Saturday
174438 01/31/09 23:57 Z.-E. Mezian Shift Summary
174435 01/31/09 23:54 Donal and Ja Target: PS to magnet
174434 01/31/09 23:49 Donal and Ja Target: Reconnect the ps to magnet
174433 01/31/09 23:46 Meziani TTarget position study summary
174432 01/31/09 23:45 Donal Target: Pump switch
174431 01/31/09 23:15 anusha Target: controll access to fix the target encoder problem
174429 01/31/09 22:48 Donal Target: Update
174426 01/31/09 22:01 anusha Target: target moved to the empty target. encoder position is 0.154
174425 01/31/09 22:01 Donal Taget Epics screen
174423 01/31/09 21:57 Donal Target
174421 01/31/09 21:40 Donal Target: Status
174420 01/31/09 21:38 Meziani Analysis: Wrong comment on the target.
174419 01/31/09 21:22 Martin Jones Target: Encoder value
174418 01/31/09 21:18 anusha Target: target moved to Carbon which is the encoder position is 2.914
174416 01/31/09 21:14 Martin Jones Target alignment
174413 01/31/09 21:00 Martin Jones Target alignment
174410 01/31/09 20:37 Martin Jones Target encoder issues
174406 01/31/09 20:20 Lassiter HMS Q1 Valve 1
174405 01/31/09 20:06 jmaxwell Target: Encoder values?
174403 01/31/09 19:45 Martin Jones Targer encoder issues
174402 01/31/09 19:20 W. Luo root Online GUI: added helicity state to HMS_standard.cfg
174399 01/31/09 18:48 Martin Jones Target position issues.
174394 01/31/09 18:23 anusha Target: target moved to the encoder 0.098 for the empty target
174393 01/31/09 18:21 Martin Jones Position of the target
174391 01/31/09 18:13 Donal Target: 4He pressure in Frig
174389 01/31/09 18:11 W. Luo Online replay GUI of GEP3 tranport to Sane 08
174388 01/31/09 17:42 Martin Jones Analysis: Problems with worker computer station
174387 01/31/09 17:40 gaskell Moller quad ioc rebooted
174386 01/31/09 17:39 Rondon Target: Screen shot
174385 01/31/09 17:39 anusha Target: encorder position is 0.153
174384 01/31/09 17:37 anusha Target: moved the target to empty target
174383 01/31/09 17:31 Donal Target: Confusion about encoder values
174382 01/31/09 17:12 meziani Moller Quad
174381 01/31/09 17:06 Rondon RUN PLAN for Sat. 1/31 to Sun. 2/1 Eve. -- UPDATED
174380 01/31/09 16:59 Z. Meziani Moller Quad trip
174379 01/31/09 16:42 Martin Jones
174378 01/31/09 16:18 cdaq Beam Time Accounting
174377 01/31/09 16:15 W. Luo BigCal LED trigger ok now
174374 01/31/09 16:03 Hoyoung Day shift summary
174373 01/31/09 15:49 Donal Target: Screenshot while waiting
174372 01/31/09 15:41 Donal Target: Pump control
174371 01/31/09 15:25 whit Cherenkov PMT4 optics
174370 01/31/09 14:52 Donal Target: Moved to Carbon=2.860
174369 01/31/09 14:51 W. Luo BigCal: replaced one first level discrimator on BigCal plate form
174368 01/31/09 14:45 Donal Target: New Event File
174365 01/31/09 14:22 Donal Target: First Anneal
174364 01/31/09 13:53 ccbutu Switched back the ribbon cables to corresponding TDC slots!
174363 01/31/09 13:42 J Mulholland Target: Pump failure
174362 01/31/09 11:39 Bosted HMS electron rates
174361 01/31/09 11:23 jmaxwell Target: Moved to Top for Anneal
174358 01/31/09 10:20 jmaxwell Target: IOC Reboot
174355 01/31/09 09:28 jmaxwell Target: Moved to Carbon=2.860
174354 01/31/09 09:23 J Mulholland Target: Access made to close valve
174353 01/31/09 09:02 jmaxwell Target: Fill valve opening and opening
174351 01/31/09 08:57 jmaxwell Target: IOC Reboot
174350 01/31/09 08:33 jmaxwell Target: PDP Screenshot
174349 01/31/09 08:32 jmaxwell Beginning of shift cryo screenshot
174346 01/31/09 08:21 jmaxwell Target: Magnet Level Low
174345 01/31/09 08:03 L. NDukum owl shift summary
174344 01/31/09 08:02 cdaq Beam Time Accounting
174341 01/31/09 07:21 narayan Target: the helium Out-flow is too high
174338 01/31/09 05:58 M Jones Look at bigcal energy sum versus x and y position at BigCal
174335 01/31/09 05:37 narayan Target: sanetarget1 screenshot
174334 01/31/09 05:33 narayan Target: IOC reboot
174333 01/31/09 05:31 narayan Target: IOC reboot
174330 01/31/09 04:55 narayan Target: target screenshot
174329 01/31/09 04:49 bhovik SANE RUN DATABASE
174328 01/31/09 04:38 M Jones Updated Analyzer to fix mistakes I made
174323 01/31/09 02:41 M Jones Modified Sane Cerenkov part of Analyzer
174320 01/31/09 01:55 lzwano Analysis: Lucite
174317 01/31/09 01:27 jmaxwell Target: Moved to Top Target=3.312
174316 01/31/09 01:25 jmaxwell Target: NMR Peak Lower than Expected
174315 01/31/09 01:22 M Jones Looked at electronics for low rate areas in BigCal
174314 01/31/09 01:17 M Jones Replaced VME TDC modules in slots 12 and 7 in Roc13
174313 01/31/09 01:16 M Jones Fixed lucite TDC 7 problem
174312 01/31/09 01:15 jmaxwell Target: Changed Target Position Switches
174310 01/31/09 01:11 Hoyoung Run control reboot
174309 01/31/09 00:54 narayan Target: Microwave standby, controlled access, polarization
174308 01/31/09 00:11 cdaq Beam Time Accounting
174306 01/31/09 00:04 anusha Target: NMR screenshoot
174304 01/31/09 00:03 anusha Target: cryo computer screenshot
Friday
174303 01/30/09 23:32 Danagoulian SANE run database
174296 01/30/09 20:56 albayrak BPM monitor screenshot
174295 01/30/09 20:46 anusha Target: cryo computer screenshot
174294 01/30/09 20:40 anusha Target: NMR screenshot
174293 01/30/09 20:38 anusha Target: target polarization
174292 01/30/09 20:22 vulcan Shift Summary
174289 01/30/09 19:35 bhovik Licite detector %7
174284 01/30/09 18:03 mahbub Tracker: PMT 3 scalers on plane Y1
174283 01/30/09 18:03 C Keith Target:
174282 01/30/09 17:53 mahbub Tracker: HV settings of the PMTs
174281 01/30/09 17:33 jmaxwell Target: Bottom Target Up to 77%
174279 01/30/09 17:09 jmaxwell Target: Lost Liquid Level in Nose
174277 01/30/09 17:01 ccbutu Turned off PMT HV #2 probably by mistake!
174276 01/30/09 16:53 cdaq Beam Time Accounting
174275 01/30/09 16:42 Hoyoung Now Tracker_2 HV is on
174271 01/30/09 15:24 Hoyoung Tracker_2 HV is off
174269 01/30/09 15:05 ccbutu Currently replaying fully the run #72165
174268 01/30/09 15:00 ccbutu Adjusted HV for the TRACKER during run #72165
174267 01/30/09 14:42 jmaxwell Target: Bottom Target Polarization Screenshot
174264 01/30/09 13:37 vahe Target: Third root pump is on.
174263 01/30/09 13:27 vahe Target: First and second roots pumps are on.
