Jefferson Lab Hall C Logbook for August 09 - runstarts omitted
Main INDEX
Monday
182839 08/31/09 23:52 Reinhold Glitch on H2X-III
182838 08/31/09 23:50 Reinhold Charged particle trigger group 3, CP3
182837 08/31/09 23:48 Reinhold Charged particle trigger group 2, CP2
182835 08/31/09 23:29 Chiba HDC tripped
182833 08/31/09 23:09 Reinhold LC low threshold TUL gate widths
182825 08/31/09 22:36 Gogami [EHODO hitpattern in different current on HES-D]==>rate
182824 08/31/09 22:34 Reinhold During current run look at LC TUL outputs
182820 08/31/09 22:22 Reinhold Also checked CP0 again: LC seems narrow
182819 08/31/09 22:13 Tang Beam time accounting during commissioning using low beam current
182817 08/31/09 21:52 chench run 74592 is junk
182814 08/31/09 21:47 doi HTOF(KHODO) 1X9T&2X8T ADC signal
182813 08/31/09 21:46 Reinhold Ungrouped HKS0 trigger might have changed it's timing
182810 08/31/09 21:40 Reinhold Timing of grouped particle ID trigger K1
182806 08/31/09 21:17 yez I fixed a bug that causing the replay error message by increasing HMAX_LUC_TOTHITS 4 times
182804 08/31/09 21:11 xqiu Fission chamber hv is turned off
182803 08/31/09 21:11 Nue Fission Chamber HV tripped
182802 08/31/09 21:10 chench run=74588 is junk
182799 08/31/09 21:01 yez I found an error in analyzer that might cause the lose of Lucite TDC distribution
182798 08/31/09 21:00 yez I found an error in analyzer that might cause the lose of Lucite TDC distribution
182797 08/31/09 20:52 Reinhold Timing of grouped charged particle trigger CP1
182796 08/31/09 20:43 Chiba Study of KHODO 1X09T & 2X08T ADC line signal check. Problem.
182794 08/31/09 20:03 Chiba KHODO ADC cables are inserted now
182790 08/31/09 19:41 xqiu estimation of fission rate
182788 08/31/09 19:22 yuan Change HDC1 and HDC2 threshold: 2.5 V --> 2.3 V from run 74585
182785 08/31/09 18:46 Gogami EHODO HV[EH2-22T]==>changed 1678[V] to 1500
182781 08/31/09 18:26 yez In replay analyzer -- Cerenkov detectors' f1tdc_gate_width are not defined, but still doesn't help Lucite TDC problem
182774 08/31/09 17:39 Gogami EHODO histpattern right-left ==> Correct figure
182773 08/31/09 17:36 Gogami EHODO histpattern right-left
182772 08/31/09 17:30 yez Lucite TDCs distribution still can not be seen in the replayed histograms
182771 08/31/09 17:22 doi HTOF(KHODO) : No a few signals in ADC
182770 08/31/09 17:21 kawama This hit pattern never occued by optical particles
182768 08/31/09 17:19 cdaq End of Run Query:No Database Selected:
182767 08/31/09 17:17 Gogami EHODO HV [EH2-22T] is turned off to know left-right
182761 08/31/09 17:03 Gogami EHODO HV [EH2-22T] is turned off
182759 08/31/09 16:59 Chiba KHODO ADC data are junk from Run74574
182758 08/31/09 16:48 saw Beam: New (rough) BCM calibrations
182756 08/31/09 16:39 Nue Please make more explanation
182755 08/31/09 16:33 Reinhold Before run 74575: tke 16 ns out of level 1 accept delay
182752 08/31/09 16:19 P Carter MCC increased current to 2 μA
182750 08/31/09 16:06 xqiu The frequency of photon beam we expecting is about 2000hz
182749 08/31/09 16:05 cdaq Beam Time Accounting
182748 08/31/09 15:59 Gogami EHODO hitpattern in different current on HES-D
182747 08/31/09 15:56 lyzhu All HVs turned on
182746 08/31/09 15:36 lyzhu status: stop beam tuning for Hall A's spin dance
182744 08/31/09 15:33 Nue Beam tune practice
182740 08/31/09 15:29 lyzhu target: move to C
182739 08/31/09 14:54 lyzhu target: move to BEO
182738 08/31/09 14:46 Nue HES D was back to 676A for beam tune
182737 08/31/09 14:46 Reinhold Reminder: HKS0 timing has been delayed by 16 ns. Still need to take this out of the gate timing!!!
182736 08/31/09 14:37 lyzhu taget: move to empty and all HV off except fission chamber
182734 08/31/09 14:35 lyzhu status: start beam tuning
182733 08/31/09 14:26 Nue Spare electronics boards for HKS D power supply
182732 08/31/09 14:11 lyzhu status: MCC is going to reboot the BPMs.
182730 08/31/09 14:02 Nue HES D 710A
182728 08/31/09 13:38 lyzhu status: spin dance starting
182727 08/31/09 13:21 lyzhu bpm screen
182725 08/31/09 13:20 Nue HES D 645A
182721 08/31/09 13:00 lyzhu status: beam is back
182720 08/31/09 12:30 Tang Current Status and Tasks other than HKS/HES experimental commissioning
182719 08/31/09 12:13 lyzhu status: back to beam permit
182718 08/31/09 11:55 Reinhold Re: Cointime and Gate adjustment Study
182717 08/31/09 11:54 lyzhu status: a short controlled access
182716 08/31/09 11:23 lyzhu status: another hour to have beam
182715 08/31/09 11:13 lyzhu correction: ABU 7.22 for the aug 30 owl shift
182714 08/31/09 11:09 Nue High count rate in HES could be caused by Moller
182713 08/31/09 11:06 lyzhu BTA corrected for Aug 30 owl shit
182712 08/31/09 10:54 Nue Information from RC, today plan and machine study moved to Thursday
182711 08/31/09 10:12 lyzhu status: waiting for beam
182710 08/31/09 10:02 Reinhold Uncorrected coincidence spectrum: link to how it looked in 2005
182709 08/31/09 09:06 chench EDC1&2 HIT PATTERN.
