Jefferson Lab Hall C Logbook for May 07 - runstarts omitted
Main INDEX
Thursday
138425 05/31/07 23:49 A. Puckett end of shift target snapshots
138424 05/31/07 22:57 jmaxwell Shift Checklist, May 31
138422 05/31/07 22:23 A. Puckett target: moved to Carbon
138421 05/31/07 21:02 horn run ends with dipole problems and target IOC reboot
138420 05/31/07 21:01 A. Puckett target: Lifter Status "error"
138419 05/31/07 21:00 A. Puckett target: Alarm Setpoint Changes
138418 05/31/07 20:54 horn HMS dipole communication errors
138417 05/31/07 20:49 A. Puckett Ballast Pressure issue: H vs. D?
138416 05/31/07 20:47 jmaxwell BCM/BPM grabs
138415 05/31/07 20:45 A. Puckett Red Alarms, Alarm Handler, funky limits after target IOC reboot
138412 05/31/07 19:21 A. Puckett target: moved to Copper
138411 05/31/07 16:54 saw vmec18 is back too (HMS Quad hall probes)
138410 05/31/07 16:43 M JOnes SOS Quad is down
138409 05/31/07 16:42 M Jones SOS vmec19 back
138408 05/31/07 16:04 cdaq Beam Time Accounting
138407 05/31/07 15:55 Solvignon Shift summary
138406 05/31/07 15:11 Lassiter HMS DIpole lost communication
138405 05/31/07 14:52 dunne Target: Position FSD restored
138403 05/31/07 14:24 M Jones Epics values for HMS Quad set current
138402 05/31/07 11:53 M JOnes SOS vmec19 not responding
138401 05/31/07 11:52 horn HMS magnet information in start run scripts
138400 05/31/07 11:43 M Jones SOS and tracker work
138399 05/31/07 11:36 horn run 63466 is a cosmic run
138397 05/31/07 09:42 Fowler Dipole NMR Comm Error
138396 05/31/07 09:36 Solvignon Hall C in controlled access
138394 05/31/07 08:29 smithg Target: tgt operator notification
138392 05/31/07 08:19 cdaq Beam Time Accounting
138391 05/31/07 08:00 dalton Shift Summary
138390 05/31/07 07:57 vahe Target status GUI, end of shift
138389 05/31/07 07:39 mahbub Shift checklist
138388 05/31/07 06:48 mahbub BPm BCM screens
138386 05/31/07 06:41 vahe Change target to 4 cm Dummy
138380 05/31/07 02:25 vahe Move target to LD2
138378 05/31/07 02:01 dunne EPICS archiver
138377 05/31/07 01:57 vahe Change target to 4 cm Dummy
138376 05/31/07 01:45 vahe Move target to Iron
138375 05/31/07 01:14 dunne Target: New procedure for target motion
138372 05/31/07 00:01 vahe Start of shift, Target status GUI
138371 05/31/07 00:01 cdaq Beam Time Accounting
138370 05/31/07 00:00 horn Swing Shift Summary
Wednesday
138369 05/30/07 23:52 A. Puckett End-of-shift target snapshots:
138368 05/30/07 23:20 jmaxwell Shift Checklist, May 30
138367 05/30/07 23:16 jmaxwell BCM/BPM grabs
138366 05/30/07 22:50 A. Puckett target: Moved to Carbon
138363 05/30/07 20:44 A. Puckett target: moved to dummy
138359 05/30/07 18:41 horn beam off for Hall A BCM calibration
138358 05/30/07 18:29 A. Puckett target: moved to LD2
138357 05/30/07 18:08 smithg Target: new administrative control
138356 05/30/07 16:56 A. Puckett target: Moved to Copper
138354 05/30/07 16:30 A. Puckett target: moved to BeO
138353 05/30/07 16:02 cdaq Beam Time Accounting
138352 05/30/07 15:52 hamlet Day shift summary, 30 May 2007
138351 05/30/07 14:59 hamlet No Beam due to Hall B study, Controlled Access for target FSD
138350 05/30/07 14:39 hamlet Have problem to put Fe target in correct position
138346 05/30/07 12:50 beaufait sos dipole trip
138344 05/30/07 12:25 hamlet Controlled Access for SOS magnets
138341 05/30/07 09:37 hamlet Beam OFF for Hall A BCM calibration
138339 05/30/07 08:15 cdaq Beam Time Accounting
138338 05/30/07 08:09 dalton Owl Shift Summary
138337 05/30/07 08:09 dalton Owl Shift Summary
138335 05/30/07 07:57 vahe Target lifter comunication problem
138333 05/30/07 06:18 vahe Change target to Carbon
138330 05/30/07 04:17 vahe Change target to Dummy
138329 05/30/07 04:17 vahe Change Target to LD2 (late log)
138328 05/30/07 04:16 vahe Change target to Dummy (Late log)
138327 05/30/07 03:49 dalton Magnet control confusion
138321 05/30/07 00:10 vahe Target status start of shift
138320 05/30/07 00:06 cdaq Beam Time Accounting
138319 05/30/07 00:03 horn Swing Shift Summary
Tuesday
138318 05/29/07 23:56 saw Photo of "Bender"
138317 05/29/07 23:50 A. Puckett end-of-shift target snapshots, pt. 1
138315 05/29/07 23:25 dunne Target: Target lifter problem resolved
138313 05/29/07 22:28 jmaxwell Shift Checklist, May 29
138312 05/29/07 22:25 A. Puckett target: moved to Copper
138311 05/29/07 21:59 jmaxwell BPM, BCM Screen Grab
138307 05/29/07 20:50 horn DAQ problems - resolved
138296 05/29/07 19:05 A. Puckett target: moved to Carbon
138295 05/29/07 18:49 cdaq Beam Time Accounting
138294 05/29/07 18:39 horn Kinematics setup
138293 05/29/07 18:37 M JOnes SOS D1 faults on "InpCur"
138292 05/29/07 18:30 M Jones SOS s1y2- had overvoltage problem, moved to channel 8 in crate 13
138290 05/29/07 16:21 kenyon A can pump controller bad
138289 05/29/07 16:02 kenyon Shaft seal leak on BL turbo fore pump
138288 05/29/07 16:00 kenyon Be window chiller H20 level ok
138287 05/29/07 16:00 kenyon HMS, BL, and SOS vacuum status
138286 05/29/07 15:55 kenyon SOS door problem and operation reminder
138284 05/29/07 15:08 Solvignon HMS HVs are now on
138283 05/29/07 14:29 Solvignon Moved target to empty for MCC beam tests
138282 05/29/07 14:26 Solvignon Target is ready
138281 05/29/07 14:17 E. Christy HMS trigger change from p -> e- running
138280 05/29/07 14:17 E. Christy HMS trigger change from p -> e- running
138279 05/29/07 12:05 hamlet SHMS "Bender prototype" back in pivot
138278 05/29/07 12:01 hamlet HMS Aerogel moved out
138277 05/29/07 10:23 beaufait camera on nmr
Monday
138276 05/28/07 21:22 cdaq Beam Time Accounting
138275 05/28/07 20:32 ent swing shift summary
138274 05/28/07 20:27 bruell Target: moved to C target
138270 05/28/07 18:31 bruell Beam: no beam for 20 minutes
138267 05/28/07 16:08 cdaq Beam Time Accounting
138266 05/28/07 16:03 hamlet Day shift summary, 28 May 2007
138264 05/28/07 15:28 Solvignon Moved target from Dummy to LH2
138262 05/28/07 14:52 Solvignon Target screens
138261 05/28/07 14:49 Solvignon Target moved from LH2 to Dummy
138258 05/28/07 11:49 hamlet Beam OFF since 11:20
138256 05/28/07 10:11 Solvignon Move target from carbon to LH2
138254 05/28/07 10:03 Solvignon Move target from dummy to carbon
138252 05/28/07 09:15 hamlet Beam OFF since 09:00
138251 05/28/07 08:58 Solvignon Problem encountered moving the target: now fine
138249 05/28/07 08:54 Solvignon Move to dummy
138248 05/28/07 08:01 K. Hafidi Owl shift summary
138247 05/28/07 08:01 cdaq Beam Time Accounting
138245 05/28/07 05:43 Hafidi BPM and BCM scans
138244 05/28/07 04:31 Danagoulian Target: TgtIOC reboot
138240 05/28/07 00:09 cdaq Beam Time Accounting
138239 05/28/07 00:03 Danagoulian Target: Target status
138238 05/28/07 00:02 Danagoulian Target: Target status
Sunday
138237 05/27/07 23:51 ent swing shift summary
138236 05/27/07 23:51 ent Q^2 = 5.08 kinematics
138234 05/27/07 23:39 bruell Target: moved to LH2 target
138233 05/27/07 23:25 bruell Target: moved to Carbon target
138230 05/27/07 22:29 ent general plan until tomorrow
138229 05/27/07 22:27 bruell target screen
138227 05/27/07 22:23 bruell Target: moved to dummy target
138224 05/27/07 20:07 bruell Beam: vacuum valve problems
138220 05/27/07 16:06 cdaq Beam Time Accounting
138219 05/27/07 15:45 Reimer Day shift summary
138218 05/27/07 15:37 Reimer Q^2=5.76 kinematics
138216 05/27/07 15:29 adaniel Target: changed from Carbon to LH2
138215 05/27/07 15:13 adaniel Target: changed from Dummy to Carbon
138213 05/27/07 14:58 adaniel Target: changed from LH2 to Dummy
138207 05/27/07 14:13 adaniel Target: changed from Carbon to LH2
138205 05/27/07 14:01 adaniel Target: changed from Dummy to Carbon
138202 05/27/07 13:31 Reimer BPM BCM
138200 05/27/07 12:58 Reimer Beam off
138199 05/27/07 12:57
138198 05/27/07 12:42 adaniel Target: changed from LH2 to dummy
138195 05/27/07 11:54 Fowler Dipole communication reset
138194 05/27/07 11:41 adaniel Target: Alarm
138193 05/27/07 11:08 Reimer HMS communication error--Hall access
138192 05/27/07 10:43 Reimer HMS communication error
138191 05/27/07 09:46 adaniel Target: target alarm
138190 05/27/07 08:43 Reimer Accelerator down for LCW leak fix
138189 05/27/07 08:41 Reimer PS1 = 2 for runs 63374-63377
138186 05/27/07 08:26 adaniel Target: target gui
138184 05/27/07 08:12 K. Hafidi Owl shift summary
138183 05/27/07 08:08 cdaq Beam Time Accounting
138180 05/27/07 07:58 Danagoulian Target: Hydrogen target, 7:57 a.m.
