07 12:35 cdaq Run 63024: Production - LH2 Q2=0.8
  • 137442 05/17/07 12:32 cdaq Run 63023: Production - LH2 Q2=0.8
  • 137441 05/17/07 12:12 cdaq Run 63022: Production - carbon Q2=2.95
  • 137440 05/17/07 11:44 cdaq Run 63021: Production - Dummy Q2=2.95
  • 137439 05/17/07 11:24 Danagoulian SOS gate width change
  • 137438 05/17/07 11:20 cdaq Run 63020: Production - Dummy Q2=2.95
  • 137437 05/17/07 11:19 Bosted Moved to 4 cm dummy target
  • 137436 05/17/07 11:03 johna SOS Thresholds update
  • 137435 05/17/07 10:43 cdaq Run 63019: Production - LH2 Q2=2.95
  • 137434 05/17/07 10:14 cdaq Run 63018: cosmic
  • 137433 05/17/07 09:14 manly pulsed mode at end of 63017
  • 137432 05/17/07 09:02 manly incorrect q2 in header file
  • 137431 05/17/07 08:51 Bosted SOS Lucite HV
  • 137430 05/17/07 08:29 cdaq Run 63017: Production - LH2 Q2=3.61
  • 137429 05/17/07 08:02 cdaq Beam Time Accounting
  • 137428 05/17/07 07:51 cdaq Run 63016: Production - LH2 Q2=3.61
  • 137427 05/17/07 07:16 cdaq Run 63015: Production - LH2 Q2=3.61
  • 137426 05/17/07 06:44 A. Puckett Changed to new kinematic setting pHMS = 2.328 thetaHMS = 30.28
  • 137425 05/17/07 06:38 cdaq Run 63014: Production - LH2 Q2=3.61
  • 137424 05/17/07 06:37 cdaq Run 63014: Production - LH2 Q2=3.61
  • 137423 05/17/07 06:24 L.Pentchev LH target
  • 137422 05/17/07 06:10 L.Pentchev carbon target
  • 137421 05/17/07 06:09 cdaq Run 63012: Production - Carbon Q2=3.61
  • 137420 05/17/07 05:38 cdaq Run 63011: Production - Dummy Q2=3.61
  • 137419 05/17/07 05:37 L.Pentchev dummy target
  • 137418 05/17/07 04:57 cdaq Run 63010: Production - LH2 Q2=3.61
  • 137417 05/17/07 04:57 cdaq Run 63010: Production - LH2 Q2=3.61
  • 137416 05/17/07 04:54 A. Puckett mid shift progress report...
  • 137415 05/17/07 04:20 cdaq Run 63008: Production - LH2 Q2=3.61
  • 137414 05/17/07 04:16 L.Pentchev target screen capture
  • 137413 05/17/07 03:49 L.Pentchev LH target
  • 137412 05/17/07 03:46 cdaq Run 63007: Production - LH2 Q2=3.61
  • 137411 05/17/07 03:10 cdaq Run 63006: Production - LH2 Q2=3.61
  • 137410 05/17/07 02:19 cdaq Run 63005: Production - LH2 Q2=3.61
  • 137409 05/17/07 02:11 cdaq Run 63004: Production - LH2 Q2=3.61
  • 137408 05/17/07 01:33 cdaq Run 63003: Production - Dummy Q2=3.61
  • 137407 05/17/07 01:31 cdaq Run 63002: Production - Dummy Q2=3.61
  • 137406 05/17/07 01:28 L.Pentchev dummy target
  • 137405 05/17/07 01:27 cdaq Run 63001: Production - LH2 Q2=3.61
  • 137404 05/17/07 01:21 Arshak target
  • 137403 05/17/07 00:38 cdaq Run 63000: Production - LH2 Q2=3.61
  • 137402 05/17/07 00:01 cdaq Beam Time Accounting
  • 137401 05/17/07 00:01 cdaq Run 62999: Production - LH2 Q2=3.61
  • Wednesday

  • 137400 05/16/07 23:18 cdaq Run 62998: Production - LH2 Q2=3.61
  • 137399 05/16/07 23:09 cdaq Run 62996: Production - LH2 Q2=3.61
  • 137398 05/16/07 22:38 dunne checklist bpm bcm screens
  • 137397 05/16/07 22:34 Perdrisa Beam off for 40 minutes
  • 137396 05/16/07 22:32 cdaq Run 62995: Production - LH2 Q2=3.61
  • 137395 05/16/07 21:25 cdaq Run 62994: Production - LH2 Q2=3.61
  • 137394 05/16/07 21:03 dunne Target screen capture
  • 137393 05/16/07 20:49 cdaq Run 62993: Production - LH2 Q2=3.61
  • 137392 05/16/07 20:08 cdaq Run 62992: Production - LH2 Q2=3.61
  • 137391 05/16/07 20:04 johna (mostly) painless kinematics change, and possible documentation error
  • 137390 05/16/07 20:00 cdaq Run 62991: Production - LH2 Q2=3.61
  • 137389 05/16/07 19:47 dunne Target: Moved to LH2 target
  • 137388 05/16/07 19:29 cdaq Run 62990: Production - Carbon Q2=0.983
  • 137387 05/16/07 19:25 dunne Target: Moved to Carbon
  • 137386 05/16/07 19:14 cdaq Run 62989: Production - DUMMY Q2=0.983
  • 137385 05/16/07 19:03 cdaq Run 62988: Production - DUMMY Q2=0.983
  • 137384 05/16/07 18:58 cdaq Run 62987: Production - DUMMY Q2=0.983
  • 137383 05/16/07 18:52 dunne Target: Target move to dummy
  • 137382 05/16/07 18:45 dunne Runs 62981-62985 are on LH2 not dummy
  • 137381 05/16/07 18:39 cdaq Run 62986: Production - LH2 Q2=0.983
  • 137380 05/16/07 18:25 cdaq Run 62985: Production - Dummy Q2=0.983
  • 137379 05/16/07 18:14 cdaq Run 62984: Production - Dummy Q2=0.983
  • 137378 05/16/07 18:02 cdaq Run 62983: Production - Dummy Q2=0.983
  • 137377 05/16/07 17:59 cdaq Run 62982: Production - Dummy Q2=0.983
  • 137376 05/16/07 17:42 cdaq Run 62981: Production - Dummy Q2=0.983
  • 137375 05/16/07 17:27 Lassiter DIpole mods
  • 137374 05/16/07 16:33 cdaq Run 62980: Production - Carbon Q2=4.25
  • 137373 05/16/07 16:03 cdaq Beam Time Accounting
  • 137372 05/16/07 16:03 cdaq Beam Time Accounting
  • 137371 05/16/07 15:54 melissa target: end of shift screenshot
  • 137370 05/16/07 15:21 melissa target: changing to H2
  • 137369 05/16/07 15:05 cdaq Run 62979: Production - Carbon Q2=4.25
  • 137368 05/16/07 15:03 melissa target: moved to carbon
  • 137367 05/16/07 14:37 Brash Weekly Summary
  • 137366 05/16/07 14:33 cdaq Run 62978: Production - Dummy Q2=4.25
  • 137365 05/16/07 14:05 cdaq Run 62977: Production - Dummy Q2=4.25
  • 137364 05/16/07 14:03 melissa target: moved to dummy
  • 137363 05/16/07 13:49 melissa target: 1 more JT adjustment
  • 137362 05/16/07 13:34 melissa target: JT power
  • 137361 05/16/07 13:31 cdaq Run 62976: Production - LH2 Q2=4.25
  • 137360 05/16/07 13:21 Huber Checklist BPM BCM screen
  • 137359 05/16/07 13:04 Huber Beam Energy Results
  • 137358 05/16/07 13:03 cdaq Run 62975: Production - LH2 Q2=4.25
  • 137357 05/16/07 10:44 cdaq Run 62974: Production - LH2 Q2=4.25 JUNK
  • 137356 05/16/07 10:18 Huber Down for beam energy measurement
  • 137355 05/16/07 10:13 saw Sanity check fix
  • 137354 05/16/07 09:48 cdaq Run 62973: Production - LH2 Q2=4.25
  • 137353 05/16/07 09:21 cdaq Beam Time Accounting
  • 137352 05/16/07 09:20 Huber Vesda fault warnings
  • 137351 05/16/07 09:18 cdaq Run 62972: Production - LH2 Q2=4.25
  • 137350 05/16/07 09:08 Huber S1X S2X HVs ON
  • 137349 05/16/07 09:03 Huber Beam current down to 70uA
  • 137348 05/16/07 08:39 cdaq Run 62971: Production - LH2 Q2=4.25
  • 137347 05/16/07 08:24 cdaq Beam Time Accounting
  • 137346 05/16/07 08:18 cdaq Run 62970: Production - LH2 Q2=4.25
  • 137345 05/16/07 08:04 melissa target: start of shift, screen shot
  • 137344 05/16/07 07:41 cdaq Run 62969: Production - LH2 Q2=4.25
  • 137343 05/16/07 07:39 seva target: screen shot
  • 137342 05/16/07 07:36 seva target: changed target to H2
  • 137341 05/16/07 07:26 Vahe Shift checklist May 16
  • 137340 05/16/07 06:54 cdaq Run 62968: Production - Dummy Q2=4.25
  • 137339 05/16/07 06:20 cdaq Run 62967: Production - LH2 Q2=4.25
  • 137338 05/16/07 06:00 S.Danagoulia change of ps2
  • 137337 05/16/07 05:55 cdaq Run 62966: Production - LH2 Q2=4.25
  • 137336 05/16/07 05:30 cdaq Run 62965: Production - LH2 Q2=5.080
  • 137335 05/16/07 05:27 cdaq Run 62964: Production - LH2 Q2=5.080
  • 137334 05/16/07 04:59 S.Danagoulia HMS dipole trip
  • 137333 05/16/07 04:20 cdaq Run 62963: Junk - LH2 Q2=5.080
  • 137332 05/16/07 04:15 seva target: changed to H2
  • 137331 05/16/07 04:14 seva target masking
  • 137330 05/16/07 04:07 cdaq Run 62962: Production - Carbon Q2=5.080
  • 137329 05/16/07 04:05 seva target: changed to carbon
  • 137328 05/16/07 04:02 Danagoulian change ethane bottle
  • 137327 05/16/07 03:39 cdaq Run 62961: Production - DummyQ2=5.080
  • 137326 05/16/07 03:37 seva target: changed target to dummy
  • 137325 05/16/07 03:06 cdaq Run 62960: Production - LH2 Q2=5.080
  • 137324 05/16/07 02:43 Vahe ROC 1 & 2 error, run 62958
  • 137323 05/16/07 02:37 cdaq Run 62959: Production - LH2 Q2=5.080
  • 137322 05/16/07 02:26 cdaq Run 62958: Production - LH2 Q2=5.080
  • 137321 05/16/07 02:10 cdaq Run 62957: Production - LH2 Q2=5.080
  • 137320 05/16/07 01:52 cdaq Run 62956: Production - LH2 Q2=5.080
  • 137319 05/16/07 01:38 Danagoulian ROC 1 &2 error, run 62954
  • 137318 05/16/07 01:31 cdaq Run 62955: Production - LH2 Q2=5.080
  • 137317 05/16/07 01:15 cdaq Run 62954: Production - LH2 Q2=5.080
  • 137316 05/16/07 00:59 cdaq Run 62953: Production - LH2 Q2=5.080
  • 137315 05/16/07 00:33 cdaq Run 62952: Production - LH2 Q2=5.080
  • 137314 05/16/07 00:21 L.Pentchev swing shift summary
  • 137313 05/16/07 00:21 cdaq Beam Time Accounting
  • 137312 05/16/07 00:18 cdaq Run 62951: Production - LH2 Q2=5.080
  • Tuesday

