Jefferson Lab Hall C Logbook for February 09 - runstarts omitted

  • Main INDEX

    Saturday

  • 177858 02/28/09 23:58 ent shift summary
  • 177857 02/28/09 23:52 Hoyoung Run 72844 was short run; we had no beam
  • 177856 02/28/09 23:49 Luwani Analysis: Helium bottle changed
  • 177855 02/28/09 23:20 Hoyoung Target: PDP screen P=71.3%
  • 177852 02/28/09 22:22 Hoyoung Target: PDP screen P=77.8%
  • 177847 02/28/09 21:24 ccbutu Tracker rates & HV for run #72846
  • 177846 02/28/09 21:21 Hoyoung Target: PDP screen P=79.3%
  • 177843 02/28/09 20:21 Hoyoung Target: PDP screen P=86.1%
  • 177842 02/28/09 19:48 Hoyoung Beam is back after 50min
  • 177839 02/28/09 19:20 Hoyoung Target: PDP screen P=91.0%
  • 177838 02/28/09 19:00 Luwani Analysis: Slow Raster for run72844
  • 177836 02/28/09 18:45 Hoyoung Target: 60% within 15 minutes
  • 177835 02/28/09 18:36 Hoyoung Target: PDP screen P=35.9%
  • 177834 02/28/09 18:26 Hoyoung Target: moved to Top target encoder=3.442
  • 177831 02/28/09 18:06 Hoyoung Moved to empty target, encoder=0.221
  • 177830 02/28/09 18:05 Hoyoung Target: IOC reboot and read-out problem solved
  • 177826 02/28/09 17:05 Hoyoung Target: we are filling nose
  • 177823 02/28/09 16:36 Hoyoung Target: The screenshot shows shim heater on, but it's off
  • 177821 02/28/09 16:03 Hoyoung Target: Cryo screen
  • 177820 02/28/09 16:03 hamlet Shift Summary, 28 February 2009
  • 177819 02/28/09 16:03 cdaq Beam Time Accounting
  • 177818 02/28/09 16:02 Hoyoung Target: PDP screen
  • 177816 02/28/09 15:48 hamlet Have problem to set HMS dipole field. Call Steve Lassiter.
  • 177815 02/28/09 15:28 hamlet Set HMS at 22.30 deg, for proton, momentum 3.5852 GeV/c.
  • 177812 02/28/09 15:04 hamlet Started preparation for Moller measurements.
  • 177811 02/28/09 15:04 anusha Target moved to the 10mm Hole, Encoder=0.251
  • 177809 02/28/09 14:57 ccbutu Tracker HV & Rates
  • 177808 02/28/09 14:36 hamlet Changed trigger to HMS cosmic (3/4) before run 72837
  • 177803 02/28/09 14:12 Rondon Beam: Slow raster is about 20 mm
  • 177802 02/28/09 14:02 M Jones Set slow raster calibration constants
  • 177796 02/28/09 12:44 hamlet No Beam since 11:40
  • 177795 02/28/09 12:24 hamlet Slow raster ADC for 10 mm Haole target, run 72832
  • 177794 02/28/09 12:23 anusha Target moved to the Carbon Target. Encoder=2.983
  • 177793 02/28/09 12:07 melnik Raster pottern with 10 mm Hole
  • 177792 02/28/09 12:06 Rondon RUN PLAN -- UPDATE for Sat. 2/28 day/eve to Sun. 3/1 owl and Sun. 3/1 day/eve
  • 177791 02/28/09 11:52 anusha Target moved to the 8mm Hole. Encoder=0.657
  • 177788 02/28/09 10:53 anusha Target moved to the 10mm Hole, Encoder=0.253
  • 177787 02/28/09 10:48 hamlet Moved hole target In
  • 177786 02/28/09 10:46 anusha Target PDP Screenshot
  • 177785 02/28/09 10:43 hamlet Beam status
  • 177784 02/28/09 10:01 ccbutu HV Change for TRACAKER PMTs
  • 177783 02/28/09 09:28 hamlet Beam OFF. RF trip in Linac.
  • 177781 02/28/09 09:13 anusha Target IOC crashed and rebooted
  • 177779 02/28/09 08:33 hamlet End Run 72830. Beam OFF since 08:10.
  • 177777 02/28/09 08:13 anusha Target Cryo Computer and the Stript charts
  • 177776 02/28/09 08:11 anusha Target PDP screenshot
  • 177775 02/28/09 08:01 cdaq Beam Time Accounting
  • 177774 02/28/09 08:01 Markowitz Owl shift summary
  • 177771 02/28/09 07:50 adaniel Target: IOC screen
  • 177770 02/28/09 07:48 adaniel Target: PDP screen
  • 177767 02/28/09 06:09 adaniel Target: IOC screen
  • 177766 02/28/09 06:07 adaniel Target: PDP screen
  • 177763 02/28/09 04:59 adaniel Target: IOC screen
  • 177762 02/28/09 04:56 adaniel Target: PDP screen
  • 177761 02/28/09 04:46 whit cdaql5 locked up
  • 177758 02/28/09 03:15 Markowitz Wrong target position in run starts, runs 72824-72826
  • 177755 02/28/09 02:41 adaniel Target: IOC panel
  • 177754 02/28/09 02:36 adaniel Target: PDP screen p=+83.4
  • 177753 02/28/09 01:37 adaniel
  • 177750 02/28/09 01:33 Fatiha Lecroy HV alarm
  • 177749 02/28/09 01:33 Fatiha Lecroy HV alarm
  • 177748 02/28/09 01:31 Fatiha Lecroy HV alarm
  • 177747 02/28/09 00:55 adaniel Target: IOC panel
  • 177746 02/28/09 00:41 adaniel Target: IOC panel and strip charts
  • 177745 02/28/09 00:35 adaniel Target: PDP screenshot beginning of shift
  • 177744 02/28/09 00:30 Rondon RUN PLAN-- UPDATE for Fri. 2/27 eve to Sat. 2/28 owl/day
  • 177743 02/28/09 00:29 jmaxwell Target: Instruction for Move to Top in Morning, Bottom 79%
  • 177742 02/28/09 00:26 whit Raster for run72824
  • 177740 02/28/09 00:14 cdaq Beam Time Accounting
  • Friday

  • 177739 02/27/09 23:57 ent shift summary
  • 177738 02/27/09 23:54 jmaxwell Target: Bottom Target In
  • 177735 02/27/09 23:45 jmaxwell Target: Moving Target for Crosshair
  • 177730 02/27/09 23:30 jmaxwell Target: Moving Target for Crosshair
  • 177728 02/27/09 23:23 narbe Beam: Slow raster set back to full size (2cm diameter)
  • 177724 02/27/09 23:14 narbe Target: Slow Raster set to ~1.5cm diameter
  • 177721 02/27/09 23:03 jmaxwell Target: Slow Raster Turned on, Set to ~1cm
  • 177718 02/27/09 22:45 ent beam o.k., start tests
  • 177715 02/27/09 21:52 anusha Target: Target moved to the Empty Target. Encoder=0.143
  • 177714 02/27/09 21:30 ent beam permit, slow raster off
  • 177713 02/27/09 21:01 jmaxwell Target: Magnet Ramp Up Finished
  • 177712 02/27/09 19:20 jmaxwell Target: Begin Magnet Ramp Up
  • 177711 02/27/09 19:01 narbe Target: Shim heaters on
  • 177710 02/27/09 19:00 narbe Target: Lead resistances seem good.
  • 177709 02/27/09 16:20 cdaq Beam Time Accounting
  • 177708 02/27/09 15:54 manzlak HCLIST EHS&Q REVIEW Rotation of SANE Cryostat
  • 177707 02/27/09 15:47 veilleux Day shift summary
  • 177706 02/27/09 15:26 Phil Carter Checklist scan
  • 177704 02/27/09 14:54 Target: Magnet quench
  • 177703 02/27/09 14:30 cdaq Beam Time Accounting
  • 177702 02/27/09 14:03 veilleux bpm, bcm screenshots
  • 177700 02/27/09 13:46 j mulholland Target: PDP screenshot
  • 177699 02/27/09 13:43 j mulholland target: Moved to 10mm hole
  • 177698 02/27/09 13:06 narbe Target: Screen shot of PDP gui, 26.6%, no beam
  • 177697 02/27/09 12:05 narbe Target: Magnet Ramp Finished
  • 177696 02/27/09 11:59 narbe Target: Magnet at full current
  • 177695 02/27/09 11:27 narbe Target: Magnet at 72 A
  • 177694 02/27/09 11:05 J Mulholland Magnet: Ramping to 72 A
  • 177693 02/27/09 10:51 J Mulholland Magnet: At 60A
  • 177692 02/27/09 10:42 J Mulholland Target: Magnet Ramping to 60A
  • 177690 02/27/09 10:28 J Mulholland Target: Sitting at 50 A
  • 177689 02/27/09 10:08 J Mulholland Target: MAgnet Ramp continues
  • 177688 02/27/09 09:57 J Mulholland Target: Magnet at 25A
  • 177687 02/27/09 09:44 J Mulholland Target: BPMs before quench
  • 177686 02/27/09 09:26 Donal Target: Ramp up begins
  • 177685 02/27/09 08:14 albayrak separator valve opened to 0.5
  • 177684 02/27/09 07:45 Luwani Target: PDP screenshot
  • 177683 02/27/09 05:10 Rondon Target: (More readable) Short waits, long waits, beam, no beam: it quenches just the same
  • 177682 02/27/09 04:48 Rondon Target: Short waits, long waits, beam, no beam: it quenches just the same
  • 177681 02/27/09 04:36 Luwani Target: changed the run valve to 0.20
  • 177680 02/27/09 04:32 Luwani Target: Cryo computer monitor goes off
  • 177679 02/27/09 04:12 J Mulholland Target: Ramp at 8 sih
  • 177678 02/27/09 04:11 J Mulholland Target: The computer that is running the cry screen
  • 177677 02/27/09 02:56 jmaxwell Target: Ramp Up in the Morning
  • 177676 02/27/09 02:44 jmaxwell Target: Access to Heat Gun Pop-offs
  • 177675 02/27/09 02:27 Markowitz Owl shift summary
  • 177674 02/27/09 02:25 jmaxwell Target: Magnet Quench
  • 177673 02/27/09 02:06 jmaxwell Target: Moved to Empty
  • 177672 02/27/09 01:54 jmaxwell Target: Magnet Ramp Finished
  • 177671 02/27/09 00:06 jmaxwell Target: Starting Ramp Up Procedure
  • Thursday

  • 177670 02/26/09 23:52 jpchen targte screen shot
  • 177669 02/26/09 23:40 hamlet Shift Summary, 26 February 2009
  • 177668 02/26/09 21:45 jpchen magnet level full at ~ 9:00 pm
  • 177667 02/26/09 20:48 jpchen magnet cold, and still filling
  • 177666 02/26/09 19:43 jpchen Access in the hall to get relieve valves closed.
  • 177665 02/26/09 19:03 hamlet BPM and BCM before magnet quenched
  • 177664 02/26/09 19:02 ellis Raster pictures before quench
  • 177663 02/26/09 18:53 J Mulholland Target: Magnet to Ramp about midnight
  • 177662 02/26/09 18:45 hamlet Ask MCC for controlled access. We have target magnet problem.
  • 177661 02/26/09 18:42 jpchen magnet quenched
  • 177659 02/26/09 18:36 jpchen microwave on
  • 177657 02/26/09 18:29 jpchen turned off microwave
  • 177656 02/26/09 18:26 jpchen turned on microwave
  • 177653 02/26/09 18:17 jpchen turned on roots pump #1
  • 177652 02/26/09 18:08 hamlet Put Cross Hairs. Ask MCC for 65 nA beam
  • 177651 02/26/09 18:05 jpchen target to EMPTY (cross hair)
  • 177650 02/26/09 18:00 J Mulholland Target: TE bottom Target
  • 177649 02/26/09 17:40 Donal Target: TE Top proton
  • 177648 02/26/09 17:17 W. Luo BigCal: effect of target field on gain of BigCal
  • 177647 02/26/09 17:01 hamlet Ready to go Beam Permit
  • 177642 02/26/09 16:40 Rondon RUN PLAN -- Thurs. 2/26 eve to Fri. 2/27 owl/day
  • 177641 02/26/09 16:35 J Mulholland Target: Magnet up to field
  • 177640 02/26/09 16:27 ccbutu TRACKER HV turned ON
  • 177639 02/26/09 16:06 YaLi shift summary
  • 177638 02/26/09 16:05 W. Luo BigCal: LED run 72810, target field = 67A
  • 177637 02/26/09 16:04 hamlet Set HMS at 16.0 deg, Electron polarity, momentum 2.2 GeV/c
  • 177634 02/26/09 16:00 cdaq Beam Time Accounting
  • 177633 02/26/09 15:30 M Jones Set slow raster for 4 pass beam
  • 177630 02/26/09 14:46 jmaxwell Target: Begining Ramp Up Magnet
  • 177629 02/26/09 14:45 jmaxwell Target: Insert C Tuned
  • 177628 02/26/09 14:28 Donal Target: Status
  • 177627 02/26/09 14:25 vulcan ready for beam
  • 177622 02/26/09 13:40 manzlak HCLIST EHS&Q REVIEW Counting room fire strobe
  • 177619 02/26/09 13:21 ccbutu 5 mm thick plastic sheet in front of the TRACKER!
  • 177618 02/26/09 13:02 Donal Target: Insert installed
  • 177617 02/26/09 10:53 Donal Target: Update
  • 177616 02/26/09 09:02 ccbutu TRACKER HV turned off!
  • 177615 02/26/09 08:23 vulcan locked out the BE,FZ maganet power supply
  • 177614 02/26/09 08:05 adaniel yield plot for top runs
  • 177613 02/26/09 08:02 cdaq Beam Time Accounting
  • 177604 02/26/09 07:16 jmaxwell Target: Magnet Leads Locked
  • 177603 02/26/09 07:06 jmaxwell Target: Ramp Down Finished
  • 177602 02/26/09 06:08 puckett full survey done
  • 177601 02/26/09 05:57 jmaxwell Target: Magnet Ramp Down
  • 177600 02/26/09 05:29 Luwani Target: PDP screen shot after IOC crashed and rebooted
  • 177599 02/26/09 05:27 Luwani Target: IOC crashed and rebooted
  • 177597 02/26/09 04:44 Luwani Target: change run valve to 0.35
  • 177593 02/26/09 03:43 Luwani Target: IOC Panel and Stripcharts
  • 177591 02/26/09 03:37 Luwani Target: PDP screenshot
  • 177588 02/26/09 02:44 Luwani Target: Target: IOC Panel and the Stripcharts
  • 177587 02/26/09 02:40 Luwani Target:PDP screen shot
  • 177586 02/26/09 02:00 Luwani Target: PDP screenshot after changing run valve
  • 177585 02/26/09 01:57 Luwani Target: Changed run valve value to 0.30
  • 177582 02/26/09 01:42 Luwani Target: IOC Panel and the Stripcharts
  • 177581 02/26/09 01:42 Luwani Target: IOC Panel and the Stripcharts
  • 177580 02/26/09 01:21 Luwani Target: PDP screen shot
  • 177577 02/26/09 00:18 Rondon When polarization < 62% increase beam current to 105 nA
  • 177576 02/26/09 00:18 Luwani Target: Strip chart
  • 177575 02/26/09 00:15 Luwani Target: cryoscreen shot
  • 177574 02/26/09 00:09 Luwani Target: PDP screenshot at beginning of shift
  • 177573 02/26/09 00:01 cdaq Beam Time Accounting
  • 177572 02/26/09 00:00 hamlet Shift Summary, 25 February 2009
  • Wednesday

  • 177569 02/25/09 23:22 anusha Target: IOC Panel and the Stript Charts.
  • 177568 02/25/09 23:17 anusha Target PDP Screenshot
  • 177567 02/25/09 23:01 J Mulholland Target: Before backfilling the fridge
  • 177565 02/25/09 22:58 J Mulholland Target: Cup repaired
  • 177564 02/25/09 22:47 hamlet Beam OFF due to RF problem in Linac
  • 177562 02/25/09 22:32 hamlet Change beam current from 70 nA to 95 nA during run 72794
  • 177560 02/25/09 22:12 anusha Polarization suddenly droped to 0 from 73.3 %
  • 177559 02/25/09 22:02 ellis bpm bcm screen shots
  • 177558 02/25/09 22:01 hamlet Lost target polarization. Ask MCC for beam OFF.
  • 177556 02/25/09 21:56 hamlet Beam current changed from 60 nA to 95 nA during run 72793
  • 177554 02/25/09 21:38 Rondon Beam: Plots used to calibrate slow raster
  • 177553 02/25/09 21:28 ellis yield plot for bottom runs
  • 177552 02/25/09 21:18 anusha Target PDP Screenshot
  • 177551 02/25/09 21:04 anusha Target: Target moved to the Top NH3
  • 177550 02/25/09 20:58 hamlet Ask MCC for beam OFF, move Top target in.
  • 177548 02/25/09 20:11 hamlet Run 72791 is Junk !
  • 177544 02/25/09 19:31 anusha Target PDP screenshot
  • 177542 02/25/09 18:47 hamlet Ask MCC for beam OFF to continue target polarization work
  • 177539 02/25/09 18:02 ellis 2 lucite adc channels missing
  • 177538 02/25/09 18:00 hamlet Ask MCC for beam OFF. Experts will try to increase target polarization
  • 177534 02/25/09 17:17 hamlet Ask MCC for beam current 105 nA, run 72787 in progress
  • 177533 02/25/09 17:09 ccbutu Tracker HV & Rates for run #72739
  • 177530 02/25/09 16:54 ccbutu HV & Rates for run#72786
  • 177529 02/25/09 16:26 hamlet Target for Run 72786 is Bottom (Negative)
  • 177528 02/25/09 16:14 J Mulholland target: Flow back to a sort of reasonable level
  • 177526 02/25/09 16:03 cdaq Beam Time Accounting
  • 177525 02/25/09 15:56 J Mulholland Target: High flow...beam off
  • 177524 02/25/09 15:55 reinhold ask for beam off; work on target polarization
  • 177521 02/25/09 15:54 reinhold Day shift summary
  • 177520 02/25/09 15:53 Donal Target: Feb 25 Anneal Plot
  • 177518 02/25/09 15:45 Nuruzzaman PDP Screen before IOC rebooting
  • 177517 02/25/09 15:34 reinhold request drop to 90 nA
  • 177516 02/25/09 15:24 Nuruzzaman Cryo & Stripchart Screenshots
  • 177515 02/25/09 15:12 reinhold just asked to increase current to 105 nA ...
  • 177514 02/25/09 15:02 reinhold run 72784: -59.3 % at 95 nA bottom
  • 177512 02/25/09 14:56 reinhold found an open connection to hctsv7 at ONLINE console
  • 177511 02/25/09 14:55 Nuruzzaman PDP Screenshot
  • 177510 02/25/09 14:53 reinhold target at -58.7%, ask for beam ...
  • 177509 02/25/09 14:51 reinhold connection to hctsv7 refused; cannot check HMS slit
  • 177508 02/25/09 14:41 L. Zhu raster plots for 72783
  • 177506 02/25/09 14:35 reinhold BPM and BCM screens
  • 177504 02/25/09 14:31 Nuruzzaman PDP Screenshot
  • 177503 02/25/09 14:28 reinhold target over annealed; ask for 110 nA at -55.1% polarization
  • 177502 02/25/09 14:05 L. Zhu sorry! wrong run number
  • 177501 02/25/09 13:56 Nuruzzaman Polarizing the Bottom Target
  • 177500 02/25/09 13:47 reinhold Call from Cornel
  • 177499 02/25/09 13:41 narbe Target: Frig full; Moved to Bottom NH3
  • 177498 02/25/09 13:29 L. Zhu tracker plots different due to HV change
  • 177497 02/25/09 13:26 reinhold start polarizing target
  • 177495 02/25/09 13:14 reinhold BPM&BCM screens
  • 177493 02/25/09 13:03 narbe Target: Didn't fill frig, only cooled it down.
  • 177492 02/25/09 13:03 reinhold Carbon target in; ask MCC for 150 nA
  • 177491 02/25/09 13:03 narbe Target: Moved to Carbon
  • 177490 02/25/09 12:47 narbe Target: Finished Anneal; Cooling down frig
  • 177489 02/25/09 11:56 Rondon RUN PLAN -- UPDATE: Wed. 2/25 day/eve to Thurs. 2/26 owl
  • 177488 02/25/09 11:54 Rondon RUN PLAN -- UPDATE: Wed. 2/25 day/eve to Thurs. 2/26 owl
  • 177487 02/25/09 11:34 narbe Target: Moved to Top NH3
  • 177486 02/25/09 11:28 reinhold MCC offers beam; target can't take it right now
  • 177485 02/25/09 11:19 narbe Target: Anneal Started
  • 177484 02/25/09 11:16 reinhold unprovoked HMS DC HV trip
  • 177483 02/25/09 11:07 reinhold There's an out-of-date Moller how-to ...
  • 177482 02/25/09 11:05 reinhold Moller quad1 on again at 110.9 A
  • 177481 02/25/09 10:48 jmaxwell Target: Yale Gain During TE
  • 177480 02/25/09 10:41 reinhold Call Dave G.; Moeller quad 1 off
  • 177479 02/25/09 10:40 reinhold Called MCC and request beam; not available
  • 177478 02/25/09 10:38 jmaxwell Target: TE Results
  • 177477 02/25/09 10:35 jmaxwell Target: Bottom TE Done, Carbon in for Anneal
  • 177476 02/25/09 10:10 jmaxwell Target: Moved to Bottom for TE
  • 177475 02/25/09 10:05 jmaxwell TE Picture, Long Time Scale
  • 177474 02/25/09 09:49 reinhold MCC call: something about a sane magnet not being right
  • 177473 02/25/09 09:30 reinhold HMS screen shots for new setting
  • 177472 02/25/09 09:20 reinhold Changed prescale setting: enable HMS singles
  • 177471 02/25/09 09:16 reinhold Rotated HMS to 15.40 degree
  • 177470 02/25/09 08:59 reinhold HMS NMR locks: HMS now ready at 4.40 GeV
  • 177469 02/25/09 08:54 reinhold Call from Steve
  • 177468 02/25/09 08:43 reinhold HMS was not settling
  • 177467 02/25/09 08:08 cdaq Beam Time Accounting
  • 177466 02/25/09 08:06 Hoyoung Owl shift summary
  • 177465 02/25/09 07:32 Hoyoung HMS set to 4.4GeV, 15.4 angle, Electron
  • 177464 02/25/09 07:14 adaniel yield plot for top runs
  • 177463 02/25/09 06:00 Hoyoung HMS DC trip
  • 177462 02/25/09 05:54 narayan Target: PDP Screenshot just before going to the TE and Anneal
  • 177461 02/25/09 05:48 narayan Target update and screenshot
  • 177460 02/25/09 05:45 Hoyoung Preparing TE and Anneal
  • 177459 02/25/09 05:43 jmaxwell Target: End of Running for TE, Anneal
  • 177457 02/25/09 05:32 narayan Target: PDP screenshot after increase in current to 100
  • 177456 02/25/09 05:20 narayan Target: current up to 100,screenshot
  • 177455 02/25/09 05:15 Hoyoung Beam current raised to 100nA
  • 177452 02/25/09 04:36 Narayan/Luwa Target: PDP screen shot after IOC reboot.
  • 177451 02/25/09 04:30 Narayan/Luwa Target: PDP screen after IOC reboot
  • 177450 02/25/09 04:25 Narayan Target: IOC crashed and rebooted
  • 177449 02/25/09 04:10 narayan Target: Stripchart screenshot
  • 177448 02/25/09 03:47 narayan Target: PDP screen shot after IOC reboot.
  • 177447 02/25/09 03:47 Hoyoung Beam position back to run plan during 72779
  • 177444 02/25/09 03:43 narayan Target: IOC crashed and rebooted
  • 177443 02/25/09 03:37 adaniel Raster plots looks OK
  • 177442 02/25/09 03:36 narayan Target: run valve at 0.30
  • 177438 02/25/09 03:16 Hoyoung Beam x position is changing
  • 177436 02/25/09 02:59 Hoyoung Beam position back to run plan
  • 177433 02/25/09 02:50 adaniel raster plot for run 72776
  • 177430 02/25/09 02:16 narayan Target: PDP screen shot
  • 177429 02/25/09 02:13 narayan Target: run valve at 0.27
  • 177428 02/25/09 01:58 Hoyoung Beam current keeps 90 nA (72774,72775)
  • 177427 02/25/09 01:52 Hoyoung Changing beam position
  • 177425 02/25/09 01:38 adaniel slow raster adc plot for run 72774
  • 177423 02/25/09 01:35 Rondon Beam: BPM 00A should be x = -1.5 mm
  • 177422 02/25/09 01:35 narayan Target: cryo screenshot
  • 177421 02/25/09 01:29 jmaxwell Target: Please Post Slow Raster ADC Images
  • 177420 02/25/09 01:29 Rondon Beam: Slow raster is 20 mm
  • 177419 02/25/09 01:29 narayan Target: PDP screen shot, encoder position 3.359
  • 177418 02/25/09 01:22 Hoyoung BPM 3H00A x=-1.0 not -1.5
  • 177417 02/25/09 01:11 Hoyoung Slow raster size=2.18cm
  • 177414 02/25/09 00:36 narayan Run valve opened to 0.3
  • 177413 02/25/09 00:03 Rondon Shift summary (partial)
  • 177412 02/25/09 00:02 cdaq Beam Time Accounting
  • 177411 02/25/09 00:01 Rondon RUN PLAN for Wed 2/25 Day/Eve to Thurs. 2/26 Owl
  • 177410 02/25/09 00:01 A. Deur yields for top runs
  • Tuesday