138179 05/27/07 07:40 Danagoulian Target: Carbon, 7:40 a.m.
138174 05/27/07 06:27 Danagoulain Target: Target moved to dummy
138173 05/27/07 06:27 Danagoulain Target: Target moved to dummy
138172 05/27/07 05:17 Danagoulian Target: Alarm at 5:09 a.m.
138169 05/27/07 04:01 HAFIDI BPM and BCM SNAPSHOTS
138165 05/27/07 00:05 cdaq Beam Time Accounting
138164 05/27/07 00:04 Danagoulian Target: Target, 5-27-07 night
138163 05/27/07 00:02 bruell swing shift summary
Saturday
138161 05/26/07 23:47 bruell Target: moved to LH2 target
138160 05/26/07 23:32 bruell Target: moved to Carbon target
138157 05/26/07 22:31 bruell target screen
138156 05/26/07 22:30 steinman Run 63360 is dummy
138155 05/26/07 22:29 bruell Target: moved to dummy target
138153 05/26/07 22:21 bruell BPM+BCM screens
138147 05/26/07 16:44 bruell Beam: no beam for 30 minutes
138146 05/26/07 16:03 cdaq Beam Time Accounting
138145 05/26/07 15:55 hamlet Day shift summary, 26 May 2007
138143 05/26/07 15:31 hamlet MCC Energy measurement
138142 05/26/07 14:26 Reimer Target: Change to LH2 target
138140 05/26/07 14:12 Reimer Target: Carbon target
138136 05/26/07 12:58 Reimer Target: 4 cm dummy
138132 05/26/07 10:36 hamlet Beam OFF since 10:20
138129 05/26/07 08:30 Reimer Target: Screen shot
138128 05/26/07 08:06 Hafidi Shift summary
138127 05/26/07 08:05 cdaq Beam Time Accounting
138124 05/26/07 06:33 Danagoulian Thresholds
138123 05/26/07 06:25 Danagoulian Lucite test
138118 05/26/07 03:25 Hafidi BPM and BCM Snapshots
138116 05/26/07 02:20 Danagoulian Target: C12 Target was set after dummy
138114 05/26/07 02:18 Danagoulian Target: Target is back to H2
138110 05/26/07 00:30 Danagoulian Target: Target moved to dummy
138109 05/26/07 00:09 Danagoulian Target: Target, 5-26-07night
138108 05/26/07 00:01 cdaq Beam Time Accounting
Friday
138107 05/25/07 23:54 ent swing shift summary
138106 05/25/07 23:53 Perdrisat Tracker HV change
138104 05/25/07 23:43 Perdrisat BPM screen shot
138099 05/25/07 18:47 Reimer SOS HV s1y8- trip
138095 05/25/07 17:01 frw stand-by shifts on Monday/Tuesday
138094 05/25/07 16:19 Reimer Target: Target: Moved to LH2 target
138093 05/25/07 16:08 Reimer Target: target gui
138092 05/25/07 16:04 cdaq Beam Time Accounting
138091 05/25/07 16:03 ioana shift summary
138089 05/25/07 14:31 johna Raster was still set for 1 GeV, but readout said 5 GeV
138088 05/25/07 14:16 Rondon Target: Moved to C at ~11:50
138087 05/25/07 14:15 ioana HMS dipole interlock
138086 05/25/07 14:13 Rondon Targtet: strange excursion of HPH
138085 05/25/07 13:41 Rondon Target: restarted Loop1 power strip chart
138084 05/25/07 12:32 ioana pass change
138080 05/25/07 11:36 Rondon Target: moved to dummy
138077 05/25/07 10:54 frw Beam: energy measurement: 1076.184 MeV
138075 05/25/07 10:33 Rondon Target: moved to LH2
138074 05/25/07 10:32 ioana changed kinematics
138073 05/25/07 10:31 Rondon Target: moved to C target
138071 05/25/07 10:26 steinman Run 63315 is Dummy
138069 05/25/07 10:14 Rondon Target: moved to 4 cm dummy
138067 05/25/07 09:58 steinman Remember: Update Runlist
138065 05/25/07 09:37 kenyon Changed argon and ethane
138064 05/25/07 09:36 mack small angle beam pipe?
138063 05/25/07 09:25 ioana Would be nice to have a camera on the dipole NMR
138062 05/25/07 09:23 ioana HMS dipole ok
138060 05/25/07 09:12 ioana HMS dipole NMR communication problem
138056 05/25/07 08:15 Rondon Target: Start of shift GUI
138055 05/25/07 08:10 cdaq Beam Time Accounting
138053 05/25/07 08:03 A. Puckett LH2 in place, ready for beam
138052 05/25/07 07:57 Donal Target
138051 05/25/07 07:52 Donal Target
138050 05/25/07 07:52 A. Puckett Owl Shift Summary
138049 05/25/07 07:48 Donal Target
138048 05/25/07 07:30 Donal Target
138047 05/25/07 07:21 Donal Target
138046 05/25/07 07:20 Lassiter Communication problems
138045 05/25/07 07:11 Donal Target
138044 05/25/07 06:40 Donal Target
138043 05/25/07 05:43 A. Puckett requested controlled access to fix magnets
138042 05/25/07 05:19 A. Puckett HMS Dipole communications down, waiting for tech
138041 05/25/07 05:11 J Mulholland Waiting
138040 05/25/07 05:10 A. Puckett BCM and BPM snapshots
138039 05/25/07 04:52 J Mulholland HMS Dipole Communication Hung
138038 05/25/07 04:39 Donal Target
138036 05/25/07 03:07 Donal Target
138034 05/25/07 02:22 A. Puckett Back to data taking on dummy tgt.
138033 05/25/07 02:20 Donal target
138031 05/25/07 01:57 A. Puckett Status Update--beam steering optimization
138030 05/25/07 01:19 johna update on ion chamber trips
138029 05/25/07 01:08 A. Puckett I meant "pion" collimator
138028 05/25/07 00:51 A. Puckett switched to "large" collimator
138027 05/25/07 00:45 donal Target
138025 05/25/07 00:25 Reimer Swing Shift Summary
138024 05/25/07 00:22 Reimer Sieve Slits/access
138023 05/25/07 00:10 cdaq Beam Time Accounting
138022 05/25/07 00:06 Perdrisat Beam: Sieve slit remote does not respond
Thursday
138021 05/24/07 23:01 Punjabi Target Move
138020 05/24/07 22:46 Reimer Vacuum ok
138019 05/24/07 22:32 Reimer Beam Dump Ion chamger
138011 05/24/07 18:24 Reimer Beam Returns
138009 05/24/07 16:33 Reimer MCC stops beam for Hall B tuning
138008 05/24/07 16:11 ioana shift summary
138007 05/24/07 16:06 cdaq Beam Time Accounting
138005 05/24/07 15:56 Holt screenshot target
138002 05/24/07 15:02 Fowler Dipole NMR
138001 05/24/07 14:59 johna HMS Quad cycling (new procedure)
137992 05/24/07 12:08 Holt H2 target in beam
137991 05/24/07 11:45 Holt Moved C target in beam
137990 05/24/07 11:08 hcf GAS SHED PROCEDURE CHANGE -- SHIFT-TAKERS PLEASE READ
137989 05/24/07 10:00 frw DC gas shut off??!