  • 137311 05/15/07 23:55 melissa end of swing shift screenshot (target)
  • 137310 05/15/07 23:49 cdaq Run 62950: Production - LH2 Q2=5.080
  • 137309 05/15/07 23:31 cdaq Run 62949: Production - LH2 Q2=5.080
  • 137308 05/15/07 23:29 melissa target: changed to H2 again
  • 137307 05/15/07 23:13 melissa c dummy screen shot
  • 137306 05/15/07 23:10 cdaq Run 62948: Production - Dummy Q2=5.080
  • 137305 05/15/07 23:01 jmaxwell Shift Checklist, May 15
  • 137304 05/15/07 22:54 jmaxwell Checklist Screen grabs
  • 137303 05/15/07 22:47 cdaq Run 62947: Production - Dummy Q2=5.080
  • 137302 05/15/07 22:05 melissa moved to dummy cell
  • 137301 05/15/07 21:57 jmaxwell LN2 a little low on Q3
  • 137300 05/15/07 21:43 cdaq Run 62946: Production - LH2 Q2=5.080
  • 137299 05/15/07 21:41 L.Pentchev switched the ethane bottle
  • 137298 05/15/07 21:31 Melissa C screen shot - temp jump (no alarm)
  • 137297 05/15/07 21:28 cdaq Run 62945: Production - LH2 Q2=5.080
  • 137296 05/15/07 21:14 cdaq Run 62944: Production - LH2 Q2=5.080
  • 137295 05/15/07 21:01 johna effect of removing hodoscope paddles.
  • 137294 05/15/07 20:52 cdaq Run 62943: Production - LH2 Q2=5.080
  • 137293 05/15/07 20:33 mack watch hsxpfp as well
  • 137292 05/15/07 20:31 cdaq Run 62942: Production - LH2 Q2=5.080
  • 137291 05/15/07 20:12 johna Turned off S1X5
  • 137290 05/15/07 20:11 cdaq Run 62941: Production - LH2 Q2=5.080
  • 137289 05/15/07 19:55 cdaq Run 62940: Production - LH2 Q2=5.080
  • 137288 05/15/07 19:37 cdaq Run 62939: Production - LH2 Q2=5.080
  • 137287 05/15/07 19:36 johna Turning off even more SCIN HV
  • 137286 05/15/07 19:33 smithg Target: why was this done?
  • 137285 05/15/07 19:23 johna Turning off more SCIN HV
  • 137284 05/15/07 19:23 cdaq Run 62938: Production - LH2 Q2=5.080
  • 137283 05/15/07 19:08 cdaq Run 62937: Production - LH2 Q2=5.080
  • 137282 05/15/07 18:57 johna Turned off S2X1+ and S2X1-
  • 137281 05/15/07 18:52 Melissa C (better) H2 screenshot
  • 137280 05/15/07 18:51 cdaq Run 62936: Production - LH2 Q2=5.080
  • 137279 05/15/07 18:43 I. Albayrak run numbers that have bad wire problem
  • 137278 05/15/07 18:42 Melissa C H2 target screenshot
  • 137277 05/15/07 18:34 cdaq Run 62935: Production - LH2 Q2=5.080
  • 137276 05/15/07 18:21 cdaq Run 62934: Production - LH2 Q2=5.080
  • 137275 05/15/07 17:39 cdaq Run 62933: Production - LH2 Q2=5.080
  • 137274 05/15/07 17:26 Melissa C. Moved to H2 target
  • 137273 05/15/07 16:36 cdaq Run 62932: Production - Carbon Q2=2.284
  • 137272 05/15/07 16:28 Melissa C moved to Carbon target
  • 137271 05/15/07 16:14 Melissa C. Moved to 4cm Dummy
  • 137270 05/15/07 16:13 Melissa C. Moved to 4cm Dummy
  • 137269 05/15/07 16:13 Melissa C. Moved to 4cm Dummy
  • 137268 05/15/07 16:09 cdaq Run 62931: Production - Dummy Q2=2.284
  • 137267 05/15/07 16:07 cdaq Beam Time Accounting
  • 137266 05/15/07 15:54 cdaq Run 62930: Production - Dummy Q2=2.284
  • 137265 05/15/07 15:36 cdaq Run 62929: Production - LH2 Q2=2.284
  • 137264 05/15/07 15:03 cdaq Run 62928: Production - LH2 Q2=2.284
  • 137263 05/15/07 14:45 A. Puckett temp. fluctuations, before and after
  • 137262 05/15/07 14:35 donal Shift Ck grab
  • 137261 05/15/07 14:28 cdaq Run 62927: Production - LH2 Q2=2.284
  • 137260 05/15/07 14:18 A. Puckett bad encoder readbacks causing HPH alarms
  • 137259 05/15/07 14:10 johna HMS 2y2 bad wires
  • 137258 05/15/07 14:02 Fowler Q2 LN2 temp error masked
  • 137257 05/15/07 13:57 cdaq Run 62926: Production - LH2 Q2=2.284
  • 137256 05/15/07 13:47 Huber Injector problems
  • 137255 05/15/07 13:09 cdaq Run 62925: Production - LH2 Q2=2.284
  • 137254 05/15/07 12:47 cdaq Run 62924: Production - LH2 Q2=2.284
  • 137253 05/15/07 12:44 A. Puckett Earlier today, changed "cell parameters" for beam power calc.
  • 137252 05/15/07 12:44 Huber HMS Q2 LN2 temp error
  • 137251 05/15/07 12:36 A. Puckett encoder positions screengrab
  • 137250 05/15/07 12:21 Huber Painless HMS configuration change!
  • 137249 05/15/07 12:17 Huber Run 62922 with SOS PS for Eric
  • 137248 05/15/07 12:14 cdaq Run 62923: Production - LH2 Q2=2.284
  • 137247 05/15/07 12:08 A. Puckett moving back to LH2
  • 137246 05/15/07 12:04 hcf HMS DC +-5v supplies were also adjusted slightly
  • 137245 05/15/07 11:56 A. Puckett Also, "power fail" light sometimes comes on...
  • 137244 05/15/07 11:54 A. Puckett periodic lifter encoder readback problem
  • 137243 05/15/07 11:54 cdaq Run 62922: Production - Carbon Q2=1.90
  • 137242 05/15/07 11:42 johna updated HMS and SOS thresholds
  • 137241 05/15/07 11:29 cdaq Run 62921: Production - Dummy Q2=1.90
  • 137240 05/15/07 11:16 cdaq Run 62920: Production - Dummy Q2=1.90
  • 137239 05/15/07 10:56 Huber Beam off for Hall B tuning
  • 137238 05/15/07 10:55 Dutta Owl Shift Summary
  • 137237 05/15/07 10:43 cdaq Run 62919: Production - LH2 Dummy Q2=1.90
  • 137236 05/15/07 10:03 A. Puckett Moved to dummy target
  • 137235 05/15/07 09:34 smithg Target: Turned off HPH beam compensation
  • 137234 05/15/07 09:33 cdaq Run 62918: Production - LH2 Q2=1.90
  • 137233 05/15/07 09:15 A. Puckett frequent HPH alarms
  • 137232 05/15/07 09:07 cdaq Run 62917: Production - LH2 Q2=1.90
  • 137231 05/15/07 08:37 A. Puckett start of shift target screengrab
  • 137230 05/15/07 08:32 cdaq Run 62916: Production - LH2 Q2=1.90
  • 137229 05/15/07 08:10 cdaq Run 62915: Production - LH2 Q2=1.90
  • 137228 05/15/07 08:09 cdaq Beam Time Accounting
  • 137227 05/15/07 06:44 cdaq Run 62914: Production - LH2 Q2=1.90
  • 137226 05/15/07 06:23 saw Boot infor reprogrammed for ROC1 and ROC2
  • 137225 05/15/07 06:06 Dutta DAQ Problems
  • 137224 05/15/07 05:30 Dutta Beam: Beam position and harp scan and raster size
  • 137223 05/15/07 05:13 seva target: changed target from BeO to LH2, increased HP
  • 137222 05/15/07 03:16 cdaq Beam Time Accounting
  • Monday