  • 177409 02/24/09 23:56 narbe Target: Screen shot of PDP gui, 70.0%, IBeam90nA
  • 177408 02/24/09 23:54 narbe Target: IOC Reboot
  • 177405 02/24/09 22:52 narbe Target: Screen shot of PDP gui, 72.4%, IBeam90nA
  • 177402 02/24/09 21:52 narbe Target: Screen shot of PDP gui, 74.3%, IBeam90nA
  • 177399 02/24/09 21:35 narbe Target: IOC Reboot
  • 177398 02/24/09 20:52 narbe Target: Screen shot of PDP gui, 73.9%, IBeam90nA
  • 177395 02/24/09 20:32 Rondon RUN PLAN-- UPDATE for Tue. 2/24 eve to Wed. 2/25 owl
  • 177394 02/24/09 19:59 narbe Target: IOC Reboot
  • 177393 02/24/09 19:55 narbe Target: Screen shot of PDP gui, 68.7%, IBeam105nA
  • 177392 02/24/09 19:53 M JOnes Swing shift summary ( halfway point)
  • 177390 02/24/09 19:37 narbe Target: Moved to Top NH3
  • 177389 02/24/09 19:36 M JOnes Moller results
  • 177388 02/24/09 19:30 A. Deur Yield plot for bottom target
  • 177384 02/24/09 18:50 narbe Target: IOC Reboot
  • 177380 02/24/09 18:13 Narbe Target: Screen shot of PDP gui, 63.7%, IBeam105nA
  • 177379 02/24/09 18:13 cdaq Beam Time Accounting
  • 177378 02/24/09 18:11 narbe Target: Moved to Empty to get ready for Moller run
  • 177376 02/24/09 17:43 A. Deur Shift checklist
  • 177373 02/24/09 17:16 M Jones BCm and BPM screens
  • 177372 02/24/09 17:15 narbe Target: Screen shot of PDP gui, 64.0%, IBeam105nA
  • 177371 02/24/09 17:01 narbe Target: Rebooted IOC, HallC Network Switch, then PDP
  • 177369 02/24/09 16:11 A. Deur HMS DC trip
  • 177368 02/24/09 16:07 narbe Target: Screen shot of PDP gui, 71.0%, IBeam0nA
  • 177367 02/24/09 16:05 narbe Target: Target Cryo and Atrip Screenshots
  • 177366 02/24/09 16:00 reinhold MCC has cavity problems
  • 177364 02/24/09 15:56 reinhold BPM&BCM for last 2 hours
  • 177363 02/24/09 15:54 reinhold Shift Summary
  • 177360 02/24/09 15:25 anusha Target IOC Panel
  • 177358 02/24/09 15:18 anusha Strip Charts
  • 177357 02/24/09 15:15 reinhold MCC reports RF cavity problem
  • 177355 02/24/09 15:13 anusha Target PDP Screenshot
  • 177353 02/24/09 14:41 reinhold target back at 65.4% w/out beam; ask for beam back
  • 177352 02/24/09 14:32 reinhold lost some polarization; take beam off for re-polarizing
  • 177348 02/24/09 14:27 anusha Target IOC crashed and rebooted
  • 177347 02/24/09 14:10 reinhold slow raster and BPM for run 72759
  • 177346 02/24/09 14:04 reinhold Run72759, tracker Y2 looks funny: is OK
  • 177345 02/24/09 14:02 Luwani Run72759, tracker Y2 looks funny
  • 177344 02/24/09 13:56 Luwani Run72759, tracker Y2 looks funny
  • 177343 02/24/09 13:44 anusha Target PDP screenshot
  • 177342 02/24/09 13:44 reinhold run 72759 is 105 nA and +61.7% on bottom target
  • 177340 02/24/09 13:38 reinhold polarization at 62.8%; ask MCC for 105 nA
  • 177339 02/24/09 13:11 reinhold HMS DC HV tripped
  • 177338 02/24/09 12:40 anusha Target: Target moved back to the Bottom Target and started polarizing.
  • 177337 02/24/09 12:29 reinhold target abandons TE; start polarizing again
  • 177336 02/24/09 12:23 jmaxwell Target: Camera Cable Caught
  • 177335 02/24/09 12:06 reinhold end controlled access
  • 177334 02/24/09 11:57 J Mulholland Access made to try and fix camera
  • 177333 02/24/09 11:47 J Mulholland Target: Reconnect magnet leads and prepare for TE
  • 177332 02/24/09 11:46 reinhold Ask MCC for controlled access: need to fix a target camera
  • 177331 02/24/09 11:35 reinhold target starts a TE measurement
  • 177330 02/24/09 11:33 reinhold Steve brought HMS Magnet controls back to life
  • 177329 02/24/09 11:26 reinhold BPM & BCM screens last two hours
  • 177328 02/24/09 11:17 ccbutu TRACKER PMT #3 & #7 HV & RATES
  • 177327 02/24/09 11:16 reinhold MCC starts working an their zone problem; needs 0.5 to 2 hrs
  • 177325 02/24/09 11:06 reinhold MCC call: have problems with a zone ...
  • 177324 02/24/09 10:55 reinhold P.S.: Hall probes on camera are OK
  • 177323 02/24/09 10:52 reinhold HMS Magnet Controls not receiving data
  • 177322 02/24/09 10:33 anusha Target PDP screenshot after restarting the RF generator and the PDP
  • 177320 02/24/09 10:26 reinhold Run 72757 end failed; reboot roc 14
  • 177319 02/24/09 10:24 reinhold Fire alarm (due to testing of sprinkler system)
  • 177318 02/24/09 10:19 narbe Target: Lost connection with RF generator; rebooted HCReboot16
  • 177316 02/24/09 10:00 reinhold BPM & BCM screens 8:00 - 10:00
  • 177315 02/24/09 09:47 Donal Target: Anneal Plot Feb 24 am
  • 177312 02/24/09 09:06 reinhold slow raster plot before/after adjusting beam pos
  • 177311 02/24/09 08:39 reinhold run 72756 pol is +69.4
  • 177310 02/24/09 08:23 reinhold adjusted beam x position before run 72756
  • 177308 02/24/09 08:20 reinhold Ask MCC to adjust beam x position
  • 177306 02/24/09 08:17 reinhold BPM screen
  • 177304 02/24/09 08:07 anusha Target: TArget PDP screenshot
  • 177303 02/24/09 08:07 reinhold target polarized at +70% bottom; ask for beam
  • 177302 02/24/09 08:04 adaniel plot of yield vs run number
  • 177301 02/24/09 08:02 cdaq Beam Time Accounting
  • 177300 02/24/09 07:57 M Jones Owl shift summary
  • 177299 02/24/09 07:35 J Mulholland Target: Moved to Bottom Target
  • 177298 02/24/09 07:15 J Mulholland Target: Anneal finished
  • 177297 02/24/09 06:11 J Mulholland Target: Moved to Top Target for Anneal
  • 177295 02/24/09 06:05 J Mulholland Target: IOC reboot didn't respond
  • 177294 02/24/09 06:03 J Mulholland Target: Anneal procedure started
  • 177293 02/24/09 06:01 Loss of polarization in post 177283
  • 177291 02/24/09 05:44 J Mulholland Target: Moved to Carbon
  • 177288 02/24/09 04:59 Hoyoung Target: increaed polariztion right before losing
  • 177287 02/24/09 04:42 Hoyoung Target: lost polarization
  • 177285 02/24/09 03:59 Hoyoung Target: PDP screen P=-63.7%
  • 177283 02/24/09 03:25 Hoyoung Target: lost polarization
  • 177276 02/24/09 00:32 Hoyoung Target: Moved to bottom target(encoder=1.670)
  • 177274 02/24/09 00:16 Rondon Shift summary (partial)
  • 177273 02/24/09 00:15 Hoyoung Target: Cryo screen
  • 177272 02/24/09 00:14 cdaq Beam Time Accounting
  • 177271 02/24/09 00:13 Hoyoung Target: PDP screen P=-61.1%
  • 177270 02/24/09 00:01 Rondon RUN PLANS-- UPDATE for Mon. 2/23 eve to Tue.. 2/24 owl and Tue. 2/24 day/eve
  • Monday

  • 177269 02/23/09 23:53 mahbub Tracker: still looking into Y1-PM3 and Y2-PM7 problem
  • 177268 02/23/09 23:33 Martin Jones BPM & BCM
  • 177262 02/23/09 21:34 albayrak target screenshot
  • 177261 02/23/09 21:30 albayrak pumps are tripped
  • 177257 02/23/09 20:11 albayrak target screenshot
  • 177254 02/23/09 19:51 albayrak IOC rebooted
  • 177253 02/23/09 19:27 Martin Jones Slow raster improvement
  • 177252 02/23/09 19:20 Rondon Analysis: Moved sane08/replay/paw/old out of scratch2
  • 177251 02/23/09 19:20 albayrak high fridge pressure
  • 177248 02/23/09 18:34 albayrak target screenshot
  • 177247 02/23/09 18:21 Martin Jones Analysis: Disk is full
  • 177244 02/23/09 17:46 J Mulholland Target: Correction to Insert Material names
  • 177243 02/23/09 17:13 M Jones Wien angle at 13 degrees
  • 177241 02/23/09 17:07 albayrak stripcharts screenshots
  • 177240 02/23/09 17:06 albayrak strip charts screenshots
  • 177239 02/23/09 17:05 albayrak stripcharts sceenshots
  • 177238 02/23/09 17:00 albayrak target screen screenshots
  • 177237 02/23/09 16:57 albayrak target controls sceernshot
  • 177236 02/23/09 16:53 jmaxwell Target: Raster Images Superimposed on Photo of Cross-hair
  • 177235 02/23/09 16:47 J Mulholland Target: Better Screenshot
  • 177234 02/23/09 16:46 J Mulholland Target: Polarizing at 60% and rising
  • 177233 02/23/09 16:41 Donal Target: Anneal Plot Feb 23 about 4pm
  • 177232 02/23/09 16:03 cdaq Beam Time Accounting
  • 177231 02/23/09 15:58 reinhold Shift Summary
  • 177230 02/23/09 15:50 Luwani Shift Check List
  • 177229 02/23/09 15:30 reinhold Call from MCC: pass change complete
  • 177228 02/23/09 15:08 reinhold Connected LN2 dewar to SANE Cerenkov
  • 177227 02/23/09 15:01 J Mulholland Target: Liquid Level Extremely high
  • 177226 02/23/09 14:55 narbe Target: VNC died; Rebooted target-NMR cpu
  • 177225 02/23/09 14:14 J Mulholland Target: Anneal Starting
  • 177224 02/23/09 14:02 reinhold Ask for controlled access: Mark will check gas in Cerenkov
  • 177223 02/23/09 14:00 reinhold Called MCC: probably 4 to 5 hrs
  • 177222 02/23/09 13:38 mahbub Tracker: Patch 4 analog signals to counting room
  • 177221 02/23/09 13:24 Nuruzzaman PDP Screenshot
  • 177220 02/23/09 12:36 Nuruzzaman We get -82.0% polarization
  • 177219 02/23/09 12:23 M Jones Fixed network connection to hcreboot1
  • 177218 02/23/09 12:09 reinhold Folks are out of Hall C; MCC ~> 2 hrs away from finishing pass change
  • 177217 02/23/09 11:46 Nuruzzaman We reached -81% polarization
  • 177216 02/23/09 11:33 Nuruzzaman Target: Correction: The polarization was -80.0%
  • 177215 02/23/09 11:22 Nuruzzaman Polarization is 80.0%
  • 177214 02/23/09 11:20 reinhold Silenced a tracker HV alarm
  • 177213 02/23/09 10:58 Nuruzzaman We get Polarization -78.2%
  • 177212 02/23/09 10:48 Nuruzzaman We get polarization -77.1%
  • 177211 02/23/09 10:37 Nuruzzaman We get the polarization -75.2%
  • 177210 02/23/09 10:08 reinhold Hall surveyed and in controlled access
  • 177209 02/23/09 09:59 Donal Target: Anneal Plot Feb 22 about 3 am
  • 177208 02/23/09 09:57 Nuruzzaman PDP Screenshot
  • 177207 02/23/09 09:38 Donal Target: Anneal Plot Feb 21 about 9 am
  • 177206 02/23/09 09:38 narbe Target: Moved to polarize Top NH3
  • 177205 02/23/09 09:37 reinhold Ask for controlled access
  • 177204 02/23/09 09:30 Donal Target: Anneal Plot Feb 23 (early morning)
  • 177203 02/23/09 09:26 Nuruzzaman Target Moved to Top target
  • 177201 02/23/09 09:15 Nuruzzaman Target: Screenshot of cryo & strip chart
  • 177199 02/23/09 09:07 REINHOLD MCC call: start pass change for Hall A
  • 177198 02/23/09 08:50 narbe Target: Nose full, repolarizing
  • 177197 02/23/09 08:48 narbe Target: Correction on post for previous nose-level drop
  • 177196 02/23/09 08:31 reinhold current raster setting
  • 177195 02/23/09 08:31 Nuruzzaman Moved the target to Bottom Target
  • 177194 02/23/09 08:28 reinhold ask beam off; move to bottom target
  • 177193 02/23/09 08:21 narbe Target: nose level dropped=>loss of polarization
  • 177192 02/23/09 08:20 reinhold Lost polarization; take data on 8mm hole target
  • 177190 02/23/09 08:18 Nuruzzaman Target Moved
  • 177188 02/23/09 08:02 narbe Target: Screen shot of PDP gui, 64.5%, IBeam98nA
  • 177187 02/23/09 08:00 pking Owl shift summary
  • 177186 02/23/09 07:43 T.Walton Monitoring the yield
  • 177185 02/23/09 07:30 T.Walton tracker TDC run 72739
  • 177182 02/23/09 07:18 pking Target: Reboot iochc4 again
  • 177181 02/23/09 07:09 vahe Target: Cryoscreen
  • 177180 02/23/09 06:59 vahe Target PDP screen
  • 177179 02/23/09 06:56 pking Target: Reboot iochc4
  • 177178 02/23/09 06:35 pking Target: Reboot IOCHC4
  • 177177 02/23/09 06:28 T.Walton tracker TDC run 72737
  • 177176 02/23/09 06:21 T.Walton Screen Snapshots 95 nA
  • 177174 02/23/09 06:05 T.Walton monitoring the yield
  • 177173 02/23/09 06:03 T.Walton monitoring the yield
  • 177172 02/23/09 06:02 T.Walton tracker TDC histograms
  • 177171 02/23/09 05:59 pking OPS will do an optics check
  • 177167 02/23/09 05:16 jmaxwell Target: Poor Target Performace
  • 177166 02/23/09 05:09 pking Changed the slow raster at 03:49; increased by 10%
  • 177165 02/23/09 04:43 jmaxwell Target: Insert C Material Removal Pictures
  • 177164 02/23/09 04:39 T.Walton drop in the yield
  • 177163 02/23/09 04:38 pking Beam current for run 72736 was 95 nA.
  • 177162 02/23/09 04:37 pking Beam current for run 72735 was 95 nA.
  • 177161 02/23/09 04:34 jmaxwell Target: PDP screen pol=68%
  • 177160 02/23/09 04:31 jmaxwell Target: Cross-hair runs
  • 177157 02/23/09 03:32 jmaxwell Target: Cryoscreen
  • 177156 02/23/09 03:31 jmaxwell Target: PDP Screen, Pol 74%
  • 177152 02/23/09 02:57 jmaxwell Target: Anneal Done, Polarizing
  • 177151 02/23/09 02:09 pking Target: Our TO is missing; James will stay until about 0500, then Vahe will complete the shift.
  • 177150 02/23/09 02:07 jmaxwell Target: Moved to Bottom = 1.680
  • 177149 02/23/09 02:06 pking Request beam off; move the target, begin the anneal
  • 177147 02/23/09 02:01 jmaxwell Target: Anneal
  • 177144 02/23/09 01:51 pking The half wave plate is being taken OUT now.
  • 177112 02/23/09 00:15 jmaxwell Target: Moved to Empty
  • 177111 02/23/09 00:04 cdaq Beam Time Accounting
  • 177110 02/23/09 00:00 jmaxwell Target: Anneal Heater ON
  • Sunday