174261 01/30/09 13:25 W. Luo Load BigCal HV file HV_LeCr_2009-1-28-10:45_hv_change.hv for Lecroy crate
174260 01/30/09 13:07 vahe Target: We moved to bottom target
174259 01/30/09 13:06 M Jones Attached figure for 174255
174258 01/30/09 13:05 M Jones Final raster setting
174257 01/30/09 12:53 J Mulholland Target: Wrong NMR Channel
174256 01/30/09 12:44 M Jones Raster study
174255 01/30/09 12:23 M Jones Recap of cetner on the crosshair target
174254 01/30/09 12:21 J Mulholland Target: Pumps on
174249 01/30/09 11:40 vahe Target: NMR screenshoot
174248 01/30/09 11:09 J Mulholland Target: Material evaporated?
174247 01/30/09 11:03 jonathan Target: We dont see signal on bottom target.
174246 01/30/09 10:54 M Jones Reload BigCal HV settings for "Hall A" HV controls
174245 01/30/09 10:38 ccbutu Changed HV for the Tracker Detector!
174244 01/30/09 10:36 M Jones Stop beam to start polarizing the bottom NH3 target
174239 01/30/09 10:27 M Jones Who is playing with tracker HV?
174222 01/30/09 09:10 vahe Target: IOC reboot was done because the Polarized Target Controle window froze
174216 01/30/09 08:57 M Jones Ignore the run start header, the magnet current is 77.09A
174215 01/30/09 08:56 vahe Target: carbon target (encoder: 2.919)
174212 01/30/09 08:43 vahe Target: Target screen
174206 01/30/09 08:22 cdaq Beam Time Accounting
174203 01/30/09 08:12 narayan Target: carbon target (encoder: 2.919)
174201 01/30/09 08:00 lzwano Analysis: Slow raster
174198 01/30/09 07:53 narayan Target: New Encoder position corresponding to Crosshair: 0.154
174195 01/30/09 07:44 lzwano Analysis: Slow raster
174193 01/30/09 07:38 lzwano Analysis:
174192 01/30/09 07:36 M Jones Reduce raster size by factor of 0.95
174187 01/30/09 07:20 M Jones The witness field is .00316 and steady on the meter
174184 01/30/09 07:09 M Jones Moved HMS to 16 degrees
174182 01/30/09 07:03 narayan Run initials
174181 01/30/09 07:00 cdaq Beam Time Accounting
174180 01/30/09 06:51 narayan Target: target moved to empty target (encoder: 0.098)
174179 01/30/09 06:50 M Jones Set Sane Cerenkov threshold to -270mV
174178 01/30/09 06:48 M Jones Set Bigcal threshold to -400mV
174177 01/30/09 06:07 saw FSD limits on witness field
174176 01/30/09 04:25 Rondon Ammonia target ready for measuring asymmetries
174175 01/30/09 03:44 narayan Target: target on Top
174174 01/30/09 03:16 jmaxwell Target: Bottom Target Screenshot
174173 01/30/09 03:08 J Mulholland Follow up on witness field
174172 01/30/09 03:00 jmaxwell Target: Bottom Target 37%
174171 01/30/09 02:56 J Mulholland Status report -- beam not possible.
174170 01/30/09 02:34 J Mulholland Target: Insert
174169 01/30/09 02:29 J Mulholland Target: Magnet up
174168 01/30/09 02:00 jmaxwell Target: Beginning to Polarize
174166 01/30/09 00:28 jmaxwell Target: Discount this entry
174165 01/30/09 00:27 jmaxwell Target: Rough Ammonia TEs
174164 01/30/09 00:24 jmaxwell Target: Rough Ammonia TEs
174163 01/30/09 00:12 whit SANE Cherenkov Full Field with Iron Shield
Thursday
174162 01/29/09 23:35 vahe Target: Thermal equilibrium calibration on ammonia
174139 01/29/09 21:47 jmaxwell Magnet on SIgn Working Now
174138 01/29/09 21:47 whit SANE CHERENKOV - LED with Iron Shield
174135 01/29/09 21:43 jmaxwell Magnet On Sign not working
174130 01/29/09 21:37 jmaxwell Target: Ramp Status
174101 01/29/09 20:53 jmaxwell Target: Target under liquid, Ramping Continues
174079 01/29/09 19:56 jmaxwell Target: Ramping Magnet Up
174077 01/29/09 19:49 jmaxwell Target: Coil DVM is Giving Error
174076 01/29/09 19:31 jmaxwell Target: Correction on slot info
174075 01/29/09 19:28 jmaxwell Target: Unlocked Magnet Leads
174074 01/29/09 19:19 jmaxwell Target: Insert B installed with Ammonia
174073 01/29/09 19:05 bhovik Analysis: Analyzer was fixed to work with multiple hit TDC
174072 01/29/09 19:04 narbe Target: Set witness field for higher range (0.6 T)
174071 01/29/09 18:56 narbe Target: Witness Field Gaussmeter not working
174070 01/29/09 18:46 whit SANE Cherenkov - Change in LED amplitude
174068 01/29/09 18:19 M Jones Set thresholds for BigCal to 500mV ( about 1.0 GeV)
174067 01/29/09 18:13 jmaxwell He Bag has large wrinkle
174066 01/29/09 17:43 vahe Elevator not working
174065 01/29/09 17:20 M Jones Iron sheet installed
174064 01/29/09 17:04 Rondon NEW: Run Plan for Thurs. 1/29 - Fri. 1/30/09
174063 01/29/09 16:13 Lingyan Zhu day shift summary
174062 01/29/09 16:10 cdaq Beam Time Accounting
174061 01/29/09 16:09 Lingyan Zhu Beam: notify MCC for 20 mm raster use
174060 01/29/09 15:40 vahe Target: Target screenshot
174059 01/29/09 15:32 jmaxwell Target: He4 Manometer Zeroed and Fridge Start
174058 01/29/09 14:26 Lingyan Zhu slow raster fixed
174057 01/29/09 14:15 jmaxwell, J Target: Debris Removed from Bottom of Nose
174056 01/29/09 12:58 ccbutu Tracker Update
174055 01/29/09 12:06 Rondon Beam: Slow Raster not circular or elliptical on preset 2
174054 01/29/09 11:07 jmaxwell Target: Magnet Leads Locked, Tagged
174053 01/29/09 11:04 jmaxwell Target: Ramp Complete, Field Zero
174052 01/29/09 10:58 J Mulholland Target: Back-filling Fridge
174051 01/29/09 10:32 jmaxwell Target: 8.7A glitch during Ramp Down
174049 01/29/09 10:08 jmaxwell Target: Ramp Down Continues, again
174048 01/29/09 09:56 C Keith Target IOC crashes
174047 01/29/09 09:51 C Keith Magnet transfer line valve stuck
174046 01/29/09 09:35 jmaxwell Target: Ramp Down Continues
174045 01/29/09 09:13 jmaxwell Target: Small Change
174044 01/29/09 09:10 jmaxwell Target: Ramping Down
174043 01/29/09 09:09 jmaxwell Target: Wrong Encoder Position
174042 01/29/09 09:05 Lingyan Zhu controlled access
174041 01/29/09 08:54 M Jones Set slow raster for 2cm diameter
174040 01/29/09 08:15 Hoyoung Target: another IOC crash
174039 01/29/09 08:00 cdaq Beam Time Accounting
174038 01/29/09 07:53 Dutta Owl shift summary
174037 01/29/09 07:47 Hoyoung Target: PDP screen
174036 01/29/09 07:46 Hoyoung Target: Cryo screen
174034 01/29/09 07:24 Hoyoung Target: back to blue light
174033 01/29/09 07:17 Hoyoung Target: Temperature is restored
174031 01/29/09 07:06 Hoyoung Target: EV91120 set to 1.5
174030 01/29/09 06:59 Hoyoung Target: Cryo screen status
174029 01/29/09 06:43 Dutta Analysis: HMS dipole is set
174027 01/29/09 06:28 Hoyoung Target: nose temperature is high
174025 01/29/09 06:22 Hoyoung Target: PDP chip
174024 01/29/09 06:14 Hoyoung Target: IOC rebooted
174018 01/29/09 04:34 lzwano Analysis: Lucite voltage decreased by 100volts
174015 01/29/09 03:43 mahbub Tracker: Changed HV on PMT 3 and 7
174013 01/29/09 03:17 Dutta Analysis: HMS dipole not ramping
174012 01/29/09 03:13 Lzwano Analysis: Lucite voltage increased
174008 01/29/09 02:53 Hoyoung Target: IOC crash
174006 01/29/09 02:31 Dutta Beam: HMS sive slit removed
174005 01/29/09 02:10 Hoyoung Target: LL91111 still alarming
174004 01/29/09 02:09 lzwano Analysis: Lucite voltage increased by 25volts
174002 01/29/09 02:06 Hoyoung Target: CH2 target
174000 01/29/09 01:33 Dutta Analysis: Lucite voltage
173997 01/29/09 01:22 Hoyoung Target: IOC reboot
173996 01/29/09 01:03 Hoyoung PDP was rebooted
173995 01/29/09 00:57 Lzwano Analysis: lucite voltage
173993 01/29/09 00:54 Hoyoung Target: PDP screen
173991 01/29/09 00:47 Hoyoung Target: move to Carbon target
173990 01/29/09 00:44 Hoyoung Target: magnet LL is too high
173986 01/29/09 00:07 albayrak Problem with tracker at run 72085
173985 01/29/09 00:06 Huber Swing shift summary
173984 01/29/09 00:02 cdaq Beam Time Accounting
173983 01/29/09 00:02 Huber Changed Hcer threshold
Wednesday
173982 01/28/09 23:52 J Mulholland Target: Pictures from the insert freeze-in
173981 01/28/09 23:36 anusha Target: IOC crashed and rebooted.