182708 08/31/09 08:12 cdaq Beam Time Accounting
182707 08/31/09 06:42 kawama HES backgroud study
182705 08/31/09 04:24 kawama Probably no beam in this shift
182704 08/31/09 03:59 kawama Butterfly image at HES
182703 08/31/09 02:23 doi Map file was chenged.
182702 08/31/09 01:53 Nue Cointime and Gate adjustment Study
182701 08/31/09 01:21 YaLi Beam: NO Beam
182698 08/31/09 01:06 HKSPRE+16ns; switched to HKS0 trigger with AC veto
182696 08/31/09 01:01 Reinhold Re: Changed back to 16 ns added to HKSPRE; switched to HKS0 trigger w/out AC veto
182694 08/31/09 00:56 Reinhold Changed back to 16 ns added to HKSPRE; switched to HKS0 trigger w/out AC veto
182691 08/31/09 00:47 Reinhold Added another 8 ns to HKSPRE before COIN module (now a total of 24 ns added)
182688 08/31/09 00:37 Reinhold Added another 8 ns to HKSPRE before COIN module (now a total of 16 ns added)
182685 08/31/09 00:25 Reinhold Added 8 ns to HKSPRE before COIN module
182682 08/31/09 00:03 cdaq Beam Time Accounting
Sunday
182681 08/30/09 23:45 Reinhold H1X grouping signals' widths: Explanation for the funny short pulses
182680 08/30/09 23:37 saw Automatic data deletion
182679 08/30/09 23:15 Reinhold H1X grouping signals' widths: need to adjust?? Also some funny signals!!
182678 08/30/09 23:06 Reinhold Run #74561 (coin) : end of run failed
182677 08/30/09 22:17 Nue RF in F1
182676 08/30/09 21:55 cdaq Beam Time Accounting
182675 08/30/09 21:37 Reinhold Delayed entry: K0 particle identification (PID) timing
182674 08/30/09 20:22 Reinhold SVN Update of hks09/replay directory to revision 96
182673 08/30/09 20:07 yuan Change HDC1 and HDC2 threshold: 2.8 V --> 2.5 V
182672 08/30/09 20:07 sho adjustmert of grouping output from TUL
182668 08/30/09 19:40 yuan Change HDC1 and HDC2 threshold: 3.0V --> 2.8 V
182661 08/30/09 19:11 taniya WC pion peak(run%74522)
182654 08/30/09 18:41 Chiba KHODO 1X6T,1X7T,1X12T HV tripped
182653 08/30/09 18:28 yuan Change HDC1 and HDC2 threshold: 5.0 V --> 3.0 V
182650 08/30/09 17:35 Chiba "Run 74552: HES/HKS detector test" is junk
182642 08/30/09 16:39 Tang Remaining commissioning tasks associated with beam and spectrometer system
182641 08/30/09 16:39 Nue Beam is back
182639 08/30/09 16:11 Nue Acc. down for more than 1 hour
182637 08/30/09 16:06 cdaq Beam Time Accounting
182636 08/30/09 15:41 Nue HES SS scan
182635 08/30/09 15:11 maruta Rate study Update
182634 08/30/09 14:52 Nue ARC magnet down
182633 08/30/09 14:49 Gogami KTOF2X ADC [Run74540]
182632 08/30/09 14:48 Gogami KTOF1X ADC [Run74540]
182631 08/30/09 14:46 Gogami KTOF1Y ADC [Run74540]
182630 08/30/09 14:12 Nue hard disk remains only 2%
182629 08/30/09 14:04 A. Gasparian timing for the coincidence window is back to 30 ns
182628 08/30/09 14:01 Reinhold Re: We don't see TDC distribution
182622 08/30/09 13:30 Gogami The beam current is 1.3[uA]
182616 08/30/09 13:10 Gogami EHODO HV(EH2-1T) tripped
182604 08/30/09 12:20 we MUST check ADC plug insertion
182602 08/30/09 12:11 Nue Collimator Scan needs one more point
182601 08/30/09 11:58 Nue I used wrong scale for overlap, -300 is the edge of Q1 acceptance
182596 08/30/09 11:46 chench Lucite ADC missing channel and the shift of timing gate!!
182593 08/30/09 11:42 Nue Large counting rate might be Brems. (I forgot to put the second fig.)
182592 08/30/09 11:40 Nue Large counting rate might be Brems.
182591 08/30/09 11:40 Gogami KTOF1Y ADC and TDC
182588 08/30/09 11:32 yez We don't see TDC distribution -- conts.... (sorry for missing some part)
182585 08/30/09 11:27 Gogami EHODO HV prediction
182584 08/30/09 11:25 yez Lucite ADC missing signals problems fixed, but we don't see TDC distribution
182578 08/30/09 10:36 yez H2X raw ADC and TDC for run#74522
182575 08/30/09 10:30 yez HDC1&2 EDC2 raw hitpat and raw layer tdc for run#74522
182574 08/30/09 10:28 doi beam current
182569 08/30/09 10:04 yez H1X raw ADC and TDC for #run 74522
182567 08/30/09 09:52 yez Aerogel raw ADC for run#74522
182566 08/30/09 09:49 Water Cerenkov raw ADC for run#74522
182564 08/30/09 09:42 yez Lucite raw ADC signals (Pos lose first 8 signal, Neg lose last 8) for run#74521𒌚
182563 08/30/09 09:35 yez Aeroger-layer3-counter7 Pos ADC signal not seen for run#74522
182562 08/30/09 09:09 Reinhold Run #74523 (coin): no beam
182559 08/30/09 09:01 Reinhold Widened COIN time gate for fishing for real coincidences
182556 08/30/09 08:03 cdaq Beam Time Accounting
182555 08/30/09 07:52 Reinhold Run #74521 (coin) : 2M event COIN run with cointime tdc plugged in; please analyze
182551 08/30/09 06:05 Reinhold Trigger status
182549 08/30/09 05:46 Reinhold COIN timing signal put on F1 TDC
182547 08/30/09 05:31 kawama Some KHODO channels are missing
182531 08/30/09 04:16 kawama WC tdc cable 1 was misinserted so far
182529 08/30/09 03:58 HES collimator is -291.63mm
182527 08/30/09 03:56 maruta Mistake HES collimator position and rate study again.