  • 177109 02/22/09 23:57 Keppel shift summary
  • 177108 02/22/09 23:55 Martin Jones plot of yield vs run #
  • 177106 02/22/09 23:37 jmaxwell Target: Nose Overfilled
  • 177105 02/22/09 23:32 Martin Jones bpm screen
  • 177102 02/22/09 23:28 anusha Target PDP Screenshot
  • 177101 02/22/09 23:27 anusha Target: Target IOC Panel and the Strip charts
  • 177100 02/22/09 23:14 anusha Target: polarization suddenly dropped to 48 % from around 65%
  • 177099 02/22/09 23:02 Martin Jones problem with plot_yield script
  • 177096 02/22/09 22:22 Martin Jones Discrepancy with gold run
  • 177095 02/22/09 21:59 Keppel run number for target polarization drop
  • 177094 02/22/09 21:59 Keppel run number for target polarization drop
  • 177093 02/22/09 21:55 Keppel run number for target polarization drop
  • 177092 02/22/09 21:51 anusha Target: Target IOC crashed and rebooted
  • 177091 02/22/09 21:49 Keppel SANE run database problem
  • 177090 02/22/09 21:48 anusha Target: Target IOC crashed and rebooted
  • 177087 02/22/09 21:26 Rondon Target: Does not look like a mini anneal
  • 177086 02/22/09 21:19 anusha Target: Target IOC Panel and strip charts.
  • 177085 02/22/09 21:17 anusha Target PDP screenshot
  • 177084 02/22/09 21:16 Rondon RUN PLAN -- UPDATE for Sun. 2/22 eve to Mon. 2/23 owl/day
  • 177083 02/22/09 21:14 anusha Target: Polarization dropped to 0
  • 177076 02/22/09 18:26 anusha Target: Target strip charts.
  • 177075 02/22/09 18:24 anusha the polarization suddenly increased about 4%
  • 177072 02/22/09 17:36 anusha Target: Target Strip Charts
  • 177071 02/22/09 17:34 anusha Target: Target cryo screen
  • 177070 02/22/09 17:33 anusha Target PDP screenshot.
  • 177069 02/22/09 17:31 anusha Target PDP screenshot
  • 177068 02/22/09 17:25 anusha Target: Target IOC crashed and rebooted
  • 177065 02/22/09 16:36 anusha Target PDP screenshot
  • 177064 02/22/09 16:24 ccbutu HV & RATES for run #72708
  • 177063 02/22/09 16:02 hamlet Shift Summary, 22 February 2009
  • 177062 02/22/09 16:02 cdaq Beam Time Accounting
  • 177061 02/22/09 16:01 Luwani Ethane Bottle
  • 177060 02/22/09 15:56 ates IOC and stripcharts screenshot
  • 177059 02/22/09 15:45 ates Target: PDP Screenshot
  • 177058 02/22/09 15:43 jmaxwell Target: Top SR ADC, Pol=78%
  • 177055 02/22/09 15:37 jmaxwell no_key
  • 177053 02/22/09 15:06 jmaxwell Target: Low magnet level
  • 177052 02/22/09 14:45 ates Target: IOC crashed and rebooted
  • 177051 02/22/09 14:13 ates Target: IOC screenshot
  • 177050 02/22/09 13:59 hamlet MCC informed that down time will be more than 1 hour
  • 177049 02/22/09 13:47 hamlet Will be no beam next 15-20 min
  • 177048 02/22/09 13:40 Rondon Target: Check slow raster size to see if polarization can improve
  • 177047 02/22/09 13:30 hamlet Ask MCC for 60 nA beam to force top target polarization.
  • 177046 02/22/09 13:25 Luwani Monitor yield for bottom target
  • 177045 02/22/09 13:22 Rondon Beam: Administrative limits are posted under the Run Control console
  • 177044 02/22/09 12:42 hamlet HMS DC1 and DC2 HV trip
  • 177043 02/22/09 12:16 ates Target: Target Moved from Carbon to Top Target
  • 177042 02/22/09 12:02 hamlet Ask for Beam OFF to polorize Top NH3
  • 177038 02/22/09 11:27 ates Target: Target moved from Bottom to Carbon Target Encoder: 2.906
  • 177036 02/22/09 11:21 hamlet End data taking on Bottom NH3.
  • 177029 02/22/09 09:06 PD Hall C current limit
  • 177028 02/22/09 08:38 ates Target: PDP Screenshot
  • 177027 02/22/09 08:37 ates Target: IOC screenshot
  • 177025 02/22/09 08:12 narayan Target: loss of polarization twice successively
  • 177024 02/22/09 08:03 pking Owl shift summary
  • 177023 02/22/09 08:02 cdaq Beam Time Accounting
  • 177022 02/22/09 08:02 narayan target: polarization fell suddenly
  • 177019 02/22/09 07:39 T.Walton Monitoring the yield
  • 177017 02/22/09 07:34 pking Target polarization dropped.
  • 177016 02/22/09 07:34 narayan target lost polarization
  • 177013 02/22/09 06:34 mahbub Tracker: hall access to check PMT HV cable map
  • 177012 02/22/09 06:34 jmaxwell Target: Bottom Slow Raster ADC
  • 177010 02/22/09 06:26 jmaxwell Target: Pol=80% Screen, Plan
  • 177009 02/22/09 06:24 pking Request 60 nA.
  • 177008 02/22/09 06:17 pking Request change to beam permit
  • 177007 02/22/09 05:54 jmaxwell Target: Moved to Bottom to polarize
  • 177006 02/22/09 05:49 jmaxwell Target: Nose Full
  • 177005 02/22/09 05:36 jmaxwell Target: Anneal Done, Cooling Nose
  • 177004 02/22/09 05:18 pking Escorted access for tracker work.
  • 177003 02/22/09 05:05 jmaxwell Target: Moved to Top for Anneal
  • 177002 02/22/09 05:03 pking Done with carbon run; request beam off; request escorted access.
  • 177001 02/22/09 05:01 pking Target: Reboot IOCHC4
  • 176999 02/22/09 04:54 pking HMS DC1 and DC2 tripped
  • 176996 02/22/09 04:13 pking Carbon target in place; request 100 nA
  • 176994 02/22/09 04:11 jmaxwell Target: Carbon In, Start Anneal Procedure
  • 176993 02/22/09 04:06 pking Request beam off to move to carbon target.
  • 176991 02/22/09 04:04 narayan target PDP Screenshot
  • 176988 02/22/09 03:34 pking Target polarization is 59%; James will come in to do the anneal
  • 176985 02/22/09 02:53 narayan Target cryo screenshot
  • 176984 02/22/09 02:51 narayan Target PDP screenshot
  • 176981 02/22/09 01:58 narayan Target:PDP screenshot
  • 176980 02/22/09 01:55 narayan Target Cryo Screenshot
  • 176979 02/22/09 01:48 pking Target: Rebooted iochc4
  • 176976 02/22/09 00:44 Rondon Target: Underannealed targets: try 85 nA
  • 176975 02/22/09 00:36 pking Reduce beam current to 85 nA
  • 176974 02/22/09 00:30 Rondon RUN PLAN for Sun. 2/22 day/eve to Mon. 2/23 owl
  • 176973 02/22/09 00:09 reinhold Shift Summay Swing
  • 176972 02/22/09 00:08 cdaq Beam Time Accounting
  • 176971 02/22/09 00:04 reinhold shift summary
  • Saturday

  • 176970 02/21/09 23:58 Martin Jones yield vs. run#
  • 176969 02/21/09 23:49 reinhold Stopped run because of HMS DC HV trip
  • 176966 02/21/09 23:43 reinhold Run Database GUI sucks
  • 176963 02/21/09 23:01 Martin Jones bpm and bcm
  • 176957 02/21/09 21:35 reinhold top target polarized at -65.2
  • 176956 02/21/09 21:31 Hoyoung Target: PDP screen P=-61.2%
  • 176955 02/21/09 21:13 Hoyoung Target: Encoder position = 3.360
  • 176954 02/21/09 21:12 Hoyoung Target: Roots pumps tripped and recovered
  • 176953 02/21/09 21:08 Hoyoung Target: moved to top target
  • 176952 02/21/09 21:06 jmaxwell Target: Moving Target
  • 176951 02/21/09 21:04 reinhold Will move to top target
  • 176945 02/21/09 18:22 reinhold HMS DC HV tripped; stopped run 72684
  • 176942 02/21/09 18:13 reinhold BPM and BCM screens
  • 176941 02/21/09 18:03 reinhold run 72682 is good run
  • 176940 02/21/09 17:29 Martin Jones Lucite detector
  • 176939 02/21/09 17:28 reinhold Verything OK, HMS not supposed to see anything
  • 176934 02/21/09 17:12 reinhold Something wrong with HMS spectra
  • 176931 02/21/09 16:45 reinhold HMS dipole does not settle; called steve lassiter
  • 176930 02/21/09 16:38 hamlet Shift summary
  • 176929 02/21/09 16:37 reinhold HMS dipole current not yet settled
  • 176928 02/21/09 16:36 cdaq Beam Time Accounting
  • 176927 02/21/09 16:32 jamxwell Target: Bottom=1.672, SR ADC Image
  • 176925 02/21/09 16:19 Hoyoung Target: Cryo screen
  • 176924 02/21/09 16:17 Hoyoung Target: PDP screen P=-63.7%
  • 176923 02/21/09 16:06 anusha Target: Target IOC Panel and the script charts
  • 176922 02/21/09 16:02 anusha Target: Target PDP screenshot
  • 176921 02/21/09 16:02 jmaxwell Target: Pumps and Polarizing
  • 176920 02/21/09 15:54 hamlet Set HMS at 22 deg, proton polarity, P=4.17 GeV/c
  • 176919 02/21/09 15:43 anusha Target: Target changed to the Bottom NH4. encoder =1.672
  • 176918 02/21/09 15:25 anusha Target: RB2 and RB3 are turned off automatically.
  • 176917 02/21/09 15:17 hamlet Ask MCC for beam OFF to polorize target.
  • 176915 02/21/09 14:24 Luwani Helium flow
  • 176911 02/21/09 13:50 anusha Target: Open the run valve upto 0.8 to fill the nose in order to take C+He data
  • 176909 02/21/09 13:34 Rondon RUN PLAN --- UPDATE Sat. 2/21 day to Sun. 2/22 owl
  • 176908 02/21/09 12:49 anusha Target: Target moved to Carbon Target. encoder=2.905
  • 176906 02/21/09 12:19 anusha Target: Target IOC crashed and rebooted
  • 176905 02/21/09 12:18 anusha Target: target moved to the empty target. encoder=0.274
  • 176904 02/21/09 11:49 hamlet MCC have problem to send CW beam
  • 176903 02/21/09 11:30 J Mulholland Target: Moved target again: Carbon
  • 176902 02/21/09 11:24 J Mulholland Target: Pumps on and At Empty Target
  • 176901 02/21/09 10:59 J Mulholland Target: Anneal over
  • 176900 02/21/09 10:44 J Mulholland Target: Magnet Dewar IS ok
  • 176899 02/21/09 10:04 J Mulholland Target: The Magnet Buffer Dewar fine?
  • 176898 02/21/09 09:45 J Mulholland Target: Moved to top for anneal
  • 176897 02/21/09 09:40 hamlet Controlled access for target
  • 176896 02/21/09 09:39 J Mulholland Target: Magnet Dewar stuck open
  • 176895 02/21/09 09:36 J Mulholland Target: IOC crash and reboot
  • 176893 02/21/09 08:54 anusha Target moved to the Carbon target. encoder=2.937
  • 176891 02/21/09 08:38 J Mulholland Target: RF OFF error
  • 176890 02/21/09 08:03 cdaq Beam Time Accounting
  • 176889 02/21/09 08:02 narayan target PDP screenshot
  • 176888 02/21/09 08:02 pking Owl shift summary
  • 176887 02/21/09 08:01 pking Request beam off
  • 176886 02/21/09 08:01 narayan polarization fell to 0
  • 176885 02/21/09 07:59 pking Target: Target polarization dropped to zero suddenly.
  • 176881 02/21/09 07:21 narayan Target PDP Screenshot
  • 176880 02/21/09 06:45 narayan He Level in Target Nose
  • 176878 02/21/09 06:20 pking HV trip of hctsv12:2006
  • 176876 02/21/09 06:10 narayan target PDP Screenshot
  • 176875 02/21/09 05:47 Phil Carter can't get HMS slit from telnet
  • 176874 02/21/09 05:46 Phil Carter Helium flow restarted for some reason
  • 176873 02/21/09 05:40 veilleux checklist scan
  • 176870 02/21/09 04:58 pking BPM & BCM screenshots: 95 nA
  • 176869 02/21/09 04:40 pking HV alarm which seems to have resolved itself
  • 176868 02/21/09 04:33 narayan target cryo screenshot
  • 176866 02/21/09 04:32 narayan regular PDP screenshots
  • 176864 02/21/09 04:25 mahbub Tracker: Test of PMT 3 and 7 with varying currents in Run 72670
  • 176863 02/21/09 03:51 narayan target PDP screenshot
  • 176860 02/21/09 03:03 pking Analysis: Partial cleanup of cdaql4:/local
  • 176858 02/21/09 02:35 pking Stopped run 72670 due to machine trip
  • 176856 02/21/09 02:18 narayan Target
  • 176855 02/21/09 02:13 pking RC's recommendation: No full replay until morning.
  • 176854 02/21/09 01:56 pking Ran out of space on cdaql4:/local
  • 176853 02/21/09 01:26 pking Lost connection to hcreboot1
  • 176852 02/21/09 01:25 narayan Target PDP Screenshot
  • 176849 02/21/09 01:00 narayan target reached 80% and now falling, regular cryo screenshot
  • 176848 02/21/09 00:43 Phil Carter A replay graph for run 72669 possibly doesn't match the golden run
  • 176846 02/21/09 00:22 pking Request 95 nA
  • 176845 02/21/09 00:22 J Mulholland Target: Anneal tomorrow
  • 176844 02/21/09 00:20 pking Request 65 nA to check beam position.
  • 176843 02/21/09 00:02 narayan Target Moved(3.370)
  • 176842 02/21/09 00:02 cdaq Beam Time Accounting
  • 176841 02/21/09 00:01 Rondon RUN PLAN -- Sat. 2/21 day to Sun. 2/22 owl
  • Friday

  • 176840 02/20/09 23:55 kawama Yield summary swing 20Feb2009
  • 176839 02/20/09 23:49 Zhihong Ye Shift summery for swing shift
  • 176838 02/20/09 23:42 cdaq Beam Time Accounting
  • 176836 02/20/09 23:03 kawama Bigcal hitpat in run72668
  • 176835 02/20/09 23:03 kawama Bigcal hitpat in run72668
  • 176832 02/20/09 21:56 kawama Bigcal hitpat in run72667
  • 176831 02/20/09 21:47 albayrak target screenshot
  • 176830 02/20/09 21:47 albayrak target screenshots
  • 176828 02/20/09 21:45 Zhihong Ye HMS DC1&2 off
  • 176824 02/20/09 20:38 albayrak some of the readings were frozen
  • 176818 02/20/09 18:22 albayrak target screenshots
  • 176816 02/20/09 18:17 albayrak Target Screenshots
  • 176811 02/20/09 16:01 cdaq Beam Time Accounting
  • 176810 02/20/09 15:50 Donal Target: Anneal Plot Feb 19
  • 176809 02/20/09 15:45 Nue Analysis: New plots for beta monitor
  • 176807 02/20/09 15:26 gaskell back to beam permit- 95 nA on the way
  • 176806 02/20/09 15:18 Nue Analysis: Yield summary day 20th Feb 2009
  • 176805 02/20/09 15:01 Kovacs Target: Polarization 74.9
  • 176804 02/20/09 15:00 Kovacs Target: Cryo
  • 176803 02/20/09 13:56 gaskell Controlled access
  • 176801 02/20/09 13:52 Kovacs Target: Polarization 75.3
  • 176800 02/20/09 13:51 Kovacs Target: Cryo
  • 176797 02/20/09 13:08 Bosted Analysis: ep elastic peak
  • 176796 02/20/09 13:03 Kovacs Target: Polarization 79.8
  • 176795 02/20/09 13:02 Kovacs Target: Cryo
  • 176794 02/20/09 12:29 gaskell tracker HV was off for run 72657
  • 176791 02/20/09 12:21 jmaxwell Target: New Encoder Positions
  • 176790 02/20/09 12:17 Nue Analysis: HMS sintillator histogram
  • 176789 02/20/09 11:57 jmaxwell Target: PDP Screen, 78%, Bottom
  • 176788 02/20/09 11:44 gaskell Increased current to 95 nA
  • 176787 02/20/09 11:31 jmaxwell Target: Asking for beam
  • 176785 02/20/09 10:59 gaskell Status: polarizing
  • 176784 02/20/09 10:56 gaskell updated hms cerenkov calibration
  • 176782 02/20/09 10:25 jmaxwell Target: Moved to Bottom
  • 176781 02/20/09 10:24 Nue Target: Target height was adjusted
  • 176780 02/20/09 10:16 jmaxwell Target: Moved Empty with Cross hair
  • 176774 02/20/09 09:53 jmaxwell Target: TE Data
  • 176770 02/20/09 09:46 jmaxwell Target: Material in Insert B
  • 176769 02/20/09 09:43 jmaxwell Target: TE done, moved to Empty
  • 176768 02/20/09 09:09 jmaxwell Target: Bottom TE done, Move to Top
  • 176767 02/20/09 08:40 gaskell Rotated HMS to 15.41 degrees
  • 176766 02/20/09 08:11 jmaxwell Target: Magnet Ramp Finished
  • 176765 02/20/09 08:01 cdaq Beam Time Accounting
  • 176764 02/20/09 06:44 jmaxwell Target: Ramping Continues
  • 176763 02/20/09 06:11 jmaxwell Target: Starting Ramp Procedure
  • 176762 02/20/09 03:47 Rondon Day shift:: set HMS at 15.4 degrees before taking data
  • 176761 02/20/09 03:47 riordan Target: Cryo and stripchart screenshots
  • 176760 02/20/09 03:43 Rondon RUN PLAN for Fri. 2/20 day/eve to Sat. 2/21 owl/day
  • 176759 02/20/09 03:27 riordan HMS momentum set at 3.1 GeV electrons
  • 176758 02/20/09 03:23 Crabb New target Material loaded
  • 176757 02/20/09 03:06 Rondon Target: Coil resistances OK after the quench
  • 176756 02/20/09 02:20 riordan Changing HMS Momentum Setting and polarity to 3.1 GeV electrons
  • Thursday

  • 176755 02/19/09 23:50 Hoyoung Target: PDP screen
  • 176754 02/19/09 23:49 Hoyoung Target: Cryo screen
  • 176753 02/19/09 23:33 ccbutu Tracker HV OFF!
  • 176752 02/19/09 22:47 PD Maybe pass change only Monday
  • 176751 02/19/09 22:22 silviu Beam: shifts for Friday Owl
  • 176750 02/19/09 22:17 cdaq Beam Time Accounting
  • 176749 02/19/09 22:15 shichijo Analysis: Yield summary swing 19 Feb.
  • 176748 02/19/09 22:08 Hoyoung Target: Cryo screen
  • 176747 02/19/09 22:06 jmaxwell Target: Quench During Backfill
  • 176746 02/19/09 21:44 PD Beam: Likely Hall A pass change 11AM Friday
  • 176745 02/19/09 21:27 Huber Hall C Access
  • 176744 02/19/09 21:26 Hoyoung Target: preparing material change
  • 176743 02/19/09 21:22 Hoyoung Target: Cryo screen
  • 176742 02/19/09 21:21 Hoyoung Target: PDP screen P=64.8%
  • 176740 02/19/09 20:33 Hoyoung Target: Cryo screen
  • 176739 02/19/09 20:32 Hoyoung Target: PDP screen P=65.8%
  • 176736 02/19/09 19:44 Hoyoung Target: Cryo screen
  • 176735 02/19/09 19:43 Hoyoung Target: PDP screen P=66.3%
  • 176732 02/19/09 18:57 Hoyoung Target: IOC rebooted
  • 176731 02/19/09 18:50 Hoyoung Target: nose level dropping
  • 176730 02/19/09 18:45 Hoyoung Target: Cryo screen
  • 176729 02/19/09 18:44 Hoyoung Target: PDP screen P=67.8%
  • 176726 02/19/09 17:54 jmaxwell Target: Computer Error
  • 176725 02/19/09 17:38 Hoyoung Target: PDP screen P=61.4%
  • 176721 02/19/09 17:27 Hoyoung Target: Encoder position for bottom is 1.702
  • 176720 02/19/09 17:24 Hoyoung Target: Moved to bottom NH3
  • 176719 02/19/09 17:22 Hoyoung Target: Cryo screen
  • 176718 02/19/09 17:20 Hoyoung Target: PDP screen
  • 176716 02/19/09 16:06 Hoyoung Target: IOC screen
  • 176715 02/19/09 16:05 Hoyoung Target: PDP screen P=63.0%
  • 176714 02/19/09 16:03 J Mulholland Target: NMR computer Error
  • 176713 02/19/09 16:01 cdaq Beam Time Accounting
  • 176712 02/19/09 15:59 L. Zhu Day Shift Summary
  • 176709 02/19/09 15:36 T.Gogami Yield_top_day19Feb
  • 176708 02/19/09 15:12 anusha Target: Target IOC pannel and the Script charts.
  • 176707 02/19/09 15:10 anusha Target: Target PDP screenshot after anneal the targets.
  • 176704 02/19/09 14:43 T.Gogami BPM screen
  • 176702 02/19/09 13:56 J Mulholland Target: Bypass Valve Still inoperable
  • 176701 02/19/09 13:56 J Mulholland Target: Bypass Valve Still inoperable
  • 176700 02/19/09 13:48 jmaxwell Target: Anneal Done, Fridge Cold, Full
  • 176699 02/19/09 12:27 Lingyan Zhu computer deadtime change
  • 176698 02/19/09 12:06 jmaxwell Target: Anneal Started
  • 176697 02/19/09 12:02 Lingyan Zhu HMS Wire Chamber HV tripped
  • 176696 02/19/09 11:49 Lingyan Zhu HMS Wire Chamber HV tripped
  • 176694 02/19/09 11:40 anusha Target: Target changed to the Bottom target. encoder=1.709
  • 176692 02/19/09 11:17 T.Gogami Analysis: «176690 is Top yield summary«
  • 176691 02/19/09 11:17 T.Gogami Analysis: «176690 is Top yield summary«
  • 176690 02/19/09 11:10 T.Gogami Analysis: Yield summary day 19
  • 176689 02/19/09 11:04 narbe Target: Reboot of ioc; reboot for RF; nose overfull
  • 176688 02/19/09 11:02 silviu Beam: no pass change today for Hall A
  • 176685 02/19/09 10:21 jmaxwell Target: TE Summary for this Material
  • 176684 02/19/09 10:15 anusha Target: Target PDP screenshot showing both the Bottom and Top target polarizations.
  • 176683 02/19/09 10:12 jmaxwell Target: Last Night's Polarization
  • 176682 02/19/09 10:07 Lingyan Zhu remove flag of "laser" in the prescale file
  • 176677 02/19/09 09:23 T.Gogami Yield_top_run
  • 176676 02/19/09 09:14 Lingyan Zhu database: owl shift runs missing
  • 176673 02/19/09 08:37 Donal Target: Plot of Anneal Temperatures for Feb 18
  • 176672 02/19/09 08:28 anusha Target: Target IOC panel and the Script charts.
  • 176671 02/19/09 08:25 anusha Target: Target PDP screenshot
  • 176670 02/19/09 08:04 cdaq Beam Time Accounting
  • 176667 02/19/09 07:49 puckett Shift summary
  • 176664 02/19/09 07:03 riordan Target: NMR Screen - Top Target, Pol = -61.4%
  • 176661 02/19/09 06:04 riordan Target: NMR Screen - Top Target, Pol = -64.4%
  • 176658 02/19/09 05:08 xqiu beam position
  • 176657 02/19/09 05:03 riordan Target: NMR Screen - Top Target, Pol = -67.3%
  • 176656 02/19/09 04:54 xqiu beam position
  • 176655 02/19/09 04:27 riordan Target: Top Target Polarized - -70.9%
  • 176653 02/19/09 03:56 riordan Target: Begin Polarization for Top Target
  • 176652 02/19/09 03:53 riordan Target: Moved to top target - Encoder reads 3.392
  • 176650 02/19/09 03:03 riordan Target: Target NMR Screen - Bottom Target, Pol = -59.8%
  • 176647 02/19/09 02:03 riordan Target: Target NMR Screen - Bottom Target, Pol = -58.6%
  • 176642 02/19/09 01:03 riordan Target: Target NMR Screen - Bottom Target, Pol = -61.9%
  • 176641 02/19/09 00:23 puckett correction--HV trip was between 72631 and 72632
  • 176640 02/19/09 00:21 puckett Bigcal HV trip--recovered
  • 176637 02/19/09 00:06 riordan Target: Target NMR Screen - Bottom Target, Pol = -61.0%
  • 176636 02/19/09 00:02 riordan Target: Cryo and stripcharts
  • 176635 02/19/09 00:01 cdaq Beam Time Accounting
  • Wednesday