  • 137221 05/14/07 21:56 Donal Shift checklist
  • 137220 05/14/07 21:37 donal May 14 Checklist
  • 137219 05/14/07 19:54 I Albayrak missing wire
  • 137218 05/14/07 19:46 E. Christy SOS dipole magnets and HV on
  • 137217 05/14/07 18:46 I. Albayrak new histogram in online histograms
  • 137216 05/14/07 17:11 smithg Target: Software changes
  • 137215 05/14/07 15:52 Perdrisat Beam: Late entry on target reboot
  • 137214 05/14/07 15:27 hcf HMS DC2Y2 Status
  • 137213 05/14/07 13:33 smithg Target: Opened fill valve to mitigate pressure spikes
  • 137212 05/14/07 12:20 beaufait SMS: sos q1
  • 137211 05/14/07 12:10 jmaxwell Shift Checklist, May 13
  • 137210 05/14/07 12:09 jmaxwell Shift Checklist, May 12
  • 137209 05/14/07 12:09 jmaxwell Shift Checklist, May 11
  • 137208 05/14/07 12:08 jmaxwell Shift Checklist, May 10
  • 137207 05/14/07 12:07 jmaxwell Shift Checklist, May 9
  • 137206 05/14/07 11:48 jmaxwell Shift Checklist, May 8
  • 137205 05/14/07 11:42 jmaxwell Check-list Scan Howto
  • 137204 05/14/07 11:38 saw Disk was replaced
  • 137203 05/14/07 10:26 Huber Hall C is now restricted access
  • 137202 05/14/07 09:24 Perdrisat Target: loop 1 power taken down to 80 mkA
  • 137201 05/14/07 09:18 Perdrisat Target: move to BeO target
  • 137200 05/14/07 09:12 saw cdaqfs fileserver beeping - disk needs replacement
  • 137199 05/14/07 08:57 cdaq Run 62912: Production - LH2 Q2=1.34
  • 137198 05/14/07 08:44 cdaq Run 62911: Production - LH2 Q2=1.34
  • 137197 05/14/07 08:29 cdaq Run 62910: Production - LH2 Q2=1.34
  • 137196 05/14/07 08:25 Perdrisat Target: back to 2H, cell 1
  • 137195 05/14/07 08:24 Perdrisat Target: Change to carbon
  • 137194 05/14/07 08:22 Perdrisat Target: Change target to dummy
  • 137193 05/14/07 08:19 cdaq Run 62909: Production - Carbon Q2=1.34
  • 137192 05/14/07 08:15 cdaq Beam Time Accounting
  • 137191 05/14/07 08:15 hamlet Owl shift summary 14 May
  • 137190 05/14/07 08:05 cdaq Run 62908: Production - Dummy Q2=1.34
  • 137189 05/14/07 08:01 Dutta Target: Target moved to 4cm Dummy
  • 137188 05/14/07 07:42 cdaq Run 62907: Production - LH2 Q2=1.34
  • 137187 05/14/07 07:32 cdaq Run 62906: Production - LH2 Q2=1.34
  • 137186 05/14/07 07:19 cdaq Run 62905: Production - LH2 Q2=1.34
  • 137185 05/14/07 07:08 cdaq Run 62904: Production - LH2 Q2=1.34
  • 137184 05/14/07 06:58 Fowler Dipole NMR communications working again.
  • 137183 05/14/07 06:52 hamlet Ready for beam
  • 137182 05/14/07 06:14 Arthur Mike is here...
  • 137181 05/14/07 05:27 Arthur Communication error
  • 137180 05/14/07 05:14 Arthur HMS Dipole NMR Communication error
  • 137179 05/14/07 04:44 Arthur HMS Dipole & NMR problems
  • 137178 05/14/07 02:23 cdaq Run 62902: Production - LH2 Q2=2.95
  • 137177 05/14/07 01:49 cdaq Run 62901: Production - LH2 Q2=2.95
  • 137176 05/14/07 00:54 smithg Target: Restarted archiver. Relaxed alarm.
  • 137175 05/14/07 00:50 cdaq Run 62900: Production - LH2 Q2=2.95
  • 137174 05/14/07 00:50 Dutta Target: Target screen grab
  • 137173 05/14/07 00:36 Arthur Helium Changed
  • 137172 05/14/07 00:36 Bruell Target: Frequent yellow alarm on H2_P_Fill_Target_R
  • 137171 05/14/07 00:02 cdaq Beam Time Accounting
  • Sunday

  • 137170 05/13/07 23:45 bruell Beam: beam positions
  • 137169 05/13/07 23:34 cdaq Run 62899: Production - LH2 Q2=2.95
  • 137168 05/13/07 23:24 bruell Target: moved to LH2 target
  • 137167 05/13/07 23:23 bruell Target: IOC reboot and alarm limits
  • 137166 05/13/07 23:07 jmaxwell BPM a bit off
  • 137165 05/13/07 22:58 cdaq Run 62898: Run Position Test - Dummy
  • 137164 05/13/07 22:22 cdaq Run 62897: Production - Dummy Q2=2.95
  • 137163 05/13/07 21:51 bruell Target: moved to dummy target
  • 137162 05/13/07 21:50 cdaq Run 62896: Production - Dummy Q2=2.95
  • 137161 05/13/07 21:38 cdaq Run 62895: Production - Carbon Q2=2.95
  • 137160 05/13/07 21:33 bruell Target: moved to C target
  • 137159 05/13/07 21:32 ent magnet saga continues
  • 137158 05/13/07 18:48 cdaq Run 62894: Production - Carbon Q2=2.284
  • 137157 05/13/07 18:26 cdaq Run 62893: Production - Dummy Q2=2.284
  • 137156 05/13/07 18:13 ent dummy - MCC current mistake
  • 137155 05/13/07 18:11 bruell Target: moved to dummy target
  • 137154 05/13/07 18:10 cdaq Run 62892: Production - Dummy Q2=2.284
  • 137153 05/13/07 17:30 cdaq Run 62891: Production - LH2 Q2=2.284
  • 137152 05/13/07 16:53 cdaq Run 62890: Production - LH2 Q2=2.284
  • 137151 05/13/07 16:24 cdaq Run 62889: Production - LH2 Q2=2.284
  • 137150 05/13/07 16:06 cdaq Beam Time Accounting
  • 137149 05/13/07 15:48 cdaq Run 62888: Production - LH2 Q2=2.284
  • 137148 05/13/07 15:24 Solvignon DC TDC module slot 21: changed then changed back
  • 137147 05/13/07 15:11 ccbutu@jlab. fan on the HMS electronic rack
  • 137146 05/13/07 15:10 cdaq Run 62887: Production - LH2 Q2=2.84
  • 137145 05/13/07 14:45 cdaq Run 62886: cosmic test for new DC TDC module
  • 137144 05/13/07 14:40 Huber HMS status
  • 137143 05/13/07 14:36 cdaq Run 62885: cosmic test for new DC TDC module
  • 137142 05/13/07 14:21 cdaq Run 62884: cosmic test for new DC TDC module
  • 137141 05/13/07 14:14 cdaq Run 62883: cosmic test for new DC TDC module
  • 137140 05/13/07 14:08 cdaq Run 62882: cosmic test for new DC TDC module
  • 137139 05/13/07 13:01 Lassiter HMS Q2 communications restored
  • 137138 05/13/07 11:25 Huber Hall access report
  • 137137 05/13/07 10:49 seva target: changet target to LH2
  • 137136 05/13/07 10:16 cdaq Run 62880: Production - Dummy Q2=1.90
  • 137135 05/13/07 10:03 cdaq Run 62879: Production - LH2 Q2=1.90
  • 137134 05/13/07 09:58 seva target: changet target from LH2 to dummy target
  • 137133 05/13/07 09:43 johna The bad wire is back, but who knows for how long....
  • 137132 05/13/07 09:42 smithg Target: Target went sub-atmospheric!
  • 137131 05/13/07 09:38 cdaq Run 62878: Production - LH2 Q2=1.90
  • 137130 05/13/07 09:15 cdaq Run 62877: Production - LH2 Q2=1.90
  • 137129 05/13/07 08:52 cdaq Run 62876: Production - LH2 Q2=1.90
  • 137128 05/13/07 08:30 Huber Run 62874 is junk
  • 137127 05/13/07 08:28 cdaq Run 62875: Production - LH2 Q2=1.90
  • 137126 05/13/07 08:05 jamesj owl shift BPM/BCM
  • 137125 05/13/07 08:02 cdaq Beam Time Accounting
  • 137124 05/13/07 08:01 Dutta Owl Shift Summary
  • 137123 05/13/07 07:49 gaskell target controls screen grab
  • 137122 05/13/07 07:47 cdaq Run 62874: Production - LH2 Q2=1.90
  • 137121 05/13/07 07:43 gaskell Target: moved to LH2
  • 137120 05/13/07 07:27 cdaq Run 62873: Production - CARBON Q2=1.90
  • 137119 05/13/07 02:43 gaskell Run 62870 log entry missing
  • 137118 05/13/07 02:41 gaskell Target: move to carbon target
  • 137117 05/13/07 02:37 gaskell beam off for pass change
  • 137116 05/13/07 02:28 cdaq Run 62872: Production - DUMMY Q2=1.90
  • 137115 05/13/07 02:18 gaskell target really dummy
  • 137114 05/13/07 02:10 cdaq Run 62871: Production - LH2 Q2=1.90
  • 137113 05/13/07 01:51 gaskell Target: moved to 4 cm dummy
  • 137112 05/13/07 01:37 cdaq Run 62869: Production - LH2 Q2=1.90
  • 137111 05/13/07 01:01 cdaq Run 62868: Production - LH2 Q2=1.90
  • 137110 05/13/07 00:41 cdaq Run 62867: Production - LH2 Q2=1.90
  • 137109 05/13/07 00:40 gaskell another bad cell in DC 2Y
  • 137108 05/13/07 00:21 cdaq Run 62866: Production - LH2 Q2=1.90
  • 137107 05/13/07 00:19 cdaq Beam Time Accounting
  • 137106 05/13/07 00:00 cdaq Run 62865: Production - LH2 Q2=1.90
  • Saturday