182523 08/30/09 03:26 Reinhold For now done with trigger adjustments
182519 08/30/09 03:02 Reinhold WC top HV was OFF; turned it ON
182516 08/30/09 02:16 kawama HES rate study changing collimator position
182515 08/30/09 02:06 maruta HES Sieve slit is -209.63mm
182514 08/30/09 00:46 Chiba KTOF HV change ~ 4
182513 08/30/09 00:11 cdaq Beam Time Accounting
Saturday
182512 08/29/09 23:36 Reinhold WC1 & 2 relative timing
182511 08/29/09 23:15 taniya WC Pion peak
182510 08/29/09 23:09 doi HTOF(KHODO) ADC signal can not be observed in the analysis result.
182509 08/29/09 22:45 taniya WC Pion peak
182508 08/29/09 22:19 Reinhold Ungrouped Charged particle trigger (CP0) timing
182507 08/29/09 21:47 sho Daed time of TUL width-shaper
182506 08/29/09 21:31 sho The timing differences of TUL grouping output
182505 08/29/09 21:23 Reinhold Relative timing of COIN and HKS-singles triggers
182501 08/29/09 20:09 Reinhold HES retimed gates
182493 08/29/09 18:51 Tang
182490 08/29/09 18:23 Nue HV group in display
182483 08/29/09 18:16 taniya WC gain matching
182482 08/29/09 18:16 brads FFB on C line needs some software work
182480 08/29/09 18:10 Nue Pay atention to HV control alarm
182479 08/29/09 17:55 taniya HV
182478 08/29/09 17:50 Reinhold Re: About Energy lock:
182477 08/29/09 17:45 taniya EHODO 1-23
182475 08/29/09 17:40 Reinhold About Energy lock: ask MCC whether it is possible to set it to C; right no none of the halls has it
182471 08/29/09 16:58 Nue Necessary helps to be arranged on Monday
182466 08/29/09 16:21 cdaq Beam Time Accounting
182465 08/29/09 16:15 Chiba HTOF ADC is now all pluged
182460 08/29/09 15:40 Nue HKS-D-PS problem
182456 08/29/09 14:37 Chiba Now checking HTOF ADC line
182452 08/29/09 14:23 cdaq this is a junk run!!
182446 08/29/09 14:06 Gogami All WC HV is turned on
182441 08/29/09 13:54 Gogami Plugged EHODO ADC cable
182439 08/29/09 13:32 Reinhold WC top HV is OFF; since when?
182438 08/29/09 13:18 Nue Analysis: Do not use pdf file for pictures
182437 08/29/09 13:06 Tang Summary for the past day
182434 08/29/09 12:40 Reinhold Post trigger changes as individual entries
182429 08/29/09 12:19 Reinhold Changed COIN trigger from HKS0 & HES0 to CP0 & HES0
182418 08/29/09 11:25 chench The mistake is I should not push the botton on!!
182414 08/29/09 11:13 Reinhold Re: I make the mistake for last entry!!
182404 08/29/09 10:23 chench I make the mistake for last entry!!
182401 08/29/09 10:21 chench Lucite trigger botton is pushed!!
182397 08/29/09 09:37 chench There is no any LUCITE ADC SIGNAL!!
182396 08/29/09 08:08 cdaq Beam Time Accounting
182387 08/29/09 04:31 kawama DAQ has sometimes error
182384 08/29/09 04:09 kawama Add HKS single trigger output for EHODO gate retiming
182338 08/29/09 01:04 Re: Answer for Zhihong's question
182337 08/29/09 01:00 Reinhold Beam leakage??? -- Correction
182336 08/29/09 00:59 Chiba Analysys of Run74406 ( EHODO & EDC hit pattern )
182329 08/29/09 00:04 cdaq Beam Time Accounting
182328 08/29/09 00:00 maruta Cannot check HDC gas bubbling
Friday
182315 08/28/09 23:13 sho TUL ready
182312 08/28/09 22:42 doi KHODO map file was changed.
182311 08/28/09 22:25 Nue HKS D current instability
182310 08/28/09 21:55 Nue C target
182309 08/28/09 21:19 lgan Beam: IOCs fixed
182308 08/28/09 20:58 Reinhold Beam leakage???
182307 08/28/09 20:47 Nue Beam hit right side of the target
182306 08/28/09 20:36 sho ROM of TUL broken
182305 08/28/09 20:30 lgan Beam: two IOC's in Hall C are down
182304 08/28/09 20:29 Nue Today's HKS D-PS study summary
182303 08/28/09 20:16 Reinhold Turned ON HV for HHodo; all other is OFF
182302 08/28/09 19:59 vmaxwell ac bucking coil test
182301 08/28/09 19:23 maruta HKS-D PS looks stable
182299 08/28/09 18:40 Nue HTF, HDC were tripped
182298 08/28/09 18:14 lgan SMS: HKS hodoscope HV
182296 08/28/09 18:10 kawama Answer for Zhihong's question
182295 08/28/09 18:08 Nue EDC1,2 threshold power supplies
182294 08/28/09 18:03 Nue HTF counters were tripped
182293 08/28/09 18:00 Nue Beam: confimed that YAG and Hall C dump viewer have beam spots, put carbon target
182292 08/28/09 17:34 yez EDC2 signal not seen in raw datam, need to look into the FASTBUS raw data
182290 08/28/09 17:11 Nue Target: BeO target, MCC requested
182289 08/28/09 16:43 Reinhold Delayed entry: Turned lights OFF in HKS bunker
182288 08/28/09 16:36 Nue HKS D current set at 1060A manually
182287 08/28/09 16:34 maruta Target is empty
182286 08/28/09 16:34 Nue Target empty
182285 08/28/09 16:33 chench Threshold status for Lucite!