  • 176634 02/18/09 23:58 mahbub Target: IOC crashed
  • 176633 02/18/09 23:49 Nue Target: Raster pattern and beam position
  • 176629 02/18/09 23:36 mahbub Target: PDP screen after TE and anneal
  • 176628 02/18/09 23:32 mahbub Target: Cryo screen after TE and anneal
  • 176624 02/18/09 23:16 jmaxwell Target: Ready for Beam
  • 176623 02/18/09 23:12 Nue HMS DCs are tripped
  • 176622 02/18/09 22:37 J Mulholland Target: Anneal over Moved to Bottom Target
  • 176621 02/18/09 21:25 Rondon RUN PLAN - Wed. 2/18 day/eve to Thurs. 2/19 day
  • 176620 02/18/09 21:18 jmaxwell Target: Anneal Started, Moved to Top
  • 176619 02/18/09 21:17 jmaxwell Target: TE results
  • 176618 02/18/09 20:16 jmaxwell Target: Top TE finished, Moved to Bottom, Bottom TE Started
  • 176617 02/18/09 19:15 jmaxwell Target: Still TEing
  • 176616 02/18/09 18:58 W. Luo run 72628 BigCal LED run
  • 176611 02/18/09 18:32 mahbub Tracker: Thresholds changed on Y1 and Y2
  • 176608 02/18/09 18:16 silviu Beam: BTA policy
  • 176607 02/18/09 17:16 jmaxwell Target: IOC Reboot
  • 176606 02/18/09 17:14 jmaxwell Target: TEs
  • 176605 02/18/09 16:53 saw Analysis: Analyzing runs with Insertable Half Wave Plate change
  • 176604 02/18/09 16:51 M Jones Put back cables for Bigcal 17D
  • 176603 02/18/09 16:32 Huber Controlled Access
  • 176602 02/18/09 16:23 jmaxwell Target: Moved to MT for Baseline
  • 176601 02/18/09 16:10 jmaxwell Target: Moved to Top for TE
  • 176600 02/18/09 16:06 cdaq Beam Time Accounting
  • 176599 02/18/09 16:04 YaLi Day Shift Summary
  • 176598 02/18/09 16:04 YaLi Day Shift Summary
  • 176597 02/18/09 16:02 Toshiyuki Go Analysis: Yield_day18Feb
  • 176596 02/18/09 16:02 Toshiyuki Go Analysis: Yield_day18Feb
  • 176594 02/18/09 15:26 anusha Target: Target IOC panel and the Strip charts
  • 176593 02/18/09 15:24 anusha Target: Target PDP screenshot
  • 176592 02/18/09 15:22 anusha Target: Target IOC rebooted
  • 176587 02/18/09 14:02 bhovik RUN DATABASE UPDATED
  • 176586 02/18/09 13:14 YaLi The new run database input worked
  • 176583 02/18/09 13:01 anusha Target: Target IOC panel and the Strip charts after rebooting the IOC panel
  • 176582 02/18/09 12:58 anusha Target: Target PDP screen after rebooting the IOC panel
  • 176581 02/18/09 12:57 bhovik RUN DATABASE UPDATED
  • 176580 02/18/09 12:47 anusha Target: IOC rebooted
  • 176577 02/18/09 11:59 ccbutu Run #72620 at 50 nA to check the Tracker rates
  • 176574 02/18/09 10:37 anusha Target: Target polarization=77.0%. Frequency = 140.164 GHz
  • 176573 02/18/09 10:33 anusha Target: Target cryo screen and the strip chart.
  • 176570 02/18/09 10:27 anusha Target: Target PDP screenshot
  • 176568 02/18/09 09:29 YaLi Half Plate In at 9:20am
  • 176566 02/18/09 09:24 W. Luo BigCal: power cycled HV crate 36
  • 176563 02/18/09 09:03 W. Luo BigCal: 17D has one hot channel(17,32)
  • 176561 02/18/09 08:50 anusha Target: target moved to up littlebit, encoder=1.607
  • 176558 02/18/09 08:32 gaskell half wave plate was in for 4 hours
  • 176555 02/18/09 08:21 anusha Target: Target Cryo screen and the script chart
  • 176554 02/18/09 08:14 anusha Target: Target PDP screenshot.
  • 176553 02/18/09 08:03 cdaq Beam Time Accounting
  • 176552 02/18/09 08:00 Hoyoung Owl shift summary
  • 176551 02/18/09 08:00 Hoyoung Owl shift summary
  • 176550 02/18/09 07:28 riordan Target: Cryo screen and stripcharts
  • 176548 02/18/09 07:23 riordan Target: Target NMR Screen
  • 176547 02/18/09 07:18 xqiu beam position at run 72613
  • 176546 02/18/09 07:12 riordan Target: Polarizing Bottom Target
  • 176545 02/18/09 07:07 riordan Target: At Bottom Target - Encoder reads 1.704
  • 176542 02/18/09 06:50 riordan Target: At Empty Target - Encoder reads 0.171
  • 176541 02/18/09 06:43 riordan Target: Moving to Empty Target
  • 176539 02/18/09 06:05 riordan Target: NMR Screen
  • 176536 02/18/09 05:27 xqiu BPM screen grap
  • 176535 02/18/09 05:03 riordan Target: NMR Screen
  • 176532 02/18/09 04:16 riordan Target: Cryo Screen and Strip Charts
  • 176531 02/18/09 04:13 riordan Target: NMR Screen
  • 176530 02/18/09 03:52 Hoyoung Beam position back to previous
  • 176527 02/18/09 03:21 riordan Target: NMR Screen
  • 176526 02/18/09 03:17 Hoyoung Beam position
  • 176523 02/18/09 02:27 riordan Target: NMR Screen
  • 176522 02/18/09 02:04 Hoyoung 95nA, not 85nA
  • 176520 02/18/09 01:52 M Jones Disconnected Bigcal 17D from the trigger
  • 176519 02/18/09 01:28 M Jones Turned Cerenkov LED off and insert out
  • 176518 02/18/09 01:18 Hoyoung Controlled Access
  • 176517 02/18/09 01:18 riordan Target: NMR Screen
  • 176514 02/18/09 01:07 riordan Target: Rebooted ioc again
  • 176511 02/18/09 00:36 riordan Target: Rebooted iochc4
  • 176509 02/18/09 00:23 riordan Target: Cryo screen and strip charts
  • 176508 02/18/09 00:21 Huber High DAQ rates
  • 176507 02/18/09 00:18 cdaq Beam Time Accounting
  • Tuesday

  • 176502 02/17/09 23:57 Huber Runs 72601-2 Junk
  • 176496 02/17/09 23:23 smithg Target: PDP screen grab
  • 176494 02/17/09 23:19 smithg Target: Target polarized to 79%. Cryo screen grab
  • 176492 02/17/09 23:00 J Mulholland Target: Polarizizing top target
  • 176491 02/17/09 22:45 jmaxwell Target: Ramp Complete
  • 176490 02/17/09 22:18 whit Bucking coil removed
  • 176489 02/17/09 21:42 jmaxwell Target: Holding Ramp for Batch Fill
  • 176488 02/17/09 21:10 smithg Target: run valve on pid
  • 176487 02/17/09 20:57 jmaxwell Target: More Ramping
  • 176486 02/17/09 20:46 jmaxwell Target: Ramp Begins
  • 176485 02/17/09 20:41 jmaxwell Target: Beginning Magnet Ramp Procedure
  • 176484 02/17/09 20:04 smithg Target: nose full
  • 176483 02/17/09 19:53 Rondon RUN PLAN - Tue. 2/17 eve to Wed. 2/18 owl/day
  • 176482 02/17/09 18:27 J Mulholland Target: Insert B status
  • 176481 02/17/09 17:10 smithg Target: filling the nose
  • 176480 02/17/09 17:07 smithg Target: cryo screen grab, improved forecast
  • 176479 02/17/09 16:11 smithg Target: cryo screen grab, forecast
  • 176476 02/17/09 15:51 ccbutu Tracker HV turned OFF
  • 176475 02/17/09 15:37 whit SANE Cherenkov HV off
  • 176474 02/17/09 15:24 narbe Target: Magnet Quench
  • 176473 02/17/09 15:16 M Jones Turned Sane Cerenkov HV off
  • 176472 02/17/09 14:58 jmaxwell Target: Ramp Complete
  • 176468 02/17/09 14:46 ccbutu Correction to the SANE MAP!
  • 176466 02/17/09 14:43 ccbutu Discriminator Thresholds for Tracker Y2 Plane changed!
  • 176463 02/17/09 14:37 ccbutu TRACKER HV were turned ON
  • 176462 02/17/09 14:34 ccbutu Corrections to the SANE map file to reflect TRACKER PMT/SCINTILLATOR/TDC CHANNEL Config.
  • 176446 02/17/09 13:11 jmaxwell Target: Magnet Ramp up Begun
  • 176444 02/17/09 12:46 J Mulholland Target: Bypass valve unplugged
  • 176443 02/17/09 12:46 M Jones TUrned on all cerenkov HV channels
  • 176442 02/17/09 12:41 jmaxwell Target: Magnet Leads unlocked, Magnet sweep complete
  • 176441 02/17/09 12:40 W. Luo BigCal: LED run with 2 sides on
  • 176438 02/17/09 11:59 whit Bucking Coil added to SANE Cherenkov PMT4
  • 176437 02/17/09 11:58 lassiter HMS Q3 current lead tubing
  • 176436 02/17/09 11:56 M Jones Fixed 1Mhz clock into tsgep3 scaler bank
  • 176433 02/17/09 11:30 Bosted Bosted
  • 176430 02/17/09 10:45 narbe Target: 2nd plot regarding post on ioc counts for 02/10/09-02/16/09
  • 176429 02/17/09 10:38 Rondon Target: Coil resistances OK after the quench
  • 176428 02/17/09 10:34 narbe Target: ioc trips since switching to 5-pass
  • 176427 02/17/09 08:51 narbe Ramped down Q3 on HMS
  • 176426 02/17/09 08:49 jmaxwell Target: Magnet Leads Locked
  • 176425 02/17/09 08:34 Lassiter HMS Q1 turning off
  • 176424 02/17/09 08:24 Donal Target: Plot of temperatures for Feb 14 anneal
  • 176423 02/17/09 08:20 Donal Target: Plot of Feb 16 anneal
  • 176422 02/17/09 07:03 riordan Target: Cryo Screen and Stripcharts Screenshots
  • 176421 02/17/09 05:02 riordan Target: Nose Not Refilling
  • 176420 02/17/09 04:13 riordan Target: Cryo Screen and Stripcharts Screenshots
  • 176419 02/17/09 03:52 ccbutu Tracker PMTs #3 & #7 Replaced!
  • 176418 02/17/09 00:25 riordan Target: Stripcharts Screenshot
  • 176417 02/17/09 00:21 riordan Target: Cryo Screenshot
  • 176416 02/17/09 00:10 J Mulholland HMS Q1 Ramped Down Workers Should Contact HMS Expert Tomorrow
  • Monday

  • 176415 02/16/09 23:56 jmaxwell Target: Anneal Done
  • 176414 02/16/09 22:26 jmaxwell Target: Anneal Started
  • 176413 02/16/09 22:10 J Mulholland Target: Moved to top for anneal.
  • 176412 02/16/09 21:49 ccbutu Work in the Hall - TRACKER
  • 176411 02/16/09 21:11 Huber Khandaker & Butuceanu in Hall
  • 176410 02/16/09 21:08 cdaq Beam Time Accounting
  • 176409 02/16/09 20:49 silviu slight plan change for tomorrow
  • 176408 02/16/09 20:32 silviu shifts for Tue Owl
  • 176407 02/16/09 20:28 jmaxwell Target: Entry for Heat Gunning Pop-offs
  • 176406 02/16/09 20:27 jmaxwell Target: Figure
  • 176405 02/16/09 20:12 Huber Hall in Controlled Access
  • 176404 02/16/09 19:45 jmaxwell Target: Magnet Quench
  • 176403 02/16/09 19:05 jmaxwell Target: Starting TE
  • 176401 02/16/09 18:56 mahbub Target: PDP screenshot pol= -54.6%
  • 176400 02/16/09 18:53 mahbub Target: Cryo screenshot
  • 176399 02/16/09 18:53 Huber Rates at 100nA vs 85nA
  • 176398 02/16/09 18:52 mahbub Target: Nose level dropped to 35%, pol dropped to -43%
  • 176397 02/16/09 18:45 mahbub Target: Beam dropped to 85 nA, pol = -71.5%
  • 176394 02/16/09 18:15 mahbub Target: IOC crashed
  • 176393 02/16/09 18:15 vahe Analysis: Golden run changed
  • 176391 02/16/09 18:12 jmaxwell Target: Calibration Constant for Top Not Changed This Morning
  • 176390 02/16/09 18:12 M Jones Work during tommorrow's beam studies
  • 176388 02/16/09 18:07 mahbub Target: Beam current up to 100 nA pol drop by 1%
  • 176387 02/16/09 17:56 vahe Analysis: Golden run changed
  • 176386 02/16/09 17:44 CKeith Target: PID for the RUN valve
  • 176385 02/16/09 17:43 Rondon Target: Hall to controlled access on Tue. 2/17 at 7:00 AM
  • 176384 02/16/09 17:39 mahbub Target: PDP screen -70.3% bot tgt
  • 176383 02/16/09 17:26 mahbub Target: Cryo screenshot pol= -69.8% bot tgt
  • 176379 02/16/09 16:07 cdaq Beam Time Accounting
  • 176378 02/16/09 16:06 gaskell Day shift summary
  • 176377 02/16/09 16:01 smithg Target: Lost nose level
  • 176375 02/16/09 15:26 bhovik RUN DATABASE UPDATED
  • 176374 02/16/09 15:17 smithg Target: Mystery nmr channel change
  • 176371 02/16/09 14:42 smithg Target: Strip Charts
  • 176369 02/16/09 14:33 smithg Target: Rash of caput & caget errors: rebooted IOC
  • 176368 02/16/09 14:32 Rondon RUN PLAN - Mon. 2/16 day/eve to Tues. 2/17 day
  • 176366 02/16/09 14:08 Rondon Target: Bottom target polarization loss: TO's please note
  • 176363 02/16/09 13:05 smithg Target: rebooted ioc
  • 176362 02/16/09 12:26 J Mulholland Target: Follow up on microwave tuning
  • 176359 02/16/09 12:19 J Mulholland Target: Material swap can probably wait till tomorrow...details
  • 176358 02/16/09 11:27 M Jones Hopefully fixed problem with runinfosanity.tcl ( Pink window)
  • 176356 02/16/09 11:13 smithg Target: lost nose level & polarization
  • 176351 02/16/09 09:54 smithg Target: rebooted IOC
  • 176350 02/16/09 09:31 saw Analysis: /group/sane quota problem reported to CC
  • 176349 02/16/09 09:26 shichijo Analysis: Lucite ADC 72574
  • 176346 02/16/09 08:25 smithg PDP screen grab.
  • 176345 02/16/09 08:23 smithg Target: cryo screen grab
  • 176344 02/16/09 08:15 pking Owl shift summary
  • 176343 02/16/09 08:15 smithg Target: rebooted IOC
  • 176342 02/16/09 08:15 cdaq Beam Time Accounting
  • 176339 02/16/09 07:35 T.Walton Yield summary owl 16 Feb 2009
  • 176335 02/16/09 06:07 kovacs Target: Polarization 77.4
  • 176334 02/16/09 06:06 Kovacs Target: cryo
  • 176333 02/16/09 06:01 pking BPM & BCM strip charts, 85 nA
  • 176332 02/16/09 05:46 pking Run 72571 is on the top target
  • 176330 02/16/09 05:37 pking Request 85 nA
  • 176329 02/16/09 05:16 pking Target: Request beam off to change to top target
  • 176327 02/16/09 05:02 Kovacs Target: Polarization -63.4
  • 176326 02/16/09 05:00 Kovacs Target: cryo
  • 176325 02/16/09 05:00 T.Walton hlx11
  • 176324 02/16/09 04:42 pking Request 95 nA
  • 176321 02/16/09 04:05 Kovacs Target: polarization 65
  • 176320 02/16/09 04:04 Kovacs Target: cryo
  • 176317 02/16/09 03:17 Kovacs Target: polarization 65.9
  • 176316 02/16/09 03:16 Kovacs Target: cryo
  • 176313 02/16/09 02:01 Kovacs Target: polarization 69.1
  • 176312 02/16/09 02:00 kovacs Target: cryo
  • 176311 02/16/09 01:54 pking Run start screen didn't come up for run 72567 or 72566
  • 176308 02/16/09 01:44 pking Target: EPICS displays went away; reboot iochc4
  • 176307 02/16/09 01:11 Kovacs Target: Polarization 71.4
  • 176306 02/16/09 01:09 Kovacs Target: cryo
  • 176305 02/16/09 01:01 pking This error message on cdaql5 came up after the acroread process was killed
  • 176304 02/16/09 00:47 pking Killed runaway acroread on cdaql5
  • 176303 02/16/09 00:47 T.Walton cdaq 15
  • 176299 02/16/09 00:29 pking HMS dipole NMR relocked
  • 176297 02/16/09 00:03 Mostafa Target: PDP Screen, -86.5%, no beam, NH3 bottom, Freq 140.494
  • 176296 02/16/09 00:01 cdaq Beam Time Accounting
  • 176295 02/16/09 00:00 hamlet Sift Summary, 15 February 2009
  • Sunday

  • 176294 02/15/09 23:56 hamlet Reset HMS Dipole NMR during run 72565
  • 176293 02/15/09 23:51 kawama Yield summary swing 15 Feb.
  • 176290 02/15/09 23:19 Rondon RUN PLAN - Update for 2/15 - Mon. 2/16
  • 176289 02/15/09 23:18 Mostafa Target: PDP Screen, -86.5%, no beam, NH3 bottom, Freq 140.475
  • 176288 02/15/09 23:05 Mostafa Target: Cryo and strip screens
  • 176287 02/15/09 23:04 Mostafa Target: PDP Screen, -86.5%, no beam, NH3 bottom, Freq 140.475
  • 176286 02/15/09 22:45 kawama Bigcal hitpat in run72564
  • 176285 02/15/09 22:39 Mostafa Target: PDP Screen, -90%, no beam, NH3 bottom, Freq 140.450
  • 176283 02/15/09 22:27 hamlet Ready to start production run. Waiting to get maximum polarization for target
  • 176282 02/15/09 22:13 Mostafa Target: Bottom target in position 1.704
  • 176281 02/15/09 22:09 kawama Beam position at run72563
  • 176279 02/15/09 22:04 Mostafa Target: Cryo and strip, empty target
  • 176278 02/15/09 22:02 Mostafa Target: PDP screen, empty target
  • 176276 02/15/09 21:57 J Mulholland Target: TE postponed
  • 176275 02/15/09 21:54 Mostafa Target: Cross hair is in, Encoder .168
  • 176274 02/15/09 21:37 Rondon Can't see the shift schedule
  • 176273 02/15/09 21:35 Rondon Analysis: No space on /gorup/sane
  • 176272 02/15/09 21:28 hamlet We are going to Beam Permit
  • 176271 02/15/09 21:26 narbe Target: Took of 2 baselines
  • 176270 02/15/09 21:23 narbe Target: Moved to Bottom, for TE
  • 176269 02/15/09 21:14 narbe Target: Moved to Empty
  • 176268 02/15/09 20:49 narbe Target: Anneal finished; Cooling frig.
  • 176267 02/15/09 20:18 J Mulholland Target: Anneal "started"
  • 176266 02/15/09 20:14 kenyon HMS Q3 Lead Flow
  • 176265 02/15/09 19:51 W. Luo BigCal: need to update (53,5) pedestal.
  • 176264 02/15/09 19:34 jmaxwell Target: RF Error
  • 176263 02/15/09 19:33 narbe Target: Anneal procedure started
  • 176262 02/15/09 19:24 J Mulholland Target: Magnet leads ramped up and connected
  • 176261 02/15/09 19:23 hamlet Controlled access to ANNEL target
  • 176260 02/15/09 19:18 J Mulholland Target: RF Off Error
  • 176258 02/15/09 19:05 narbe Target: Problem with PDP
  • 176257 02/15/09 18:49 hamlet Controlled access will be at 19:15
  • 176256 02/15/09 18:29 Rondon Target: TE's: are the TE's calculated at the field given by the NMR frequency?
  • 176255 02/15/09 18:28 Mostafa Target: Cryo and Strip Screens
  • 176254 02/15/09 18:23 hamlet Target actual polarization is 20% less than we assumed
  • 176253 02/15/09 18:23 Mostafa Target: PDP Screen, -66%, 85nA, old cal constant
  • 176250 02/15/09 17:59 hamlet We are planing to have controlled access around 19:00
  • 176249 02/15/09 17:36 Don Crabb TE Constants
  • 176248 02/15/09 17:11 Mostafa Target: Cryo and Strip Screens
  • 176246 02/15/09 17:06 Elaasar Target: PDP screen, -63.9%, 85nA
  • 176244 02/15/09 16:08 M JOnes BigCal OK, col 5 row 52 has suddenly get more events
  • 176243 02/15/09 16:07 Bosted Day shift summary
  • 176242 02/15/09 16:02 cdaq Beam Time Accounting
  • 176240 02/15/09 15:57 shichijo Analysis: Yield summary day 15Feb2009
  • 176239 02/15/09 15:53 ates Target: Moved to Bottom Target
  • 176238 02/15/09 15:39 shichijo Analysis: Biccal spectrum
  • 176236 02/15/09 15:26 Bosted Analysis: ep elastics
  • 176235 02/15/09 15:25 ates Target: PDP screenshot
  • 176234 02/15/09 15:24 ates Target: IOC Screenshot
  • 176233 02/15/09 15:22 ates Target: Strip charts screenshots
  • 176232 02/15/09 14:56 Bosted DAQ: run 72558 would not start
  • 176228 02/15/09 14:24 ates PDP screenshot
  • 176227 02/15/09 14:22 ates IOC screenshot
  • 176226 02/15/09 13:57 ates Target: lost target pol.
  • 176225 02/15/09 13:46 Bosted Q3 problems
  • 176224 02/15/09 13:37 ates Target: lost target polarization
  • 176222 02/15/09 13:31 ates PDP screenshot
  • 176221 02/15/09 13:29 ates IOC screenshot
  • 176220 02/15/09 13:26 M Jones Short term runplan
  • 176218 02/15/09 13:19 ates Target: lost target polarization
  • 176216 02/15/09 12:56 Bosted HMS Q3 tripped again
  • 176214 02/15/09 12:26 ates PDP screenshot
  • 176213 02/15/09 12:25 ates IOC screenshot
  • 176212 02/15/09 12:21 Bosted Target: really TOP since 06:30 (starting with run 72551)
  • 176209 02/15/09 11:43 shichijo HMS Q3 interlock
  • 176208 02/15/09 11:22 ates PDP screenshot
  • 176207 02/15/09 11:21 ates IOC screenshot
  • 176206 02/15/09 11:20 ates Target: time of top target move: 6:30 am
  • 176205 02/15/09 11:14 ates Target: top target position: 3.391
  • 176204 02/15/09 11:03 Rondon RUN PLAN - Update for Sun 2/15 to Mon 2/16
  • 176203 02/15/09 11:02 Rondon RUN PLAN - Update for Sun 2/15 to Mon 2/16
  • 176200 02/15/09 10:32 ates Target: PDP screenshot
  • 176199 02/15/09 10:30 ates Target: IOC screenshot
  • 176198 02/15/09 10:29 ates Target: IOC crashed
  • 176197 02/15/09 10:07 ates Target: lost target pol.
  • 176194 02/15/09 09:44 J Mulholland Target: Target: Gui restart reminder
  • 176193 02/15/09 09:43 ates Target: PDP screenshot
  • 176192 02/15/09 09:37 ates Target: IOC screenshot
  • 176191 02/15/09 09:16 ates Target: lost target pol.
  • 176188 02/15/09 08:37 ates Target: Target: IOC rebooted
  • 176187 02/15/09 08:04 pking Owl shift summary
  • 176186 02/15/09 08:03 cdaq Beam Time Accounting
  • 176185 02/15/09 07:54 Kovacs Target: cryo
  • 176184 02/15/09 07:53 Kovacs Target: Polarization 74.3
  • 176183 02/15/09 07:51 pking Run 72551 is on the top target cell, with positive polarization
  • 176181 02/15/09 07:35 pking Target polarization is above 70%; requet beam
  • 176180 02/15/09 07:03 Kovacs Target: Polarization 53.2
  • 176179 02/15/09 07:01 Kovacs Target: cryo
  • 176178 02/15/09 06:28 pking Target: Power cycle lower platform camera
  • 176177 02/15/09 06:20 pking Request beam off to change to the upper target cup
  • 176175 02/15/09 06:08 Kovacs Target: Polarization -60
  • 176174 02/15/09 06:07 Kovacs Target: cryo
  • 176173 02/15/09 06:04 pking BPM & BCM strip charts
  • 176170 02/15/09 05:34 pking Target: All EPICS variables on target control screens disappear. Try rebooting IOC.
  • 176169 02/15/09 05:17 Kovacs Target: Polarization -63.4
  • 176168 02/15/09 05:08 Kovacs Target: cryo
  • 176165 02/15/09 03:53 pking Target: Reboot target ioc again
  • 176163 02/15/09 03:37 pking Target: Reboot IOCHC4; liquid levels readback was gone
  • 176161 02/15/09 02:35 pking Request 85 nA
  • 176158 02/15/09 02:11 Rondon Target: Stay on bottom target until P ~ 60%
  • 176157 02/15/09 02:09 pking Request beam off to try to boost polarization
  • 176156 02/15/09 02:03 Kovacs Target: Polarization -67.6
  • 176155 02/15/09 02:02 Kovacs Target: Cryo
  • 176154 02/15/09 01:42 Rondon Target: Use 85 nA beam: ammonia seems to be aging
  • 176153 02/15/09 01:33 pking Change to 85 nA between run 72545 and 72546.
  • 176149 02/15/09 01:16 pking Request 95 nA
  • 176148 02/15/09 01:11 Kovacs Target: Polarization -88.3
  • 176147 02/15/09 01:10 Kovacs Target: Cryo
  • 176146 02/15/09 01:07 pking Machine is ready; request 50 nA to check positions
  • 176145 02/15/09 00:31 pking Cerenkov LED pulser and insertion have been ON; turned off now.
  • 176144 02/15/09 00:24 pking Machine down for RF controller replacement
  • 176143 02/15/09 00:09 Mostafa Target: PDP screen, -83.9%, no beam, and I changed the calibration constant
  • 176142 02/15/09 00:02 cdaq Beam Time Accounting
  • Saturday