  • 137105 05/12/07 23:57 ent started at 11 pm
  • 137104 05/12/07 23:43 cdaq Run 62864: Production - LH2 Q2=1.90
  • 137103 05/12/07 23:27 bruell Target: moved to LH2 target
  • 137102 05/12/07 23:26 cdaq Run 62863: Production - LH2 Q2=1.90
  • 137101 05/12/07 23:01 cdaq Run 62862: Production - Carbon Q2=1.90
  • 137100 05/12/07 22:11 E. Christy First pass luminosity scan analysis
  • 137099 05/12/07 20:52 ent only problems to date
  • 137098 05/12/07 20:06 cdaq Run 62861: Production - Carbon Q2=2.95
  • 137097 05/12/07 18:34 jmaxwell HV Alarm Sound Check
  • 137096 05/12/07 16:08 cdaq Beam Time Accounting
  • 137095 05/12/07 16:07 Huber Water near Hall C entrance
  • 137094 05/12/07 16:05 Huber HMS problems (yet again)
  • 137093 05/12/07 16:00 Huber Day shift summary
  • 137092 05/12/07 15:45 seva target: screen shot
  • 137091 05/12/07 15:17 cdaq Run 62860: Production - Carbon Q2=2.95
  • 137090 05/12/07 15:00 cdaq Run 62859: Production - Dummy Q2=2.95
  • 137089 05/12/07 14:47 cdaq Run 62858: Production - Dummy Q2=2.95
  • 137088 05/12/07 14:34 cdaq Run 62857: Production - Dummy Q2=2.95
  • 137087 05/12/07 14:28 L.Pentchev ethane bottle changed
  • 137086 05/12/07 14:19 cdaq Run 62856: Production - Dummy Q2=2.95
  • 137085 05/12/07 14:08 cdaq Run 62855: Production - Dummy Q2=2.95
  • 137084 05/12/07 14:08 seva target: changed target from H2 to dummy position
  • 137083 05/12/07 13:35 cdaq Run 62854: Production - LH2 Q2=2.95
  • 137082 05/12/07 13:34 L.Pentchev run 62852 ROC1 error, beam position drifting
  • 137081 05/12/07 13:25 cdaq Run 62853: Production - LH2 Q2=2.95
  • 137080 05/12/07 13:07 cdaq Run 62852: Production - LH2 Q2=2.95
  • 137079 05/12/07 12:56 cdaq Run 62851: Production - LH2 Q2=2.95
  • 137078 05/12/07 12:44 cdaq Run 62850: Production - LH2 Q2=2.95
  • 137077 05/12/07 12:33 cdaq Run 62849: Production - LH2 Q2=2.95
  • 137076 05/12/07 12:20 cdaq Run 62848: Production - LH2 Q2=2.95
  • 137075 05/12/07 12:08 Huber Adjusted beamspot position
  • 137074 05/12/07 12:05 cdaq Run 62847: Production - LH2 Q2=2.95
  • 137073 05/12/07 12:03 L.Pentchev ethane bottle
  • 137072 05/12/07 11:50 cdaq Run 62846: Production - LH2 Q2=2.95
  • 137071 05/12/07 11:36 cdaq Run 62845: Production - LH2 Q2=2.95
  • 137070 05/12/07 11:32 Huber Will have to make an entry to change HMS momentum
  • 137069 05/12/07 11:22 cdaq Run 62844: Production - LH2 Q2=2.95
  • 137068 05/12/07 11:09 cdaq Run 62843: Production - LH2 Q2=2.95
  • 137067 05/12/07 10:58 Huber HMS Q2 communication errors
  • 137066 05/12/07 10:56 cdaq Run 62842: Production - LH2 Q2=2.95
  • 137065 05/12/07 10:47 cdaq Run 62841: Production - LH2 Q2=2.95
  • 137064 05/12/07 10:36 cdaq Run 62840: Production - LH2 Q2=2.95
  • 137063 05/12/07 10:21 cdaq Run 62839: Production - LH
  • 137062 05/12/07 10:04 cdaq Run 62838: Production - LH
  • 137061 05/12/07 10:02 johna Trigger back to SCIN
  • 137060 05/12/07 09:53 cdaq Run 62837: Production - LH
  • 137059 05/12/07 09:36 cdaq Run 62836: Production - LH
  • 137058 05/12/07 09:18 cdaq Run 62835: Production - LH
  • 137057 05/12/07 09:17 cdaq Run 62834: Production - LH
  • 137056 05/12/07 09:12 cdaq Run 62833: Production - LH
  • 137055 05/12/07 09:09 cdaq Run 62832: Production - LH
  • 137054 05/12/07 09:05 cdaq Run 62831: Production - LH
  • 137053 05/12/07 09:03 cdaq Run 62830: Production - LH
  • 137052 05/12/07 08:40 M Jones HMS and SOS ntuple files can also be segmented
  • 137051 05/12/07 08:39 Huber More HMS dipole problems
  • 137050 05/12/07 08:07 hamlet Owl shift summary
  • 137049 05/12/07 08:04 cdaq Beam Time Accounting
  • 137048 05/12/07 08:00 dutta target incident
  • 137047 05/12/07 07:38 dutta target
  • 137046 05/12/07 06:58 dutta target
  • 137045 05/12/07 06:50 dutta target
  • 137044 05/12/07 06:34 cdaq Run 62829: Production - Carbon Single
  • 137043 05/12/07 06:05 cdaq Run 62828: Production - Dummy
  • 137042 05/12/07 05:46 cdaq Run 62827: Production - Dummy
  • 137041 05/12/07 05:32 cdaq Run 62826: Production - Dummy
  • 137040 05/12/07 05:30 dutta target
  • 137039 05/12/07 05:07 cdaq Run 62825: Production - LH2
  • 137038 05/12/07 04:49 cdaq Run 62824: Production - LH2
  • 137037 05/12/07 04:32 cdaq Run 62823: Production - LH2
  • 137036 05/12/07 04:13 cdaq Run 62822: Production - LH2
  • 137035 05/12/07 03:55 cdaq Run 62821: Production - LH2
  • 137034 05/12/07 03:39 cdaq Run 62820: Production - LH2
  • 137033 05/12/07 03:21 cdaq Run 62819: Production - LH2
  • 137032 05/12/07 03:03 cdaq Run 62818: Production - LH2
  • 137031 05/12/07 02:47 hamlet HMS Dipole problem
  • 137030 05/12/07 02:45 cdaq Run 62817: Production - LH2
  • 137029 05/12/07 02:26 cdaq Run 62816: Production - LH2
  • 137028 05/12/07 02:10 cdaq Run 62815: Production - LH2
  • 137027 05/12/07 01:44 cdaq Run 62814: Production - LH2
  • 137025 05/12/07 01:12 dutta target: screen grab/checklist
  • 137024 05/12/07 00:23 cdaq Beam Time Accounting
  • Friday