182284 08/28/09 16:22 doi HTOF(KHODO) ADC signal check
182283 08/28/09 16:14 cdaq Beam Time Accounting
182282 08/28/09 16:09 Reinhold AC bucking coil power supply exchanged and coil set to 9 A
182281 08/28/09 14:38 lyzhu plan: hall locked up in about an hour
182280 08/28/09 14:04 beaufait HKS dipole stabuility
182279 08/28/09 13:15 Reinhold AC bucking coil power supply broken
182278 08/28/09 13:15 lauze System Status/Plan
182277 08/28/09 13:13 Reinhold AC bucking coil power supply broken
182276 08/28/09 13:05 vmaxwell one mistake
182275 08/28/09 13:04 vmaxwell ac1 bucking coil test
182274 08/28/09 12:55 vmaxwell ac2 bucking coil test
182273 08/28/09 12:47 vmaxwell ac3 bucking coil test
182271 08/28/09 12:36 Reinhold Trigger status
182270 08/28/09 11:43 lyzhu status: going to controlled access
182268 08/28/09 11:27 brads Beam spot seen on YaG viewer
182267 08/28/09 11:23 brads Fast raster image on BeO
182266 08/28/09 11:09 Tang Status of HDC1 & 2
182265 08/28/09 10:31 Gogami EHODO gain difference between TOP and bottom PMT
182264 08/28/09 10:29 yez HDC1&2 hitpat for run#74404
182263 08/28/09 10:17 lyzhu status: fast raster looks OK
182261 08/28/09 10:02 Reinhold Timing of HKS ADC gates
182260 08/28/09 09:50 anusha turned OFF all the HES and HKS drift chamber HV.
182259 08/28/09 09:45 lyzhu status: fast raster check
182258 08/28/09 09:44 lyzhu target: move to BEO
182257 08/28/09 09:42 REINHOLD RE: Run 74426: WC bottom tubes where all off
182256 08/28/09 09:34 Reinhold Moved to BeO target
182252 08/28/09 08:01 cdaq Beam Time Accounting
182245 08/28/09 06:22 Reinhold PS757 Propagation delay
182240 08/28/09 05:56 Reinhold AC to WC timing
182207 08/28/09 01:07 Y.Fujii Target is changed to Carbon. Beam is 1uA CW
182205 08/28/09 00:56 Nue Beam: Tonight, Tomorrow (Weekend, Monday) Plan
182200 08/28/09 00:37 kawama BeO singles rate in HES
182199 08/28/09 00:34 Y.Fujii We have stable 1uA CW beam on BeO target at 0:33
182197 08/28/09 00:26 Y.Fujii BPM and Hall C beam line magnet settings screen shot as of 0:15
182196 08/28/09 00:25 sho The condition of TUL of HTOF, AC, WC, and EHODO
182195 08/28/09 00:24 Y.Fujii MCC will give us 1uA CW beam after harp scan
182192 08/28/09 00:01 cdaq Beam Time Accounting
Thursday
182183 08/27/09 23:16 Nue Beam: We have stable beam spot!
182180 08/27/09 22:30 Nue Beam: DZ polarity was changed
182179 08/27/09 21:34 Reinhold ac bucking coil test
182178 08/27/09 21:28 brads Tech coming in to flip the leads
182177 08/27/09 21:18 vmaxwell ac bucking coil test
182176 08/27/09 21:13 maruta HKS-D @ 500A
182175 08/27/09 21:06 Gogami KHODO Discriminator at counting house
182174 08/27/09 21:05 Nue HKS Dipole stability
182173 08/27/09 21:01 Nue Beam: DZ magnet poloarity is wronge
182172 08/27/09 20:34 vmaxwell dz magnet polarity
182171 08/27/09 20:28 Nue Collimator edge should be 30mm from the HES tilt plane
182170 08/27/09 20:10 ioana gas panel alarm
182169 08/27/09 20:06 Nue HKS Dipole stability
182168 08/27/09 20:04 maruta HKS-D PS stability@800A
182167 08/27/09 19:50 brads Possible magnet options if DZ fails again
182166 08/27/09 19:39 doi HTOF 1X5T
182165 08/27/09 19:31 kawama F1 reference signal of ROC14
182164 08/27/09 19:08 bono ac bucking coil tests
182163 08/27/09 19:03 Reinhold Hall sudenly dropped from beam permit to restricted
182162 08/27/09 18:45 Nue KQ1, EQ2 ON
182161 08/27/09 18:41 bono ac bucking coil 171
182160 08/27/09 18:40 Nue Target: Target empty
182159 08/27/09 18:11 kenyon Covered DZ leads with sheet of plastic
182158 08/27/09 18:11 suhring Hall C DZ magnet update
182157 08/27/09 18:04 maruta HKS-D PS sets 800A
182151 08/27/09 17:21 maruta HKS-D PS instability
182147 08/27/09 16:16 cdaq Beam Time Accounting
182143 08/27/09 15:54 maruta Set HKS-D PS to 500A
182142 08/27/09 15:53 beaufait DZ test
182132 08/27/09 15:07 Nue hv.tcl modified
182131 08/27/09 13:59 bono correction
182130 08/27/09 13:24 sho update TUL
182123 08/27/09 09:34 Nue RADCON surveyed Tohoku Oscilloscope
182122 08/27/09 08:00 cdaq Beam Time Accounting
182121 08/27/09 07:49 Arshak Run 74383 prescale factor.
182119 08/27/09 07:37 Reinhold Trigger status.
182118 08/27/09 07:24 Reinhold Beam motion due to DZ
182117 08/27/09 07:12 Y. Fujii Requested Hall C into restricted access
182116 08/27/09 06:16 Run #74383 (coin): also got beam back to 5uA 1.5% duty factor
182114 08/27/09 06:15 Reinhold H1X5T ADC signal not present
182112 08/27/09 05:50 Reinhold Attempted to scan the coincidence window
182110 08/27/09 04:59 Reinhold Asked MCC to reduce beam current with slit; get 0.6 uA now
182109 08/27/09 04:54 Arshak HKS Water Cerenkov.
182108 08/27/09 04:33 Arshak Beam is back and is 5.1 uA
182106 08/27/09 03:43 Arshak MCC called BEAM is OFF approximately for 15 min
182098 08/27/09 02:07 Arshak RUN 74378 was stopped, because Joerg told he is playing whith cables in Hall-C electronic room.