  • 176141 02/14/09 23:56 Hoyoung Evening shift summary
  • 176140 02/14/09 23:53 Mostafa Target: PDP screen, +100% and it is going
  • 176139 02/14/09 23:40 Mostafa Target: PDP screen, -90%
  • 176138 02/14/09 23:25 Hoyoung Polarization reached -60% within 30 min. But no beam
  • 176137 02/14/09 23:13 Mostafa Target: Cryo and strip screen
  • 176136 02/14/09 23:12 Mostafa Target: PDP screen, no beam, -13.4
  • 176135 02/14/09 22:54 Mostafa Target: The target Nose is not filling
  • 176134 02/14/09 22:11 Mostafa Target: PDP screen
  • 176133 02/14/09 22:10 Mostafa Target: Cryo and strip screens, The blowers tripped
  • 176132 02/14/09 21:50 Hoyoung Counting house VESDA system and network fault
  • 176131 02/14/09 21:22 Mostafa Target: Cryo and strip screen, NH3 bottom, encoder 1.705
  • 176130 02/14/09 21:18 Mostafa Target: PDP screen, NH3 bottom, encoder1.705, -ve polarization
  • 176129 02/14/09 21:11 Hoyoung Target: Beam center and polarization starting
  • 176128 02/14/09 20:41 kawama Beam position at run72544
  • 176126 02/14/09 20:35 kawama Beam position at run72543
  • 176122 02/14/09 20:23 kawama Beam position at run72542
  • 176119 02/14/09 20:09 kawama Beam position at run72541
  • 176117 02/14/09 20:05 Mostafa Target: PDP screen, target empty
  • 176116 02/14/09 20:01 Mostafa Target: Cryo and Strip screens, target empty
  • 176112 02/14/09 19:40 Mostafa Target: Target on empty position 0.178
  • 176111 02/14/09 19:31 J Mulholland Target: Bottom TE done needs different baseline
  • 176110 02/14/09 19:01 J Mulholland Target: Beginning of the Bottom TE
  • 176109 02/14/09 18:46 narbe Target: TE results for Top NH3
  • 176108 02/14/09 18:33 narbe Target: Moved to Top for TE
  • 176107 02/14/09 18:29 J Mulholland Target: Top TE finished. will post results later
  • 176106 02/14/09 16:36 J Mulholland Target: TE Setup and Target location
  • 176105 02/14/09 16:05 T.Gogami Analysis: Yield summary day 14Feb2009
  • 176104 02/14/09 16:05 cdaq Beam Time Accounting
  • 176103 02/14/09 16:03 Bosted Day shift summary
  • 176102 02/14/09 15:44 Rondon RUN PLAN - Sun. 2/5 to Mon 2/16 -- Wiki page changes
  • 176101 02/14/09 15:40 J Mulholland Target: Anneal over
  • 176100 02/14/09 14:47 gaskell Moller backout
  • 176099 02/14/09 14:45 gaskell Moller results: P=-73.34 +/- 0.70%
  • 176098 02/14/09 14:36 J Mulholland Target: Anneal Started Moved to Top
  • 176092 02/14/09 13:30 J Mulholland Target: Anneal Prep during Moeller
  • 176086 02/14/09 13:11 anusha Target: Target moved to the empty target, encoder=0.177
  • 176085 02/14/09 13:10 Bosted Starting Moller run and target anneal
  • 176084 02/14/09 13:08 gaskell Moller preparations - SR off
  • 176080 02/14/09 12:29 Rondon RUN PLAN -- TE calibrations
  • 176079 02/14/09 12:26 Rondon RUN PLAN -- TE calibrations
  • 176078 02/14/09 12:26 anusha Target: cryo panel screenshot
  • 176077 02/14/09 12:24 anusha Target: Target PDP screenshot.
  • 176074 02/14/09 11:33 anusha Target: strip charts after rebooting the IOC panel.
  • 176073 02/14/09 11:27 anusha Target: Target IOC panel rebooted.
  • 176070 02/14/09 10:32 Bosted HMS controls working again.
  • 176067 02/14/09 09:54 anusha Target: Target Strip Charts
  • 176066 02/14/09 09:48 anusha Target: IOC panel screenshot.
  • 176065 02/14/09 09:46 anusha Target: both the cryo computer and the target IOC rebooted and the polarization is back to 80.2%
  • 176064 02/14/09 09:17 Bosted Beam back, run 72530 started
  • 176062 02/14/09 09:02 Bosted HMS screen
  • 176061 02/14/09 09:00 Bosted Target: lost polarization
  • 176059 02/14/09 08:15 pking Owl shift summary
  • 176058 02/14/09 08:15 cdaq Beam Time Accounting
  • 176057 02/14/09 08:14 pking HMS Q1 valve 3 had an error
  • 176056 02/14/09 08:14 narayan Target: regular cryo screenshot
  • 176055 02/14/09 08:12 narayan Target: PDP screenshot and target ideas for Owl shift
  • 176050 02/14/09 06:23 narayan Target: regular PDP screenshot
  • 176049 02/14/09 06:20 pking Polarization dropped at end of run 72526
  • 176046 02/14/09 05:55 pking BPM & BCM strip charts: 96nA
  • 176045 02/14/09 05:44 narayan Target: regular screenshot for cryo screen
  • 176040 02/14/09 03:29 narayan Target: regul
  • 176037 02/14/09 02:42 M Jones Before Run 72515 changed HMS to detect elastic protons in coincidence with beta
  • 176036 02/14/09 02:35 pking Run 72523 is on the top target cup
  • 176034 02/14/09 02:27 pking HMS rates are really low; is it a problem?
  • 176032 02/14/09 02:11 narayan Target: regular PDP screenshot
  • 176031 02/14/09 01:53 narayan Target: moved to Top Target (3.393)
  • 176030 02/14/09 01:37 pking Run 72522 is on the top target cup
  • 176028 02/14/09 01:31 pking Request beam on
  • 176027 02/14/09 01:30 jmaxwell Target: RF Generator Error
  • 176026 02/14/09 01:29 Rondon RUN PLAN - Follow-up for Sat. 2/14 day
  • 176025 02/14/09 01:17 pking Request beam off again
  • 176024 02/14/09 01:10 pking Top target cup is in; request beam
  • 176023 02/14/09 01:08 Rondon RUN PLAN for Sat. 2/14 day/eve to Sun. 2/15 owl/day
  • 176022 02/14/09 00:53 pking Request beam off to change to the upper target cup
  • 176020 02/14/09 00:42 pking BPM and BCM strip charts: 97nA
  • 176019 02/14/09 00:35 pking Resaved the prescale flags; PS1==99999 now
  • 176017 02/14/09 00:26 pking BTA problem: Hall C status from MCC hadn't cleared for swing shift
  • 176015 02/14/09 00:03 cdaq Beam Time Accounting
  • 176014 02/14/09 00:01 Mostafa Target: PDP screen, +69.9, 96nA
  • Friday

  • 176013 02/13/09 23:56 cdaq Beam Time Accounting
  • 176012 02/13/09 23:52 kawama Yield summary evening shift 13Feb
  • 176011 02/13/09 23:48 kawama Shape of SLIY.15 TDC/ADC at run72520
  • 176010 02/13/09 23:38 anusha Beam: Error of the Beam Time Accounting.
  • 176007 02/13/09 23:25 Mostafa Target: Cryo and Strip Screens
  • 176006 02/13/09 23:05 Mostafa Target: PDP screen, 72.5%,101 nA
  • 176003 02/13/09 22:16 Mostafa Target: Cryo and strip screens
  • 176002 02/13/09 22:14 Mostafa Target: PDP screen, +73.8%, 99nA
  • 175999 02/13/09 21:06 Mostafa Target: Cryo and Strip screens, 77%, 98 nA
  • 175997 02/13/09 21:03 Mostafa Target: PDP screen, +77%, 96.7 nA
  • 175995 02/13/09 20:13 kawama No shape at focal plane in run72515
  • 175993 02/13/09 20:11 Mostafa Target: Cryo and strip screen, 80.5%, 100nA
  • 175991 02/13/09 20:02 Mostafa Target: PDP screen, +80 % , 98 nA
  • 175988 02/13/09 19:12 M Jones How much did we pay for this piece of crap HMS software?
  • 175987 02/13/09 19:02 Mostafa Target: Cryo and Strip screens, +83.1, 104nA
  • 175986 02/13/09 18:58 Mostafa Target: PDP screen, +83.5% , 104 nA
  • 175983 02/13/09 18:30 kawama Strange shape TDC of SLIY.15 at run72513
  • 175982 02/13/09 18:09 Mostafa Target: Cryo and strip screens, +85.5%, 100nA
  • 175980 02/13/09 18:05 Mostafa Target: PDP screen, 86%, 97nA
  • 175976 02/13/09 17:11 Mostafa Target: PDP screen, 89.6%, 100n A
  • 175975 02/13/09 17:10 Rondon Target: and here is the beam current at the time of Pt= 90%
  • 175974 02/13/09 17:03 Rondon Target: Pt = 90%Here is the PDP screen shot, a bit later than the log entry
  • 175973 02/13/09 16:59 Mostafa Target: PDP screen, +88%
  • 175972 02/13/09 16:56 mostafa Target: PDP screen, +88%
  • 175971 02/13/09 16:44 kawama Analysis: HMS histgrams changed at run72511
  • 175970 02/13/09 16:44 kawama Analysis: HMS histgrams changed at run72511
  • 175968 02/13/09 16:16 Mostafa Target: Cryo and strip screen
  • 175967 02/13/09 16:13 cdaq Beam Time Accounting
  • 175966 02/13/09 16:12 mostafa Target: PDP Screen, +50%, no beam
  • 175964 02/13/09 15:45 Mostafa Target: IOC reboot
  • 175963 02/13/09 15:31 smithg Target: Moved to C tgt,
  • 175961 02/13/09 15:00 J Mulholland Target: See run #72509 and post #175958
  • 175960 02/13/09 14:55 J Mulholland Target: Target Positions
  • 175958 02/13/09 14:38 ccbutu run #72509 cross hair final check
  • 175956 02/13/09 14:32 smithg Target: Moved to empty target, 0.16
  • 175953 02/13/09 14:19 M Jones Run 72507 was at encoder = 0.101 NOT 0.175
  • 175952 02/13/09 14:19 smithg Target: Moved to empty target, 0.98
  • 175951 02/13/09 14:19 ccbutu run #72507 cross hair check
  • 175948 02/13/09 14:03 ccbutu Cross hair with the encoder at 0.175
  • 175947 02/13/09 14:03 smithg Target: Moved to empty target, old position
  • 175944 02/13/09 13:51 smithg Target: Moved to empty target.
  • 175943 02/13/09 13:46 jmaxwell Target: Magnet Lifted
  • 175942 02/13/09 13:41 J Mulholland Target: Separator heated and Target Positions
  • 175941 02/13/09 13:38 M Jones Hall C hctsv7 reconnected to network
  • 175940 02/13/09 13:37 ccbutu Corection to the Tracker X plane MAP!
  • 175939 02/13/09 12:51 Rondon SHIFT LEADERS: Please submit online run sheets for each run
  • 175938 02/13/09 12:36 J Mulholland Target: Anneal over
  • 175937 02/13/09 12:01 J Mulholland Target: Anneal and Move to Top
  • 175936 02/13/09 11:57 narbe Target: Moved due to raster-ADC picture
  • 175933 02/13/09 10:46 smithg Target: Nose empty
  • 175930 02/13/09 10:34 J Mulholland Target: Anneal Procedure starting
  • 175929 02/13/09 10:31 smithg Target: Moved to C for anneal
  • 175927 02/13/09 09:59 smithg Target: status
  • 175924 02/13/09 09:17 smithg Target: PDP screen grab
  • 175923 02/13/09 08:47 smithg Target: rebooted target IOC
  • 175922 02/13/09 08:29 smithg Target: cryo screen grab
  • 175919 02/13/09 08:04 cdaq Beam Time Accounting
  • 175918 02/13/09 07:57 Nuruzzaman Analysis: Correction
  • 175917 02/13/09 07:51 Nuruzzaman Analysis:Yield Summary Owl Shift 13th Feb
  • 175914 02/13/09 07:10 Kovacs Target: Polarization 73.8
  • 175913 02/13/09 07:08 Kovacs Target: cryo
  • 175910 02/13/09 06:09 Kovacs Target: polarization 74.5
  • 175909 02/13/09 06:09 Kovacs Target: Cryo back to normal
  • 175907 02/13/09 04:49 Kovacs Target: nose level sudden drop
  • 175903 02/13/09 04:01 Kovacs Target: Cryo
  • 175902 02/13/09 04:00 kovacs Target: Polarization 72.9
  • 175899 02/13/09 03:07 Kovacs Target: Polarization 71.0
  • 175898 02/13/09 03:05 Kovacs Target: Cryo
  • 175897 02/13/09 02:32 jpchen BPMs and BCMs
  • 175895 02/13/09 02:16 jmaxwell Target: Slow Raster ADC for Top
  • 175893 02/13/09 02:08 Kovacs Target: cryo
  • 175892 02/13/09 02:06 Kovacs Target: Polarization 72.0
  • 175891 02/13/09 01:50 Nuruzzaman hdc wiremap
  • 175888 02/13/09 01:08 Kovacs Target: cryo
  • 175887 02/13/09 01:04 Kovacs Target: Polarization 74.8
  • 175886 02/13/09 00:43 Nuruzzaman Histograms seems to be reduced by scale factor
  • 175883 02/13/09 00:15 cdaq Beam Time Accounting
  • Thursday

  • 175882 02/12/09 23:50 Nue Analysis: Yield summary swing 12 Feb.
  • 175880 02/12/09 23:39 kohlm Target: beam polarization above -70%
  • 175879 02/12/09 23:37 Nue Beam: Request beam
  • 175878 02/12/09 23:36 jmaxwell Target: Cal. Constant
  • 175877 02/12/09 23:34 Rondon RUN PLAN (Follow-Up)
  • 175876 02/12/09 23:25 Rondon RUN PLAN - Fri. 2/13 day to Sat. 2/14 day
  • 175875 02/12/09 23:12 kohlm Target: switched to top target, pdp screen shot
  • 175874 02/12/09 22:43 Nue Beam: HMS Chamber tripped and target will be changed.
  • 175872 02/12/09 22:39 kohlm Target: cryo screen shot and pid loop
  • 175871 02/12/09 22:35 kohlm Target: pdp update
  • 175868 02/12/09 22:17 M Jones Good coin timing peak moved into bigcal trigger time
  • 175865 02/12/09 21:17 kohlm Target: PID loop
  • 175864 02/12/09 21:09 kohlm Target: cryo screen and strip charts
  • 175863 02/12/09 21:05 M Jones Problem with 1mHZ scaler in the tsgep scaler bank
  • 175862 02/12/09 21:05 Nue Analysis: LC ADC and Cerenkov TDC
  • 175861 02/12/09 21:04 kohlm Target: pdp update
  • 175858 02/12/09 20:31 Nue Analysis: HDC2 may have less events
  • 175857 02/12/09 20:09 Nue Analysis: BETA spectra have larger background
  • 175854 02/12/09 19:47 Nue Analysis: Hot channel in Hcal nhits histogram in HMS
  • 175852 02/12/09 16:55 kohlm Target: target polarization / pdp screenshot
  • 175851 02/12/09 16:48 jmaxwell Target: TE not good
  • 175850 02/12/09 16:24 Rondon Beam: There were 3 runs at 50 nA
  • 175849 02/12/09 16:21 Rondon Target: Correction to name
  • 175848 02/12/09 16:06 saw Beam: Moeller Current EPICS
  • 175847 02/12/09 16:03 cdaq Beam Time Accounting
  • 175846 02/12/09 15:49 jmaxwell Target: Started New Event File
  • 175845 02/12/09 15:45 Mostafa Target: Roots blower are on
  • 175844 02/12/09 15:43 jmaxwell Target: TE over, Turning on roots blowers
  • 175843 02/12/09 15:39 Mostafa Target: Cryo and strip screen, end of TE
  • 175842 02/12/09 15:34 Mostafa Target: Bottom target in position 1.631
  • 175841 02/12/09 15:30 Mostafa Target: PDP screen, end of TE
  • 175840 02/12/09 15:00 jmaxwell Target: Target Material Runlist
  • 175839 02/12/09 14:57 Mostafa Target: Cryo and Strip screens, TE measurement
  • 175838 02/12/09 14:53 mostafa Target: PDP screen, TE measurement
  • 175837 02/12/09 14:23 cdaq Beam Time Accounting
  • 175836 02/12/09 13:54 jmaxwell Target: Moved to Top for TE
  • 175835 02/12/09 13:50 jmaxwell Target: Encoder for Bottom?
  • 175834 02/12/09 13:29 jmaxwell Target: Turning off pumps for TE
  • 175833 02/12/09 12:57 mostafa Target: Cryo and strip screens, -75.8%, no beam
  • 175832 02/12/09 12:54 mostafa Target: PDP screen, 76.5%, no beam
  • 175831 02/12/09 12:52 M Jones Change to beta2 trigger timing to and SANE cerenkov determine the timing
  • 175830 02/12/09 12:07 J Mulholland Target: Repeat of list of runs with which target was being used
  • 175829 02/12/09 12:04 J Mulholland Target: list of runs with which target was being used
  • 175828 02/12/09 12:00 mostafa Target: Cryo and strip screens
  • 175827 02/12/09 11:58 mostafa Target: PDP screen, -70.0%, no beam
  • 175826 02/12/09 11:51 Rondon Target: Added shielding to target IOC
  • 175825 02/12/09 11:21 C Keith Target: Bypass valve repaired
  • 175824 02/12/09 11:14 mostafa Target: Cryo and strip screen, Bypass valve
  • 175823 02/12/09 11:07 mostafa Target: pdp screen, -39%, no beam
  • 175822 02/12/09 10:25 mostafa Target: New PDP screen, -79.7%, no beam
  • 175821 02/12/09 10:15 mostafa PDP screen, -77.9%, no beam
  • 175820 02/12/09 10:01 mostafa Target: Cryo and strip screens, -77.7%, no beam
  • 175819 02/12/09 09:55 mostafa Target: PDP screen, -77.5%, no beam
  • 175818 02/12/09 09:50 puckett MCC new downtime estimate: noon
  • 175817 02/12/09 08:56 Rondon Target: Please add the polarization and current to the TITLE of logs
  • 175816 02/12/09 08:51 Mostafa Target: Cryo and strip screens
  • 175815 02/12/09 08:49 mostafa Target: PDP screen
  • 175814 02/12/09 08:41 puckett Accelerator down... MCC says until at least 10:00. Go to controlled access
  • 175810 02/12/09 08:04 bhovik Shift Summary starting from run 72477 negative polarization
  • 175809 02/12/09 08:01 mostafa Target: screen shot of target strip shot
  • 175806 02/12/09 07:22 narbe Target: Rebooted PDP gui
  • 175805 02/12/09 07:19 narbe Target: Screen shot of PDP gui
  • 175804 02/12/09 07:10 cdaq Beam Time Accounting
  • 175801 02/12/09 06:17 narbe Target: Screen shot of PDP gui
  • 175800 02/12/09 06:10 bhovik Irrelevant to TE picture
  • 175797 02/12/09 05:29 veilleux checklist screenshots
  • 175796 02/12/09 05:21 narbe Target: Screen shot of PDP gui
  • 175795 02/12/09 04:40 narbe Target: ioc crash
  • 175792 02/12/09 04:17 narbe Target: Screen shot of PDP gui
  • 175789 02/12/09 03:20 narbe Target: Screen shot of PDP gui
  • 175787 02/12/09 03:06 narbe Target: Polarization back up
  • 175786 02/12/09 02:48 narbe Target: Nose level back up; polarizing again
  • 175785 02/12/09 02:46 narbe Target: Lost polarization ioc crash
  • 175784 02/12/09 02:45 veilleux low yield
  • 175780 02/12/09 01:53 narbe Target: Screen shot of PDP gui
  • 175779 02/12/09 00:51 narbe Target: Screen shot of PDP gui
  • 175775 02/12/09 00:26 narbe Target: Moved Target up some
  • 175771 02/12/09 00:11 narbe Target: Screen shots of Target cryo and strips
  • 175770 02/12/09 00:10 narbe Target: ioc reboot
  • 175769 02/12/09 00:09 vahe Shift summary
  • 175768 02/12/09 00:07 narbe Target: Screen shot of PDP gui
  • Wednesday