  • 137023 05/11/07 23:27 ent LH2 luminosity scan - high I
  • 137022 05/11/07 23:11 cdaq Run 62812: Luminosity scan - LH2
  • 137021 05/11/07 23:09 johna BPM screen grab
  • 137020 05/11/07 23:06 bruell Target: moved to LH2 target
  • 137019 05/11/07 23:02 cdaq Run 62811: Luminosity scan - LH2
  • 137018 05/11/07 22:59 ent carbon luminosity scan
  • 137017 05/11/07 22:55 cdaq Run 62810: Luminosity scan - LH2
  • 137016 05/11/07 22:46 cdaq Run 62809: Luminosity scan - LH2
  • 137015 05/11/07 22:27 cdaq Run 62808: Luminosity scan - Carbon
  • 137014 05/11/07 22:21 cdaq Run 62807: Luminosity scan - Carbon
  • 137013 05/11/07 22:08 cdaq Run 62806: Luminosity scan - Carbon
  • 137012 05/11/07 21:27 cdaq Run 62805: Luminosity scan - Carbon
  • 137011 05/11/07 21:24 cdaq Run 62804: Luminosity scan - Carbon
  • 137010 05/11/07 21:14 cdaq Run 62803: Luminosity scan - Carbon
  • 137009 05/11/07 21:08 cdaq Run 62802: Luminosity scan - Carbon
  • 137008 05/11/07 20:57 cdaq Run 62801: Luminosity scan - Carbon
  • 137007 05/11/07 20:51 cdaq Run 62800: Luminosity scan - Carbon
  • 137006 05/11/07 20:44 cdaq Run 62799: Luminosity scan - Carbon
  • 137005 05/11/07 20:37 cdaq Run 62798: Luminosity scan - Carbon
  • 137004 05/11/07 20:30 bruell Target: moved to C target
  • 137003 05/11/07 20:29 cdaq Run 62797: Luminosity scan - Carbon
  • 137002 05/11/07 20:24 ent LH2 luminosity scan (up to now)
  • 137001 05/11/07 20:21 ent waiting for high current
  • 137000 05/11/07 19:40 cdaq Run 62796: Luminosity scan
  • 136999 05/11/07 19:28 cdaq Run 62795: Luminosity scan
  • 136998 05/11/07 19:20 cdaq Run 62794: Luminosity scan
  • 136997 05/11/07 19:03 E. Christy Changed HMS ntuple record length to 4096
  • 136996 05/11/07 18:43 cdaq Run 62793: Luminosity scan
  • 136995 05/11/07 18:33 cdaq Run 62792: Luminosity scan
  • 136994 05/11/07 18:31 cdaq Run 62791: Luminosity scan
  • 136993 05/11/07 18:20 cdaq Run 62790: Luminosity scan
  • 136992 05/11/07 18:14 cdaq Run 62789: Luminosity scan
  • 136991 05/11/07 18:10 ioana luminosity scan
  • 136990 05/11/07 18:08 cdaq Run 62788: Luminosity scan
  • 136989 05/11/07 17:57 cdaq Run 62787: Luminosity scan
  • 136988 05/11/07 17:51 ioana ROC 1 and ROC 2 errors
  • 136987 05/11/07 17:46 cdaq Run 62786: Luminosity scan
  • 136986 05/11/07 17:38 cdaq Run 62785: test
  • 136985 05/11/07 17:36 cdaq Run 62784: test
  • 136984 05/11/07 17:20 cdaq Run 62783: Luminosity scan
  • 136983 05/11/07 17:14 cdaq Run 62782: Luminosity scan
  • 136982 05/11/07 17:00 cdaq Run 62781: Luminosity scan
  • 136981 05/11/07 16:40 cdaq Run 62780: Luminosity scan
  • 136980 05/11/07 16:38 gaskell H00C bpms in adcs
  • 136979 05/11/07 16:16 M Jones Beam Energy Measurement
  • 136978 05/11/07 16:16 cdaq Beam Time Accounting
  • 136977 05/11/07 16:14 Bosted Target: Moved to LH2 (loop 1)
  • 136976 05/11/07 16:12 E. Christy New BCM calibration constants in online replay
  • 136975 05/11/07 16:07 gabriel shift summary
  • 136974 05/11/07 15:02 saw Ozone levels in the hall
  • 136973 05/11/07 14:29 saw New BCM calibration uploaded
  • 136972 05/11/07 14:01 Bosted Turned on SOS D1
  • 136971 05/11/07 13:48 gabriel Energy measurement started
  • 136970 05/11/07 13:32 cdaq Run 62779: HMS mom= 1.121 GeV
  • 136969 05/11/07 13:19 cdaq Run 62778: HMS mom= 1.121 GeV
  • 136968 05/11/07 13:14 albayrak BCM calibration results
  • 136967 05/11/07 13:08 cdaq Run 62777: HMS mom= 1.121 GeV
  • 136966 05/11/07 12:58 cdaq Run 62776: HMS mom= 1.121 GeV
  • 136965 05/11/07 12:49 cdaq Run 62775: HMS mom= 1.121 GeV
  • 136964 05/11/07 12:38 cdaq Run 62774: HMS mom= 1.121 GeV
  • 136963 05/11/07 12:37 Bosted Target: Moved to LH2
  • 136962 05/11/07 12:26 cdaq Run 62773: HMS mom= 1.121 GeV
  • 136961 05/11/07 12:16 Bosted Target: Target: apparanent lifter problem is not real
  • 136960 05/11/07 12:07 Bosted Target: Moved to Carbon
  • 136959 05/11/07 12:07 cdaq Run 62772: HMS mom= 1.36 GeV
  • 136958 05/11/07 11:53 cdaq Run 62771: HMS mom= 1.36 GeV
  • 136957 05/11/07 11:44 cdaq Run 62770: HMS mom= 1.36 GeV
  • 136956 05/11/07 11:43 Bosted Target: Moved to 4 cm Dummy
  • 136955 05/11/07 11:42 gabriel resume production
  • 136954 05/11/07 11:07 gabriel BCM calibration
  • 136953 05/11/07 10:44 saw Sanity check improvements
  • 136952 05/11/07 10:09 Fowler HMS Dipole Trip
  • 136951 05/11/07 09:58 cdaq Run 62769: HMS mom= 1.36 GeV
  • 136950 05/11/07 09:48 ccbutu@login BCM calibrations
  • 136949 05/11/07 09:48 Bosted Target: Target moved to Empty
  • 136948 05/11/07 09:28 ccbutu@jlab. Targer change
  • 136947 05/11/07 09:16 cdaq Run 62768: HMS mom= 1.34 GeV
  • 136946 05/11/07 09:05 cdaq Run 62767: HMS mom= 1.75 GeV
  • 136945 05/11/07 08:53 cdaq Run 62766: HMS mom= 1.75 GeV
  • 136944 05/11/07 08:41 cdaq Run 62765: HMS mom= 1.75 GeV
  • 136943 05/11/07 08:34 cdaq Run 62764: HMS mom= 1.75 GeV
  • 136942 05/11/07 08:34 Bosted Turned on HV for SANE detecters in SOS
  • 136941 05/11/07 08:32 Bosted Turned on HV for SANE detecters in SOS
  • 136940 05/11/07 08:31 ccbutu@jlab. Quads off for a few runs
  • 136939 05/11/07 08:28 Brash Beam: Beam Current Limit Raised to 100uA
  • 136938 05/11/07 08:28 cdaq Run 62763: HMS mom= 1.75 GeV
  • 136937 05/11/07 08:20 Bosted Target: Opened JT valve 2 clicks
  • 136936 05/11/07 08:20 cdaq Run 62762: HMS mom= 1.75 GeV
  • 136935 05/11/07 08:06 cdaq Beam Time Accounting
  • 136934 05/11/07 07:59 johna dipole settling problems
  • 136933 05/11/07 07:57 cdaq Run 62761: HMS mom=+1.36 GeV
  • 136932 05/11/07 07:46 Dutta Owl Shift Summary
  • 136931 05/11/07 07:44 cdaq Run 62760: HMS mom=+1.36 GeV
  • 136930 05/11/07 07:21 cdaq Run 62759: HMS mom=+1.36 GeV
  • 136929 05/11/07 07:01 cdaq Run 62758: HMS mom=+1.36 GeV
  • 136928 05/11/07 06:27 A. Puckett moved to LH2 again
  • 136927 05/11/07 06:24 cdaq Run 62757: HMS mom= 0.94 GeV
  • 136926 05/11/07 06:09 johna HMS dipole NMR not settling at 0.94 GeV
  • 136925 05/11/07 06:03 cdaq Run 62756: HMS mom= 0.94 GeV
  • 136924 05/11/07 05:34 cdaq Run 62755: HMS mom= 1.31 GeV
  • 136923 05/11/07 05:19 cdaq Run 62754: HMS mom= 1.31 GeV
  • 136922 05/11/07 05:04 A. Puckett moved to LH2- apparent lifter problems
  • 136921 05/11/07 04:59 cdaq Run 62753: HMS mom= 1.75 GeV
  • 136920 05/11/07 04:54 dutta pedestals updated
  • 136919 05/11/07 04:45 cdaq Run 62752: HMS mom= 1.75 GeV
  • 136918 05/11/07 03:53 A. Puckett turned OFF beam compensation for now
  • 136917 05/11/07 03:46 A. Puckett beam power calc. working, but we are in empty position
  • 136916 05/11/07 03:37 A. Puckett Moved target to empty
  • 136915 05/11/07 03:30 cdaq Run 62751: HMS mom= 1.75 GeV
  • 136914 05/11/07 03:26 A. Puckett Moved target to dummy position
  • 136913 05/11/07 03:15 cdaq Run 62750: HMS mom= 1.75 GeV
  • 136912 05/11/07 03:08 A. Puckett Loop 1 HPH "beam power" calc. not working
  • 136911 05/11/07 03:08 cdaq Run 62749: HMS mom= 1.75 GeV
  • 136910 05/11/07 02:55 cdaq Run 62748: HMS mom= 1.75 GeV
  • 136909 05/11/07 02:55 dutta BPM screen
  • 136908 05/11/07 02:51 cdaq Run 62747: HMS mom= 1.75 GeV
  • 136907 05/11/07 02:51 dutta BPM screen
  • 136906 05/11/07 02:50 johna 3H00C not readout in ADCs
  • 136905 05/11/07 02:46 dutta BPM screen
  • 136904 05/11/07 02:46 cdaq Run 62746: HMS mom= 1.75 GeV
  • 136903 05/11/07 02:40 cdaq Run 62745: HMS mom= 1.75 GeV
  • 136902 05/11/07 02:40 dutta BPM screen
  • 136901 05/11/07 02:35 dutta BCM screen
  • 136900 05/11/07 02:35 cdaq Run 62744: HMS mom= 1.75 GeV
  • 136899 05/11/07 02:28 A. Puckett Moved target to LH2 (Loop 1)
  • 136898 05/11/07 02:28 johna UPDATED NOMINAL BEAM POSITION
  • 136897 05/11/07 02:27 johna UPDATED NOMINAL BEAM POSITION
  • 136896 05/11/07 02:26 cdaq Run 62743: HMS mom= 1.75 GeV
  • 136895 05/11/07 02:17 johna Raster screen grabs
  • 136894 05/11/07 02:07 dutta BCM screen grab
  • 136893 05/11/07 02:05 cdaq Run 62742: HMS mom= 1.75 GeV
  • 136892 05/11/07 02:00 dutta BCM screen grab
  • 136891 05/11/07 02:00 cdaq Run 62741: HMS mom= 1.75 GeV
  • 136890 05/11/07 01:55 cdaq Run 62740: HMS mom= 1.75 GeV
  • 136889 05/11/07 01:54 johna MCC's definitions of "width" and "height" for faster
  • 136888 05/11/07 01:49 cdaq Run 62739: HMS mom= 1.75 GeV
  • 136887 05/11/07 01:44 cdaq Run 62738: HMS mom= 1.75 GeV
  • 136886 05/11/07 01:38 dutta BCM screen grab
  • 136885 05/11/07 01:37 cdaq Run 62737: HMS mom= 1.75 GeV
  • 136884 05/11/07 01:34 dutta bcm screen grab
  • 136883 05/11/07 01:30 cdaq Run 62736: HMS mom= 1.75 GeV
  • 136882 05/11/07 01:24 johna BPM grabs for x=-4mm, x=-2mm (from nominal)
  • 136881 05/11/07 01:24 cdaq Run 62735: HMS mom= 1.75 GeV
  • 136880 05/11/07 01:18 cdaq Run 62734: HMS mom= 1.75 GeV
  • 136879 05/11/07 01:12 cdaq Run 62733: HMS mom= 1.75 GeV
  • 136878 05/11/07 01:07 cdaq Run 62732: HMS mom= 1.75 GeV
  • 136877 05/11/07 01:00 cdaq Run 62731: HMS mom= 1.75 GeV
  • 136876 05/11/07 00:56 cdaq Run 62730: HMS mom= 1.75 GeV
  • 136875 05/11/07 00:55 ddutta Dummy target horizontal scan
  • 136874 05/11/07 00:54 johna BPM screengrab - nominal position.
  • 136873 05/11/07 00:14 johna hodoscope efficiency tests
  • 136872 05/11/07 00:13 cdaq Run 62729: HMS mom= 1.75 GeV
  • 136871 05/11/07 00:08 cdaq Beam Time Accounting
  • Thursday