182096 08/27/09 01:53 Reinhold Tuned beam on BeO rates: AC & WC
182095 08/27/09 01:40 Arshak Reboot HDC HV and turned OFF EDC HV's
182093 08/27/09 01:18 Tuned beam on BeO rates
182092 08/27/09 01:17 Arshak Run 74377 was stoped to change HDC HV's from 2050 to 2000
182088 08/27/09 01:01 Reinhold Tuned beam on BeO rates
182085 08/27/09 00:21 yuan run stopped due to one card oscillation
182082 08/27/09 00:02 cdaq Beam Time Accounting
Wednesday
182080 08/26/09 23:33 Nue Phone ex6000 was fixed
182079 08/26/09 23:31 yuan run# 74373 Junk
182078 08/26/09 23:29 Nue HKS-HES magnets setting
182076 08/26/09 23:25 maruta Sieve Slit controller updated
182074 08/26/09 23:15 Nue Beam: Finally we got beam on target
182071 08/26/09 23:06 Nue Beam: Hall C beam energy on EPICS
182070 08/26/09 22:59 Y. Fujii BeO target in
182069 08/26/09 22:44 brads Beam absolute energy estimates
182068 08/26/09 22:37 sho Downloaded WC logic to ROM in TUL
182067 08/26/09 22:37 Y. Fujii One of Hall C CH phone (ext.6000) broken
182066 08/26/09 22:36 ioana phone broken in Hall C
182065 08/26/09 22:23 Nue Beam: Strange! MCC saw beam except for our BeO and dump viewer
182064 08/26/09 22:23 brads ELOG: DZ Voltage across coils from day shift
182063 08/26/09 22:22 Y. Fujii Target is completely out by request from MCC
182062 08/26/09 22:14 Reinhold Beam: MCC cannot see beam on our BeO: is polarity still OK???
182061 08/26/09 22:02 Nue Beam: MCC cannot see beam on our BeO
182060 08/26/09 21:18 kawama Turned off all HVs beacuse of BEAM PERMIT
182058 08/26/09 21:16 bono ac bucking coil tests
182057 08/26/09 19:59 Nue Target BeO
182056 08/26/09 19:41 maruta HES/HKS SS are colllimator position and Target is #5 (Carbon)
182055 08/26/09 19:39 maruta HES Sieve Slit position sensor not work when SPL is ON
182053 08/26/09 19:26 kawama Truned all WC2 Hvs on
182052 08/26/09 18:31 chench Turn on the HV of HDC1&2
182051 08/26/09 18:26 brads DZ/beam 'twitch' work during day shift
182050 08/26/09 18:06 doi picture of EHODO noise
182049 08/26/09 17:56 sho HV of WC is turned on
182048 08/26/09 17:55 doi EHODO noise problem was solved.
182047 08/26/09 17:51 Nue HES Sieve Slit readout
182046 08/26/09 17:46 Reinhold Water Cherenkov onephoton
182045 08/26/09 17:36 taniya Water Cherenkov onephoton
182044 08/26/09 17:30 sho TUL update for AC and LCtof
182041 08/26/09 17:06 sho LV of LED pulse in AC is turned on
182039 08/26/09 17:04 sho The cable of AC3-1Top before the discriminator is BAD
182029 08/26/09 16:01 cdaq Beam Time Accounting
182028 08/26/09 16:00 Chiba Low pass filter for NMR probe
182027 08/26/09 15:54 Nue He bag gas check
182026 08/26/09 15:36 sho LV of LED pulse in AC is turned off
182001 08/26/09 14:32 lyzhu new alarms from group 35 and 37
181996 08/26/09 14:19 kawama Rebooted cdaql3
181989 08/26/09 13:54 lyzhu Low PSI Alarm
181986 08/26/09 13:40 L. Zhu reason for the HV control alarm
181984 08/26/09 11:56 beaufait dz hall probe
181983 08/26/09 11:48 suhring DZ investigation cut and paste from Accelerator's elog. Pictures may not have made it. . .
181982 08/26/09 11:43 bono ac-1 7down
181976 08/26/09 09:55 brads Joe is fixing water leak on HES supply (old BigBite supply)
181975 08/26/09 09:55 brads DZ instability investigations
181974 08/26/09 09:54 sho HV of LC is turned on
181973 08/26/09 08:26 Lingyan Zhu Status: restrictive access
181972 08/26/09 08:02 cdaq Beam Time Accounting
181971 08/26/09 07:18 Y. Fujii Hall C is in controlled access
181970 08/26/09 07:10 Reinhold Call RC: go to contolled access
181969 08/26/09 06:46 Y. Fujii MCC told that accelerator have trouble with magnet controller, takes an hour to fix it
181968 08/26/09 06:43 yuan HKS DC HV screen shot: HV=2050 V, beam I=3.2uA
181967 08/26/09 06:35 yuan run#74343 taken when beam tripped
181955 08/26/09 05:47 Reinhold See burst of events on scope when beam trips
181946 08/26/09 05:18 Reinhold Problem solved: low event limit set but not displayed; run 74334 should be OK now
181943 08/26/09 05:12 Reinhold Killed CODA; start over; run 74333 ends itself at 21k events
181940 08/26/09 05:09 Reinhold Rebooting all ROCs
181939 08/26/09 05:07 run 74332 & 74333 stopped themselves after 21k events??
181935 08/26/09 05:02 Reinhold Run #74330 (coin) stopped because no beam
181932 08/26/09 04:53 Y. Fujii EDC HV turned off
181927 08/26/09 04:33 chench trun on the HV of EDC2 and HDC1&2!!