137988 05/24/07 09:25 ioana HMS angle setting
137986 05/24/07 08:08 cdaq Beam Time Accounting
137985 05/24/07 08:06 Danagoulian Shift Summary
137983 05/24/07 07:49 Fowler LHe Level for Q3
137982 05/24/07 07:46 Holt target screenshot
137981 05/24/07 07:39 J Mulholland Quad 3 helium level low
137980 05/24/07 00:02 cdaq Beam Time Accounting
137979 05/24/07 00:01 vahe Target: start of shift
Wednesday
137978 05/23/07 22:36 reimer shift check list
137977 05/23/07 21:01 G Mbianda Run63269 after calibration
137973 05/23/07 18:01 M Jones SOS HV crate 13
137972 05/23/07 17:12 frw Beam: significant delay
137971 05/23/07 16:26 Rondon Target: Start of shift GUI
137970 05/23/07 16:08 frw weekly RC report
137969 05/23/07 16:05 cdaq Beam Time Accounting
137968 05/23/07 15:29 ioana beam time reporting
137967 05/23/07 12:21 Holt screenshot of target parameters
137966 05/23/07 08:51 Lassiter On Call Backup
137965 05/23/07 08:48 ioana beam off
137962 05/23/07 08:06 Holt target position is now 4 cm dummy
137961 05/23/07 08:04 cdaq Beam Time Accounting
137960 05/23/07 08:03 VM Rodriguez Owl shift summary
137959 05/23/07 07:48 vahe Target end of shift status
137957 05/23/07 07:42 J Mulholland Correction to Run # 63277
137955 05/23/07 07:33 J. Mulhollan Owl Shift BCM BPM screenshots
137952 05/23/07 07:08 Vm Rodriguez Kinematics Change
137951 05/23/07 06:39 VM Rodriguez No beam for a few minutes. We are changing kinematics.
137950 05/23/07 06:35 vahe Target moved to LH2
137949 05/23/07 06:35 J Mulholland Error message from Run End Error
137947 05/23/07 06:27 vahe Target moved to Dummy
137946 05/23/07 06:22 J Mulholland End Run Failed #63273 6:19
137944 05/23/07 06:13 VM Rodriguez Change kinematics
137943 05/23/07 06:10 J Mulholland Run #63272 is Junk
137941 05/23/07 05:56 J Mulholland End Failed run #63271 5:44am
137940 05/23/07 05:48 vahe Target moved to LH2
137938 05/23/07 05:40 vahe Target moved to Dummy
137937 05/23/07 05:37 J Mulholland End Failed run 63270 5:35
137935 05/23/07 05:22 VM Rodriguez Change of Kinematics
137934 05/23/07 05:15 vahe Target moved to LH2
137933 05/23/07 05:12 Mulholland End Failed run 63269 5:08
137932 05/23/07 05:11 Mulholland End Failed run 63266 4:30
137930 05/23/07 05:01 vahe Target moved to 4 cm Dummy
137928 05/23/07 04:45 VM Rodriguez Run 63266 HMS angle is 12.5
137925 05/23/07 04:16 VM Rodriguez Change of kinematics
137924 05/23/07 03:48 VM Rodriguez Q1 Computer rebooted
137923 05/23/07 03:29 vahe IOC reboot
137921 05/23/07 02:47 Mulholland Roc4 error
137918 05/23/07 02:30 vahe Move to 4 cm Dummy target
137915 05/23/07 00:09 VM Rodriguez HMS Quad 1 Power Supply Comm, Error
137914 05/23/07 00:03 vahe Target: start of shift
137913 05/23/07 00:02 cdaq Beam Time Accounting
Tuesday
137912 05/22/07 23:58 Reimer Swing Shift Summary
137911 05/22/07 23:49 Rondon Target: move to LH2
137910 05/22/07 23:38 melissa checklist
137908 05/22/07 23:35 Rondon Target: moved to C
137907 05/22/07 23:30 Reimer HMS Q1 Comm error
137905 05/22/07 22:54 melissa bpm bcm screenshot
137902 05/22/07 21:30 Reimer Expect beam in 15 min
137901 05/22/07 21:08 Rondon Target: Move to dummy target
137899 05/22/07 20:33 Reimer Beam lost again
137897 05/22/07 19:49 M Jones SOS HV crate 13
137896 05/22/07 19:30 Reimer Vacuum Problems--beam down
137895 05/22/07 19:13 melissa no beam
137894 05/22/07 19:09 Rondon Target: closed JT valve 1 step
137893 05/22/07 18:54 Reimer HV shower counter tripped run 63253
137887 05/22/07 16:24 Rondon Target: chamber vacuum GUI needs correct units
137886 05/22/07 16:11 Rondon Target: start of shift GUI grab
137885 05/22/07 16:03 cdaq Beam Time Accounting
137884 05/22/07 15:57 ioana shift summary
137883 05/22/07 15:54 manly bcm-bpm screenshots
137882 05/22/07 15:35 Holt target screen snapshot
137880 05/22/07 14:37 Fowler HMS: GUI Restart
137879 05/22/07 12:20 hamlet SHMS "bender prototype" temporary out from Hall
137878 05/22/07 11:18 M Jones Access to SOS hut
137877 05/22/07 10:56 Holt target gui snapshot
137876 05/22/07 10:53 beaufait sos power
137875 05/22/07 09:13 Holt Re-started target strip charts
137874 05/22/07 09:05 ioana beam off
137872 05/22/07 08:02 cdaq Beam Time Accounting
137871 05/22/07 07:59 Solvignon Shift summary
137869 05/22/07 07:48 Solvignon HMS rotation problem
137868 05/22/07 07:47 vahe target: end of shift screenshot
137867 05/22/07 07:16 vahe Moving to 4 cm LH2
137865 05/22/07 07:06 vahe Moving to Carbon target
137863 05/22/07 06:07 I. Albayrak BPM and BCM screen snapshots
137861 05/22/07 05:38 vahe Target moved to 4 cm Dummy
137855 05/22/07 00:10 cdaq Beam Time Accounting
137854 05/22/07 00:08 Reimer Shift Summary
Monday
137851 05/21/07 23:56 melissa target: end of shift screenshot
137850 05/21/07 23:53 melissa target: moved to H
137849 05/21/07 23:44 melissa target: moved to H
137847 05/21/07 23:40 melissa target: moved to C
137846 05/21/07 23:35 melissa target: moved to dummy
137843 05/21/07 23:08 Reimer Shift Checklist
137841 05/21/07 22:56 Reimer bpm and bcp
137837 05/21/07 22:14 melissa target: moved to H
137835 05/21/07 20:49 melissa target: ioc reboot
137832 05/21/07 19:43 melissa target: moved to dummy cell
137831 05/21/07 19:43 melissa target: won't move
137830 05/21/07 18:30 Reimer Linac problems
137824 05/21/07 16:23 M Jones Sane tracker in SOS
137823 05/21/07 16:16 melissa c target: start of shift screenshot
137822 05/21/07 16:08 M Jones SOS HV crate 13 is not working
137821 05/21/07 16:07 cdaq Beam Time Accounting
137820 05/21/07 16:06 smithg Target: Borrowed an AC powered DVM
137819 05/21/07 15:52 VM Rodriguez BCM BPM Screenshot
137818 05/21/07 15:48 A. Puckett Day Shift Summary
137817 05/21/07 15:42 M JOnes Set SOS Quad,D1 and D2 by current
137815 05/21/07 14:43 seva target: screenshot
137814 05/21/07 14:38 seva target: rebooted target IOC
137811 05/21/07 13:26 seva target: chnaged from carbon to H2
137810 05/21/07 13:26 A. Puckett MCC: Pass change completed, moving back to LH2
137809 05/21/07 13:18 A. Puckett MCC asks to send 40 uA CW
137808 05/21/07 12:48 A. Puckett MCC asks to send a few uA CW
137807 05/21/07 12:32 A. Puckett MCC requests to send tune beam
137806 05/21/07 12:18 A. Puckett Down for Hall A pass change
137800 05/21/07 08:03 cdaq Beam Time Accounting
137799 05/21/07 08:03 vahe BPM & BCM screen
137797 05/21/07 07:50 Dutta Owl Shift Summary (05/21/07)
137796 05/21/07 07:45 Dutta Last two HMS Momentum changes
137795 05/21/07 07:42 Dutta HMS rotation: Encoder error
137793 05/21/07 06:55 jamesj Target: Changed from Carbon to Hydrogen