173980 01/28/09 23:30 Huber ROC 2 died
173979 01/28/09 23:21 M Jones Lucite tdc spectra looking good
173978 01/28/09 23:10 Huber HMS sieve slit now in
173976 01/28/09 23:02 Huber Captain, she won't give me any more!
173975 01/28/09 22:55 Huber HMS Cerenkov - Run 72084
173973 01/28/09 22:49 albayrak BPM screenshot
173972 01/28/09 22:44 M Jones Lucite tdc spectra looking good
173970 01/28/09 22:34 Huber hcer voltages
173969 01/28/09 22:33 Huber HMS Cerenkov - Run 72083
173967 01/28/09 22:09 anusha Target: Man Setpt changed back to 0.3
173966 01/28/09 22:07 anusha Cryogen IOC computer screenshot
173965 01/28/09 22:04 anusha Target: PDP screen
173964 01/28/09 21:59 anusha Target: changed the Man Setpt to 0.5
173963 01/28/09 21:57 anusha Target: Current target Witness field is 0.008430
173961 01/28/09 21:37 J Mulholland Target: Microwave Temps and Flow (problems)
173960 01/28/09 21:22 jmaxwell Target: Shim Heater Test Plots and Explanation
173959 01/28/09 19:44 jmaxwell Target: PDP Screenshot with Cal. Constant
173958 01/28/09 19:29 jmaxwell Target: Rough Calibration Constant, CH2
173957 01/28/09 18:52 jmaxwell Target: TE Signal on CH2
173956 01/28/09 18:47 mahbub Tracker: TDC module in ROC13 slot 12 changed
173955 01/28/09 18:43 jmaxwell Target: Baseline Taken, Moved Target to Bottom
173954 01/28/09 18:43 mahbub Tracker: discriminator thresholds changed to 125 mV and 250 mV
173953 01/28/09 18:39 mahbub Tracker: Checkout all PMTs of tracker
173952 01/28/09 18:27 jmaxwell Target: Moved Target to Up Limit
173951 01/28/09 18:04 albayrak HMS Cerenkov voltages increased by 50 V
173950 01/28/09 17:46 jmaxwell Target: Insert B Tuned
173949 01/28/09 17:30 whit Cherenkov numbering convention
173948 01/28/09 17:02 Huber Hall in Controlled Access
173947 01/28/09 17:00 whit Target Field near Cherenkov PMTs and lead wall
173946 01/28/09 16:44 whit SANE Cherenkov while ramping
173944 01/28/09 16:12 cdaq Beam Time Accounting
173943 01/28/09 15:55 Hoyoung Day shift summary
173941 01/28/09 15:43 Hoyoung Beam is ok now
173940 01/28/09 15:40 vahe BPM, BCM screens
173939 01/28/09 15:33 Hoyoung Beam is down
173938 01/28/09 15:27 Hoyoung HMS momentum=2.2GeV/c
173934 01/28/09 14:34 ccbutu Target OIOC Reboot!
173930 01/28/09 13:30 vahe Analysis: Beta lucite HV were changed starting run # 72078
173928 01/28/09 13:27 ccbutu Target IOC reboot
173926 01/28/09 12:58 Hoyoung Beam is restored
173925 01/28/09 12:57 M Jones Modified HV.hvc in SOS subdirectory
173924 01/28/09 12:41 Hoyoung Beam is down
173922 01/28/09 12:36 ccbutu Target Update Screens!
173921 01/28/09 12:30 ccbutu TRACKER UPDATED MAP HARDWARE/SOFTWARE
173918 01/28/09 12:20 ccbutu Update on the Tracker MAP (HARDWARE VS SOFTWARE)
173915 01/28/09 11:06 M Jones 4atm house helium is cutoff
173914 01/28/09 10:38 W. Luo BigCal changed HV for some channels
173910 01/28/09 10:26 vahe Analysis: Beta lucite HV lowered starting run # 72072
173903 01/28/09 09:37 vahe Analysis: Beta lucite HV lowered by 50 V starting run # 72070
173898 01/28/09 08:55 Hoyoung Magnet current is 77A
173895 01/28/09 08:45 ccbutu Target moved to Ch2
173894 01/28/09 08:29 bhovik Crosshair Run 72067
173893 01/28/09 08:10 Nuruzzaman Cross hair observed for run # 72067
173892 01/28/09 08:07 Dutta Cross hair located
173889 01/28/09 08:05 cdaq Beam Time Accounting
173879 01/28/09 07:34 Dutta Owl Shift Summary
173878 01/28/09 07:13 bhovik Something wrong is with target motion.
173876 01/28/09 06:35 narayan Target: encoder to 3.863
173873 01/28/09 06:26 narayan Target: encoder to 3.809 (trying to locate cross-hair)
173870 01/28/09 06:20 narayan Target: target encoder: 3.832
173861 01/28/09 05:59 narayan Target: target moved again
173856 01/28/09 05:18 narayan Target: target moved back to Cross Hair
173855 01/28/09 05:18 Nuruzzaman Run stoped until 7am as instruction
173849 01/28/09 04:47 Nuruzzaman Fast and Slow raster looking Different
173848 01/28/09 04:46 narayan Target: Carbon target
173847 01/28/09 04:44 narayan Target: target moved to encoder 3.842
173842 01/28/09 04:22 narayan Target: target in crosshair
173841 01/28/09 04:20 Rondon e-mails for previous entry
173838 01/28/09 03:54 Dutta Analysis: Cerenkov B field shielding test completed
173837 01/28/09 03:50 jmaxwell Target: Magnet Ramp Finished, Current= 77.135
173832 01/28/09 03:38 Rondon Beam: Beam parameters for C and CH2 runs
173825 01/28/09 03:22 don Crabb Refrigerator running
173822 01/28/09 03:12 jmaxwell Target: Ramping Continues
173804 01/28/09 02:35 J Mulholland Target: Insert In... target list
173801 01/28/09 02:32 J Mulholland Target: Don't use top Target
173776 01/28/09 01:35 jmaxwell Target: Resuming Magnet Ramp After Tests
173775 01/28/09 01:31 jmaxwell Target: Shim Test Results
173774 01/28/09 00:06 W. Luo BigCal: decrease threshold to 315mv
Tuesday
173773 01/27/09 23:36 Huber Correction: target current 2.2A
173772 01/27/09 23:35 W. Luo 72022 also with BigCal LED on
173769 01/27/09 23:31 W. Luo Load BigCal HV hv_80005.new
173760 01/27/09 23:05 anusha slow raster is keeping it's circular pattern.