  • 175763 02/11/09 23:20 mahbub Target: Moved to Bottom target
  • 175762 02/11/09 23:07 jmaxwell Target: Cross-hair Measurements
  • 175760 02/11/09 22:27 anusha cross hair for the run=72473
  • 175759 02/11/09 22:23 mahbub Target: move cross hair tgt by 3 mm
  • 175756 02/11/09 21:28 gaskell Moller backout
  • 175755 02/11/09 21:26 gaskell Polarization at Wien angle=23 degrees
  • 175749 02/11/09 20:34 gaskell Polarization at Wien=20 degrees
  • 175747 02/11/09 20:19 gaskell Wien changing to 23 degrees
  • 175740 02/11/09 18:50 gaskell Changing Wien to 20 degrees
  • 175739 02/11/09 18:49 gaskell Polarization at Wien=29.99 degrees
  • 175737 02/11/09 18:28 M Jones Updated the replay directory into the CVS
  • 175736 02/11/09 18:20 gaskell Moller tuned at 5.9 GeV
  • 175735 02/11/09 18:17 M Jones Updated the Analyzer into the CVS
  • 175732 02/11/09 18:11 M Jones Fixed problem with the HMS electron reconstruction in field
  • 175730 02/11/09 17:48 Rondon Beam: 50 nA beam was with nominal, uncalibrated BPMs
  • 175713 02/11/09 17:11 mahbub Target: PDP screenshot
  • 175712 02/11/09 17:07 mahbub Target: IOC crash
  • 175709 02/11/09 17:04 Rondon RUN PLAN - Wed. 2/11 eve to Thurs. 2/12 eve
  • 175708 02/11/09 17:01 mahbub Target: Cryo screenshot
  • 175707 02/11/09 16:50 Hoyoung Replay parameters updated
  • 175706 02/11/09 16:29 saw Added epics channel for Moller BCM
  • 175705 02/11/09 16:20 jmaxwell Target: Note on Bypass
  • 175704 02/11/09 16:09 gaskell Slow raster is off!
  • 175703 02/11/09 16:06 cdaq Beam Time Accounting
  • 175701 02/11/09 15:50 jmaxwell Target: Lifted Magnet Current
  • 175700 02/11/09 15:50 puckett shift summary
  • 175698 02/11/09 15:40 jmaxwell Target: Target Screenshot after anneal
  • 175697 02/11/09 15:36 jmaxwell Target: Moved to Empty for Moller
  • 175696 02/11/09 15:29 Donal Target: Anneal Plot Feb 11
  • 175695 02/11/09 15:11 jmaxwell Target: Anneal Done, Cooled Down
  • 175694 02/11/09 14:40 cdaq Beam Time Accounting
  • 175693 02/11/09 14:28 mack online BCM calibration for 85nA to 200 nA
  • 175692 02/11/09 14:03 mack offline BCM calibration for 80 nA to 200 nA
  • 175691 02/11/09 13:55 jmaxwell Target: Anneal Started
  • 175690 02/11/09 13:55 jmaxwell Target: TEs finished
  • 175689 02/11/09 13:53 mack bcm calibration data for 85na to 200 nA
  • 175688 02/11/09 11:51 Rondon Target: Plot of Anneal #3 (2/10/9)
  • 175687 02/11/09 11:50 jmaxwell Target: Moved to Top
  • 175686 02/11/09 11:30 M Jones Checked HMS gas flow in hut
  • 175685 02/11/09 11:25 M Jones Added delay to the Lucite ADC Left all channels
  • 175684 02/11/09 11:21 M Jones Work hctsv7 in hall
  • 175683 02/11/09 10:45 J Mulholland Target: TE on Bottom Target Begin Cryo screen followup
  • 175682 02/11/09 10:44 J Mulholland Target: TE on Bottom Target Begin Cryo screen
  • 175681 02/11/09 10:43 J Mulholland Target: TE Bottom Start
  • 175679 02/11/09 10:09 Kovacs Target: target moved to empty screenshot
  • 175678 02/11/09 10:04 A. Deur shift check list scans
  • 175677 02/11/09 10:03 A. Deur shift check list scans
  • 175676 02/11/09 09:55 J Mulholland Target: TE procedure begun
  • 175675 02/11/09 09:53 J Mulholland Target: moved to bottom
  • 175674 02/11/09 09:47 J Mulholland Target: Anneal log columns
  • 175673 02/11/09 09:26 A. Deur yielf plot
  • 175672 02/11/09 09:23 A. Deur yields
  • 175671 02/11/09 09:19 Kovacs Target moved to empty
  • 175670 02/11/09 09:08 Donal Target: Anneal plot for Feb 10
  • 175669 02/11/09 09:06 A. Deur yield for run 72452
  • 175665 02/11/09 08:21 puckett HMS drift chambers turned off--turned back on
  • 175662 02/11/09 08:15 Kovacs target screenshots
  • 175661 02/11/09 08:05 bhovik Shift Summary
  • 175658 02/11/09 07:32 narbe Target: Screen shot of PDP gui
  • 175653 02/11/09 06:34 narbe Target: Screen shot of PDP gui
  • 175650 02/11/09 05:36 narbe Target: Screen shot of PDP gui
  • 175648 02/11/09 04:54 narbe Target: Move to Top NH3
  • 175646 02/11/09 04:23 narbe Target: Screen shot of PDP gui
  • 175642 02/11/09 03:33 narbe Target: Screen shot of PDP gui
  • 175641 02/11/09 03:27 narbe Target: Moved to bottom NH3, start polarizing
  • 175634 02/11/09 02:52 narbe Target: Moved to Empty Target
  • 175631 02/11/09 02:23 narbe Target: Target moved to Carbon
  • 175626 02/11/09 02:07 narbe Target: Roots blowers turned on
  • 175624 02/11/09 02:02 jmaxwell Target: Fridge Full
  • 175622 02/11/09 02:00 narbe Target: Moved to Empty Target
  • 175621 02/11/09 01:01 narbe Target: Screenshots of Target Cryo and Strips
  • 175620 02/11/09 00:42 jmaxwell Target: Anneal Finished, Cooling Fridge
  • 175619 02/11/09 00:31 Rondon Analysis: Raster ADC plots, target and beam centering
  • 175618 02/11/09 00:17 bhovik Raster Size change
  • 175617 02/11/09 00:17 bhovik Raster Size change
  • 175616 02/11/09 00:03 P. Monaghan Swing Shift Summary
  • 175615 02/11/09 00:03 cdaq Beam Time Accounting
  • Tuesday

  • 175614 02/10/09 23:36 anusha yields for the top target
  • 175613 02/10/09 23:32 anusha shift checklist for Feb 8 thru Feb 10
  • 175612 02/10/09 23:09 anusha slow raster for the 8 mm hole
  • 175611 02/10/09 23:00 jmaxwell Target: Move to Top
  • 175608 02/10/09 22:44 anusha Target: Cross-hair Raster ADC
  • 175607 02/10/09 22:31 J Mulholland Target: Moved to the 8mm hole
  • 175605 02/10/09 22:19 anusha hdc 1 hits plot.
  • 175603 02/10/09 22:13 J Mulholland Target: Moved to Crosshairs
  • 175601 02/10/09 21:53 J Mulholland Target: IOC reboot
  • 175600 02/10/09 21:40 J Mulholland Target: Anneal Procedure Started
  • 175596 02/10/09 21:18 chench Move target
  • 175594 02/10/09 20:59 M Jones Shift checklist for Feb 4 thru Feb 7
  • 175591 02/10/09 20:01 chench target PDP screenshot
  • 175588 02/10/09 19:02 chench target screenshot of PDP
  • 175587 02/10/09 18:54 Rondon RUN PLAN - Tue. 2/10 eve to Wed. 2/11 day
  • 175584 02/10/09 17:58 chench target polarization is back
  • 175582 02/10/09 17:43 chench target PDP screenshot
  • 175581 02/10/09 17:30 chench The Target polarization goes down to 0.0%
  • 175577 02/10/09 16:53 puckett belated shift summary
  • 175576 02/10/09 16:40 chench Target: screenshot of strip and cryo
  • 175573 02/10/09 16:10 cdaq Beam Time Accounting
  • 175572 02/10/09 15:55 jmaxwell Target: Cross-hair Raster ADC
  • 175571 02/10/09 15:48 P Carter plotting yield for each run
  • 175570 02/10/09 15:31 vahe Top target encoder
  • 175569 02/10/09 15:24 P Carter replay plots for run 72428
  • 175568 02/10/09 15:21 P Carter Lucite ADCs look wrong in the online replay for run 72428
  • 175567 02/10/09 15:20 jmaxwell Target: Guesstimate Calibration Constant
  • 175566 02/10/09 15:20 vahe IOC reboot
  • 175565 02/10/09 15:17 vahe PDP snapshot
  • 175564 02/10/09 15:15 jmaxwell Target: Updated Target Encoder Values in PDP
  • 175563 02/10/09 15:14 M Jones Beam Studies on Wed 9am-12
  • 175561 02/10/09 14:41 vahe Top target
  • 175560 02/10/09 14:39 vahe Target moved to top
  • 175559 02/10/09 14:34 J Mulholland Target: Pressure back down
  • 175558 02/10/09 14:24 J Mulholland TargetL TC on target insert
  • 175557 02/10/09 14:21 J Mulholland Target: nose overfull and anneal heater.
  • 175556 02/10/09 13:40 vahe PDP restart
  • 175555 02/10/09 13:33 J Mulholland Target: Polarization frop and Pump trip
  • 175551 02/10/09 13:00 vahe PDP snapshot
  • 175550 02/10/09 12:28 puckett turned on HMS drift chambers before run 72426
  • 175547 02/10/09 12:07 vahe Target: Error message from NMR computer
  • 175545 02/10/09 11:47 P Carter can't connect to hctsv7
  • 175543 02/10/09 11:41 puckett BPM and BCM screens for shift checklist
  • 175542 02/10/09 11:11 vahe Nose liquid level
  • 175541 02/10/09 11:01 Donal Target: Before moving target
  • 175538 02/10/09 10:51 vahe Nose liquid level
  • 175535 02/10/09 10:07 M Jones Gas flow to HMS reestablished and alarm turned back on.
  • 175534 02/10/09 10:04 puckett turned off bypass switch for gas system interlock
  • 175533 02/10/09 09:50 vahe PDP screen shot
  • 175530 02/10/09 09:20 puckett gas system interlock alarm--silenced
  • 175528 02/10/09 08:39 vahe Target: IOC reboot
  • 175526 02/10/09 08:34 fanning Beam Time Accounting
  • 175525 02/10/09 08:25 M Jones No gas flow to HMS, turn off HMS drift chambers
  • 175522 02/10/09 08:02 cdaq Beam Time Accounting
  • 175521 02/10/09 07:59 bhovik Shift Summary
  • 175520 02/10/09 07:56 vahe Screen shot of PDP gui
  • 175519 02/10/09 07:56 M Jones Lowered Bigcal threshold on Large Angle side to 500mV
  • 175516 02/10/09 07:30 narbe Target: Screen shot of PDP gui
  • 175515 02/10/09 06:47 narbe Target: Screen shot of PDP gui
  • 175511 02/10/09 05:45 narbe Target: Screen shot of PDP gui
  • 175507 02/10/09 05:19 narbe Target: Moved to Empty Target 0.172
  • 175499 02/10/09 04:23 narbe Target: Screen shot of PDP gui
  • 175498 02/10/09 04:11 narbe Target: Screenshot of Target EPICS and Strip charts
  • 175497 02/10/09 03:38 jmaxwell Target: Fridge Cold, Full
  • 175496 02/10/09 02:49 jmaxwell Target: Insert C Material
  • 175494 02/10/09 02:11 jmaxwell Target: Insert C Tuned
  • 175493 02/10/09 00:56 Donal Target: Frig cold
  • 175492 02/10/09 00:41 bhovik Alcohol Bubles
  • 175491 02/10/09 00:27 melnik Cer LED run
  • 175490 02/10/09 00:00 cdaq Beam Time Accounting
  • Monday

  • 175489 02/09/09 23:55 Keppel target field FSD tolerances
  • 175487 02/09/09 23:51 Keppel evening shift summary
  • 175486 02/09/09 23:47 Nuruzzaman The Alcohol is Not Bubbling
  • 175483 02/09/09 23:27 Nuruzzaman Helium Bottle Changed
  • 175480 02/09/09 22:51 saw Witness probe field much larger
  • 175477 02/09/09 22:38 jmaxwell Target: Magnet Ramped to 77.095A
  • 175447 02/09/09 21:17 Nuruzzaman HMS momentum changed & angel Changed
  • 175443 02/09/09 21:00 jmaxwell Target: Magnet Ramping Up, Behaving
  • 175440 02/09/09 20:55 J Mulholland Target: Ramp up and Fridge cool down
  • 175439 02/09/09 20:52 Keppel HMS angle change
  • 175438 02/09/09 19:48 Rondon RUN PLAN - Mon. 2/9 eve to Tue. 2/10 eve
  • 175437 02/09/09 19:34 Rondon Beam: Saved Slow raster settings in Preset 6
  • 175436 02/09/09 19:10 M Jones Made file sem_59GeV.param for new slow raster conversion
  • 175435 02/09/09 18:31 M Jones Moved probe for the "witness" field
  • 175434 02/09/09 18:29 M Jones Gaussmeter at the Cerenkov
  • 175431 02/09/09 18:17 M Jones Set SLow raster for 2cm diameter for 5.9 GeV beam
  • 175430 02/09/09 18:06 J Mulholland Target: Carpenter's level
  • 175429 02/09/09 17:57 j mulholland Target: Pivot access and danger to magnet please read
  • 175428 02/09/09 17:53 jmaxwell Target: Magnet Leads Unlocked to Ramp Up
  • 175427 02/09/09 17:05 Donal Target: Piston work
  • 175426 02/09/09 16:04 cdaq Beam Time Accounting
  • 175424 02/09/09 15:50 W. Deconinck Day shift summary
  • 175423 02/09/09 14:38 Donal Target: Correction
  • 175422 02/09/09 14:04 Donal Target: frozen sticks and resolution
  • 175421 02/09/09 13:39 Donal Target: Stick removed and unloaded
  • 175420 02/09/09 12:22 jmaxwell Target: Insert C Thermocouple
  • 175419 02/09/09 11:30 jpchen Correction: It was roots pump #1 (not #3)
  • 175418 02/09/09 11:11 ccbutu Hi My name is SANE Forward Tracker and I just signed OFF!
  • 175417 02/09/09 10:58 Don Crabb Roots Pump #3
  • 175416 02/09/09 10:21 jmaxwell Target: Magnet Leads Locked
  • 175415 02/09/09 09:25 Donal Target: New Event file
  • 175414 02/09/09 09:21 Donal Target: Ramp down complete
  • 175413 02/09/09 08:25 cdaq Beam Time Accounting
  • 175412 02/09/09 08:15 jpchen turned off roots pump #3
  • 175411 02/09/09 07:46 W. Deconinck RADCON hall survey done
  • 175410 02/09/09 07:38 bhovik Analysis: Shift Summary
  • 175409 02/09/09 07:31 Donal Target: Ramp down
  • 175408 02/09/09 07:25 Donal Target: ramp down
  • 175406 02/09/09 06:54 narbe Target: Screen shot of PDP gui
  • 175403 02/09/09 06:11 narbe Target: Screen shot of PDP gui
  • 175398 02/09/09 04:57 T.Walton histogram for track y1
  • 175397 02/09/09 04:56 narbe Target: Screen shot of PDP gui
  • 175394 02/09/09 04:03 narbe Target:
  • 175393 02/09/09 03:51 narbe Target: Screen shot of PDP gui
  • 175390 02/09/09 02:55 narbe Target: Screen shot of PDP gui
  • 175388 02/09/09 01:52 narbe Target: Screen shot of PDP gui
  • 175385 02/09/09 01:31 narbe Witness filed reading
  • 175382 02/09/09 00:55 narbe Target: Screen shot of PDP gui
  • 175381 02/09/09 00:30 narbe Target: Screenshots of Target GUIs EPICS and Strips
  • 175378 02/09/09 00:05 narbe Target: Screen shot of PDP gui
  • 175377 02/09/09 00:01 cdaq Beam Time Accounting
  • Sunday

  • 175376 02/08/09 23:14 hamlet Run 72380, Bottom target, 80 nA. Polarization -19.5%
  • 175373 02/08/09 22:43 kohlm Target: cryo screen shot
  • 175372 02/08/09 22:41 kohlm Target: polarizing up
  • 175369 02/08/09 21:53 hamlet Ask MCC for 100 nA, target polarization now -5.5%
  • 175368 02/08/09 21:47 hamlet cdaql5 stuck
  • 175367 02/08/09 21:43 jmaxwell Target: Beam on Target
  • 175366 02/08/09 21:41 hamlet Ask MCC for 80 nA to force polarization.
  • 175364 02/08/09 20:49 hamlet MCC ready to send beam. Ask 50 nA to polarize bottom target
  • 175363 02/08/09 20:39 jmaxwell Target: Another TE
  • 175362 02/08/09 20:34 hamlet Shift Summary, 08 February 2009
  • 175361 02/08/09 19:42 jmaxwell Target: Another Quick TE
  • 175360 02/08/09 19:35 jmaxwell Target: Quick TE
  • 175359 02/08/09 18:24 jmaxwell Target: Moved to Bottom
  • 175358 02/08/09 18:19 kohlm Target: nose level at 86%
  • 175357 02/08/09 17:54 jmaxwell Target: Bad Encoder Read
  • 175356 02/08/09 17:48 kohlm Target: nose level up at 70%
  • 175355 02/08/09 17:35 hamlet Pass change started. Estimated down time about 1 hour
  • 175351 02/08/09 17:12 kohlm Target: cryo screen shot
  • 175350 02/08/09 17:11 kohlm Target: PDP screen
  • 175349 02/08/09 16:57 kohlm Target: nose level at 43%
  • 175346 02/08/09 16:48 kohlm Target: separator valve changed
  • 175345 02/08/09 16:42 hamlet Pass change will start at 17:30
  • 175343 02/08/09 16:25 hamlet Beam OFF. MCC started pass change for Hall A
  • 175340 02/08/09 16:08 W. Deconinck Day shift summary
  • 175339 02/08/09 16:06 cdaq Beam Time Accounting
  • 175334 02/08/09 15:49 W. Deconinck Moving target up and down blindly
  • 175333 02/08/09 15:49 chench encoder readout
  • 175330 02/08/09 15:43 chench encoder readout
  • 175329 02/08/09 15:41 W. Deconinck HMS to 2.2 GeV / 16 deg
  • 175324 02/08/09 15:22 whit SANE Cherenkov LED RUN - field comparisons
  • 175323 02/08/09 15:03 W. Deconinck 100 nA on empty target
  • 175322 02/08/09 14:55 W. Deconinck Back to beam permit
  • 175319 02/08/09 13:59 jmaxwell Target: Moved to Empty Target, PID on Nose Level
  • 175318 02/08/09 13:51 jmaxwell Target: Top Target NMR Coil Bad
  • 175317 02/08/09 13:28 jmaxwell Target: Screenshot with New Magnet Current, Bottom Target Signal
  • 175316 02/08/09 13:24 jmaxwell Target: Nose Level Probe Working
  • 175315 02/08/09 12:56 chench Cryoscreen
  • 175314 02/08/09 12:51 jmaxwell Target: Insert C Material, Retuned
  • 175313 02/08/09 12:47 Donal Target: Frig is cold
  • 175312 02/08/09 12:41 narbe Target: Magnet fully Ramped and in Persistent
  • 175311 02/08/09 11:17 Donal Target: Ramp Up
  • 175310 02/08/09 11:08 Donal Target: Piston
  • 175309 02/08/09 10:50 Donal Target: Ramp Up
  • 175308 02/08/09 10:24 Donal Target: Ramp up
  • 175307 02/08/09 09:16 Donal Target: Cooling frig
  • 175306 02/08/09 09:10 chench Cryoscreen
  • 175305 02/08/09 09:08 chench run valve
  • 175304 02/08/09 09:04 chench Target: camera
  • 175303 02/08/09 09:00 chench low target plat form
  • 175302 02/08/09 08:36 chench new event file was created
  • 175301 02/08/09 08:17 cdaq Beam Time Accounting
  • 175300 02/08/09 08:15 chench Strip Chart of the target
  • 175299 02/08/09 08:00 Hoyoung Target: Overall status during OWL shift
  • 175298 02/08/09 07:41 Hoyoung Target: PDP screen
  • 175297 02/08/09 07:41 Hoyoung Target: Cryo screen
  • 175296 02/08/09 07:39 Hoyoung Target: separator flow 50.0
  • 175295 02/08/09 03:22 Hoyoung Target: PDP screen
  • 175294 02/08/09 03:22 Hoyoung Target: Cryo screen
  • 175293 02/08/09 02:57 Hoyoung Target: PDP screen
  • 175292 02/08/09 02:55 Hoyoung Target: IOC screen
  • 175291 02/08/09 01:27 jmaxwell Target: Microwaves Mysteriously On
  • 175290 02/08/09 01:18 jmaxwell Target: Magnet Quench
  • 175289 02/08/09 01:13 Donal Target: Insert installed
  • 175288 02/08/09 01:08 Hoyoung Target: LHe level dropped
  • 175287 02/08/09 00:43 Hoyoung Target: Cryo screen
  • 175286 02/08/09 00:10 Rondon RUN PLAN for Sun 2/8 to Mon. 2/9 Owl.
  • 175285 02/08/09 00:01 cdaq Beam Time Accounting
  • Saturday