181925 08/26/09 04:03 Nue Beam: DZ coil moved
181924 08/26/09 03:55 Y.Fujii Recovered just after the entry, but no beam to Hall C
181923 08/26/09 03:53 kawama Quick check of EQ1 effect on HES singles rate
181922 08/26/09 03:47 Y.Fujii Injector trouble
181921 08/26/09 03:37 Nue Beam: Tonight's achivements and necessary action during Day
181920 08/26/09 03:33 Y.Fujii Hall C beam line magnet setting screen shot as of 3:30AM
181919 08/26/09 03:25 kawama First HES singles rate w/ carbon target
181918 08/26/09 03:20 Y.Fujii BPM screenshot after MCC finished Owl shift tuning
181917 08/26/09 03:20 Nue BCM are not yet calibrated
181916 08/26/09 03:11 Y.Fujii Beam current differes in three different screen
181915 08/26/09 02:58 chench turn on the lucite HV
181914 08/26/09 02:51 kawama Trun on all EHODO HVs
181913 08/26/09 02:51 Y.Fujii C target in, 5uA CW, no raster at least until morning
181912 08/26/09 02:38 Y. Fujii Turned on HKS and HES magnets to its nominal current (except for HES-Q1)
181911 08/26/09 02:35 Y.Fujii Target is completely out by request from MCC
181910 08/26/09 02:02 Y. Fujii Raster pattern study
181909 08/26/09 01:51 Nue Ion Chamber for Carbon(target #5) CW 4.92uA
181908 08/26/09 01:47 Nue Target: Target BeO -> C
181907 08/26/09 01:27 Nue Beam: Ion Chamber Empty Target, 53uA, CW
181906 08/26/09 01:11 Y.Fujii We got 50uA CW beam into dump without our experimental target
181905 08/26/09 00:33 Y. Fujii Beam directed into Hall C beam dump
181904 08/26/09 00:27 Gogami EHODO nois
181903 08/26/09 00:25 Gogami EHODO nois
Tuesday
181902 08/25/09 23:59 cdaq Beam Time Accounting
181901 08/25/09 23:55 Nue All HVs are off
181900 08/25/09 23:50 Nue Target is empty now
181867 08/25/09 22:42 sho HV of LC is turned on
181851 08/25/09 22:23 brads Fast raster test plan for tonight
181847 08/25/09 22:20 Nue Water leak from HES-Q1 power supply
181840 08/25/09 22:11 maruta EPICS variables recorded by DAQ
181836 08/25/09 22:07 Nue HKS: HKS Q2 control and HP readout (Current - Clamp - Field 4% inconsistecy)
181831 08/25/09 22:00 Nue DZ power supply jumped
181826 08/25/09 21:51 Reinhold Re: A few channel on EHODO ADC are fat
181823 08/25/09 21:40 sho HV of HTOF is operated
181798 08/25/09 20:56 Gogami A few channel on EHODO ADC are fat
181795 08/25/09 20:53 Ioana nicule Status
181790 08/25/09 20:42 Nue HKS Q2 Hall Probe
181789 08/25/09 20:33 doi EHODO flat cable from delay to ADC module
181780 08/25/09 19:36 Reinhold Turned on AC bucking coils
181777 08/25/09 19:02 taniya WC AMP
181776 08/25/09 18:30 sho HV of HTOF was turn off
181775 08/25/09 18:25 sho HTOF2 logic was downloaded to ROM in TUL
181774 08/25/09 18:22 Nue/brads HKS Q2, HES Q1 control (from 12:52:20, Aug 25)
181773 08/25/09 18:18 Reinhold RC called; MMC got dispersion issues; hall lockup >= 8 pm
181772 08/25/09 18:12 brads Beam update -- couple more hours (lock-up around 8pm?)
181767 08/25/09 18:02 brads Hall status update
181734 08/25/09 17:35 chench The timing of lucite ADC gate is shifted!!
181675 08/25/09 16:42 beaufait dz magnet
181666 08/25/09 16:23 Nue DZ, HKS-Q2 power supplies were changed
181665 08/25/09 16:20 maruta NMR, HallProbe and PC104 power strip exchange also
181664 08/25/09 16:20 kawama EDC1 hitpat at run74195 (modified)
181662 08/25/09 16:13 cdaq Beam Time Accounting
181661 08/25/09 16:11 brads Update on Harps, YaG viewer, OTR
181659 08/25/09 15:58 sho HHODO1 logic in TUL was updated
181653 08/25/09 15:43 brads Confirmed 5V supplies in HMS hut are off
181652 08/25/09 15:39 brads Power supply swap is underway: "New supply" -> HKS Q2 -> DZ, old DZ decommissioned
181645 08/25/09 15:02 Gogami EHODO Discri Lecroy4413 at counting house
181644 08/25/09 14:59 shichijo signal of HHODO 7T and 7D without HV
181640 08/25/09 14:26 sho HV of HHODO is turned on
181638 08/25/09 14:25 Nue HKS Q2 Hall Probe
181619 08/25/09 13:19 Nue New PS -> HKS Q2 -> DZ PS
181616 08/25/09 13:17 brads re: HKS Q2 Power Supply
181614 08/25/09 13:12 Nue HKS Q2 Power Supply
181610 08/25/09 12:55 brads Hall C DZ power supply update
181607 08/25/09 12:48 suhring MDZ3H01 power supply plan
181600 08/25/09 12:32 maruta HKS SS controller power cycle and now at HOME position
181591 08/25/09 11:33 sho supplementation about picture of previous entry
181590 08/25/09 11:32 brads Fast Raster system re-enabled, no problem found...
181589 08/25/09 10:57 Nue Today's Day Plan
181588 08/25/09 10:45 suhring MDZ3H01 power supply plan
181587 08/25/09 10:33 chench Hallc is in restricted access
181586 08/25/09 10:31 sho signal of HHODO 7T and 7D without HV
181585 08/25/09 10:30 Reinhold run 74168 -- 74184 are AC bucking coil test
181584 08/25/09 10:19 chench Brad called: the splitter is off!!
181583 08/25/09 10:04 Taniya WC HV
181582 08/25/09 09:55 chench He gas checklist!
181581 08/25/09 09:20 chench HallC is going to be in restricted controlled access!
181580 08/25/09 09:20 sho HV of HHODO is operated
181579 08/25/09 08:58 chench HKS-HES magnet status
181578 08/25/09 08:47 chench Hallc starts to be in Controlled acess!!