173759 01/27/09 23:04 jmaxwell Target: Ramping Magnet Up
173758 01/27/09 22:56 W. Luo HMS DC1 and DC2 turned off. Turned back on
173757 01/27/09 22:03 Huber All voltages now on
173756 01/27/09 18:58 Don Crabb Piston back
173755 01/27/09 18:41 mahbub Tracker: Not possible to slide in plastic absorber
173753 01/27/09 17:48 saw Further Slow Raster Tweaking
173752 01/27/09 17:12 Don Crabb Insert removed
173751 01/27/09 17:01 brads re: SANE Cherenkov status/work details
173750 01/27/09 16:55 brads/whit SANE Cherenkov status/work details
173749 01/27/09 16:38 jmaxwell Target: Strike that, 0.10A, not 0.01A
173748 01/27/09 16:26 Huber HMS drift times
173747 01/27/09 16:14 jmaxwell Target: Replaced Shim Heater PS again
173746 01/27/09 15:52 M Jones Slow raster change
173745 01/27/09 15:34 vulcan Drift chamber two
173743 01/27/09 12:37 Rondon Target: DVM error 550: Read operation in local mode
173742 01/27/09 12:07 whit SANE Cherenkov PMT5 base replace again and added mu metal sheets
173739 01/27/09 11:48 jmaxwell Target: Turned Off Shim Heater
173738 01/27/09 10:35 Lingyan Zhu Target: LN2 level too high
173736 01/27/09 10:06 Rondon Target: DVM, coils
173735 01/27/09 10:00 Lingyan Zhu Target: PDP screen
173734 01/27/09 08:57 Lingyan Zhu Target: status & screenshots
173733 01/27/09 08:50 M jones Polarized target magnet coolant recovered around midnight
Monday
173732 01/26/09 23:10 J Mulholland Target: Quench Ignore previous entry
173731 01/26/09 22:46 J Mulholland Target: Quench
173730 01/26/09 22:23 J Mulholland Target: Target shifts till Jan 27th day shift
173729 01/26/09 22:16 J Mulholland Target: Insert Leak
173728 01/26/09 21:50 whit Tracker and Lucite HV STILL ON
173727 01/26/09 21:50 J Mulholland Target: Field up to full
173726 01/26/09 21:49 whit SANE Cherenkov HV OFF
173725 01/26/09 21:46 M Jones Updated KINEMATICS.db and MAIN_SANE.db and files sane_16.param and beta_16.param
173721 01/26/09 21:38 whit SANE Cherenkov PMT5 went bad again
173680 01/26/09 20:19 jmaxwell Target: Ramp Status
173673 01/26/09 20:02 jmaxwell Target: Starting Magnet Ramp Up Procedure
173672 01/26/09 19:55 Don Crabb Insert frozen in place
173671 01/26/09 19:14 M Jones Delay in target work because 4atm helium line was cut-off
173670 01/26/09 18:59 Danagoulian Lucite signals
173669 01/26/09 18:28 jmaxwell Target: NMR Tuned
173668 01/26/09 18:20 whit Reference for Cherenkov LED runs while ramping magnet
173667 01/26/09 18:09 M Jones Slow raster
173666 01/26/09 17:57 Danagoulian Lucite HV
173665 01/26/09 17:34 jmaxwell Target: Replaced Q-meter Power Supply
173662 01/26/09 17:14 cdaq Beam Time Accounting
173661 01/26/09 16:36 Donal Target: Adjusted limits
173660 01/26/09 16:29 user hms drift chamber
173659 01/26/09 16:06 Hoyoung Target: Cryo Computer Screen Shots
173658 01/26/09 16:04 Hoyoung Target: PDP Screen
173657 01/26/09 16:00 Hoyoung Day shift summary
173656 01/26/09 15:59 Rondon Connected to Gizmo for 4 PM mtg.
173654 01/26/09 14:50 whit SANE Cherenkov Calibration at ~1/5 Field
173645 01/26/09 14:23 Rondon UPDATED: Run plan for Mon. 1/26 to Wed. 1/28 day
173637 01/26/09 14:10 Donal Target: Elbow on Frig pressurization line
173634 01/26/09 14:01 Hoyoung BTA Software was down
173633 01/26/09 13:56 whit Cherenkov LED ON
173632 01/26/09 13:32 YaLi Slow Raster shape forms a line along 45 degree
173630 01/26/09 12:34 Hoyoung Run 71980 is junk
173627 01/26/09 12:18 whit Cherenkov LED run at ~1/5 Field
173626 01/26/09 12:10 Hoyoung Run 71978 is junk
173622 01/26/09 11:59 whit SANE Cherenkov pmt 5 base replaced
173621 01/26/09 11:57 YaLi shape change of the slow raster
173617 01/26/09 10:03 YaLi Raster shape after phase shifter bypassed
173616 01/26/09 09:11 Hoyoung Target: PDP Screen
173615 01/26/09 09:08 Hoyoung Target: Cryo Computer Screen Shots
173614 01/26/09 08:56 M Jones Beam studies on Tues from 9am to 5pm
173611 01/26/09 08:50 M Jones Bypassed the " phase adjuster" of the Slow raster
173610 01/26/09 08:48 M jones Access cerenkov platform with magnet at 15A
173609 01/26/09 08:34 jmaxwell Target: Testing Target Motion
173608 01/26/09 08:22 M Jones Owl shift summary
173607 01/26/09 08:22 cdaq Beam Time Accounting
173606 01/26/09 08:21 jmaxwell Target: Magnet at 15A
173605 01/26/09 07:37 jmaxwell Target: Ramp Down Continues
173604 01/26/09 07:31 jmaxwell Target: Power Cycled Lower Platform Camera
173601 01/26/09 07:11 jmaxwell Target: Ramp Down Continues
173600 01/26/09 06:46 jmaxwell Target: Voltage Spike
173599 01/26/09 06:44 jmaxwell Target: Ramping Down Magnet
173596 01/26/09 05:57 jmaxwell Going to Controlled Access to Ramp Down Magnet
173595 01/26/09 05:32 M Jones Runs 71971-3 are junk test runs
173594 01/26/09 05:28 M Jones New detector map saneF1_71973.map and updated MAIN_SANE.db
173592 01/26/09 05:11 M Jones Really fixed the lucite adc problem this time.
173586 01/26/09 04:02 jmaxwell Target: Witness Field=84.55G
173583 01/26/09 03:33 jmaxwell Target: Run Valve Setting
173582 01/26/09 03:18 Danagoulian Lucite hit with cosmic and beam
173581 01/26/09 03:11 Danagoulian Lucite without cosmic
173574 01/26/09 02:34 Danagoulian Lucite HV change
173571 01/26/09 02:13 Danagoulian Lucite HV change
173566 01/26/09 01:29 M Jones Changed Lucite discriminator threshold
173564 01/26/09 01:24 M Jones Change BETA1 trigger to be just BigCal without Cerenkov
173561 01/26/09 00:41 M Jones Lucite adc problem fixed
173560 01/26/09 00:30 jmaxwell Target: Run set to 1, then back to .3
173558 01/26/09 00:07 anusha Target: current witness field is 0.00845
173557 01/26/09 00:06 anusha Target: changed the man setpt up to 0.5
173556 01/26/09 00:05 anusha strip charts
173555 01/26/09 00:02 cdaq Beam Time Accounting
173554 01/26/09 00:00 anusha Target: PDP screen
Sunday
173553 01/25/09 23:56 anusha Cryogen IOC Computer Screenshot
173551 01/25/09 23:51 Huber Swing Shift Summary
173548 01/25/09 22:50 veilleux checklist screenshots
173546 01/25/09 22:25 anusha Target: current witness field is 0.008455
173545 01/25/09 22:23 anusha Target: changed the man setpt
173544 01/25/09 22:21 anusha cryo computer screenshot
173543 01/25/09 22:12 anusha PDP screen
173542 01/25/09 22:12 anusha Target: PDP screen
173541 01/25/09 22:12 anusha Target: PDP screen
173540 01/25/09 22:00 veilleux replay
173537 01/25/09 21:36 Donal Target: Clarification
173535 01/25/09 20:59 anusha Target: ran valve closed.