137791 05/21/07 06:44 jamesj Target: Changed from Dummy to Carbon
137789 05/21/07 05:47 jamesj Target: Changed from Hydrogen to Dummy
137783 05/21/07 00:22 jamesj Target: Changed from Carbon to Hydrogen
137781 05/21/07 00:13 jamesj Target: Target changed from Dummy to Carbon
137780 05/21/07 00:10 cdaq Beam Time Accounting
137778 05/21/07 00:03 adaniel target changed from LH2 to 4cm Dummy
137777 05/21/07 00:01 Reimer Shift Summary (w better format)
Sunday
137776 05/20/07 23:59 Reimer Shift Summary
137774 05/20/07 23:41 Reimer Feedback on for Hall A
137773 05/20/07 23:38 Reimer shift check list
137772 05/20/07 23:36 adaniel Target screenshot
137770 05/20/07 23:31 Reimer Beam energy lock
137767 05/20/07 22:59 adaniel target changed from Carbon to LH2
137766 05/20/07 22:47 reimer bpm &bcm screen
137764 05/20/07 22:45 adaniel target changed from 4cm Dummy to Carbon
137762 05/20/07 22:21 adaniel target changed from LH2 to 4cm Dummy
137756 05/20/07 19:44 adaniel target changed from Carbon to LH2
137754 05/20/07 19:30 adaniel target changed from 4cm Dummy to Carbon
137752 05/20/07 17:58 adaniel target changed from LH2 to 4cm Dummy
137747 05/20/07 16:05 seva target: screenshot
137746 05/20/07 16:01 cdaq Beam Time Accounting
137745 05/20/07 16:01 VM Rodriguez Day Shift Summary
137742 05/20/07 15:20 seva target: D2 low pressure alarm gave a sound , called Greg, nothing to worry about (alarm is silenced)
137740 05/20/07 14:30 VM Rodriguez Day Shift BPM and BCM screenshots
137736 05/20/07 13:09 VM Rodriguez Q1 communication problem
137734 05/20/07 12:58 seva target: changed to H2
137733 05/20/07 12:52 VM Rodriguez Kinematics change to HMS angle of 17.64 and momentum 3.896 Q2=5.76
137732 05/20/07 11:54 VM Rodriguez Asked MCC for an Energy measurement
137729 05/20/07 10:44 steinman Run 63175 is Dummy and NOT Carbon
137727 05/20/07 10:37 seva target: changed to dummy
137722 05/20/07 08:02 cdaq Beam Time Accounting
137720 05/20/07 07:58 Dutta Owl Shift Summary (05/20/07)
137719 05/20/07 07:51 Dutta Owl Shift Summary (05/20/07)
137717 05/20/07 07:11 Solvignon Target screenshot
137716 05/20/07 07:06 solvignon BPM and BCM screenshots
137713 05/20/07 05:48 Dutta HMS Dipole
137711 05/20/07 05:23 Dutta HMS dipole problem
137708 05/20/07 03:37 Solvignon Target to dummy
137705 05/20/07 02:50 Dutta Raster was too small
137702 05/20/07 02:33 Solvignon Target to LH2
137700 05/20/07 02:14 Dutta Beam back and update
137698 05/20/07 00:02 cdaq Beam Time Accounting
Saturday
137697 05/19/07 23:55 Reimer Swing Shift Summary
137696 05/19/07 23:22 Reimer Shift check
137694 05/19/07 20:23 L.Pentchev carbon target
137692 05/19/07 20:10 L.Pentchev target screen
137691 05/19/07 20:08 L.Pentchev dummy target
137689 05/19/07 20:02 L.Pentchev LH target
137685 05/19/07 19:17 L.Pentchev carbon target
137683 05/19/07 19:04 L.Pentchev dummy target
137680 05/19/07 18:41 saw Switch reboot worked
137677 05/19/07 18:10 Network in H Network in Hall C
137676 05/19/07 18:10 Reimer HMS Hall Probes
137675 05/19/07 18:07 Reimer HMS Q3 OK
137674 05/19/07 18:04 L.Pentchev changed limits on chamber vacuum
137672 05/19/07 17:49 L.Pentchev target IOC reboot
137670 05/19/07 17:37 L.Pentchev vacuum pressure reading problem
137666 05/19/07 16:38 Reimer HMS Magnets and hall probes
137664 05/19/07 16:08 cdaq Beam Time Accounting
137663 05/19/07 16:07 VM Rodriguez Day Shift Summary
137662 05/19/07 15:58 VM Rodriguez BCM BPM Screenshots
137656 05/19/07 14:55 seva target:changed target to H2
137654 05/19/07 14:45 seva target:changed target to carbon
137653 05/19/07 14:37 frw Beam: energy measurement
137650 05/19/07 14:14 G Mbianda HMS angle checks
137647 05/19/07 13:58 G Mbianda tof calibration
137645 05/19/07 13:44 VM Rodriguez Run 63129 is a dummy target run
137643 05/19/07 13:38 seva target:changed target to dummy
137642 05/19/07 13:19 saw Network in Hall C
137641 05/19/07 12:56 VM Rodriguez We are ready for beam energy measurement
137640 05/19/07 12:45 seva target: we are back on, changed target to empty
137639 05/19/07 12:43 johna Target IOC "fix" - network problems in the hall
137638 05/19/07 11:52 VM Rodriguez Reboot VME create didn't fixed the problem Dave Meekins will come
137637 05/19/07 11:43 VM Rodriguez Dutta and Seva went into the Hall to reboot VME4
137636 05/19/07 11:35 VM Rodriguez Ask for Controlled Access to reboot VME create for target
137635 05/19/07 11:29 VM Rodriguez IOC can not reboot
137634 05/19/07 11:24 seva target: IOC is stuck, reboot did not work, paged Dave Meekins
137619 05/19/07 08:03 cdaq Beam Time Accounting
137617 05/19/07 07:55 hamlet Qwl shift summary, 19 May 2007
137606 05/19/07 04:39 Dutta Target: Moved to LH2
137605 05/19/07 04:39 Dutta Target: Moved to Carbon
137602 05/19/07 04:07 Dutta Target: Moved to 4cm Dummy
137601 05/19/07 04:00 Dutta Target: Back to normal operation
137600 05/19/07 03:55 hamlet ps factors for run 63094-63099
137597 05/19/07 03:44 hamlet We cannot keep SOS BMO1 ON
137590 05/19/07 02:53 hamlet Ready for beam
137589 05/19/07 01:29 hamlet Controlled access for target
137588 05/19/07 00:50 Dutta Target: Cannot move to Loop 1
137587 05/19/07 00:46 hamlet Problem to put LH2 target
137586 05/19/07 00:34 hamlet harp scan results
137585 05/19/07 00:17 Dutta Target: Screen shot
137584 05/19/07 00:15 cdaq Beam Time Accounting
Friday
137583 05/18/07 23:38 Reimer checklist scanned
137582 05/18/07 22:21 dunne Target: Target screen shot
137581 05/18/07 19:50 I. Albayrak BCM Calibration results
137580 05/18/07 18:27 Danagoulian Lucite signals amplified
137579 05/18/07 17:19 Reimer SOS magnets on
137578 05/18/07 17:11 saw Current settings for SOS
137577 05/18/07 17:02 dunne Increased He flow
137576 05/18/07 16:19 Reimer SOS magnets turned on
137575 05/18/07 16:07 VM Rodriguez Day Shift Summary
137574 05/18/07 16:06 VM Rodriguez Day Shift Summary
137573 05/18/07 16:06 cdaq Beam Time Accounting
137572 05/18/07 16:06 VM Rodriguez No Sound in HV Alarm
137571 05/18/07 14:58 VM Rodriguez Low He Flow and Presurre
137570 05/18/07 14:27 Bosted Target to carbon
137569 05/18/07 12:58 smithg Target: Pid thermometer fix
137568 05/18/07 12:44 Bosted Targeet: changed limits on vacuum to reflect new units
137567 05/18/07 12:03 hamlet SHMS "Bender Prototype' taken out from pivot
137566 05/18/07 12:03 VM Rodriguez All people working in the Hall are out.
137565 05/18/07 11:53 Bosted Target IOC rreboot
137564 05/18/07 11:29 smithg Target: BDS noise work. PID thermometer noisy too.
