Main INDEX,
Monthly INDEX,
PREV,
NEXT
Make New Entry,
Make Followup Entry
User name Fatiha
Log entry time 00:04:19 on July 04, 2007
Entry number 141530
keyword=Swing Shift Summary
Shift Crew: F. Benmokhtar, G. Mbianda Njencheu, L. Huang
4:00 Started shift with MCC doing harp scans.
4:55 Beam back, but the position is not acceptable.
5:10 Moving to LH2 target, 80 uA
Data taking at: Q^2= 5.76 GeV2, Momentum 3.896GeV, Theta = 12.26
7:30 Started beam energy easurements.
8:30 Some DAQ problems do to roc3. Mark solved them.
9:50 Started production running.
-During this shift we recorded 7 fukk good runs, one needs to take
53 more to achieve the 0.1 M in the elastic peak.