173534 01/25/09 20:57 veilleux power cycled slow raster
173533 01/25/09 20:23 Huber MCC can't talk to Bz magnet
173532 01/25/09 20:13 anusha Target: target witness field is 0.008455
173531 01/25/09 20:06 anusha Target: changed the man setpt up to 0.5
173530 01/25/09 20:04 Rondon Consider reducing the magnet current down to 15 A
173529 01/25/09 19:55 anusha Target: PDP screen
173528 01/25/09 19:46 anusha Target: target moved to the bottom target. encorder = 1.378
173527 01/25/09 19:46 whit Magnetic Field at Cherenkov PMTs
173526 01/25/09 19:44 Rondon RUN PLAN for Mon. 1/26 -Tue. 1/27
173525 01/25/09 19:44 anusha Target: target moved to the bottom target. encorder = 1.378
173524 01/25/09 19:42 anusha Target: rebooted the IOC panel
173523 01/25/09 19:37 anusha liquid level plot
173522 01/25/09 19:37 Danagoulian Lucite status
173521 01/25/09 19:30 Huber Slow raster slowly dying
173520 01/25/09 19:30 M Jones Ended work on the Cerenkov platform
173519 01/25/09 19:16 whit No work done on Cherenkov PMT 5
173518 01/25/09 18:22 anusha Target: target witness field
173517 01/25/09 18:01 M Jones Access to the cerenkov platform with field ON
173516 01/25/09 17:55 M Jones Increased gas flow to HMS DC2 improves efficiency
173515 01/25/09 17:32 whit Cherenkov PMT 5 problem
173514 01/25/09 16:44 whit Cherenkov pmt collection efficiency
173512 01/25/09 16:33 gaskell Moller summary
173510 01/25/09 16:28 whit Cherenkov LED run
173509 01/25/09 16:26 whit Need to take a Chrenkov LED run
173508 01/25/09 16:14 whit Cherenkov Momentum Dependence in Transverse Field
173507 01/25/09 16:05 cdaq Beam Time Accounting
173506 01/25/09 16:02 gaskell Moller backout
173505 01/25/09 16:02 Don Crabb Roots Pumps off
173504 01/25/09 16:00 ates Target: Strip Charts
173502 01/25/09 15:49 ates Target: PDP Screen
173501 01/25/09 15:47 ates Cyro Computer Screenshot
173499 01/25/09 15:30 ccbutu Make log entry when HV of Beta Detectors & HMS are turned OFF & ON!
173493 01/25/09 14:59 ates Target: Witness field
173490 01/25/09 14:46 ates Target: IOC crashed
173489 01/25/09 14:42 ates PDP screen
173488 01/25/09 14:41 ates Target: Cyro Computer Screenshot
173479 01/25/09 14:06 Danagoulian HMS on elastic kinematics
173469 01/25/09 12:30 ates Target: Witness field
173468 01/25/09 12:30 ates Target: Witness field
173466 01/25/09 12:27 gaskell Moller controls
173465 01/25/09 12:25 gaskell Moller tuned
173464 01/25/09 12:21 C Keith New default position for 1K fridge run valve
173461 01/25/09 11:04 Donal Witness field
173460 01/25/09 11:02 chench Turn on Slow Raster
173456 01/25/09 10:53 ates PDP Screen
173455 01/25/09 10:32 ates Target: Cyro Computer Screenshot
173454 01/25/09 10:26 chench Turn off Slow Raster at grun=71940
173453 01/25/09 10:11 Donal and At Target: 4He pressure in Frig
173450 01/25/09 09:45 ates Target: moved to Empty Target 3.842
173447 01/25/09 09:39 gaskell Moller setup
173446 01/25/09 09:21 J Mulholland Target: LN2 restored
173445 01/25/09 09:19 Danagoulian Somebody increased Lucite HV?
173443 01/25/09 08:21 M Jones Run plan for next shift
173442 01/25/09 08:20 M Jones Run plan for next shift
173441 01/25/09 08:08 cdaq Beam Time Accounting
173440 01/25/09 08:06 M Jones Owl shift summary
173439 01/25/09 08:05 Donal Target: Witness probe
173436 01/25/09 07:36 J Mulholland Target: Run Valve After Reboot
173435 01/25/09 07:23 J Mulholland Target: LN2 fill not progressing
173433 01/25/09 06:38 J Mulholland Target: Another cryo ioc reboot and artificially fast fill
173431 01/25/09 05:52 J Mulholland Target: cryo IOC crash
173428 01/25/09 05:34 M Jones Looking at old run 71714 see same problem with DC2
173427 01/25/09 05:11 M Jones HMS shutter was IN !
173426 01/25/09 05:03 M Jones HMS DC2 is not efficient
173424 01/25/09 04:21 M Jones Go to controlled access to look at HMS DC gas flows
173422 01/25/09 03:31 ccbutu Forward Tracker HV Update!
173421 01/25/09 03:17 J Mulholland Target: Moved to Carbon
173414 01/25/09 02:45 J Mulholland Target: Level Probe Readout still flaky?
173404 01/25/09 01:38 ccbutu F1 TDC Card in Slot7 Replaced in Roc 13
173402 01/25/09 00:55 Rondon Target: Watch and log the witness field every 4 h.
173396 01/25/09 00:32 J Mulholland Target: Witness field change?
173389 01/25/09 00:13 J Mulholland Target: PDP Screen
173388 01/25/09 00:11 J Mulholland Target: Cryo Computer Screen Shots
173387 01/25/09 00:11 M Jones Plan to do Moller starting at 9:30am on Sunday
173386 01/25/09 00:07 M Jones In Controlled Access for work on the tracker
173385 01/25/09 00:04 cdaq Beam Time Accounting
173384 01/25/09 00:03 M Jones Set Bigcal thresholds to 350mV ( or about 700 MeV)
Saturday
173372 01/24/09 22:15 Albayrak Evening Shift Summary
173370 01/24/09 22:08 ccbutu Carbon Target!
173359 01/24/09 20:48 ccbutu Slow Raster Off!
173358 01/24/09 20:44 mack HMS drift time spectra
173357 01/24/09 20:44 ccbutu Buffer Dewer filling up the magnet with He
173352 01/24/09 20:06 ccbutu Target Plots Update!
173350 01/24/09 19:48 W. Luo BigCal: Deceased HV on (3,26) by 200v
173349 01/24/09 19:48 ccbutu Target Graphs #3
173348 01/24/09 19:47 ccbutu Target Graphs #2
173347 01/24/09 19:46 ccbutu Target Plots!
173340 01/24/09 19:12 ccbutu TARGET IOC REBBOT
173339 01/24/09 19:10 W. Luo BigCal: decrease HV on (3,26)
173337 01/24/09 19:02 Huber HMS drift spectra
173328 01/24/09 18:19 cdaq Beam Time Accounting
173327 01/24/09 18:19 Donal Target: Target motion limited
173326 01/24/09 17:51 jmaxwell Target: New Encoder Values, Position Switch Change
173325 01/24/09 17:20 Albayrak Controlled access into hall
173324 01/24/09 16:29 Huber HMS delta spectrum is cut off
173323 01/24/09 16:27 Bosted HMS rates when helium level in nose drops
173322 01/24/09 16:16 whit HMS rate vs Target Encoder Plot
173321 01/24/09 15:52 whit Beam: Location of bottom of 8mm hole
173320 01/24/09 15:52 hamlet SEM plots looks strange after run 71873
173319 01/24/09 15:51 Danagoulian HDC2 abnormal drift time
173318 01/24/09 15:48 anusha reboot the target machines.