137563 05/18/07 11:22 V.M. Rodrigu HMS angle moved to 37.28 and momentum to 1.360 GeV
137562 05/18/07 11:19 Bosted Loop 1 temperature unstable
137561 05/18/07 11:10 M Jones Checked SANE tracker connection in SOS hut
137560 05/18/07 10:47 beaufait sos quad ground fault
137559 05/18/07 10:44 saw SOS scalers fixed
137558 05/18/07 10:40 Bosted Target heater power dropped to zero
137557 05/18/07 09:37 seva target: IOC reboot
137556 05/18/07 08:52 Lassiter PLC Software correction
137555 05/18/07 08:39 cdaq Beam Time Accounting
137554 05/18/07 08:31 Danagoulian SOS lucite
137553 05/18/07 08:20 Victor M. Ro Hall in controlled access at 8:15
137552 05/18/07 08:16 Danagoulian SOS Lucite data
137551 05/18/07 07:56 L.Pentchev target doesn't move
137547 05/18/07 06:19 L.Pentchev targetIOC reboot
137544 05/18/07 05:40 L.Pentchev LH target
137543 05/18/07 05:33 L.Pentchev carbon target
137538 05/18/07 04:28 L.Pentchev dummy target
137536 05/18/07 04:01 L.Pentchev target screen
137521 05/18/07 00:06 cdaq Beam Time Accounting
Thursday
137520 05/17/07 23:53 dunne Runs 63056 - 63068 were not production runs
137519 05/17/07 23:46 dunne BCM calibration
137518 05/17/07 22:25 dunne Current change during end of last beam scan on LH2
137516 05/17/07 22:03 dunne beam scan on LH2: -3.5
137514 05/17/07 21:52 dunne beam scan on LH2: -3.3
137511 05/17/07 21:43 dunne beam scan on LH2: -1.2
137509 05/17/07 21:34 dunne beam scan on LH2: +6.8
137507 05/17/07 21:26 dunne beam scan on LH2: +4.9
137505 05/17/07 21:18 dunne beam scan: +2.8
137504 05/17/07 21:08 dunne Horz. beam scan on LH2: +0.78
137502 05/17/07 21:03 dunne Target: moved to LH2
137500 05/17/07 20:52 dunne beam scan: -2.4
137498 05/17/07 20:44 dunne beam scan: -1.2
137495 05/17/07 20:37 dunne beam scan +4.79
137494 05/17/07 20:34 dunne beam scan: +2.88 horz
137491 05/17/07 20:19 dunne Target: moved to dummy target
137489 05/17/07 20:12 dunne Target: moved to carbon target
137487 05/17/07 19:55 dunne Target: Moved to Dummy target
137481 05/17/07 18:17 M JOnes Investigated SOS tracker tdc
137480 05/17/07 18:16 johna Updated SOS thresholds
137477 05/17/07 17:46 dunne Target: Moved to LH2 target
137475 05/17/07 17:36 dunne Target: Moved to carbon target
137472 05/17/07 17:11 dunne Target: Moved to dummy target
137469 05/17/07 16:15 dunne Target screen shot
137468 05/17/07 16:02 cdaq Beam Time Accounting
137466 05/17/07 15:32 Danagoulian Helium flow
137464 05/17/07 15:13 Bosted Changed target to LH2
137463 05/17/07 15:12 Bosted Changed target to Carbon
137458 05/17/07 14:35 saw Data disk deleting fixed
137456 05/17/07 14:29 Bosted Changed target to 4cm dummy
137448 05/17/07 12:54 Bosted Target moved to LH2 at 12:20 while HMS angle, momentum being changed
137446 05/17/07 12:53 M Jones Lowered SOS threshold on S2X+ and S2X- to 15mV
137445 05/17/07 12:53 Bosted Target moved to carbon at noon
137439 05/17/07 11:24 Danagoulian SOS gate width change
137437 05/17/07 11:19 Bosted Moved to 4 cm dummy target
137436 05/17/07 11:03 johna SOS Thresholds update
137433 05/17/07 09:14 manly pulsed mode at end of 63017
137432 05/17/07 09:02 manly incorrect q2 in header file
137431 05/17/07 08:51 Bosted SOS Lucite HV
137429 05/17/07 08:02 cdaq Beam Time Accounting
137426 05/17/07 06:44 A. Puckett Changed to new kinematic setting pHMS = 2.328 thetaHMS = 30.28
137423 05/17/07 06:24 L.Pentchev LH target
137422 05/17/07 06:10 L.Pentchev carbon target
137419 05/17/07 05:37 L.Pentchev dummy target
137416 05/17/07 04:54 A. Puckett mid shift progress report...
137414 05/17/07 04:16 L.Pentchev target screen capture
137413 05/17/07 03:49 L.Pentchev LH target
137406 05/17/07 01:28 L.Pentchev dummy target
137404 05/17/07 01:21 Arshak target
137402 05/17/07 00:01 cdaq Beam Time Accounting
Wednesday
137398 05/16/07 22:38 dunne checklist bpm bcm screens
137397 05/16/07 22:34 Perdrisa Beam off for 40 minutes
137394 05/16/07 21:03 dunne Target screen capture
137391 05/16/07 20:04 johna (mostly) painless kinematics change, and possible documentation error
137389 05/16/07 19:47 dunne Target: Moved to LH2 target
137387 05/16/07 19:25 dunne Target: Moved to Carbon
137383 05/16/07 18:52 dunne Target: Target move to dummy
137382 05/16/07 18:45 dunne Runs 62981-62985 are on LH2 not dummy
137375 05/16/07 17:27 Lassiter DIpole mods
137373 05/16/07 16:03 cdaq Beam Time Accounting
137372 05/16/07 16:03 cdaq Beam Time Accounting
137371 05/16/07 15:54 melissa target: end of shift screenshot
137370 05/16/07 15:21 melissa target: changing to H2
137368 05/16/07 15:03 melissa target: moved to carbon
137367 05/16/07 14:37 Brash Weekly Summary
137364 05/16/07 14:03 melissa target: moved to dummy
137363 05/16/07 13:49 melissa target: 1 more JT adjustment
137362 05/16/07 13:34 melissa target: JT power
137360 05/16/07 13:21 Huber Checklist BPM BCM screen
137359 05/16/07 13:04 Huber Beam Energy Results
137356 05/16/07 10:18 Huber Down for beam energy measurement
137355 05/16/07 10:13 saw Sanity check fix
137353 05/16/07 09:21 cdaq Beam Time Accounting
137352 05/16/07 09:20 Huber Vesda fault warnings
137350 05/16/07 09:08 Huber S1X S2X HVs ON
137349 05/16/07 09:03 Huber Beam current down to 70uA
137347 05/16/07 08:24 cdaq Beam Time Accounting
137345 05/16/07 08:04 melissa target: start of shift, screen shot
137343 05/16/07 07:39 seva target: screen shot
137342 05/16/07 07:36 seva target: changed target to H2
137341 05/16/07 07:26 Vahe Shift checklist May 16
137338 05/16/07 06:00 S.Danagoulia change of ps2
137334 05/16/07 04:59 S.Danagoulia HMS dipole trip
137332 05/16/07 04:15 seva target: changed to H2
137331 05/16/07 04:14 seva target masking
137329 05/16/07 04:05 seva target: changed to carbon
137328 05/16/07 04:02 Danagoulian change ethane bottle
137326 05/16/07 03:37 seva target: changed target to dummy
137324 05/16/07 02:43 Vahe ROC 1 & 2 error, run 62958
137319 05/16/07 01:38 Danagoulian ROC 1 &2 error, run 62954
137314 05/16/07 00:21 L.Pentchev swing shift summary
137313 05/16/07 00:21 cdaq Beam Time Accounting
Tuesday
137311 05/15/07 23:55 melissa end of swing shift screenshot (target)
137308 05/15/07 23:29 melissa target: changed to H2 again
137307 05/15/07 23:13 melissa c dummy screen shot
137305 05/15/07 23:01 jmaxwell Shift Checklist, May 15
137304 05/15/07 22:54 jmaxwell Checklist Screen grabs
137302 05/15/07 22:05 melissa moved to dummy cell
137301 05/15/07 21:57 jmaxwell LN2 a little low on Q3
137299 05/15/07 21:41 L.Pentchev switched the ethane bottle
137298 05/15/07 21:31 Melissa C screen shot - temp jump (no alarm)
137295 05/15/07 21:01 johna effect of removing hodoscope paddles.
137293 05/15/07 20:33 mack watch hsxpfp as well
137291 05/15/07 20:12 johna Turned off S1X5
137287 05/15/07 19:36 johna Turning off even more SCIN HV
137286 05/15/07 19:33 smithg Target: why was this done?
137285 05/15/07 19:23 johna Turning off more SCIN HV
137282 05/15/07 18:57 johna Turned off S2X1+ and S2X1-
137281 05/15/07 18:52 Melissa C (better) H2 screenshot
137279 05/15/07 18:43 I. Albayrak run numbers that have bad wire problem
137278 05/15/07 18:42 Melissa C H2 target screenshot
137274 05/15/07 17:26 Melissa C. Moved to H2 target
137272 05/15/07 16:28 Melissa C moved to Carbon target
137271 05/15/07 16:14 Melissa C. Moved to 4cm Dummy
137270 05/15/07 16:13 Melissa C. Moved to 4cm Dummy
137269 05/15/07 16:13 Melissa C. Moved to 4cm Dummy
137267 05/15/07 16:07 cdaq Beam Time Accounting
137263 05/15/07 14:45 A. Puckett temp. fluctuations, before and after
137262 05/15/07 14:35 donal Shift Ck grab
137260 05/15/07 14:18 A. Puckett bad encoder readbacks causing HPH alarms
137259 05/15/07 14:10 johna HMS 2y2 bad wires
137258 05/15/07 14:02 Fowler Q2 LN2 temp error masked
137256 05/15/07 13:47 Huber Injector problems
137253 05/15/07 12:44 A. Puckett Earlier today, changed "cell parameters" for beam power calc.
137252 05/15/07 12:44 Huber HMS Q2 LN2 temp error
137251 05/15/07 12:36 A. Puckett encoder positions screengrab
137250 05/15/07 12:21 Huber Painless HMS configuration change!
137249 05/15/07 12:17 Huber Run 62922 with SOS PS for Eric
137247 05/15/07 12:08 A. Puckett moving back to LH2
137246 05/15/07 12:04 hcf HMS DC +-5v supplies were also adjusted slightly
137245 05/15/07 11:56 A. Puckett Also, "power fail" light sometimes comes on...