181577 08/25/09 08:00 cdaq Beam Time Accounting
181576 08/25/09 07:21 Y.Fujii HKS & HES magnets are off (HKS-Q2 and HES-Q1 are still on) for upcoming hall access
181575 08/25/09 06:52 Y. Fujii EDC hitpattern of run #74195 (cosmic)
181574 08/25/09 06:19 Y.Fujii No beam until day shift (PD decision)
181570 08/25/09 05:02 Y. Fujii No beam in this Owl shift
181568 08/25/09 04:50 kawama The rate of EHODO TUL output #7
181565 08/25/09 04:19 Copy of ELOG entry #1482678
181562 08/25/09 04:05 kawama All EHODO HV on
181558 08/25/09 02:13 Y.Fujii MCC still cannot see the beam on the beam dump viewer
181557 08/25/09 01:22 Nue HKS: He gas flow looks stopped
181556 08/25/09 00:53 brads Re: Which is right beam energy?
181555 08/25/09 00:38 Nue Which is right beam energy?
181554 08/25/09 00:28 Nue HP readouts were only reference
181553 08/25/09 00:02 cdaq Beam Time Accounting
Monday
181552 08/24/09 23:48 Nue Beam jumping is NOT due to raster
181551 08/24/09 23:25 Nue Magnets' status current set value
181550 08/24/09 23:23 Nue Beam: Rmoved power lines from FR system
181549 08/24/09 23:02 yez Control Access to remove the power completely from Fast Raster
181548 08/24/09 22:56 Nue Beam: Fast raster is still strange
181547 08/24/09 22:46 Nue Tonight Plan
181546 08/24/09 22:42 chench HKS-HES magnet status!!
181545 08/24/09 22:26 reinhold run 74168 -- 74184 are AC bucking coil test
181544 08/24/09 22:11 yez HKS Dipole turn on (I=1056A)
181543 08/24/09 22:06 vmaxwell patch pannel connection for AC3
181540 08/24/09 21:15 Nue Beam: Current SPL setting
181539 08/24/09 21:10 Nue Beam jumping as yesterday
181538 08/24/09 21:03 Y. Fujii BeO target in
181537 08/24/09 20:51 yez Yag Viewer has a problem,MCC will come to check it
181536 08/24/09 20:39 yez Beam Permit
181535 08/24/09 19:59 yez DZ power supply has not enough current to drive cards related to FSD
181534 08/24/09 19:29 Gogami EHODO Discriminator threshold at Hall
181533 08/24/09 19:21 Gogami EHODO Discriminator at Counting house
181532 08/24/09 19:16 yez Control Access to connect some ports on DZ magnet
181531 08/24/09 19:05 shichijo Beam permit
181530 08/24/09 18:53 Taniya WC bucking coil and additional information of high rate PMT
181529 08/24/09 18:51 kawama All HVs turned off
181528 08/24/09 18:50 Nue Target: Target is empty now
181527 08/24/09 18:48 Nue HKS: WC, LC bucking coil current check
181526 08/24/09 18:45 Nue Beam: power permit to Hall C
181525 08/24/09 18:36 bono patchs
181524 08/24/09 18:34 xqiu Refilled gas for Fission chamber
181523 08/24/09 18:28 yez Vector Maxwell asks for a Control Access to fix problems on a patch panel
181522 08/24/09 18:27 Gogami A EHODO Discriminator at Counting house is dead
181521 08/24/09 18:12 taniya WC rate study
181520 08/24/09 18:08 Nue Beam: Yesterday, beam was 1.5% lower than 2.344GeV
181519 08/24/09 18:07 maruta Exchange power strip for hcpc10401 and motor controllers
181518 08/24/09 17:57 brads (Partial) summary for work done today
181517 08/24/09 17:33 shichijo Hall C is contorolled access
181509 08/24/09 16:49 doi Threshold of HTOF
181496 08/24/09 16:21 cdaq Beam Time Accounting
181473 08/24/09 15:47 Nue Beam: Now SPL I(remote) = I(local)
181472 08/24/09 15:42 sho HV of HHODO is operated
181471 08/24/09 15:42 beaufait dz
181465 08/24/09 15:31 Reinhold Run #74164 (coin) still junk
181457 08/24/09 15:19 Reinhold Run #74161 (coin) -- AC3 is disconnected for this and previous runs
181454 08/24/09 15:11 Reinhold Edited REPLAY.PARM to analyze coin type data file
181453 08/24/09 15:10 Reinhold Analyzer cannot find the data file; run type is in data file name
181448 08/24/09 14:55 Reinhold Edited hks_thresholds.dat in replay directory
181447 08/24/09 14:43 sho TUL update
181446 08/24/09 14:43 kawama EDCs low valtage
181445 08/24/09 13:58 shichijo HTOF discriminator problem
181444 08/24/09 13:57 Nue Beam: SPL PS clamp study
181443 08/24/09 13:50 vmaxwell aerogel patch panel connection H497
181442 08/24/09 13:35 kawama EDC1 HV on
181441 08/24/09 13:35 brads Fast raster update
181436 08/24/09 12:18 saw ROC 11 crashes probably fixed
181429 08/24/09 12:07 cdaq Beam Time Accounting
181427 08/24/09 11:52 sho HHODO discriminator @ bad
181426 08/24/09 11:44 saw ROC11 crashing
181425 08/24/09 11:40 kawama Not turned off, but ON
181421 08/24/09 11:34 kawama H1X-1T HV turned off
181416 08/24/09 11:26 Reinhold Run #74145 (coin) probably JUNK
181412 08/24/09 11:23 saw sfihes speed back up to normal
181411 08/24/09 11:19 Reinhold Run #74144 (coin) was V=7.0 V
181407 08/24/09 11:13 Reinhold Run #74143 (hks) - JUNK
181404 08/24/09 11:08 Gogami [Gas_check]__24Aug2009
181401 08/24/09 11:04 Nue Beam: Mike will come to Hall C before noon
181384 08/24/09 10:45 sho HV of HHODO is operated
181381 08/24/09 10:42 Nue Target: Asked Andy to remove lead bricks