173317 01/24/09 15:39 whit Target encoder vs HMS rate
173316 01/24/09 15:26 J Mulholland Target: Level Probe Problem
173315 01/24/09 15:01 jmaxwell Target: Target Moved = 0.319
173309 01/24/09 14:29 Danagoulian Raster Gold run number changed
173308 01/24/09 14:23 anusha slow raster OFF
173307 01/24/09 14:21 anusha correct encorder position for the 8 mm hole is 0.201 ( run=71895)
173306 01/24/09 14:20 Danagoulian Calibration of the target hole
173299 01/24/09 14:01 anusha slow raster turned ON
173298 01/24/09 13:44 anusha slaow raster turned OFF
173296 01/24/09 13:35 anusha encorder position moved to 0.280 for the 8 mm hole
173295 01/24/09 13:22 Danagoulian SEM picture inverted
173294 01/24/09 13:17 anusha center for the 10 mm hole
173293 01/24/09 13:13 whit sane cherenkov HV off
173292 01/24/09 13:12 Danagoulian beam and target positions
173288 01/24/09 12:55 anusha target encorder for the run 71890 is 3.824
173284 01/24/09 12:31 C Keith Modifications to and new thermometers on Ch-ville fridge
173283 01/24/09 12:29 Danagoulian HMS DC1 and DC2 tripped
173281 01/24/09 12:22 anusha target moved up
173276 01/24/09 12:11 anusha target moved down
173273 01/24/09 11:59 anusha target moved up
173270 01/24/09 11:40 whit Sane Cherenkov pmt 5
173268 01/24/09 11:37 anusha slow raster turn ON.
173267 01/24/09 11:17 whit Going to beam permit
173266 01/24/09 11:17 whit FSD fixed
173265 01/24/09 11:06 W. Luo BigCal HV control GUI not running & channel 36-47 tripped
173264 01/24/09 10:10 M Jones Raster picture with up/down and beam left/right identified
173263 01/24/09 10:02 M JOnes Picture of raster pattern for run 71883
173261 01/24/09 09:20 whit HMS dipole tripped off
173260 01/24/09 08:53 M Jones Runs taken so far
173259 01/24/09 08:52 whit Slow raster off
173258 01/24/09 08:44 cdaq Beam Time Accounting
173257 01/24/09 07:13 narayan Beam: beam off
173255 01/24/09 06:36 M Jones SEM in event mode
173251 01/24/09 05:17 Dinko Pocani Target: Magnet pressure event
173249 01/24/09 04:29 Dinko Pocani Target: Crosshairs/empty target inserted in beam
173248 01/24/09 04:16 M Jones SEM is in Static mode
173247 01/24/09 03:15 NARAYAN SEM ??
173246 01/24/09 02:02 narayan HMS update
173245 01/24/09 02:02 M Jones Turned slow raster on
173244 01/24/09 01:50 J Mulholland Target: Piston Greased
173243 01/24/09 01:50 narayan HMS
173242 01/24/09 00:25 jmaxwell Target: Target Mover and Encoder
173241 01/24/09 00:05 jmaxwell Target: Ramp Finished, Target at Field
Friday
173240 01/23/09 23:58 J Mulholland Target: Insert has a 10mm carbon
173239 01/23/09 23:13 jmaxwell Target: More Ramping
173238 01/23/09 22:36 jmaxwell Target: Ramping Continues
173237 01/23/09 21:30 M Jones Slow raster went out of phase, could not make it circular, turned off
173236 01/23/09 21:25 M JOnes HMS DC1 and DC2 turned off. Turned back on
173235 01/23/09 20:54 jmaxwell Target: Insert In, CH2
173234 01/23/09 20:53 jmaxwell Target: Ramping Up
173233 01/23/09 19:26 jmaxwell Target: Separator Lvl cable plugged into D connector
173232 01/23/09 19:11 jmaxwell Target: Ramping Magnet
173231 01/23/09 18:45 jmaxwell Target: Fridge running, cooling
173230 01/23/09 18:44 jmaxwell Target: Unlocked Magnet Leads
173229 01/23/09 17:48 M Jones Set Bigcal threshold to 300mV ( about 600 MeV)
173228 01/23/09 17:48 brads Items to watch during startup
173227 01/23/09 17:44 M Jones Leaving Beta HV GUI up and running with the trip alarm off
173226 01/23/09 17:30 brads SANE experiment update
173225 01/23/09 17:29 brads SANE experiment update
173223 01/23/09 16:57 brads SANE Beam Readiness Checklist -- Jan 23, 2009
173221 01/23/09 16:48 Rondon Target: Pictures for previous entry on the shim heater
173220 01/23/09 16:48 M Jones Needed to turn off slow raster to restore circular pattern
173219 01/23/09 16:46 brads re: HMS drift chambers turning off (really all cards in HV crate 1)
173218 01/23/09 16:37 jmaxwell Target: Shim Heater Set to 100mA
173217 01/23/09 16:04 W. Luo BigCal: can not load HV for Lecroy crate with script
173216 01/23/09 15:51 J Mulholland Target: Alarms on PI91137
173215 01/23/09 15:49 J Mulholland Target: Pardon, that was end of Day shift
173214 01/23/09 15:43 J Mulholland Target: End of Swing Screen Shots
173213 01/23/09 14:59 jmaxwell Target: Shim Heater Problem Summary
173209 01/23/09 13:57 M Jones HMS DC1 and DC2 turned off. Turned back on
173206 01/23/09 13:50 gaskell Moller ready
173202 01/23/09 11:31 beaufait moeller camera
173201 01/23/09 11:25 hcf Drift chamber status vs. history
173199 01/23/09 10:19 J Mulholland Target: Shim Heater
173198 01/23/09 09:29 hamlet HMS Detector status from run 71783
173197 01/23/09 08:21 brads Hall C --> Restricted Access
173196 01/23/09 08:12 J Mulholland Target: Cryo Screens
173195 01/23/09 00:23 jmaxwell Target: Plots and Data of this Ramp Down
173194 01/23/09 00:11 Rondon Ahll ready for Restricted access
Thursday
173193 01/22/09 23:57 jmaxwell Target: Locked Magnet Leads
173192 01/22/09 23:53 jmaxwell Target: Voltage Spikes and eventual Quench
173191 01/22/09 23:09 W. Luo BigCal LED signal with field on
173190 01/22/09 22:55 brads Target camera reboot wiki page added.
173189 01/22/09 22:44 brads re: Camera in Hall
173188 01/22/09 22:35 J Mulholland Camera in Hall
173187 01/22/09 22:25 J Mulholland Target: Voltage Spike during ramp
173186 01/22/09 21:29 jmaxwell Target: Beginning Magnet Ramp Down
173185 01/22/09 21:23 W. Luo BigCal: HV channel 38-47 tripped
173181 01/22/09 21:06 W. Luo End run to make a BigCal LED run
173179 01/22/09 18:54 jmaxwell Target: Replaced Shim Heater PS
173178 01/22/09 18:16 Solvignon Event type 13 problem fixed and long cosmic run ongoing
173175 01/22/09 17:41 brads SANE Cerenkov on LN dewar gas line now
173172 01/22/09 17:38 Solvignon Cosmics check: all events are type 13
173171 01/22/09 17:37 solvignon Replay is working fine
173169 01/22/09 17:22 Hovhannes Analysis: REPLAY
173168 01/22/09 17:08 jmaxwell, J Target: Shim Heater PS
173167 01/22/09 16:51 Solvignon replay not working
173166 01/22/09 16:34 jmaxwell Target: Shim Heater Off?