137244 05/15/07 11:54 A. Puckett periodic lifter encoder readback problem
137242 05/15/07 11:42 johna updated HMS and SOS thresholds
137239 05/15/07 10:56 Huber Beam off for Hall B tuning
137238 05/15/07 10:55 Dutta Owl Shift Summary
137236 05/15/07 10:03 A. Puckett Moved to dummy target
137235 05/15/07 09:34 smithg Target: Turned off HPH beam compensation
137233 05/15/07 09:15 A. Puckett frequent HPH alarms
137231 05/15/07 08:37 A. Puckett start of shift target screengrab
137228 05/15/07 08:09 cdaq Beam Time Accounting
137226 05/15/07 06:23 saw Boot infor reprogrammed for ROC1 and ROC2
137225 05/15/07 06:06 Dutta DAQ Problems
137224 05/15/07 05:30 Dutta Beam: Beam position and harp scan and raster size
137223 05/15/07 05:13 seva target: changed target from BeO to LH2, increased HP
137222 05/15/07 03:16 cdaq Beam Time Accounting
Monday
137221 05/14/07 21:56 Donal Shift checklist
137220 05/14/07 21:37 donal May 14 Checklist
137219 05/14/07 19:54 I Albayrak missing wire
137218 05/14/07 19:46 E. Christy SOS dipole magnets and HV on
137217 05/14/07 18:46 I. Albayrak new histogram in online histograms
137216 05/14/07 17:11 smithg Target: Software changes
137215 05/14/07 15:52 Perdrisat Beam: Late entry on target reboot
137214 05/14/07 15:27 hcf HMS DC2Y2 Status
137213 05/14/07 13:33 smithg Target: Opened fill valve to mitigate pressure spikes
137212 05/14/07 12:20 beaufait SMS: sos q1
137211 05/14/07 12:10 jmaxwell Shift Checklist, May 13
137210 05/14/07 12:09 jmaxwell Shift Checklist, May 12
137209 05/14/07 12:09 jmaxwell Shift Checklist, May 11
137208 05/14/07 12:08 jmaxwell Shift Checklist, May 10
137207 05/14/07 12:07 jmaxwell Shift Checklist, May 9
137206 05/14/07 11:48 jmaxwell Shift Checklist, May 8
137205 05/14/07 11:42 jmaxwell Check-list Scan Howto
137204 05/14/07 11:38 saw Disk was replaced
137203 05/14/07 10:26 Huber Hall C is now restricted access
137202 05/14/07 09:24 Perdrisat Target: loop 1 power taken down to 80 mkA
137201 05/14/07 09:18 Perdrisat Target: move to BeO target
137200 05/14/07 09:12 saw cdaqfs fileserver beeping - disk needs replacement
137196 05/14/07 08:25 Perdrisat Target: back to 2H, cell 1
137195 05/14/07 08:24 Perdrisat Target: Change to carbon
137194 05/14/07 08:22 Perdrisat Target: Change target to dummy
137192 05/14/07 08:15 cdaq Beam Time Accounting
137191 05/14/07 08:15 hamlet Owl shift summary 14 May
137189 05/14/07 08:01 Dutta Target: Target moved to 4cm Dummy
137184 05/14/07 06:58 Fowler Dipole NMR communications working again.
137183 05/14/07 06:52 hamlet Ready for beam
137182 05/14/07 06:14 Arthur Mike is here...
137181 05/14/07 05:27 Arthur Communication error
137180 05/14/07 05:14 Arthur HMS Dipole NMR Communication error
137179 05/14/07 04:44 Arthur HMS Dipole & NMR problems
137176 05/14/07 00:54 smithg Target: Restarted archiver. Relaxed alarm.
137174 05/14/07 00:50 Dutta Target: Target screen grab
137173 05/14/07 00:36 Arthur Helium Changed
137172 05/14/07 00:36 Bruell Target: Frequent yellow alarm on H2_P_Fill_Target_R
137171 05/14/07 00:02 cdaq Beam Time Accounting
Sunday
137170 05/13/07 23:45 bruell Beam: beam positions
137168 05/13/07 23:24 bruell Target: moved to LH2 target
137167 05/13/07 23:23 bruell Target: IOC reboot and alarm limits
137166 05/13/07 23:07 jmaxwell BPM a bit off
137163 05/13/07 21:51 bruell Target: moved to dummy target
137160 05/13/07 21:33 bruell Target: moved to C target
137159 05/13/07 21:32 ent magnet saga continues
137156 05/13/07 18:13 ent dummy - MCC current mistake
137155 05/13/07 18:11 bruell Target: moved to dummy target
137150 05/13/07 16:06 cdaq Beam Time Accounting
137148 05/13/07 15:24 Solvignon DC TDC module slot 21: changed then changed back
137147 05/13/07 15:11 ccbutu@jlab. fan on the HMS electronic rack
137144 05/13/07 14:40 Huber HMS status
137139 05/13/07 13:01 Lassiter HMS Q2 communications restored
137138 05/13/07 11:25 Huber Hall access report
137137 05/13/07 10:49 seva target: changet target to LH2
137134 05/13/07 09:58 seva target: changet target from LH2 to dummy target
137133 05/13/07 09:43 johna The bad wire is back, but who knows for how long....
137132 05/13/07 09:42 smithg Target: Target went sub-atmospheric!
137128 05/13/07 08:30 Huber Run 62874 is junk
137126 05/13/07 08:05 jamesj owl shift BPM/BCM
137125 05/13/07 08:02 cdaq Beam Time Accounting
137124 05/13/07 08:01 Dutta Owl Shift Summary
137123 05/13/07 07:49 gaskell target controls screen grab
137121 05/13/07 07:43 gaskell Target: moved to LH2
137119 05/13/07 02:43 gaskell Run 62870 log entry missing
137118 05/13/07 02:41 gaskell Target: move to carbon target
137117 05/13/07 02:37 gaskell beam off for pass change
137115 05/13/07 02:18 gaskell target really dummy
137113 05/13/07 01:51 gaskell Target: moved to 4 cm dummy
137109 05/13/07 00:40 gaskell another bad cell in DC 2Y
137107 05/13/07 00:19 cdaq Beam Time Accounting
Saturday
137105 05/12/07 23:57 ent started at 11 pm
137103 05/12/07 23:27 bruell Target: moved to LH2 target
137100 05/12/07 22:11 E. Christy First pass luminosity scan analysis
137099 05/12/07 20:52 ent only problems to date
137097 05/12/07 18:34 jmaxwell HV Alarm Sound Check
137096 05/12/07 16:08 cdaq Beam Time Accounting
137095 05/12/07 16:07 Huber Water near Hall C entrance
137094 05/12/07 16:05 Huber HMS problems (yet again)
137093 05/12/07 16:00 Huber Day shift summary
137092 05/12/07 15:45 seva target: screen shot
137087 05/12/07 14:28 L.Pentchev ethane bottle changed
137084 05/12/07 14:08 seva target: changed target from H2 to dummy position
137082 05/12/07 13:34 L.Pentchev run 62852 ROC1 error, beam position drifting
137075 05/12/07 12:08 Huber Adjusted beamspot position
137073 05/12/07 12:03 L.Pentchev ethane bottle
137070 05/12/07 11:32 Huber Will have to make an entry to change HMS momentum
137067 05/12/07 10:58 Huber HMS Q2 communication errors
137061 05/12/07 10:02 johna Trigger back to SCIN
137052 05/12/07 08:40 M Jones HMS and SOS ntuple files can also be segmented
137051 05/12/07 08:39 Huber More HMS dipole problems
137050 05/12/07 08:07 hamlet Owl shift summary
137049 05/12/07 08:04 cdaq Beam Time Accounting
137048 05/12/07 08:00 dutta target incident
137047 05/12/07 07:38 dutta target
137046 05/12/07 06:58 dutta target
137045 05/12/07 06:50 dutta target
137040 05/12/07 05:30 dutta target
137031 05/12/07 02:47 hamlet HMS Dipole problem
137025 05/12/07 01:12 dutta target: screen grab/checklist
137024 05/12/07 00:23 cdaq Beam Time Accounting
Friday
137023 05/11/07 23:27 ent LH2 luminosity scan - high I
137021 05/11/07 23:09 johna BPM screen grab
137020 05/11/07 23:06 bruell Target: moved to LH2 target
137018 05/11/07 22:59 ent carbon luminosity scan
137004 05/11/07 20:30 bruell Target: moved to C target
137002 05/11/07 20:24 ent LH2 luminosity scan (up to now)
137001 05/11/07 20:21 ent waiting for high current
136997 05/11/07 19:03 E. Christy Changed HMS ntuple record length to 4096
136991 05/11/07 18:10 ioana luminosity scan
136988 05/11/07 17:51 ioana ROC 1 and ROC 2 errors
136980 05/11/07 16:38 gaskell H00C bpms in adcs
136979 05/11/07 16:16 M Jones Beam Energy Measurement
136978 05/11/07 16:16 cdaq Beam Time Accounting
136977 05/11/07 16:14 Bosted Target: Moved to LH2 (loop 1)
136976 05/11/07 16:12 E. Christy New BCM calibration constants in online replay
136975 05/11/07 16:07 gabriel shift summary
136974 05/11/07 15:02 saw Ozone levels in the hall
136973 05/11/07 14:29 saw New BCM calibration uploaded
136972 05/11/07 14:01 Bosted Turned on SOS D1
136971 05/11/07 13:48 gabriel Energy measurement started
136968 05/11/07 13:14 albayrak BCM calibration results
136963 05/11/07 12:37 Bosted Target: Moved to LH2
136961 05/11/07 12:16 Bosted Target: Target: apparanent lifter problem is not real
136960 05/11/07 12:07 Bosted Target: Moved to Carbon
136956 05/11/07 11:43 Bosted Target: Moved to 4 cm Dummy
136955 05/11/07 11:42 gabriel resume production
136954 05/11/07 11:07 gabriel BCM calibration
136953 05/11/07 10:44 saw Sanity check improvements
136952 05/11/07 10:09 Fowler HMS Dipole Trip
136950 05/11/07 09:48 ccbutu@login BCM calibrations
136949 05/11/07 09:48 Bosted Target: Target moved to Empty
