Beam Energy (MeV) | 5712.25 | 5717.12 |
HMS Momentum (GeV/c) | 5.40700 | 5.40700 |
Q1 Set Current | 704.69 | 704.69 |
Q2 Set Current | 562.84 | 562.84 |
Q3 Set Current | 272.19 | 272.19 |
Q1 B Field (G) | -9311.0000 | -9311.0000 |
Q2 B Field (G) | 11442.1000 | 11442.1000 |
Q3 B Field (G) | -5922.8000 | -5922.8000 |
D Current Readback | 57202.0 | 57202.0 |
B_true | 1.48616 | 1.48616 |
Q1 Polarity | 0.0 | 0.0 |
Q2 Polarity | 1.0 | 1.0 |
Q3 Polarity | 0.0 | 0.0 |
Dipole Polarity | 1.0 | 1.0 |
HMS Angle | 11.61 | 11.59 |
SOS Angle | 147.00 | 147.0 |
Beam Current (uA) | 80.06 | 80.06 |
Target Encoder | 32513248.00 | 32513248.00 |
Target Encoder | 32513248.00 | 32513248.00 |
Fast Raster size (mmxmm) | 3x3 | 3x3 |
GEp-III high Q2, Production run, ps1=500 ps2=250 ps3=99999 ps4=10 ps5=1 Fpp Threshold is 3.
Prescale factor readback from trigger supervisor
1 | 500 |
2 | 250 |
3 | 99999 |
4 | 10 |
5 | 1 |
6 | 65536 |
7 | 1 |
8 | 1 |