173164 01/22/09 14:40 Zhihong Ye Target: New NMR Screen
173163 01/22/09 14:29 Zhihong Ye Target: NMR Computer Reboot
173162 01/22/09 14:19 brads Target status update
173161 01/22/09 13:56 J Mulholland Target: NMR computer reboot
173160 01/22/09 13:40 Zhihong Ye Target: Target Control Screen-shot
173159 01/22/09 13:38 brads Cordless phone by ramp needs new battery
173158 01/22/09 13:36 Zhihong Ye Target: VNC Screem Shot
173157 01/22/09 13:34 brads Cerenkov gas flowing
173156 01/22/09 12:52 brads re: Updated hclog tcl script
173155 01/22/09 12:47 brads Updated hclog tcl script
173154 01/22/09 12:44 brads Test from cvxwrks account
173153 01/22/09 12:34 J Mulholland Target: Witness field same as last night
173152 01/22/09 12:32 brads hclog test
173151 01/22/09 10:43 Rondon Restarted BETABRITE to get it to show "C Controlled"
173149 01/22/09 08:36 Zhihong Ye Target: Value of LL91110 jumped to 86.5
173148 01/22/09 07:48 D.P. screenshot
Wednesday
173147 01/21/09 23:14 Solvignon Hall C in controlled access
173146 01/21/09 22:26 solvignon target screenshot (part 2)
173145 01/21/09 22:23 Solvignon Target screenshots
173144 01/21/09 22:17 solvignon Hall C sweep in progress
173143 01/21/09 22:17 Solvi Hall C sweep in progress
173142 01/21/09 20:22 j mulholland Target: magnet leadsare not locked
173141 01/21/09 20:15 J Mulholland Target: Computer Reboot
173140 01/21/09 20:14 J Mulholland Target: Magnet leads ramped down and locked
173138 01/21/09 20:09 J Mulholland Target: Magnet at full field
173137 01/21/09 19:14 J Mulholland Target: Mini quench may be PS problem
173136 01/21/09 18:35 J Mulholland Target: Magnet ramping
173135 01/21/09 16:24 J Mulholland Target: Line Filter on Magnet Supply
173134 01/21/09 16:03 brads NOTE: Target will ramp this afternoon; Hall --> Controlled Access @ 10pm
173133 01/21/09 15:56 J Mulholland Target: Magnet ramp data
173132 01/21/09 13:04 JMs Target: Guide to our Magnet Test
173130 01/21/09 11:59 brads SANE Cerenkov gas bottle swapped but NOT turned on
173129 01/21/09 11:33 jmaxwell Target: First Magnet Test, further info
173128 01/21/09 11:27 jmaxwell Target: First Magnet Test
173127 01/21/09 11:01 jmaxwell Target: Low Current Magnet Ramp
173126 01/21/09 10:51 J Mulholland Target: Magnet leads unlocked
Tuesday
173113 01/20/09 18:13 brads SANE experiment update
173112 01/20/09 17:12 jmaxwell Target: Locking Magnet Leads
173110 01/20/09 17:07 M JOnes Modified ts2.crl and added HMS "cosmic" trigger
173109 01/20/09 17:06 jmaxwell, J Target: PS Test Results
173097 01/20/09 16:26 jmaxwell, J Target: Magnet PS Tests
173096 01/20/09 16:06 Fowler HMS: Restarted HMS Controls
173095 01/20/09 16:00 M Jones Bigcal channels 8-17 and 8-18 are hot
173091 01/20/09 14:57 M Jones Turning off the slow raster
173090 01/20/09 14:36 M Jones Slow raster on and set for 1.25cm diameter
173089 01/20/09 14:34 Donal Target: Refrigerator
173088 01/20/09 14:08 M Jones Slow raster fixed
173087 01/20/09 08:49 Donal Target: Spike
173086 01/20/09 03:27 M.Shabestari Target: PI91112 alarm
173085 01/20/09 02:43 jmaxwell Target: Locked Magnet Leads
173084 01/20/09 02:42 jmaxwell Target: Magnet Down
173083 01/20/09 02:34 jmaxwell Target: Spike Pictures, Explained
173082 01/20/09 02:26 jmaxwell Target: Plot of Coil Voltage
173081 01/20/09 02:20 jmaxwell, J Target: Return to Resistive Magnet Behavior at 8.6A
173080 01/20/09 01:44 jmaxwell Target: Magnet Control Log and PDP Message Log
173079 01/20/09 01:28 jmaxwell Target: Magnet Ramp Down Continues
173078 01/20/09 00:26 jmaxwell Target: Beginning Magnet Ramp Down
173077 01/20/09 00:17 jmaxwell Target: Nonsensical Magnet Current in Epics
Monday
173076 01/19/09 23:35 brads HMS drift chamber HVs tripped again. Reset.
173075 01/19/09 23:17 slifer audible alarm on cdaql5
173074 01/19/09 20:21 slifer target status (swing)
173073 01/19/09 17:17 Donal Target: Clarification
173072 01/19/09 16:48 Donal Target: TOdays work on target magnet
173071 01/19/09 16:15 jmaxwell Target: Magnet Up at Field
173070 01/19/09 13:57 J Mulholland Target: Magnet stability check(Magnet on)
173069 01/19/09 13:14 brads SANE experiment and shift schedule update for Tuesday, Wednesday
173068 01/19/09 12:46 ccbutu Forward Tracker Electronic Rack Powered OFF
173067 01/19/09 11:45 Rondon Correction to previous entry: it refers to Monday EVE, not OWL
173066 01/19/09 11:42 M Jones Restored the HV interfaces, turned HMS DC back on
173064 01/19/09 04:12 M.Shabestari Target strip charts
173063 01/19/09 04:09 M.Shabestari Target LL91110 alarm
173062 01/19/09 01:52 brads Shift worker update for Monday DAY, OWL
Sunday
173061 01/18/09 19:01 Donal Target: Taget Status
173060 01/18/09 15:38 brads Plan for Sunday SWING, Monday OWL
173059 01/18/09 13:48 J Mulholland Target: Forcing batch fill Magnet ramp prep
173058 01/18/09 13:26 brads Status update
173057 01/18/09 12:38 Wouter Decon Day: target OK, waiting for experts
173056 01/18/09 07:11 M. Shabestar HMS HVs tripped
173055 01/18/09 06:51 M.Shabestari Target: strip charts
173054 01/18/09 04:17 M.Shabestari PDP snapshot
173053 01/18/09 04:04 M.Shabestari Target Controls snapshot
173052 01/18/09 03:11 brads HMS drift chamber HVs tripped
Saturday
173051 01/17/09 23:13 slifer buffer dewar
173050 01/17/09 19:51 M Jones Overnight plans
173049 01/17/09 19:25 J Mulholland Target: some quench data
173048 01/17/09 18:57 J Mulholland Target: Magnet cold
173047 01/17/09 18:56 J Mulholland Target: Update on Quench
173046 01/17/09 18:47 brads re: cdaql5 frozen (looks OK now)
173045 01/17/09 16:51 Rondon Target: He loss due to stopper pop out probably induced quench
173044 01/17/09 16:46 Narbe 90 degree Hall camera not focusing
173043 01/17/09 16:44 Narbe Target: Camera on upper platform fixed
173042 01/17/09 16:37 J Mulholland Target: Fill
173041 01/17/09 16:18 J Mulholland Target: Status
173040 01/17/09 16:16 reinhold cdaql5 frozen
173039 01/17/09 16:15 reinhold shift checklist
173038 01/17/09 16:08 J Mulholland Target: Quench info
173037 01/17/09 16:02 J Mulholland Target: OVC Pressure
173036 01/17/09 15:47 Bosted Magnetic filed at orange fence
173035 01/17/09 15:44 Bosted Magnetic field at HMS run/safe box
173034 01/17/09 15:39 brads Target magnet quenched
173033 01/17/09 15:38 brads Lower target camera is on hcreboot13, switch 5
173032 01/17/09 14:54 jmaxwell Buffer dewar confusion
173029 01/17/09 14:25 jmaxwell Target: Magnet Ramp Finished
173028 01/17/09 14:03 jmaxwell Target: Magnet at 72A, continuing
173027 01/17/09 13:41 jmaxwell Target: Magnet at 60A, continuing
173026 01/17/09 13:39 brads ESR recovered at ~13:00 (late entry)
173025 01/17/09 13:39 C Keith Buffer dewar recovered from ESR outage
173024 01/17/09 13:36 brads BB Cerenkov nitrogen tank is at 1400psi
173023 01/17/09 13:34 narbe HMS; Interlock
173022 01/17/09 13:32 J Mulholland Target: Buffer Dewar Cold Return
173021 01/17/09 13:12 jmaxwell Target: Ramping Continues
173020 01/17/09 12:51 jmaxwell Target: Ramping Magnet Up
173019 01/17/09 12:41 jmaxwell Target: Magnet Leads Unlocked
173018 01/17/09 12:40 J Mulholland Insert: Position Hole Dimension
173017 01/17/09 12:36 J Mulholland Target: Insert in
173016 01/17/09 12:08 gaskell Moller recovered
173015 01/17/09 10:41 brads HMS, Moller and Target experts notified, ESR work starting around 11:00am
173014 01/17/09 10:36 slifer HMS
173013 01/17/09 10:29 brads ESR likely down for 60--90 minutes
173012 01/17/09 10:25 slifer HMS
173011 01/17/09 10:02 brads Frozen pipe in ESR, probable disruption in cryo flow to Hall C
Friday
173010 01/16/09 19:41 Rondon Target: Alarm problem solved
173009 01/16/09 19:37 brads SANE Readiness checklist
173008 01/16/09 19:14 hamlet Cerenkov detector added in HMS hut electronic trigger
173007 01/16/09 19:05 Rondon Target: Alarm "Polarized Target" (white alarm)
173006 01/16/09 18:23 brads SHIFT SCHEDULE UPDATE -- Saturday SWING shifts restored!