  • 175284 02/07/09 23:53 hamlet Shift Summary, 07 February 2009
  • 175283 02/07/09 23:51 hamlet We may ask for beam permit after about 1 hour
  • 175282 02/07/09 23:07 jmaxwell Target: Witness=33G
  • 175281 02/07/09 23:00 Donal Target: magnet at full field
  • 175268 02/07/09 21:16 jmaxwell Target: Ramping Up Magnet
  • 175267 02/07/09 20:41 jmaxwell Target: Mini-quench?
  • 175266 02/07/09 20:34 narbe Target: Begin frig cooldown
  • 175265 02/07/09 20:17 jmaxwell Target: Insert Leak Checked; Piston Cleaned, Greased
  • 175264 02/07/09 20:14 jmaxwell Target: Ramping Magnet Back up to 77.090A
  • 175263 02/07/09 20:11 jmaxwell Target: Insert C Tuned
  • 175262 02/07/09 20:00 Donal Target: Piston
  • 175261 02/07/09 17:50 J Mulholland Target: Reclaimed material.
  • 175260 02/07/09 17:13 Donal Target: stick and piston
  • 175259 02/07/09 17:03 whit sane cherenkov high voltages
  • 175243 02/07/09 16:10 cdaq Beam Time Accounting
  • 175240 02/07/09 16:04 whit SANE CHERENKOV PMT 4 replaced
  • 175234 02/07/09 15:41 W. Deconinck Day shift summary
  • 175233 02/07/09 15:35 jmaxwell Target: Added this Problem & Solution to Wiki
  • 175228 02/07/09 15:14 M Jones Yesterday added HMS 3of 4 to scalers, so do not need access to change HMS trigger
  • 175227 02/07/09 14:56 M Jones Added 16ns delay to Cerenkov part of BETA2 trigger
  • 175226 02/07/09 14:54 M Jones Problem with trigger since Wed evening.
  • 175225 02/07/09 14:54 jmaxwell Target: R&S on hcreboot16
  • 175224 02/07/09 13:50 whit SANE Cherenkov HV OFF
  • 175223 02/07/09 13:28 jmaxwell Target: Lost 2 screen mouse functionality
  • 175222 02/07/09 13:21 jmaxwell Target: ITC Communications
  • 175221 02/07/09 13:14 jmaxwell Target: R&S Error
  • 175220 02/07/09 13:08 jmaxwell Target: Ramping Magnet to 15A
  • 175219 02/07/09 12:16 Rondon Target: Watching target temps on anneal vi
  • 175218 02/07/09 11:15 Don Crabb Comments
  • 175217 02/07/09 11:01 whit Cherenkov update
  • 175216 02/07/09 09:55 J Mulholland Target: Run valve and seperator and target status
  • 175215 02/07/09 09:17 W. Deconinck HMS dipole power supply: communication error fixed
  • 175214 02/07/09 09:09 J Mulholland Target: Target: Leak check it
  • 175213 02/07/09 09:05 J Mulholland Target: Insert Problems... down for...
  • 175212 02/07/09 07:40 J Mulholland Target: 4 atm helium just became available
  • 175211 02/07/09 07:06 J Mulholland Target: Frozen...backfilling
  • 175210 02/07/09 05:48 E. Frlez PDP Screen shot
  • 175209 02/07/09 05:46 E. Frlez Magnet and Refrigerator Temperature screen shot
  • 175208 02/07/09 05:42 E. Frlez Target: Target move
  • 175206 02/07/09 05:18 ccbutu TRACKER HV UPDATE
  • 175195 02/07/09 03:10 mahbub Tracker: Discriminator thresholds changed
  • 175193 02/07/09 03:04 E. Frlez Target: lost 2-screen mouse functionality
  • 175192 02/07/09 02:32 E. Frlez Target: Power loss, both Cryo and PDP computers reboot
  • 175190 02/07/09 02:08 J Mulholland Target: Fan off
  • 175189 02/07/09 02:07 J Mulholland Target: Magnet back up to field
  • 175188 02/07/09 02:06 J Mulholland Target: Rhode and Schwartz and EIP problems
  • 175187 02/07/09 02:00 E. Frlez PDP screen shot
  • 175186 02/07/09 02:00 J Mulholland Target: Ice on Run valve
  • 175185 02/07/09 01:59 E. Frlez Cryo screen shot
  • 175184 02/07/09 00:22 Rondon Beam: New constants loaded and BCM vmec15 rebooted
  • 175183 02/07/09 00:19 cdaq Beam Time Accounting
  • 175182 02/07/09 00:18 Rondon RUN PLAN - Sat. 2/7 owl to Sun. 2/8 owl
  • 175181 02/07/09 00:13 whit Analyzer sane_decode - SANE CHERENKOV
  • 175180 02/07/09 00:05 E. Frlez NMR computer screen shoot
  • Friday

  • 175179 02/06/09 23:57 Rondon Shift Summary
  • 175177 02/06/09 23:29 Don Crabb Run or By-pass valve open
  • 175176 02/06/09 23:28 ccbutu Another try!
  • 175175 02/06/09 23:25 E. Frlez Target: Trouble with NMR computer
  • 175174 02/06/09 23:23 ccbutu Replayed run #72341
  • 175173 02/06/09 23:13 ccbutu New TRACKER HV!
  • 175170 02/06/09 22:03 Rondon HMS at 1.65 GeV 18 degrees
  • 175169 02/06/09 22:02 Rondon Move to C target to boil excess LHe
  • 175167 02/06/09 21:40 E. Frlez Target: NMR: switched to Monitor mode
  • 175166 02/06/09 21:38 E. Frlez Target: Moved from Bottom (1.686) to Carbon (2.920) target
  • 175165 02/06/09 21:31 E. Frlez Target: Nose pressure up, 6 torr
  • 175164 02/06/09 21:29 E. Frlez Cryo screen shot
  • 175158 02/06/09 20:02 J Mulholland Target: fail ITC is fail and implications for next anneal
  • 175157 02/06/09 19:53 E. Frlez Target: NMR: changed number of sweeps 200->300
  • 175154 02/06/09 19:00 E. Frlez StripCharts
  • 175153 02/06/09 18:39 Rondon Analysis: Run 72337 is 45 nA
  • 175152 02/06/09 18:37 Rondon Analysis: Run 72335 is NH3, not C.
  • 175151 02/06/09 18:22 E. Frlez PDP screen shot
  • 175150 02/06/09 18:20 E. Frlez Target: PDP screen lost flow data
  • 175147 02/06/09 17:43 M Jones If you need to reboot Hall C switch, instructions in the SANE wiki under target ioc reboot instructions
  • 175146 02/06/09 17:35 saw Beam: New BCM constants ready for reboot
  • 175145 02/06/09 17:18 saw Target: Replacing target ioc (vmec4)
  • 175144 02/06/09 17:02 M Jones New BCM calibration slopes and offsets
  • 175141 02/06/09 16:37 Rondon BPM BCM screen shots
  • 175140 02/06/09 16:29 E. Frlez PNP screen shot
  • 175139 02/06/09 16:24 E. Frlez Cryo screen shot
  • 175137 02/06/09 16:01 cdaq Beam Time Accounting
  • 175136 02/06/09 15:56 hamlet Day Shift summary, 06 February 2009
  • 175135 02/06/09 15:54 narbe Target: MOved to bottom NH3
  • 175134 02/06/09 15:38 gaskell bad Moller discriminator
  • 175133 02/06/09 15:15 hamlet Ask for beam OFF to polarize target
  • 175131 02/06/09 15:02 Rondon Beam: Slow Raster Size
  • 175128 02/06/09 14:23 J Mulholland SR size for run 72233
  • 175127 02/06/09 14:22 saw Bad hms_thresholds.dat file and Slow raster ills
  • 175125 02/06/09 14:11 J Mulholland Target: Target: Fail ITC is fail
  • 175124 02/06/09 14:08 whit SANE Cherenkov Signal Delayed 40ns
  • 175123 02/06/09 14:06 hamlet Ask MCC to delay beam delivery.
  • 175122 02/06/09 14:01 whit The delay was as of 72332
  • 175121 02/06/09 13:47 whit SANE Cherenkov LED system OFF
  • 175120 02/06/09 13:34 J Mulholland Target: The nose has been emptied.
  • 175119 02/06/09 13:21 Rondon Beam: IMPORTANT: BCM's were reading about 0.65 of actual beam current
  • 175118 02/06/09 13:08 hamlet Going to Beam Permit
  • 175117 02/06/09 13:07 J Mulholland Target: Moved to Carbon
  • 175116 02/06/09 13:03 Rondon Beam: Slow Raster looks circular again on replays
  • 175115 02/06/09 12:47 W. Deconinck Slow raster after phase and amplitude adjustments: better centered
  • 175113 02/06/09 12:44 whit Delayed SANE Cherenkov ADC signals
  • 175110 02/06/09 12:32 whit Run 72328 is junk
  • 175109 02/06/09 12:31 whit 72331 is junk
  • 175108 02/06/09 12:30 whit Removed 100ns of delay from trigger
  • 175107 02/06/09 12:30 W. Deconinck Slow raster after phase and amplitude adjustments: not centered?
  • 175099 02/06/09 11:32 J Mulholland Target: Seperator valve and level in nose
  • 175098 02/06/09 11:12 whit SANE Cherenkov Calibration
  • 175096 02/06/09 11:08 whit SANE Cherenkov amplitude at ~ 1 p.e.
  • 175095 02/06/09 11:05 whit Cherenkov LED RUN
  • 175091 02/06/09 10:48 whit Cherenkov LED System ON
  • 175090 02/06/09 10:05 ccbutu Separator Valve stuck on closed
  • 175089 02/06/09 10:03 hamlet Controlled access
  • 175087 02/06/09 09:58 gaskell update on last night's Moller data
  • 175074 02/06/09 08:40 ccbutu Turned Microwave off!
  • 175071 02/06/09 08:03 cdaq Beam Time Accounting
  • 175070 02/06/09 08:03 narbe Owl Shift Summary
  • 175069 02/06/09 08:02 narbe Beam: Cycled chicane magnets
  • 175066 02/06/09 07:56 narbe Beam: BCM calibration
  • 175065 02/06/09 07:39 E. Frlez PDP screen shot
  • 175064 02/06/09 07:38 E. Frlez Cryo screen shot
  • 175057 02/06/09 07:20 E. Frlez Target: Cryo IOC frozen
  • 175051 02/06/09 06:38 E. Frlez Target: Nose pressure 9 torr
  • 175050 02/06/09 06:36 M Jones Target: Target IOC problem related to Hall C network switch freezing.
  • 175049 02/06/09 06:35 E. Frlez Target: PDP screen frozen
  • 175048 02/06/09 06:30 narbe Target: Brought back targetgui
  • 175041 02/06/09 05:25 narbe Target: Target CPU/IOC Drama
  • 175039 02/06/09 04:44 E. Frlez Target: Tgtgui - IOC
  • 175038 02/06/09 04:38 E. Frlez Target: Cryo screen frozen: reboot IOC
  • 175036 02/06/09 04:35 narbe Slow rast back on
  • 175032 02/06/09 04:26 narbe Turned off slow raster
  • 175031 02/06/09 04:15 E. Frlez Target: Target moved: Bottom (1.686) to empty/crosshairs (0.154)
  • 175029 02/06/09 04:00 Analysis:
  • 175028 02/06/09 03:48 narbe Slow Raster too big
  • 175026 02/06/09 03:30 bhovik Analysis: BETA detectors
  • 175021 02/06/09 02:41 narbe Beam: Screenshot of BPM
  • 175020 02/06/09 02:33 narbe Ending polarization of run 72302
  • 175018 02/06/09 02:26 narbe Target: Target GUI came back
  • 175017 02/06/09 02:17 narbe Target: Target GUI lost connection
  • 175015 02/06/09 01:43 Y. Kim HV tracker is off
  • 175013 02/06/09 01:13 E. Frlez Target: Target moved: Empty->Bottom
  • 175012 02/06/09 00:37 E. Frlez Cryo Screenshot
  • 175011 02/06/09 00:35 E. Frlez PDP Screenshot
  • 175010 02/06/09 00:17 cdaq Beam Time Accounting
  • 175009 02/06/09 00:17 P. Monaghan Swing Shift Summary
  • 175008 02/06/09 00:13 P. Monaghan Analysis: Moller run 72301
  • Thursday

  • 175007 02/05/09 23:58 kohlm Target: cryo ioc
  • 175005 02/05/09 23:47 P. Monaghan Analysis: Moller run 72300 analysis - using bcm3
  • 175004 02/05/09 23:31 kohlm Target: nose level empty
  • 175003 02/05/09 23:22 kohlm Target: cryo target IOC reboot
  • 175002 02/05/09 23:05 chench no current from some of hms dc
  • 174999 02/05/09 22:42 ccbutu TRACKER HV UPDATE
  • 174998 02/05/09 22:33 chench Hall BPM screenshot
  • 174997 02/05/09 22:30 kohlm Target: nmr screen shot
  • 174996 02/05/09 22:28 kohlm Target: cryo screen shot
  • 174992 02/05/09 21:28 M Jones Set SANE cerenkov threshold back to 270mV
  • 174991 02/05/09 21:25 M Jones Doing runs with HMS Cerenkov out of trigger requires access
  • 174990 02/05/09 21:04 chench BPM medm screen
  • 174989 02/05/09 20:13 kohlm Target: moved target to empty
  • 174988 02/05/09 20:11 Rondon RUN PLAN Id for Thurs. 2/5 to Fri. 2/6 [CORRECTION to previous entry title]
  • 174987 02/05/09 19:57 J Mulholland Target: Moved to Bottom
  • 174986 02/05/09 19:56 J Mulholland Target: Magnet Ramped
  • 174985 02/05/09 19:55 Rondon RUN PLAN - Thurs. 2/4 eve to Fri. 2/5 owl/day/eve -- UPDATE
  • 174983 02/05/09 18:56 kohlm Target: nmr screenshot
  • 174982 02/05/09 18:47 kohlm Target: target cryo screen
  • 174981 02/05/09 18:19 jmaxwell Target: Magnet on Best Behavior
  • 174980 02/05/09 18:08 jmaxwell Target: Ramp Up
  • 174979 02/05/09 18:00 brads Put SANE Cerenkov into flush mode
  • 174978 02/05/09 16:48 M Jones Cerenkov actuator in correct position
  • 174977 02/05/09 16:34 Rondon Target: Coil resistances after the quench
  • 174976 02/05/09 16:03 L. Zhu day shift summary
  • 174975 02/05/09 16:02 cdaq Beam Time Accounting
  • 174974 02/05/09 15:54 ccbutu NMR screen Update
  • 174973 02/05/09 15:49 ccbutu Target Cryo Panel Update
  • 174972 02/05/09 15:44 narbe Target: Rebooted hcptarg computer
  • 174971 02/05/09 15:33 narbe Field measurement around Cerenkov
  • 174970 02/05/09 15:01 ccbutu Targte Cryo Panel Update
  • 174967 02/05/09 14:28 Lingyan Zhu target: spike of the magnet level in coincidence of the beam
  • 174966 02/05/09 14:05 whit Cherenkov performance changed after Quench on 2-2-09
  • 174965 02/05/09 14:00 Donal Target: Anneal missing data added
  • 174964 02/05/09 13:42 Rondon Beam: BCM calibration at low currents
  • 174963 02/05/09 13:41 gaskell CW beam during Moller steering
  • 174962 02/05/09 13:34 ccbutu Target Cryo Magnet temperature update after the quench!
  • 174959 02/05/09 13:10 Lingyan Zhu moller discontinued due to target magnet quench
  • 174958 02/05/09 13:04 Lingyan Zhu target: strip charts
  • 174957 02/05/09 12:31 ccbutu Magnet Quenched!
  • 174956 02/05/09 12:29 jmaxwell Target: Magnet Quench
  • 174955 02/05/09 12:16 Lingyan Zhu start moller measurement
  • 174954 02/05/09 11:44 J Mulholland run starts not so important
  • 174953 02/05/09 11:24 jmaxwell Target: Logs Available Online
  • 174952 02/05/09 11:20 M JOnes Replaced Moller struck scaler module
  • 174951 02/05/09 11:20 Donal Target: Anneal of Feb 05 2009
  • 174950 02/05/09 11:17 Donal Target: Target Anneal of Feb 05 2009
  • 174949 02/05/09 11:15 Rondon Please read hclog entry 174933
  • 174948 02/05/09 11:12 jmaxwell Target: Anneal Finished, Moved to Empty
  • 174947 02/05/09 11:07 Donal Target: Anneal of Feb 04 2009
  • 174946 02/05/09 11:04 ccbutu TRACKER Tresholds changed!
  • 174941 02/05/09 10:57 J Mulholland Starting Runs--Pay attention to Target
  • 174936 02/05/09 10:47 M Jones Change Lucite threshold from 100mV to 200mV
  • 174933 02/05/09 10:18 Rondon Analysis: Target in beam is given correctly on run sheet database (Bottom for 72281-288)
  • 174932 02/05/09 10:13 jmaxwell Target: VISA Clear
  • 174931 02/05/09 09:55 jmaxwell Target: Anneal Heater
  • 174930 02/05/09 09:42 jmaxwell Target: Anneal
  • 174928 02/05/09 08:59 M JOnes Reduce Cerenkov threshold to -180 mV
  • 174925 02/05/09 08:57 Donal Target: Wrong target listed in run starts
  • 174924 02/05/09 08:50 ccbutu Created a new Event File for the NMR Target
  • 174923 02/05/09 08:48 ccbutu Created a new Event File for the NMR Target
  • 174922 02/05/09 08:35 cdaq Beam Time Accounting
  • 174921 02/05/09 08:16 E. Frlez Target: nose empty
  • 174919 02/05/09 07:52 E. Frlez Cryo Screen snapshot
  • 174918 02/05/09 07:51 E. Frlez PDP Screen snapshoot
  • 174912 02/05/09 05:44 E. Frlez Target: Run valve closed (0.00), microwaves on
  • 174911 02/05/09 05:30 E. Frlez Target: Another Target IOC reboot
  • 174910 02/05/09 05:11 bhovik Cerenkov efficiency
  • 174909 02/05/09 05:07 E. Frlez Target: Run valve closed down
  • 174907 02/05/09 04:57 E. Frlez Target: Changed target: Bottom (1.690) to Carbon (2.920)
  • 174905 02/05/09 04:37 E. Frlez Target: Target IOC reboot
  • 174903 02/05/09 03:58 E. Frlez Target: Target IOC reboot
  • 174895 02/05/09 01:44 Rondon Analysis: Run 722821 is at 85 nA
  • 174894 02/05/09 01:44 Rondon Analysis: Run 72282 is at 85 nA
  • 174893 02/05/09 01:43 E. Frlez Strip Chart Screen shot
  • 174890 02/05/09 01:18 E. Frlez Cryo Screen shot
  • 174889 02/05/09 01:16 E. Frlez PDP Screen shot
  • 174888 02/05/09 01:10 Rondon BPM, BCM screens
  • 174887 02/05/09 01:09 Rondon Beam: Beam position
  • 174885 02/05/09 00:17 J Mulholland Target: Polarization decay at 100 nA
  • 174884 02/05/09 00:16 cdaq Beam Time Accounting
  • 174883 02/05/09 00:07 abdellah Swing shift summary
  • 174882 02/05/09 00:06 anusha Target: target moved to bottom target, the encorder position is 1.690
  • Wednesday

