Beam studies tomorrow will start around 9am (<8h). MCC will only perform tests in the injector and they do not need the halls. During this time there will be an access in HC to set-up the HV lines for the qweak lumi tests (~1h). If anyone else needs to go into the hall let me know.
Run plan: Take data with as high as possible stable (trip rate <15/h)
beam. Beam current 75uA
A copy of this log entry has been emailed to: jones@jlab.org