173005 01/16/09 18:09 brads SANE Cerenkov nitrogen bottle swapped out
173004 01/16/09 17:31 C Keith Leak in the refrigerator!
173003 01/16/09 17:30 C Keith Leak in the refrigerator!
173002 01/16/09 17:16 Rondon Beam: Slow raster not working
173000 01/16/09 16:48 beaufait start up test
172999 01/16/09 16:46 beaufait lower target controle working
172995 01/16/09 16:04 jmaxwell Lower Platform Camera Controls not Working
172994 01/16/09 15:28 brads Cerenkov LED mirror insert in OUT position
172993 01/16/09 14:46 narbe, oscar Beam: Slow Raster Work
172992 01/16/09 14:10 narbe Target: Sweep of pivot area done 01/15/09
172991 01/16/09 12:47 J Mulholland Target: Relative positions of targets on insert
172990 01/16/09 12:35 Rondon Beam: Slow Raster found ON, was suppossed to be OFF
172989 01/16/09 12:16 M Jones Hall C shift status
172988 01/16/09 11:32 jmaxwell Magnet On Signs Flakey?
172987 01/16/09 11:03 saw Sweep for Hot checkout started
172986 01/16/09 10:58 M Jones MCC is doing swepp before hot checkout
172985 01/16/09 10:57 M Jones On Wed , replaced SEM preamps
172984 01/16/09 10:52 M Jones Replaced Bigcal Discriminator for rows 9,10,13,14 tdc
172983 01/16/09 10:45 saw Betabrite BCM restarted
172981 01/16/09 08:29 brads NOTE: hot checkout from 1100--1300 this afternoon
172980 01/16/09 04:58 ccbutu Target: Forward Tracker Checked for Light Leaks and Dead Channels!
Thursday
172979 01/15/09 20:44 jmaxwell, J Target: Magnet Cold, Full!
172978 01/15/09 17:23 brads Hot checkout scheduled for ~2am tonight
172977 01/15/09 15:18 Lassiter HMS
Wednesday
172974 01/14/09 17:22 W. Luo BigCal HV GUI running on cdaql5
172973 01/14/09 17:16 W. Luo run 71849-71852
172966 01/14/09 16:42 W. Luo run 71487: BigCal LED test run
172963 01/14/09 16:38 W. Luo End run failed, roc14 no response
172962 01/14/09 16:12 W. Luo BigCal HV on
Tuesday
172955 01/13/09 15:37 ccbutu Target: Forward Tracker In Place!
172954 01/13/09 15:27 hamlet, vard HMS hodoscope discriminator widths changed
172951 01/13/09 09:13 M Jones Updated the thresholds for ROC1 (HMS) and ROC11 (Bigcal) before run 71841
172950 01/13/09 07:44 narbe Target: Bigger diffuser pump; notice for rotating HMS
Monday
172949 01/12/09 17:04 M Jones New BPM screens for SANE
172948 01/12/09 16:58 narbe
172947 01/12/09 16:40 saw Duplicated run numbers
172946 01/12/09 13:58 gaskell Moller cold
172943 01/12/09 10:43 J Mulholland Target: Fridge Bypass Valve
172941 01/12/09 09:43 M jones Replace p/s 706 discriminator for BigCal rows 17,18,21,22
Sunday
172939 01/11/09 12:27 brads Gas alarm in counting house
Friday
172938 01/09/09 17:41 C Keith SANE target status (Dec. 9th)
172937 01/09/09 17:14 saw Fileserver back up
172936 01/09/09 15:57 M Jones Wiremaps of HMS DC2 fro cosmic run 71837
172934 01/09/09 14:55 M Jones Turned on all HMS HV including DC
172933 01/09/09 12:13 saw Reboot fileserver at 4PM
Thursday
172931 01/08/09 16:29 theo HCList Test - please ignore
172930 01/08/09 15:18 beaufait hms drift chambers
172929 01/08/09 10:17 beaufait gas stopped to wire chambers for repair
Wednesday
172928 01/07/09 17:00 whit SANE Cherenkov HV off and pulser off
172927 01/07/09 16:56 whit Sane Cherenkov Individual Thresholds
172925 01/07/09 16:47 whit Sane Cherenkov individual thresholds
172923 01/07/09 16:41 whit SANE Cherenkov Thresholds
172922 01/07/09 16:37 whit SANE Cherenkov Remote Threshold Settings
172921 01/07/09 16:33 whit threshold value before change
172919 01/07/09 16:30 whit Sane Cherenkov Thresholds
172917 01/07/09 16:23 whit SANE Cherenkov Threshold
172915 01/07/09 16:12 whit SANE Chrenkov Threshold
172913 01/07/09 10:34 M Jones Problem with ROC5 fixed, so DAQ "coin" config is now working.
Tuesday
172909 01/06/09 18:14 M Jones Problem with endrun hanging is fixed
172905 01/06/09 17:36 M Jones Problem with ROC5, only use DAQ in "bigcal" configuration
172904 01/06/09 17:31 M Jones Replaced TDC in roc12 slot 24
172888 01/06/09 15:41 whit no ped on run
172886 01/06/09 15:35 M Jones Fixed ROC1
172885 01/06/09 15:11 Whit Cherenkov HV OFF
172884 01/06/09 15:09 whit ROC1
172883 01/06/09 15:00 saw cdaql3 upgraded to RHEL5
172882 01/06/09 14:57 whit Cherenkov LED and Status
172881 01/06/09 14:54 whit SANE Cherenkov HV ON
172880 01/06/09 14:51 whit SANE Cherenkov Gas Swapped
Monday
172879 01/05/09 16:46 Narbe Beam: Slow Raster Turned Off
172878 01/05/09 11:41 M Jones Slid SANE Tracker away from target
Saturday
172877 01/03/09 14:39 jmaxwell Target: Reset Breaker for Upper Platform