  • 136870 05/10/07 23:38 cdaq Run 62728: HMS mom= 1.75 GeV
  • 136869 05/10/07 23:27 cdaq Run 62727: HMS mom= 1.75 GeV
  • 136868 05/10/07 23:25 horn Target: Dummy target in
  • 136867 05/10/07 23:22 johna "fix" for wire with timing offset
  • 136866 05/10/07 23:12 horn Target: Moved to the other empty target position - this one works
  • 136865 05/10/07 22:59 Huber HSX2 HSY2 voltages raised again
  • 136864 05/10/07 22:45 ioana End of run fail
  • 136863 05/10/07 22:44 horn Target: Moved to empty target position
  • 136862 05/10/07 22:35 cdaq Run 62726: HMS mom= 1.75 GeV
  • 136861 05/10/07 22:34 horn HMS hodoscopes - new discriminator values for plane 1
  • 136860 05/10/07 22:26 horn HMS hodoscopes - new discriminator values
  • 136859 05/10/07 22:22 cdaq Run 62725: HMS mom= 1.75 GeV
  • 136858 05/10/07 22:19 horn run 62723 - sieve slit still in
  • 136857 05/10/07 22:18 mack drift map
  • 136856 05/10/07 22:16 horn Configuration changes before run 62724
  • 136855 05/10/07 22:13 cdaq Run 62724: HMS mom= 1.75 GeV
  • 136854 05/10/07 21:57 cdaq Run 62723: HMS mom= 1.75 GeV
  • 136853 05/10/07 21:34 Huber Helium bottle pressure
  • 136852 05/10/07 20:34 horn Target: shift checklist
  • 136851 05/10/07 19:35 johna SCIN --> STOF in HMS trigger input "C"
  • 136850 05/10/07 18:50 johna Bad wire: 2y2, wire#30
  • 136849 05/10/07 18:29 johna CENTRAL BEAM POSITION
  • 136848 05/10/07 18:18 Mbianda run 62699 without tofcal
  • 136847 05/10/07 17:59 cdaq Run 62722: HMS mom= 1. GeV
  • 136846 05/10/07 17:56 Solvignon HcalB5+ and HcalB6+ cabling path
  • 136845 05/10/07 16:14 Solvignon Aerogel ADC are now working fine
  • 136844 05/10/07 16:11 cdaq Beam Time Accounting
  • 136843 05/10/07 15:54 Mbianda Histos after TOF calibration
  • 136842 05/10/07 15:37 Mbianda Histos before TOF calibration
  • 136840 05/10/07 15:31 smithg Target: target checklist/ksnapshot
  • 136839 05/10/07 14:49 Mbianda TOF Calibration
  • 136838 05/10/07 14:43 cdaq Run 62721: HMS mom= 1. GeV
  • 136837 05/10/07 14:30 cdaq Run 62720: HMS mom= 1. GeV
  • 136836 05/10/07 14:22 cdaq Run 62719: COSMICs
  • 136835 05/10/07 14:08 Fowler HMS Ready for remote rotation
  • 136834 05/10/07 14:07 Solvignon HCAL 5+ fixed
  • 136833 05/10/07 13:59 cdaq Run 62718: COSMICs
  • 136832 05/10/07 13:39 mack hodo gain tweaks: Use the Source, Luke
  • 136831 05/10/07 12:45 smithg Target: Good news and bad news
  • 136830 05/10/07 12:35 cdaq Run 62717: COSMICs
  • 136829 05/10/07 12:30 beufait d2 ground fault
  • 136828 05/10/07 12:23 M Jones HSm scint adc spectra for run 62711
  • 136827 05/10/07 11:55 cdaq Run 62716: HMS mom= 1. GeV
  • 136826 05/10/07 11:44 mack DC gap
  • 136825 05/10/07 10:46 M JOnes SOS hut door is closed
  • 136824 05/10/07 10:27 hcf missing wire in hdc2y?
  • 136823 05/10/07 09:43 cdaq Run 62715: Cosmics - HMS and SOS on
  • 136822 05/10/07 09:34 Fowler Normal LHe Level for Q3
  • 136821 05/10/07 09:20 cdaq Run 62714: Cosmics - HMS and SOS on
  • 136820 05/10/07 08:26 Bosted HMS TOF parameters
  • 136819 05/10/07 08:22 cdaq Run 62713: Cosmics - HMS and SOS on
  • 136818 05/10/07 08:07 cdaq Beam Time Accounting
  • 136817 05/10/07 06:49 Dutta Owl Shift Summary (05/10/07)
  • 136816 05/10/07 06:00 cdaq Run 62712: HMS mom= 1. GeV
  • 136815 05/10/07 05:58 Dutta sieve slit run
  • 136814 05/10/07 05:53 dutta HMS rotation not cleared for remote rotation
  • 136813 05/10/07 05:42 dutta HMS rotation failed
  • 136812 05/10/07 05:28 cdaq Run 62711: HMS mom= 1. GeV
  • 136811 05/10/07 05:27 Dutta HMS Pointing run ang =11.5
  • 136810 05/10/07 05:24 seva target: changed target from carbon optics to carbon
  • 136809 05/10/07 05:21 Dutta X-scan (x=1.6)
  • 136808 05/10/07 05:19 cdaq Run 62710: HMS mom= 1. GeV
  • 136807 05/10/07 05:18 Dutta X-scan (x=1.6)
  • 136806 05/10/07 05:18 dutta BPM screen shot x =+1.6
  • 136805 05/10/07 05:12 Dutta X-scan (x=1)
  • 136804 05/10/07 05:12 cdaq Run 62709: HMS mom= 1. GeV
  • 136803 05/10/07 05:10 dutta BPM for x=+1
  • 136802 05/10/07 05:06 Dutta X-scan (x=-1)
  • 136801 05/10/07 05:05 cdaq Run 62708: HMS mom= 1. GeV
  • 136800 05/10/07 05:04 dutta BPM screen for x=-1
  • 136799 05/10/07 05:00 cdaq Run 62707: HMS mom= 1. GeV
  • 136798 05/10/07 04:59 dutta BPM screen shot for x=-2
  • 136797 05/10/07 04:58 Dutta X-scan (x=-2)
  • 136796 05/10/07 04:53 cdaq Run 62706: HMS mom= 1. GeV
  • 136795 05/10/07 04:52 dutta BPM screen shot for y=+2
  • 136794 05/10/07 04:51 Dutta Y-scan with -2.00
  • 136793 05/10/07 04:49 cdaq Run 62705: HMS mom= 1. GeV
  • 136792 05/10/07 04:49 dutta BPM screen shot for y=+1
  • 136791 05/10/07 04:47 Dutta Y-scan with -2.00
  • 136790 05/10/07 04:41 dutta BCM screen shot for y=0
  • 136789 05/10/07 04:35 cdaq Run 62704: HMS mom= 1. GeV
  • 136788 05/10/07 04:35 Dutta Y-scan with -2.00
  • 136787 05/10/07 04:32 cdaq Run 62703: HMS mom= 1. GeV
  • 136786 05/10/07 04:32 dutta BCM Screen shot for y=-2
  • 136785 05/10/07 04:30 Dutta Y-scan with -2.00
  • 136784 05/10/07 04:26 Dutta Y-scan with -3.00
  • 136783 05/10/07 04:25 dutta Y scan (y =-3.0) BCM screen shot
  • 136782 05/10/07 04:22 cdaq Run 62702: HMS mom= 1. GeV
  • 136781 05/10/07 03:36 Dutta Carbon Optics + Sieve slit run
  • 136780 05/10/07 03:35 cdaq Run 62701: HMS mom= 1. GeV
  • 136779 05/10/07 03:27 seva target: changed target from optics 3 foil to carbon optics
  • 136778 05/10/07 03:05 Dutta Optics 3 foil + Sieve slit run
  • 136777 05/10/07 03:05 cdaq Run 62700: HMS mom= 1. GeV
  • 136776 05/10/07 03:05 seva target: problem, target motion stuck
  • 136775 05/10/07 03:04 johna HDC "missing wire" pictures (and HCLOGENTRY script is back)
  • 136774 05/10/07 03:01 Dutta Long Detector Calibration Run
  • 136773 05/10/07 03:00 johna Trigger (scinitillator) efficiency
  • 136772 05/10/07 02:58 johna Gap in DC2
  • 136771 05/10/07 02:48 cdaq Run 62699: HMS mom= 1. GeV
  • 136770 05/10/07 02:47 Dutta Long Detector Calibration Run
  • 136769 05/10/07 02:46 johna BASIC REPLAY PROCEDURES
  • 136768 05/10/07 02:37 johna HMS aerogel
  • 136767 05/10/07 02:25 E. Christy vertical beam centering
  • 136766 05/10/07 01:59 johna CODA "sanity checks"
  • 136765 05/10/07 01:30 cdaq Run 62698: HMS mom= 1. GeV
  • 136764 05/10/07 01:23 cdaq Run 62697: HMS mom= 1. GeV
  • 136763 05/10/07 01:22 Dutta Y scan on Dummy target with sieveslits
  • 136762 05/10/07 01:18 Dutta Target IOC reboot
  • 136761 05/10/07 01:11 Dutta Horizontal beam scan on Dummy target
  • 136760 05/10/07 01:08 cdaq Run 62696: HMS mom= 1. GeV
  • 136759 05/10/07 01:03 Dutta Horizontal beam scan on Dummy target
  • 136758 05/10/07 00:55 Dutta Horizontal beam scan on Dummy target
  • 136757 05/10/07 00:53 cdaq Run 62695: HMS mom= 1. GeV
  • 136756 05/10/07 00:34 Dutta Horizontal beam scan on Dummy target
  • 136755 05/10/07 00:33 cdaq Run 62694: HMS mom= 1. GeV
  • 136754 05/10/07 00:33 seva target: ioc got stuck
  • 136753 05/10/07 00:30 cdaq Run 62693: HMS mom= 1. GeV
  • 136752 05/10/07 00:30 Dutta Horizontal beam scan on Dummy target
  • 136751 05/10/07 00:23 Dutta Horizontal beam scan on Dummy target
  • 136750 05/10/07 00:22 cdaq Run 62692: HMS mom= 1. GeV
  • 136749 05/10/07 00:15 Solvignon Calorimeter fixes and pending problem
  • 136748 05/10/07 00:02 cdaq Run 62691: HMS mom= 1. GeV
  • 136747 05/10/07 00:02 cdaq Beam Time Accounting
  • Wednesday