136948 05/11/07 09:28 ccbutu@jlab. Targer change
136942 05/11/07 08:34 Bosted Turned on HV for SANE detecters in SOS
136941 05/11/07 08:32 Bosted Turned on HV for SANE detecters in SOS
136940 05/11/07 08:31 ccbutu@jlab. Quads off for a few runs
136939 05/11/07 08:28 Brash Beam: Beam Current Limit Raised to 100uA
136937 05/11/07 08:20 Bosted Target: Opened JT valve 2 clicks
136935 05/11/07 08:06 cdaq Beam Time Accounting
136934 05/11/07 07:59 johna dipole settling problems
136932 05/11/07 07:46 Dutta Owl Shift Summary
136928 05/11/07 06:27 A. Puckett moved to LH2 again
136926 05/11/07 06:09 johna HMS dipole NMR not settling at 0.94 GeV
136922 05/11/07 05:04 A. Puckett moved to LH2- apparent lifter problems
136920 05/11/07 04:54 dutta pedestals updated
136918 05/11/07 03:53 A. Puckett turned OFF beam compensation for now
136917 05/11/07 03:46 A. Puckett beam power calc. working, but we are in empty position
136916 05/11/07 03:37 A. Puckett Moved target to empty
136914 05/11/07 03:26 A. Puckett Moved target to dummy position
136912 05/11/07 03:08 A. Puckett Loop 1 HPH "beam power" calc. not working
136909 05/11/07 02:55 dutta BPM screen
136907 05/11/07 02:51 dutta BPM screen
136906 05/11/07 02:50 johna 3H00C not readout in ADCs
136905 05/11/07 02:46 dutta BPM screen
136902 05/11/07 02:40 dutta BPM screen
136901 05/11/07 02:35 dutta BCM screen
136899 05/11/07 02:28 A. Puckett Moved target to LH2 (Loop 1)
136898 05/11/07 02:28 johna UPDATED NOMINAL BEAM POSITION
136897 05/11/07 02:27 johna UPDATED NOMINAL BEAM POSITION
136895 05/11/07 02:17 johna Raster screen grabs
136894 05/11/07 02:07 dutta BCM screen grab
136892 05/11/07 02:00 dutta BCM screen grab
136889 05/11/07 01:54 johna MCC's definitions of "width" and "height" for faster
136886 05/11/07 01:38 dutta BCM screen grab
136884 05/11/07 01:34 dutta bcm screen grab
136882 05/11/07 01:24 johna BPM grabs for x=-4mm, x=-2mm (from nominal)
136875 05/11/07 00:55 ddutta Dummy target horizontal scan
136874 05/11/07 00:54 johna BPM screengrab - nominal position.
136873 05/11/07 00:14 johna hodoscope efficiency tests
136871 05/11/07 00:08 cdaq Beam Time Accounting
Thursday
136868 05/10/07 23:25 horn Target: Dummy target in
136867 05/10/07 23:22 johna "fix" for wire with timing offset
136866 05/10/07 23:12 horn Target: Moved to the other empty target position - this one works
136865 05/10/07 22:59 Huber HSX2 HSY2 voltages raised again
136864 05/10/07 22:45 ioana End of run fail
136863 05/10/07 22:44 horn Target: Moved to empty target position
136861 05/10/07 22:34 horn HMS hodoscopes - new discriminator values for plane 1
136860 05/10/07 22:26 horn HMS hodoscopes - new discriminator values
136858 05/10/07 22:19 horn run 62723 - sieve slit still in
136857 05/10/07 22:18 mack drift map
136856 05/10/07 22:16 horn Configuration changes before run 62724
136853 05/10/07 21:34 Huber Helium bottle pressure
136852 05/10/07 20:34 horn Target: shift checklist
136851 05/10/07 19:35 johna SCIN --> STOF in HMS trigger input "C"
136850 05/10/07 18:50 johna Bad wire: 2y2, wire#30
136849 05/10/07 18:29 johna CENTRAL BEAM POSITION
136848 05/10/07 18:18 Mbianda run 62699 without tofcal
136846 05/10/07 17:56 Solvignon HcalB5+ and HcalB6+ cabling path
136845 05/10/07 16:14 Solvignon Aerogel ADC are now working fine
136844 05/10/07 16:11 cdaq Beam Time Accounting
136843 05/10/07 15:54 Mbianda Histos after TOF calibration
136842 05/10/07 15:37 Mbianda Histos before TOF calibration
136840 05/10/07 15:31 smithg Target: target checklist/ksnapshot
136839 05/10/07 14:49 Mbianda TOF Calibration
136835 05/10/07 14:08 Fowler HMS Ready for remote rotation
136834 05/10/07 14:07 Solvignon HCAL 5+ fixed
136832 05/10/07 13:39 mack hodo gain tweaks: Use the Source, Luke
136831 05/10/07 12:45 smithg Target: Good news and bad news
136829 05/10/07 12:30 beufait d2 ground fault
136828 05/10/07 12:23 M Jones HSm scint adc spectra for run 62711
136826 05/10/07 11:44 mack DC gap
136825 05/10/07 10:46 M JOnes SOS hut door is closed
136824 05/10/07 10:27 hcf missing wire in hdc2y?
136822 05/10/07 09:34 Fowler Normal LHe Level for Q3
136820 05/10/07 08:26 Bosted HMS TOF parameters
136818 05/10/07 08:07 cdaq Beam Time Accounting
136817 05/10/07 06:49 Dutta Owl Shift Summary (05/10/07)
136815 05/10/07 05:58 Dutta sieve slit run
136814 05/10/07 05:53 dutta HMS rotation not cleared for remote rotation
136813 05/10/07 05:42 dutta HMS rotation failed
136811 05/10/07 05:27 Dutta HMS Pointing run ang =11.5
136810 05/10/07 05:24 seva target: changed target from carbon optics to carbon
136809 05/10/07 05:21 Dutta X-scan (x=1.6)
136807 05/10/07 05:18 Dutta X-scan (x=1.6)
136806 05/10/07 05:18 dutta BPM screen shot x =+1.6
136805 05/10/07 05:12 Dutta X-scan (x=1)
136803 05/10/07 05:10 dutta BPM for x=+1
136802 05/10/07 05:06 Dutta X-scan (x=-1)
136800 05/10/07 05:04 dutta BPM screen for x=-1
136798 05/10/07 04:59 dutta BPM screen shot for x=-2
136797 05/10/07 04:58 Dutta X-scan (x=-2)
136795 05/10/07 04:52 dutta BPM screen shot for y=+2
136794 05/10/07 04:51 Dutta Y-scan with -2.00
136792 05/10/07 04:49 dutta BPM screen shot for y=+1
136791 05/10/07 04:47 Dutta Y-scan with -2.00
136790 05/10/07 04:41 dutta BCM screen shot for y=0
136788 05/10/07 04:35 Dutta Y-scan with -2.00
136786 05/10/07 04:32 dutta BCM Screen shot for y=-2
136785 05/10/07 04:30 Dutta Y-scan with -2.00
136784 05/10/07 04:26 Dutta Y-scan with -3.00
136783 05/10/07 04:25 dutta Y scan (y =-3.0) BCM screen shot
136781 05/10/07 03:36 Dutta Carbon Optics + Sieve slit run
136779 05/10/07 03:27 seva target: changed target from optics 3 foil to carbon optics
136778 05/10/07 03:05 Dutta Optics 3 foil + Sieve slit run
136776 05/10/07 03:05 seva target: problem, target motion stuck
136775 05/10/07 03:04 johna HDC "missing wire" pictures (and HCLOGENTRY script is back)
136774 05/10/07 03:01 Dutta Long Detector Calibration Run
136773 05/10/07 03:00 johna Trigger (scinitillator) efficiency
136772 05/10/07 02:58 johna Gap in DC2
136770 05/10/07 02:47 Dutta Long Detector Calibration Run
136769 05/10/07 02:46 johna BASIC REPLAY PROCEDURES
136768 05/10/07 02:37 johna HMS aerogel
136767 05/10/07 02:25 E. Christy vertical beam centering
136766 05/10/07 01:59 johna CODA "sanity checks"
136763 05/10/07 01:22 Dutta Y scan on Dummy target with sieveslits
136762 05/10/07 01:18 Dutta Target IOC reboot
136761 05/10/07 01:11 Dutta Horizontal beam scan on Dummy target
136759 05/10/07 01:03 Dutta Horizontal beam scan on Dummy target
136758 05/10/07 00:55 Dutta Horizontal beam scan on Dummy target
136756 05/10/07 00:34 Dutta Horizontal beam scan on Dummy target
136754 05/10/07 00:33 seva target: ioc got stuck
136752 05/10/07 00:30 Dutta Horizontal beam scan on Dummy target
136751 05/10/07 00:23 Dutta Horizontal beam scan on Dummy target
136749 05/10/07 00:15 Solvignon Calorimeter fixes and pending problem
136747 05/10/07 00:02 cdaq Beam Time Accounting
Wednesday
136746 05/09/07 23:58 mack 0.5 cm gap in X_fp
136744 05/09/07 23:46 adaniel target changed to dummy
136740 05/09/07 23:18 ioana sieve slit x vs y plot
136739 05/09/07 23:06 Solvignon test hclog
136736 05/09/07 22:58 Huber Optics check completed, back to PION collimator
136734 05/09/07 22:45 Huber HMS collimator is now sieve slit
136732 05/09/07 22:32 johna Problems (?) with H00A harp scans
136728 05/09/07 22:04 Huber HARP scans
136726 05/09/07 22:00 Huber Runs 62676, 62677
136721 05/09/07 20:34 ioana HMS magnet trouble
136720 05/09/07 20:25 ioana missing HMS magnet alarms
136719 05/09/07 20:17 Huber HMS Collimator is now PION
136718 05/09/07 20:09 Huber Run 62673
136715 05/09/07 18:27 horn Restarted betabrite display
136714 05/09/07 18:19 adaniel SOS HV off
136713 05/09/07 18:09 gaskell SOS pumped down
136712 05/09/07 18:08 Solvignon/ A HMS hodoscopes: increased HVs
136711 05/09/07 18:08 gaskell SOS doors stuck open
136710 05/09/07 18:03 cdaq Beam Time Accounting
136709 05/09/07 16:43 johna Error in HV change
136708 05/09/07 16:35 beaufait The target analog signals
136707 05/09/07 16:31 johna Lowered HV of HMS calorimeter block HA6-
136706 05/09/07 16:22 Solvignon/ A Bottom gas cerenkov HV raised by 10V.
