Main INDEX, Monthly INDEX, PREV, NEXT
Make New Entry, Make Followup Entry

User name beaufait

Log entry time 10:32:55 on December 12, 2008

Entry number 172651

keyword=clean power tripped again

The clean power was tripped again. I reset in the main power room. These trips are most likely caused by the vesda system. If welding is to occur in the hall, the system should be bypassed to avoid power interruption.