  • 136746 05/09/07 23:58 mack 0.5 cm gap in X_fp
  • 136745 05/09/07 23:56 cdaq Run 62690: HMS mom= 1. GeV
  • 136744 05/09/07 23:46 adaniel target changed to dummy
  • 136743 05/09/07 23:45 cdaq Run 62689: HMS mom= 1. GeV
  • 136742 05/09/07 23:35 cdaq Run 62688: HMS mom= 1. GeV
  • 136741 05/09/07 23:24 cdaq Run 62687: HMS mom= 1. GeV
  • 136740 05/09/07 23:18 ioana sieve slit x vs y plot
  • 136739 05/09/07 23:06 Solvignon test hclog
  • 136738 05/09/07 23:04 cdaq Run 62686: HMS mom= 1. GeV
  • 136737 05/09/07 23:02 cdaq Run 62685: HMS mom= 1. GeV
  • 136736 05/09/07 22:58 Huber Optics check completed, back to PION collimator
  • 136735 05/09/07 22:48 cdaq Run 62684: HMS mom= 1. GeV
  • 136734 05/09/07 22:45 Huber HMS collimator is now sieve slit
  • 136733 05/09/07 22:38 cdaq Run 62683: HMS mom= 1. GeV
  • 136732 05/09/07 22:32 johna Problems (?) with H00A harp scans
  • 136731 05/09/07 22:27 cdaq Run 62682: HMS mom= 1. GeV
  • 136730 05/09/07 22:20 cdaq Run 62681: HMS mom= 1. GeV
  • 136729 05/09/07 22:15 cdaq Run 62680: HMS mom= 1. GeV
  • 136728 05/09/07 22:04 Huber HARP scans
  • 136727 05/09/07 22:01 cdaq Run 62679: HMS mom= 1. GeV
  • 136726 05/09/07 22:00 Huber Runs 62676, 62677
  • 136725 05/09/07 21:35 cdaq Run 62678: HMS mom= 1. GeV
  • 136724 05/09/07 21:24 cdaq Run 62677: HMS mom= 1. GeV
  • 136723 05/09/07 21:22 cdaq Run 62676: HMS mom= 1. GeV
  • 136722 05/09/07 20:34 cdaq Run 62675: HMS mom= 1. GeV
  • 136721 05/09/07 20:34 ioana HMS magnet trouble
  • 136720 05/09/07 20:25 ioana missing HMS magnet alarms
  • 136719 05/09/07 20:17 Huber HMS Collimator is now PION
  • 136718 05/09/07 20:09 Huber Run 62673
  • 136717 05/09/07 20:08 cdaq Run 62674: HMS mom= 1. GeV
  • 136716 05/09/07 19:45 cdaq Run 62673: HMS mom= 1. GeV
  • 136715 05/09/07 18:27 horn Restarted betabrite display
  • 136714 05/09/07 18:19 adaniel SOS HV off
  • 136713 05/09/07 18:09 gaskell SOS pumped down
  • 136712 05/09/07 18:08 Solvignon/ A HMS hodoscopes: increased HVs
  • 136711 05/09/07 18:08 gaskell SOS doors stuck open
  • 136710 05/09/07 18:03 cdaq Beam Time Accounting
  • 136709 05/09/07 16:43 johna Error in HV change
  • 136708 05/09/07 16:35 beaufait The target analog signals
  • 136707 05/09/07 16:31 johna Lowered HV of HMS calorimeter block HA6-
  • 136706 05/09/07 16:22 Solvignon/ A Bottom gas cerenkov HV raised by 10V.
  • 136705 05/09/07 16:19 smithg Target: Loop assignments
  • 136704 05/09/07 15:39 Solvignon HCAL 5+ and 6+ cables switched at Hall patch panel
  • 136703 05/09/07 15:31 saw Bad ethernet to sfihms fixed
  • 136702 05/09/07 15:27 saw Aerogel 8- tube was knocked off
  • 136701 05/09/07 15:27 hcf PropTube HV's turned on.
  • 136700 05/09/07 15:18 smithg Target: wrapup estimate
  • 136699 05/09/07 15:16 horn HMS angle floor marks
  • 136698 05/09/07 15:14 horn HMS angle limits
  • 136697 05/09/07 15:12 M Jones SOS Lucite Left signal cable was unplugged
  • 136696 05/09/07 15:11 hcf Repaired -5 and Vth connections to SOS DC1
  • 136695 05/09/07 15:03 smithg Target: missing phone
  • 136694 05/09/07 14:57 horn HMS Hall probes zeroed
  • 136693 05/09/07 14:55 beaufait hms wire chamber cover removal
  • 136692 05/09/07 14:54 horn HMS dipole problems - resolved for now
  • 136691 05/09/07 14:28 Solvignon Change in detector map for HCAL B13-
  • 136690 05/09/07 14:20 M Jones Turned SOS hodo and DC HV on
  • 136689 05/09/07 14:20 M Jones SOS adc cable
  • 136688 05/09/07 13:17 Solvignon Hodoscope figure
  • 136687 05/09/07 12:21 M Jones Raster in "Hall C" mode
  • 136686 05/09/07 12:04 Solvignon HMS hodoscope performance in beam
  • 136685 05/09/07 11:37 Solvignon/Ch Hodoscope: back to normal configuration
  • 136684 05/09/07 11:35 Solvignon/Ch Plexiglass on wire chamber plane
  • 136683 05/09/07 11:17 saw A DAQ problem found (but not yet fixed)
  • 136682 05/09/07 11:16 smithg Target: Cross-contamination test results
  • 136681 05/09/07 10:22 mack Hooked BCM2 back up again
  • 136680 05/09/07 10:19 Solvignon Drift chamber: alcohol added to the gas bubbles
  • 136679 05/09/07 10:05 M Jones Running Superharp and superharp analysis is done by MCC
  • 136678 05/09/07 09:58 saw Checking out DAQ
  • 136677 05/09/07 09:56 saw Beam: BCM status
  • 136676 05/09/07 08:03 cdaq Beam Time Accounting
  • 136675 05/09/07 07:59 gaskell no scans
  • 136674 05/09/07 07:56 gaskell harps in C line
  • 136673 05/09/07 07:48 gaskell raster is in "gzero" mode
  • 136672 05/09/07 05:51 johna sieve slit run
  • 136671 05/09/07 05:18 dutta Beam: Superharp scan analysis failed
  • 136670 05/09/07 04:48 cdaq Run 62670: HMS dipole mistuned slightly, rest at 1.2 GeV
  • 136669 05/09/07 04:22 johna No aerogel signal?
  • 136668 05/09/07 04:20 johna fast raster readback
  • 136667 05/09/07 04:17 johna HMS calorimeter miscabling or bad map?
  • 136666 05/09/07 04:05 johna Trigger for 'calibration' run
  • 136665 05/09/07 04:01 johna Calibration run (98% pions, 2% electrons): Run #62669
  • 136664 05/09/07 04:00 johna calorimeter gain matching
  • 136663 05/09/07 03:35 cdaq Run 62669: HMS dipole mistuned slightly, rest at 1.2 GeV
  • 136662 05/09/07 03:32 cdaq Run 62668: HMS dipole mistuned slightly, rest at 1.2 GeV
  • 136661 05/09/07 03:25 johna DAQ freezeup
  • 136660 05/09/07 03:22 cdaq Run 62667: HMS dipole mistuned slightly, rest at 1.2 GeV
  • 136659 05/09/07 03:16 cdaq Run 62666: HMS dipole mistuned slightly, rest at 1.2 GeV
  • 136658 05/09/07 03:12 cdaq Run 62665: HMS dipole mistuned slightly, rest at 1.2 GeV
  • 136657 05/09/07 03:09 cdaq Run 62664: HMS dipole mistuned slightly, rest at 1.2 GeV
  • 136656 05/09/07 03:06 cdaq Run 62663: HMS dipole mistuned slightly, rest at 1.2 GeV
  • 136655 05/09/07 03:04 johna CODA gets run failed errors >50% of the time
  • 136654 05/09/07 03:03 johna Tried HMS mode (instead of COIN mode)
  • 136653 05/09/07 03:02 cdaq Run 62662: HMS dipole mistuned slightly, rest at 1.2 GeV
  • 136652 05/09/07 03:00 johna Thresholds problem
  • 136651 05/09/07 02:57 cdaq Run 62661: HMS dipole mistuned slightly, rest at 1.2 GeV
  • 136650 05/09/07 02:53 cdaq Run 62660: HMS dipole mistuned slightly, rest at 1.2 GeV
  • 136649 05/09/07 02:51 johna Problems running at high rate (and sparsification not working)
  • 136648 05/09/07 02:50 cdaq Run 62659: HMS dipole mistuned slightly, rest at 1.2 GeV
  • 136647 05/09/07 02:48 cdaq Run 62658: HMS dipole mistuned slightly, rest at 1.2 GeV
  • 136646 05/09/07 02:42 cdaq Run 62657: HMS dipole mistuned slightly, rest at 1.2 GeV
  • 136645 05/09/07 02:38 cdaq Run 62656: HMS dipole mistuned slightly, rest at 1.2 GeV
  • 136644 05/09/07 02:30 cdaq Run 62655: HMS dipole mistuned slightly, rest at 1.2 GeV
  • 136643 05/09/07 02:26 johna Pion collimator put in
  • 136642 05/09/07 02:20 cdaq Run 62654: HMS dipole mistuned slightly, rest at 1.2 GeV
  • 136641 05/09/07 02:14 johna Raised CER threshold in trigger
  • 136640 05/09/07 02:04 cdaq Run 62653: HMS dipole mistuned slightly, rest at 1.2 GeV
  • 136639 05/09/07 01:56 Lassiter HMS Dipole NMR/PSU
  • 136638 05/09/07 01:45 cdaq Run 62652: Back to 3/4 running for detector checks (buffered mode)
  • 136637 05/09/07 01:38 cdaq Run 62651: Back to 3/4 running for detector checks (buffered mode)
  • 136636 05/09/07 01:31 cdaq Run 62650: Back to 3/4 running for detector checks (buffered mode)
  • 136635 05/09/07 01:27 johna HMS dipole problems
  • Tuesday

  • 136634 05/08/07 23:43 adaniel Target check list
  • 136633 05/08/07 23:34 adaniel Target changed to Carbon
  • 136632 05/08/07 21:25 adaniel SOS hodoscope and drfit chamber HV is off.
  • 136631 05/08/07 20:39 Huber Hall C Beam Permit
  • 136630 05/08/07 18:49 cdaq Run 62649: Back to 3/4 running for detector checks (buffered mode)
  • 136629 05/08/07 18:13 M Jones Change to engine
  • 136628 05/08/07 18:02 Solvignon/ M HMS hodo h1X11- problem
  • 136627 05/08/07 17:53 cdaq Run 62648: Back to 3/4 running for detector checks (buffered mode)
  • 136626 05/08/07 17:44 cdaq Run 62647: Back to 3/4 running for detector checks (buffered mode)
  • 136625 05/08/07 17:40 cdaq Run 62646: Back to 3/4 running for detector checks (buffered mode)
  • 136624 05/08/07 17:30 cdaq Run 62645: Back to 3/4 running for detector checks (buffered mode)
  • 136623 05/08/07 17:27 smithg Target: Moved to empty/no target position
  • 136622 05/08/07 17:21 cdaq Run 62644: Back to 3/4 running for detector checks (buffered mode)
  • 136621 05/08/07 17:09 hcf temporary fix to sdc1u1,2
  • 136620 05/08/07 17:06 cdaq Run 62643: Back to 3/4 running for detector checks (buffered mode)
  • 136619 05/08/07 17:04 smithg Target: Even More target woes- no cooldown before Thursday at least
  • 136618 05/08/07 16:55 cdaq Run 62642: Back to 3/4 running for detector checks (buffered mode)
  • 136617 05/08/07 16:44 cdaq Run 62641: Back to 3/4 running for detector checks (buffered mode)
  • 136616 05/08/07 16:35 cdaq Run 62640: Back to 3/4 running for detector checks (buffered mode)
  • 136615 05/08/07 16:27 cdaq Run 62639: Back to 3/4 running for detector checks (buffered mode)
  • 136614 05/08/07 16:08 cdaq Run 62638: Back to 3/4 running for detector checks (buffered mode)
  • 136613 05/08/07 15:43 smithg Target: More target woes
  • 136612 05/08/07 15:39 cdaq Run 62637: Back to 3/4 running for detector checks (buffered mode)
  • 136611 05/08/07 15:27 cdaq Run 62636: Back to 3/4 running for detector checks (buffered mode)
  • 136610 05/08/07 15:07 cdaq Run 62635: Back to 3/4 running for detector checks (buffered mode)
  • 136609 05/08/07 14:29 smithg Target: Trouble
  • 136608 05/08/07 14:14 cdaq Run 62634: Back to 3/4 running for detector checks (buffered mode)
  • 136607 05/08/07 13:48 kenyon HMS windows and vacuum
  • 136606 05/08/07 13:35 kenyon New SOS entrance window installed
  • 136605 05/08/07 12:10 saw Did not see any buffered mode problems.
  • 136604 05/08/07 12:09 cdaq Run 62633: Back to 3/4 running for detector checks (buffered mode)
  • 136603 05/08/07 11:50 cdaq Run 62632: SOS and HMS 1/4 trigger to look for buf mode problems
  • 136602 05/08/07 11:43 saw CIP added for ROC1 Slot 18
  • 136601 05/08/07 11:00 mack adjusted Unser offset
  • 136600 05/08/07 09:47 smithg Target: Target cooldown procedure started
  • Monday