136705 05/09/07 16:19 smithg Target: Loop assignments
136704 05/09/07 15:39 Solvignon HCAL 5+ and 6+ cables switched at Hall patch panel
136703 05/09/07 15:31 saw Bad ethernet to sfihms fixed
136702 05/09/07 15:27 saw Aerogel 8- tube was knocked off
136701 05/09/07 15:27 hcf PropTube HV's turned on.
136700 05/09/07 15:18 smithg Target: wrapup estimate
136699 05/09/07 15:16 horn HMS angle floor marks
136698 05/09/07 15:14 horn HMS angle limits
136697 05/09/07 15:12 M Jones SOS Lucite Left signal cable was unplugged
136696 05/09/07 15:11 hcf Repaired -5 and Vth connections to SOS DC1
136695 05/09/07 15:03 smithg Target: missing phone
136694 05/09/07 14:57 horn HMS Hall probes zeroed
136693 05/09/07 14:55 beaufait hms wire chamber cover removal
136692 05/09/07 14:54 horn HMS dipole problems - resolved for now
136691 05/09/07 14:28 Solvignon Change in detector map for HCAL B13-
136690 05/09/07 14:20 M Jones Turned SOS hodo and DC HV on
136689 05/09/07 14:20 M Jones SOS adc cable
136688 05/09/07 13:17 Solvignon Hodoscope figure
136687 05/09/07 12:21 M Jones Raster in "Hall C" mode
136686 05/09/07 12:04 Solvignon HMS hodoscope performance in beam
136685 05/09/07 11:37 Solvignon/Ch Hodoscope: back to normal configuration
136684 05/09/07 11:35 Solvignon/Ch Plexiglass on wire chamber plane
136683 05/09/07 11:17 saw A DAQ problem found (but not yet fixed)
136682 05/09/07 11:16 smithg Target: Cross-contamination test results
136681 05/09/07 10:22 mack Hooked BCM2 back up again
136680 05/09/07 10:19 Solvignon Drift chamber: alcohol added to the gas bubbles
136679 05/09/07 10:05 M Jones Running Superharp and superharp analysis is done by MCC
136678 05/09/07 09:58 saw Checking out DAQ
136677 05/09/07 09:56 saw Beam: BCM status
136676 05/09/07 08:03 cdaq Beam Time Accounting
136675 05/09/07 07:59 gaskell no scans
136674 05/09/07 07:56 gaskell harps in C line
136673 05/09/07 07:48 gaskell raster is in "gzero" mode
136672 05/09/07 05:51 johna sieve slit run
136671 05/09/07 05:18 dutta Beam: Superharp scan analysis failed
136669 05/09/07 04:22 johna No aerogel signal?
136668 05/09/07 04:20 johna fast raster readback
136667 05/09/07 04:17 johna HMS calorimeter miscabling or bad map?
136666 05/09/07 04:05 johna Trigger for 'calibration' run
136665 05/09/07 04:01 johna Calibration run (98% pions, 2% electrons): Run #62669
136664 05/09/07 04:00 johna calorimeter gain matching
136661 05/09/07 03:25 johna DAQ freezeup
136655 05/09/07 03:04 johna CODA gets run failed errors >50% of the time
136654 05/09/07 03:03 johna Tried HMS mode (instead of COIN mode)
136652 05/09/07 03:00 johna Thresholds problem
136649 05/09/07 02:51 johna Problems running at high rate (and sparsification not working)
136643 05/09/07 02:26 johna Pion collimator put in
136641 05/09/07 02:14 johna Raised CER threshold in trigger
136639 05/09/07 01:56 Lassiter HMS Dipole NMR/PSU
136635 05/09/07 01:27 johna HMS dipole problems
Tuesday
136634 05/08/07 23:43 adaniel Target check list
136633 05/08/07 23:34 adaniel Target changed to Carbon
136632 05/08/07 21:25 adaniel SOS hodoscope and drfit chamber HV is off.
136631 05/08/07 20:39 Huber Hall C Beam Permit
136629 05/08/07 18:13 M Jones Change to engine
136628 05/08/07 18:02 Solvignon/ M HMS hodo h1X11- problem
136623 05/08/07 17:27 smithg Target: Moved to empty/no target position
136621 05/08/07 17:09 hcf temporary fix to sdc1u1,2
136619 05/08/07 17:04 smithg Target: Even More target woes- no cooldown before Thursday at least
136613 05/08/07 15:43 smithg Target: More target woes
136609 05/08/07 14:29 smithg Target: Trouble
136607 05/08/07 13:48 kenyon HMS windows and vacuum
136606 05/08/07 13:35 kenyon New SOS entrance window installed
136605 05/08/07 12:10 saw Did not see any buffered mode problems.
136602 05/08/07 11:43 saw CIP added for ROC1 Slot 18
136601 05/08/07 11:00 mack adjusted Unser offset
136600 05/08/07 09:47 smithg Target: Target cooldown procedure started
Monday
136598 05/07/07 19:20 johna Trigger cleanup
136596 05/07/07 17:53 smithg Target: Target status
136587 05/07/07 13:00 saw COIN mode broken at moment
136579 05/07/07 11:26 mack Final Spring 07 Unser calibration constant
136575 05/07/07 10:37 beaufait sos fast-buss is back on line
136574 05/07/07 10:20 mack BCM temperature regulating fine
Sunday
136570 05/06/07 18:23 johna HMS Scin thresholds lowered to 40mV
136568 05/06/07 16:52 johna more DAQ checks (buffered mode and SOS DC start signal)
136564 05/06/07 16:03 johna visual scalars
136563 05/06/07 16:00 johna More tests of buffered mode
136554 05/06/07 14:37 E. Christy, Updated SOS thresholds file.
136553 05/06/07 12:23 smithg Target: Leaks. So no cooldown Monday morning.
136552 05/06/07 10:46 Solvignon HMS hodoscope checks
Saturday
136548 05/05/07 17:27 johna Buffering tests
136545 05/05/07 17:16 i. Albayrak, Additional HMS detector check out with cosmics
Friday
136541 05/04/07 18:10 smithg Target: Target basically ready for cooldown
136539 05/04/07 17:13 saw Buffered mode seems OK
136538 05/04/07 16:31 fowler Problem with Q3
136536 05/04/07 10:28 beaufait taget readout
136535 05/04/07 10:26 saw COIN mode tested
Thursday
136531 05/03/07 18:36 mack run 62583 is a new Unser wire calibration
136530 05/03/07 17:03 mack Preliminary Unser wire calibration
136529 05/03/07 15:11 M Jones SOS daq
136528 05/03/07 13:38 mack Thermocouple cable quality control
136527 05/03/07 11:12 M Jones Reading HMS Cerenkov pressure by camera
136526 05/03/07 09:31 mack BCM regulation notes/progress
Wednesday
136525 05/02/07 18:42 E. Christy Change SOS cosmic trigger to 3/4 - start run 62576
136524 05/02/07 18:09 E. Christy SOS hodoscope HV on
136523 05/02/07 18:08 E. Christy SOS cosmic checks - runs 62574 - 62575
136522 05/02/07 18:02 M Jones Updated Analyzer
136521 05/02/07 17:08 mack BCM cavity temperature regulation
136520 05/02/07 15:52 mack ongoing Unser checkout - notes
136517 05/02/07 11:04 Solvignon Cerenkov HV adjusted
136515 05/02/07 08:43 Solvignon Hcal: unstability problem seems to be solved.
Tuesday
136514 05/01/07 15:45 hcf Please monitor the drift chamber gas supply
136513 05/01/07 11:50 saw,beaufait Restored DAQ to include HMS wire chambers
136512 05/01/07 11:09 beaufait hms faftbus fan