  • 174881 02/04/09 23:44 anusha Strip charts
  • 174879 02/04/09 23:32 Rondon RUN PLAN - Wed. 2/4 eve to Thurs. 2/5 owl/day -- UPDATE
  • 174878 02/04/09 23:18 anusha Cryo control panel
  • 174877 02/04/09 23:17 anusha Target: PDP screen
  • 174874 02/04/09 22:13 Rondon Analysis: Firefox now running on cdaql1
  • 174870 02/04/09 20:52 M Jones Completed back out of trigger changes except for small change
  • 174869 02/04/09 20:49 ccbutu Tracker X Plane
  • 174868 02/04/09 20:02 jmaxwell Target: Microwave Fault
  • 174867 02/04/09 19:56 jmaxwell Target: Target Motion for Baseline, Ramp up Magnet
  • 174866 02/04/09 19:46 Rondon Beam: Witness field probe is on again
  • 174865 02/04/09 18:55 Rondon Target: Materail performance after 1st. anneal
  • 174864 02/04/09 18:51 anusha Target: microwave power supply summary fault.
  • 174863 02/04/09 18:44 abdellah microwave reading zero
  • 174861 02/04/09 18:28 anusha Target: PDP screen
  • 174860 02/04/09 18:08 narbe Target: Top/Bottom reversed on post of polarization
  • 174859 02/04/09 18:07 M Jones Fixed mistake with trigger work
  • 174857 02/04/09 17:49 narbe Target: Previous NMR Screen shot shows Baseline dropped
  • 174856 02/04/09 17:45 anusha Target: NMR screen
  • 174855 02/04/09 17:39 Albayrak BPM Screenshots
  • 174854 02/04/09 17:37 jmaxwell Target: Target Procedures
  • 174853 02/04/09 17:32 Donal Target: snap shots of PDP screen
  • 174852 02/04/09 17:30 narbe Target: Target polarization so far, before and after Jan 31 anneal
  • 174850 02/04/09 17:21 bhovik 100nA vs 85nA
  • 174849 02/04/09 16:57 ccbutu Tracker HV settings!
  • 174839 02/04/09 16:25 Albayrak HMS cerenkov correction
  • 174837 02/04/09 16:19 whit Database Information
  • 174835 02/04/09 16:08 cdaq Beam Time Accounting
  • 174834 02/04/09 16:07 christy day shift summary
  • 174833 02/04/09 16:03 ccbutu Ready for action!
  • 174830 02/04/09 15:43 narbe Target: wrong pol constant (d'oh!)
  • 174825 02/04/09 15:29 whit SANE CHERENKOV LED NOT WORKING
  • 174822 02/04/09 15:19 narbe Target: Having low polarization, moved to top proton, asked for beam
  • 174817 02/04/09 15:06 christy HMS angle camera light is out
  • 174816 02/04/09 14:28 christy HMS momentum now at 2.7 GeV
  • 174815 02/04/09 14:19 J Mulholland Target: Moved to Bottom and Baseline taken
  • 174814 02/04/09 14:12 hamlet change HMS cerenkov trigger
  • 174813 02/04/09 13:59 M Jones BETA trigger work this morning
  • 174812 02/04/09 13:45 M Jones Change to HMS cerenkov cabling and HMS trigger.
  • 174811 02/04/09 13:29 Rondon Target: Magnet temp. channel 2 always reading 6.7 is ITC problem
  • 174810 02/04/09 13:14 Rondon Target: Shielding for IOC
  • 174809 02/04/09 13:14 narbe Target: Disconnected cable confirmed
  • 174808 02/04/09 13:12 M Jones Lowered SANE Cerenkov HV back to nominal
  • 174807 02/04/09 13:08 narbe Target: Interface box
  • 174806 02/04/09 13:02 J Mulholland Target: Magnet Temps ok
  • 174805 02/04/09 12:55 M Jones Raised BigCal thresholds to 560mV
  • 174804 02/04/09 12:50 M Jones Modified vmec13.boot so that tracker tdc window is shifted
  • 174803 02/04/09 12:49 M Jones Modified vmec13.boot so that tracker tdc window is shifted
  • 174802 02/04/09 12:42 J Mulholland Target: Magnet Temps failed
  • 174801 02/04/09 12:17 J Mulholland Target: Anneal
  • 174799 02/04/09 11:46 jmaxwell Target: Computer Replacement Notes
  • 174798 02/04/09 11:42 narbe Target: Buffer dewar liquid level probe
  • 174797 02/04/09 11:24 ccbutu TRACKER DISCRIMINATOR THRESHOLDS CHANGED
  • 174796 02/04/09 11:06 narbe Target: NMR Computer replaced
  • 174793 02/04/09 08:05 E. Frlez Cryo screenshot
  • 174792 02/04/09 08:04 cdaq Beam Time Accounting
  • 174791 02/04/09 08:01 Hoyoung Owl shift summary
  • 174790 02/04/09 07:20 jmaxwell Target: Replacing NMR Computer
  • 174789 02/04/09 06:28 jmaxwell Target: NMR Computer Trouble
  • 174788 02/04/09 06:16 E. Frlez Target: Microwaves off, Run valve 0.50->0.20
  • 174787 02/04/09 05:49 E. Frlez Target: Problem starting LabView on SANETARGET computer
  • 174786 02/04/09 05:36 Hoyoung SANE dipole tripped
  • 174785 02/04/09 05:27 E. Frlez Target: Polarized Target Computer reboot
  • 174781 02/04/09 05:06 E. Frlez Target: Target IOC reboot: PDP frozen
  • 174778 02/04/09 04:19 E. Frlez Target: Target IOC reboot, cryo screens frozen
  • 174773 02/04/09 02:56 E. Frlez Target: Target IOC reboot, cryo screens frozen
  • 174771 02/04/09 02:39 E. Frlez Target: Target IOC reboot, cryo screens frozen
  • 174769 02/04/09 02:15 E. Frlez Target: TD9178 high alarm value change
  • 174766 02/04/09 01:49 E. Frlez Target: Yellow alarms on TD9178
  • 174764 02/04/09 01:15 E. Frlez Target: Overfilled nose, pumps tripped off
  • 174763 02/04/09 01:06 E. Frlez Target: Target IOC reboot, cryo screens frozen
  • 174760 02/04/09 00:18 E. Frlez Target: Target moved to Top =3.374
  • 174759 02/04/09 00:12 Rondon RUN PLAN for Wed 2/4 Day to Wed. 2/4 Eve. -- UPDATED
  • 174757 02/04/09 00:02 Boeglin shift summary
  • 174756 02/04/09 00:02 cdaq Beam Time Accounting
  • 174755 02/04/09 00:01 Boeglin Cherenkov efficiency run : 72254
  • Tuesday

  • 174753 02/03/09 23:57 jpchen target ioc reboot
  • 174751 02/03/09 23:45 ccbutu Plane Y2 Fits per discriminator!
  • 174750 02/03/09 23:42 ccbutu PLANE Y1, Y2 Fits per Discriminator!
  • 174749 02/03/09 23:40 ccbutu TRACKER plots run #72253
  • 174745 02/03/09 23:00 ccbutu Y1 Discr.#16, X Discr. #17 Scalers
  • 174744 02/03/09 22:57 ccbutu TRACKER HV UPDATE !
  • 174738 02/03/09 21:33 ccbutu Playing with Tracker HV!
  • 174736 02/03/09 21:29 bhovik Cerenkov run 72187
  • 174735 02/03/09 21:11 bhovik Cerenkov Efficiency
  • 174732 02/03/09 20:42 chench efficiency of cerenkov
  • 174729 02/03/09 20:16 chench BPM medm screen
  • 174728 02/03/09 20:13 jpchen target polarization vs beam current
  • 174727 02/03/09 19:51 jpchen target polarization history
  • 174719 02/03/09 18:38 bhovik Cerenkov Bigcal Coincidence
  • 174715 02/03/09 18:10 bhovik Cerenkov HV increased
  • 174714 02/03/09 18:07 jpchen moved to bottom target, started polarizing
  • 174707 02/03/09 16:16 E. Frlez Target: Target moved to empty/crosshairs=0.154
  • 174706 02/03/09 16:08 M Jones Changed Bigcal and Cer sum of 8 signal widths
  • 174705 02/03/09 16:07 cdaq Beam Time Accounting
  • 174704 02/03/09 16:04 gaskell Day shift summary
  • 174703 02/03/09 15:42 M Jones Change signal widths for Bigcal and "Cer sum "
  • 174702 02/03/09 15:40 jmaxwell Target: Magnet at 5T
  • 174701 02/03/09 15:22 Donal Target: pumps
  • 174700 02/03/09 14:42 W. Luo BigCal: change HV for (21,2) to -1273
  • 174699 02/03/09 14:41 ccbutu Target restoring the nose level and ramping up
  • 174698 02/03/09 14:13 jmaxwell Target: Magnet Past Transition Point
  • 174697 02/03/09 13:41 jmaxwell Target: Ramping Up Magnet
  • 174696 02/03/09 13:18 Donal Target: new chiller and pump(s)
  • 174695 02/03/09 13:10 Donal Target: Anneal PID
  • 174694 02/03/09 12:33 W. Luo BigCal LED system after moving the driver box
  • 174693 02/03/09 11:36 W. Luo BigCal: TDC 25C fixed
  • 174688 02/03/09 11:20 W. Luo 72234-72236 are BigCal LED runs
  • 174681 02/03/09 10:33 gaskell BCM at 3C17
  • 174677 02/03/09 09:46 gaskell Controlled Access work
  • 174676 02/03/09 09:29 Donal Target: New Event File
  • 174675 02/03/09 08:01 cdaq Beam Time Accounting
  • 174674 02/03/09 06:07 bhovik Analysis: 3 more short runs
  • 174673 02/03/09 01:10 narbe Target: EPICS screenshots
  • 174672 02/03/09 00:50 jmaxwell Target: Small PDP Changes
  • 174671 02/03/09 00:31 Rondon Beam charge on NH3
  • 174670 02/03/09 00:07 Rondon Shift Summary
  • 174669 02/03/09 00:03 cdaq Beam Time Accounting
  • Monday

  • 174668 02/02/09 22:18 jmaxwell Target: Ramp of Feb. 2
  • 174667 02/02/09 22:10 jmaxwell Target: "C" Connector Unplugged, "D" Resistances After Quench
  • 174666 02/02/09 21:19 vahe Magnet temperature
  • 174665 02/02/09 21:06 jmaxwell Target: Magnet was Ramped before Quench
  • 174664 02/02/09 20:36 Rondon BPM and BCM screens
  • 174663 02/02/09 20:32 Rondon Magnet Quench
  • 174662 02/02/09 20:30 Donal Target: January31 Anneal
  • 174660 02/02/09 20:21 M Jones Beam Charge asymmetry
  • 174658 02/02/09 20:18 vahe Beam is on, polarization -66%
  • 174655 02/02/09 20:04 vahe IOC reboot
  • 174654 02/02/09 19:51 vahe Lost polarization
  • 174653 02/02/09 19:29 jmaxwell Target: Mechanical Pump and Chiller Changes
  • 174652 02/02/09 19:26 vahe Target polarization -75.5 %
  • 174651 02/02/09 19:11 vahe Target: Target polarization is -72%
  • 174650 02/02/09 19:02 W. Luo BigCal: Load HV hv_80007.new
  • 174649 02/02/09 18:43 Rondon Target: Camera focusing to see chiller temperature
  • 174648 02/02/09 16:31 narbe Target: Switch Pump Control from Local to Remote
  • 174647 02/02/09 16:15 cdaq Beam Time Accounting
  • 174646 02/02/09 16:12 christy Shift Summary
  • 174645 02/02/09 16:06 vahe Target: Screen shot of PDP gui
  • 174644 02/02/09 15:19 Narbe Target: Chiller and pumps issues
  • 174643 02/02/09 15:16 jmaxwell Target: Valves Closed
  • 174642 02/02/09 15:11 jpchen Chiller temperature too high
  • 174641 02/02/09 14:45 brads SANE Cerenkov nitrogen OK
  • 174640 02/02/09 14:25 jpchen He at the nose lost and refilled.
  • 174639 02/02/09 13:53 jpchen Valve
  • 174638 02/02/09 13:46 jpchen microwave on
  • 174637 02/02/09 13:26 jpchen Lost He. Open run valve to refill
  • 174636 02/02/09 13:19 jpchen microwave on, starting polarizing
  • 174635 02/02/09 13:17 Donal Target: Chiller update
  • 174634 02/02/09 13:16 jpchen target ioc reboot
  • 174633 02/02/09 13:00 mahbub Tracker: discriminator thresholds changed for Y1, Y2, and X
  • 174632 02/02/09 12:36 jmaxwell Target: Communications Problem in PDP
  • 174631 02/02/09 11:59 gaskell Moller discriminator
  • 174630 02/02/09 11:56 gaskell Moller target inspection
  • 174629 02/02/09 10:38 Lassiter HMS Q1 LN2
  • 174628 02/02/09 10:36 jpchen microwave off, He valve 0.
  • 174627 02/02/09 10:15 Donal Chiller/pumps
  • 174626 02/02/09 10:04 christy Hall now in restricted access
  • 174625 02/02/09 09:28 J Mulholland Target: Level Probe as of Now
  • 174624 02/02/09 09:22 jpchen target activities from 8:00 to 9:21
  • 174623 02/02/09 09:11 christy Target polarization now at 60%
  • 174622 02/02/09 09:05 christy Hall going to restricted access to install new chiller
  • 174618 02/02/09 08:09 Hoyoung Target: partial comm. problem solved
  • 174617 02/02/09 08:08 Hoyoung Target: Cryo screen
  • 174616 02/02/09 08:08 Hoyoung Target: LN2 supply cooldown again
  • 174615 02/02/09 08:06 Hoyoun Target: PDP screen
  • 174614 02/02/09 08:04 Hoyoung Target: partial communication problem
  • 174613 02/02/09 08:03 cdaq Beam Time Accounting
  • 174612 02/02/09 08:03 M Jones Owl Shift summary
  • 174611 02/02/09 07:50 Hoyoung Target: Polarization -62.6%
  • 174609 02/02/09 07:17 Hoyoung Target: nose level low
  • 174607 02/02/09 07:15 M Jones Target: Still have problem with batch fill of LN2
  • 174606 02/02/09 07:03 Hoyoung Target: run valve automatic mode test
  • 174605 02/02/09 06:56 M Jones Modified vmec13.boot to reduce F1_REF_WINDOW to 250 from 500ns
  • 174604 02/02/09 06:44 M Jones Raised BigCal threshold to -500mV
  • 174595 02/02/09 05:37 Hoyoung Target: -70% polarization
  • 174594 02/02/09 05:33 Hoyoung Target: LN2 temp. is still high
  • 174592 02/02/09 05:25 Hoyoung Target: Polarization
  • 174591 02/02/09 05:06 Hoyoung Target: start the roots pumps
  • 174590 02/02/09 04:02 Hoyoung Target: mechanical pump off
  • 174589 02/02/09 04:01 Hoyoung Target: pump chiller problem
  • 174588 02/02/09 03:41 Hoyoung Target: LN2 batch fill enabled
  • 174587 02/02/09 03:39 Hoyoung Target: polarization dropped
  • 174585 02/02/09 03:22 Hoyoung Target: stop the LN2 batch fill
  • 174584 02/02/09 03:18 Hoyoung Target: IOC reboot
  • 174583 02/02/09 03:15 Hoyoung Target: PDP screen
  • 174581 02/02/09 02:51 Hoyoung Target: polarization
  • 174580 02/02/09 02:43 Hoyoung Target: Roots blower is on
  • 174579 02/02/09 02:40 Hoyoung Target: close the run valve
  • 174578 02/02/09 02:33 jmaxwell Target: Access for LN2, Chiller
  • 174577 02/02/09 02:29 M Jones Transfer line to HMS is icing up
  • 174576 02/02/09 02:15 Hoyoung Target: Manget level dropping
  • 174575 02/02/09 01:38 M Jones Going to controlled access
  • 174574 02/02/09 01:09 Hoyoung Target: IOC reboot and high magnet level
  • 174573 02/02/09 00:39 Hoyoung Target: nose level dropped
  • 174569 02/02/09 00:15 boeglin Shift Summary
  • 174568 02/02/09 00:14 cdaq Beam Time Accounting
  • 174567 02/02/09 00:11 Hoyoung Target: Cryo screens
  • 174566 02/02/09 00:09 Hoyoung Target: PDP screen
  • Sunday

  • 174562 02/01/09 23:03 Bosted Target: Liquid level in nose dropped below target
  • 174557 02/01/09 22:19 Boeglin Target: Chiller cold again.
  • 174556 02/01/09 22:07 Boeglin Target: Chiller warms up again
  • 174555 02/01/09 21:54 Rondon RUN PLAN for Sun 2/1 to Mon. 2/2 Eve. -- UPDATED
  • 174554 02/01/09 21:47 Boeglin Target: Chiller warms up again
  • 174552 02/01/09 21:13 brads (late entry) RC report for Jan 16--23, 2009
  • 174551 02/01/09 21:07 narbe Target: Screen shot of PDP gui
  • 174549 02/01/09 21:06 narbe Target: EPICS Screenshots
  • 174547 02/01/09 20:43 Boeglin BPM screen shot
  • 174544 02/01/09 20:17 J Mulholland Target: If chiller fails (TO please read)
  • 174541 02/01/09 19:36 J Mulholland Hall Camera on Lower Platform
  • 174540 02/01/09 19:34 Donal Target: work list
  • 174539 02/01/09 19:29 Don Crabb Pressure threshold for pump turn on
  • 174538 02/01/09 19:22 J Mulholland Target: Truning on the pumps please read
  • 174536 02/01/09 19:11 J Mulholland Target: Access for Pump interlocks
  • 174535 02/01/09 18:30 M Jones Lower HMS cerenkov threshold from .120 to .080V
  • 174534 02/01/09 17:50 Donal Target: chiller
  • 174533 02/01/09 17:50 Boeglin Target: Pump chiller temperature at 40 degree
  • 174529 02/01/09 17:26 Target: Run default position
  • 174528 02/01/09 17:22 Bosted Target: Changed buffer dewer temperature limit
  • 174526 02/01/09 16:57 donal Target: First Negative polarization
  • 174525 02/01/09 16:24 M Jones BigCal Trigger channel 25C is still bad
  • 174524 02/01/09 16:21 M Jones Polarizing top target
  • 174522 02/01/09 16:03 cdaq Beam Time Accounting
  • 174520 02/01/09 15:46 narayan Target: switced off microwave after 12 minutes;
  • 174519 02/01/09 15:41 narayan Target: default value of run valve is too high
  • 174518 02/01/09 15:34 Danagoulian Moller 2 and 3
  • 174516 02/01/09 15:23 narayan Target: microwave switched ON
  • 174515 02/01/09 15:15 M Jones Target: Rebooted IOC
  • 174512 02/01/09 14:53 Danagoulian Moller run
  • 174506 02/01/09 13:48 J Mulholland Target: Status for now and to do
  • 174505 02/01/09 13:43 M Jones Script to get BPMA and BPMB positions during a run
  • 174504 02/01/09 13:27 whit SANE Cherenkov PMT 4
  • 174503 02/01/09 13:23 M Jones Starting Moller
  • 174502 02/01/09 13:22 narayan Target: moved to empty target for a moller run
  • 174501 02/01/09 13:13 J Mulholland Target: Pump status
  • 174500 02/01/09 13:00 Danagoulian Empty target position
  • 174499 02/01/09 12:21 M Jones In Controlled Access for target work
  • 174498 02/01/09 12:02 W. Luo BigCal decrease HV on (56,18) to -1417V
  • 174497 02/01/09 11:59 M Jones Moved BigCal 25C to a new discriminator
  • 174496 02/01/09 11:59 narayan Target: IOC Reboot and post reboot snapshot
  • 174495 02/01/09 11:54 Danagoulian Lucite HV
  • 174494 02/01/09 11:51 meziani Target: correction in the run number mentioned
  • 174493 02/01/09 11:44 M Jones Bigcal 25C is bad
  • 174491 02/01/09 11:36 Danagoulian Lucite HV
  • 174490 02/01/09 11:25 W. Luo Stopped run to change BigCal HV of 7 channels that were hot
  • 174489 02/01/09 11:18 J Mulholland Target: Position update and to do list
  • 174486 02/01/09 11:14 J Mulholland Target: Pump RB1 off
  • 174485 02/01/09 11:06 Danagoulian Lucite HV
  • 174484 02/01/09 11:05 narayan Target: Pump Chiller temperature @ 21 C
  • 174483 02/01/09 10:45 J Mulholland Target: At carbon 2.920
  • 174481 02/01/09 10:42 W. Luo BigCal cluster distribution after loading new HV
  • 174480 02/01/09 09:52 W. Luo BigCal HV trouble shooting posted near cdaql5 monitor
  • 174479 02/01/09 09:41 jmaxwell Target: Waiting for 2nd Roots
  • 174478 02/01/09 09:29 jmaxwell Target: 1st Roots Pump On
  • 174477 02/01/09 09:24 jmaxwell Target: Access for chiller
  • 174476 02/01/09 09:05 narayan Target: Microwave put on standby; screenshot of PDP
  • 174475 02/01/09 09:02 jmaxwell Target: Hot Chiller
  • 174471 02/01/09 08:25 jmaxwell Target: Mech Pump Chiller Hot Again
  • 174469 02/01/09 08:21 cdaq Beam Time Accounting
  • 174468 02/01/09 08:16 narayan Target: target screenshot
  • 174465 02/01/09 08:05 jmaxwell Target: Opps, Positive Polarization
  • 174464 02/01/09 08:03 Reinhold Shift summary
  • 174463 02/01/09 07:58 jmaxwell Target: Beam on 80% Top Target
  • 174462 02/01/09 07:57 jmaxwell Target: Target Work Shift Summary
  • 174461 02/01/09 07:56 Reinhold Ask MCC for beam
  • 174460 02/01/09 07:44 Reinhold GEN HV trip channel 36-2-15 group 6: fixed
  • 174459 02/01/09 07:36 jmaxwell Target: Top Target Polarizing, Screenshot
  • 174458 02/01/09 07:31 jmaxwell Target: He4 Mano Reading Off
  • 174457 02/01/09 07:29 jmaxwell Target: Getting Big Roots On
  • 174456 02/01/09 06:00 jmaxwell Target: Having Trouble with Last Roots
  • 174455 02/01/09 04:51 jmaxwell Target: Second Roots Pump On
  • 174454 02/01/09 04:50 jmaxwell Target: Switch Pump Control from Local to Remote Killed pumps
  • 174453 02/01/09 04:47 jmaxwell Target: Moved Target to Top
  • 174452 02/01/09 04:44 jmaxwell Target: First Roots On
  • 174451 02/01/09 04:41 jmaxwell Target: Top Target TE
  • 174450 02/01/09 04:26 jmaxwell Target: TE on Bottom
  • 174449 02/01/09 04:01 jmaxwell Target: Screenshot During TE
  • 174448 02/01/09 03:54 jmaxwell Target: TE on Bottom
  • 174447 02/01/09 03:45 jmaxwell Target: Chiller Changes
  • 174446 02/01/09 03:10 jmaxwell Target: Mech Pump Chiller
  • 174445 02/01/09 02:42 Reinhold GEN HV trip channel 36-2-15 group 6
  • 174444 02/01/09 02:37 bhovik SEM
  • 174443 02/01/09 02:33 Donal Target: The pumps
  • 174442 02/01/09 00:48 jmaxwell Target: Pump Chller Quite Hot
  • 174441 02/01/09 00:22 reinhold Start shift in controlled access
  • 174440 02/01/09 00:03 W. Luo BigCal Load new HV hv_80006.new
  • 174439 02/01/09 00:02 cdaq Beam Time Accounting