  • 136599 05/07/07 19:55 cdaq Run 62631: 3/4 cosmics for detector checks (buffered mode)
  • 136598 05/07/07 19:20 johna Trigger cleanup
  • 136597 05/07/07 19:10 cdaq Run 62630: 3/4 cosmics (buffered mode)
  • 136596 05/07/07 17:53 smithg Target: Target status
  • 136595 05/07/07 17:06 cdaq Run 62629: COIN mode test. Works now.
  • 136594 05/07/07 16:55 cdaq Run 62627: COIN mode test with sfisos disabled.
  • 136593 05/07/07 16:50 cdaq Run 62626: COIN mode test with sfisos disabled.
  • 136592 05/07/07 16:47 cdaq Run 62625: COIN mode tests. SOS Prescaled out.
  • 136591 05/07/07 16:03 cdaq Run 62624: Back to 3/4 running for detector checks (buffered mode)
  • 136590 05/07/07 15:44 cdaq Run 62623: Back to 3/4 running for detector checks (buffered mode)
  • 136589 05/07/07 14:11 cdaq Run 62622: Back to 3/4 running for detector checks (buffered mode)
  • 136588 05/07/07 13:06 cdaq Run 62621: HMS configuration for detector check.
  • 136587 05/07/07 13:00 saw COIN mode broken at moment
  • 136586 05/07/07 12:58 cdaq Run 62620: Unbuffered to see if event builder errors go away. They don't
  • 136585 05/07/07 12:55 cdaq Run 62619: HMS mode to investigate event builder errors
  • 136584 05/07/07 12:51 cdaq Run 62618: Testing SOS wire chamber readout
  • 136583 05/07/07 12:46 cdaq Run 62617: Testing SOS wire chamber readout
  • 136582 05/07/07 12:38 cdaq Run 62616: Testing SOS wire chamber readout
  • 136581 05/07/07 12:17 cdaq Run 62615: Testing SOS wire chamber readout
  • 136580 05/07/07 11:47 cdaq Run 62614: Testing SOS wire chamber readout
  • 136579 05/07/07 11:26 mack Final Spring 07 Unser calibration constant
  • 136578 05/07/07 11:21 cdaq Run 62613: Testing SOS wire chamber readout
  • 136576 05/07/07 11:02 cdaq Run 62612: Back to 3/4 running for detector checks (buffered mode)
  • 136575 05/07/07 10:37 beaufait sos fast-buss is back on line
  • 136574 05/07/07 10:20 mack BCM temperature regulating fine
  • Sunday

  • 136572 05/06/07 23:53 cdaq Run 62611: Back to 3/4 running for detector checks (buffered mode)
  • 136571 05/06/07 23:35 cdaq Run 62611: 3/4 running for detector checks (buffered mode)
  • 136570 05/06/07 18:23 johna HMS Scin thresholds lowered to 40mV
  • 136569 05/06/07 18:22 cdaq Run 62609: Back to 3/4 running for detector checks (buffered mode)
  • 136568 05/06/07 16:52 johna more DAQ checks (buffered mode and SOS DC start signal)
  • 136567 05/06/07 16:45 cdaq Run 62608: Back to 3/4 running for detector checks (buffered mode)
  • 136566 05/06/07 16:39 cdaq Run 62607: Buffer test 3/4 (buffered mode)
  • 136565 05/06/07 16:35 cdaq Run 62606: another buffering test - replace HKS DC busy signal going into TS with the TDC CIP signal.
  • 136564 05/06/07 16:03 johna visual scalars
  • 136563 05/06/07 16:00 johna More tests of buffered mode
  • 136562 05/06/07 15:54 cdaq Run 62605: Back to 3/4 running for detector checks (buffered mode)
  • 136561 05/06/07 15:48 cdaq Run 62604: Back to 3/4 running for detector checks (buffered mode)
  • 136560 05/06/07 15:46 cdaq Run 62603: Back to 3/4 running for detector checks (buffered mode)
  • 136559 05/06/07 15:37 cdaq Run 62602: 1/4 HMS & SOS for buffer checks (buffered mode)
  • 136558 05/06/07 15:34 cdaq Run 62601: 1/4 HMS & SOS for buffer checks (buffered mode)
  • 136557 05/06/07 15:30 cdaq Run 62600: 1/4 HMS & SOS for buffer checks (buffered mode)
  • 136556 05/06/07 15:26 cdaq Run 62599: HMS 1/4 running for buffer test (buffered mode)
  • 136555 05/06/07 14:39 cdaq Run 62598: Cosmics 3/4 trigger for HMS & SOS with new SOS thresholds.
  • 136554 05/06/07 14:37 E. Christy, Updated SOS thresholds file.
  • 136553 05/06/07 12:23 smithg Target: Leaks. So no cooldown Monday morning.
  • 136552 05/06/07 10:46 Solvignon HMS hodoscope checks
  • 136551 05/06/07 10:40 cdaq Run 62597: Back to 3/4 running for detector checks (buffered mode)
  • 136550 05/06/07 10:20 cdaq Run 62596: Back to 3/4 running for detector checks (buffered mode). Checking H2Y07+ and -.
  • Saturday

  • 136549 05/05/07 17:30 cdaq Run 62595: Back to 3/4 running for detector checks (buffered mode)
  • 136548 05/05/07 17:27 johna Buffering tests
  • 136547 05/05/07 17:25 cdaq Run 62594: Test run for buffered mode. 1/4 trigger for HMS and SOS
  • 136546 05/05/07 17:20 cdaq Run 62593: Test run for buffered mode. 1/4 trigger for HMS and SOS
  • 136545 05/05/07 17:16 i. Albayrak, Additional HMS detector check out with cosmics
  • Friday

  • 136544 05/04/07 18:47 cdaq Run 62592: Cosmics 3/4 HMS & SOS
  • 136543 05/04/07 18:42 cdaq Run 62591: Cosmics: HMS & SOS trigger = 1/4
  • 136542 05/04/07 18:10 cdaq Run 62590: Cosmics, HMS trigger to 3/4, SOS trigger to 3/4
  • 136541 05/04/07 18:10 smithg Target: Target basically ready for cooldown
  • 136540 05/04/07 18:06 cdaq Run 62589: Cosmic test, SOS trigger at 3/4, changed SOS thresholds
  • 136539 05/04/07 17:13 saw Buffered mode seems OK
  • 136538 05/04/07 16:31 fowler Problem with Q3
  • 136537 05/04/07 16:06 cdaq Run 62588: COIN mode test. Test of buffered mode
  • 136536 05/04/07 10:28 beaufait taget readout
  • 136535 05/04/07 10:26 saw COIN mode tested
  • 136534 05/04/07 10:18 cdaq Run 62587: COIN mode test.
  • 136533 05/04/07 10:12 cdaq Run 62586: COIN mode test.
  • 136532 05/04/07 10:06 cdaq Run 62585: COIN mode test.
  • Thursday

  • 136531 05/03/07 18:36 mack run 62583 is a new Unser wire calibration
  • 136530 05/03/07 17:03 mack Preliminary Unser wire calibration
  • 136529 05/03/07 15:11 M Jones SOS daq
  • 136528 05/03/07 13:38 mack Thermocouple cable quality control
  • 136527 05/03/07 11:12 M Jones Reading HMS Cerenkov pressure by camera
  • 136526 05/03/07 09:31 mack BCM regulation notes/progress
  • Wednesday

  • 136525 05/02/07 18:42 E. Christy Change SOS cosmic trigger to 3/4 - start run 62576
  • 136524 05/02/07 18:09 E. Christy SOS hodoscope HV on
  • 136523 05/02/07 18:08 E. Christy SOS cosmic checks - runs 62574 - 62575
  • 136522 05/02/07 18:02 M Jones Updated Analyzer
  • 136521 05/02/07 17:08 mack BCM cavity temperature regulation
  • 136520 05/02/07 15:52 mack ongoing Unser checkout - notes
  • 136519 05/02/07 15:23 cdaq Run 62572: Test of coda scripts
  • 136517 05/02/07 11:04 Solvignon Cerenkov HV adjusted
  • 136516 05/02/07 09:27 cdaq Run 62561: Trigger: 2X(for Cherenkov single photon study)
  • 136515 05/02/07 08:43 Solvignon Hcal: unstability problem seems to be solved.
  • Tuesday

  • 136514 05/01/07 15:45 hcf Please monitor the drift chamber gas supply
  • 136513 05/01/07 11:50 saw,beaufait Restored DAQ to include HMS wire chambers
  • 136512 05/01/07 11:09 beaufait hms faftbus fan
    Search this logbook:

    This file generated by /group/hallc/www/hallcweb/apps/logbooks/hclog/src/hclogscript version HC2.12
    If you have any comments or problems, please contact:
    Stephen A. Wood
    saw@jlab.org
    (757) 269-7367