181380 08/24/09 10:41 Nue HES: Sieve Slit controller power cycled
181374 08/24/09 10:34 Nue HES: No Low voltage
181372 08/24/09 10:32 Reinhold Run #74128 (coin) -: ROC 11 not responding
181368 08/24/09 10:24 Reinhold AC LED trigger timed in
181366 08/24/09 09:42 sho The logic in TUL was changed
181365 08/24/09 08:59 Lingyan Zhu status: restricted access
181363 08/24/09 08:40 yuan HKS DC test with beam this morning
181362 08/24/09 08:39 saw ROC speed tests with Blaster
181361 08/24/09 08:01 cdaq Beam Time Accounting
181359 08/24/09 07:19 Y. Fujii Requested Hall C into restricted access from 8AM
181358 08/24/09 07:01 Reinhold Run #74125 (coin): playing with PMT HV: used wrong TUL out
181357 08/24/09 06:39 Reinhold Run #74125 (coin): playing with PMT HV
181356 08/24/09 06:20 Arshak Run #74123 Junk, ROC7 error
181355 08/24/09 06:20 Arshak Run #74123 Junk, ROC7 error
181350 08/24/09 06:04 chench HDC MAP
181349 08/24/09 05:29 Reinhold Run #74122 (coin) turn off all EHodo except for EH1-16T&B and EH2-16T&B
181348 08/24/09 05:27 Reinhold Run #74122 (coin) - /home/cdaq/hks09/data/hks09_74122.log: unplug ADC cable while running
181346 08/24/09 05:22 Arshak HKS-HES Checklist
181341 08/24/09 04:35 yez Those error messages are due to earlier version of replay code, and it works fine after updating
181340 08/24/09 04:30 Reinhold EHODO 1 & 2 coincidences
181339 08/24/09 04:30 yuan HDC HV on 2050 V with 0.1 uA pulsed beam
181337 08/24/09 04:17 yez I meant for run#74120
181336 08/24/09 04:13 yez Replay error message for run#73120
181334 08/24/09 03:56 Run 74120 DAQ error: extra events in ROC14
181332 08/24/09 03:27 Reinhold Changed WC gate timing back to hodoscope triggers
181326 08/24/09 02:44 taniya WC HV
181325 08/24/09 02:44 kawama EDC2 and HDCs tripped
181308 08/24/09 02:16 Reinhold How to solve CAEN HV max error
181301 08/24/09 01:38 kawama ./hksscin.sh updated
181300 08/24/09 01:38 Nue Task: during Hall open
181295 08/24/09 01:29 shichijo HTOF HV
181283 08/24/09 01:09 Reinhold Reconnected HV to wire chambers
181275 08/24/09 00:57 Nue Beam: Errata "867A"(remote) should be 886.7A(local) = 900A (clamp)
181270 08/24/09 00:53 Nue Beam: SPL current inconsistency is now 6%
181258 08/24/09 00:36 shichijo HTOF HV
181246 08/24/09 00:20 cdaq Beam Time Accounting
181245 08/24/09 00:20 Y. Fujii Both HKS and HES magnets are excited
Sunday
181216 08/23/09 23:19 Nue Beam: Beam jumping is probably due to DZ
181213 08/23/09 23:10 Total-OR logic were downloaded
181212 08/23/09 23:06 Reinhold Orientation of target camera image
181200 08/23/09 22:52 sho Total-OR logic were downloaded
181198 08/23/09 22:49 shichijo HTOF HV
181195 08/23/09 22:45 Nue Beam: Fisson Chamber as photon viewer
181188 08/23/09 22:24 shichijo HTOF HV
181187 08/23/09 22:20 Nue Beam: Beam jumping problem is not due to Quads between DZ and Viewer
181186 08/23/09 22:19 kawama Changed WC self-trigger timing
181181 08/23/09 22:04 Y. Fujii Hall C will have 100nA CW beam soon
181178 08/23/09 21:34 Y. Fujii BeO target in
181175 08/23/09 21:21 sho HV of HHODO is turned on
181174 08/23/09 21:19 sho The lach of stability of TUL
181173 08/23/09 21:11 sho the fluctuation of the delay in TUL
181164 08/23/09 20:52 kawama Gas check result
181163 08/23/09 20:42 maruta notice
181158 08/23/09 20:32 maruta Wrong HES Sieve Slit controller response
181155 08/23/09 20:18 Gogami EHODO Discriminator at Counting house
181154 08/23/09 20:16 taniya Turned on WC HV
181153 08/23/09 19:43 Gogami Turned off EHODO HV
181152 08/23/09 19:29 Gogmai Turned on EHODO HV
181151 08/23/09 18:56 Gogami Turned on EHODO HV
181146 08/23/09 18:36 Y.Fujii BeO target out
181145 08/23/09 17:53 Y. Fujii BeO target in
181144 08/23/09 17:27 shichijo HTOF HV
181140 08/23/09 16:58 Nue Beam: Beam tune plan before fixing beam jump problem
181138 08/23/09 16:53 kawama Do NOT use configuration "ch1"
181137 08/23/09 16:51 shichijo HTOF HV
181136 08/23/09 16:44 saw Trigger supervisor code change
181135 08/23/09 16:24 saw Beam: Slower raster
181134 08/23/09 16:20 Nue Beam: Removed power lines from slow raster system
181133 08/23/09 16:12 cdaq Beam Time Accounting
181132 08/23/09 16:06 Reinhold Please check remote power switch of slow raster
181131 08/23/09 15:47 sho HV of HHODO turn on
181130 08/23/09 15:25 chench The threshold of lucite top and bottom discriminator have been changed!
181129 08/23/09 15:23 Nue Beam: Double checked Fast & Slow rasters were off
181128 08/23/09 15:16 yez Control Access for BCM study
181127 08/23/09 14:39 vmaxwell AC gain match study
181126 08/23/09 14:28 Nue Beam: Still beam jumping after DZ
181125 08/23/09 14:00 Nue Beam: SPL PS set at "982.6A" (remote)
181124 08/23/09 13:15 maruta All HKS/HES magnets OFF
181123 08/23/09 13:11 brads DZ power supply readback noise is fixed
181122 08/23/09 13:06 brads Target to 'No Target' position
181121 08/23/09 12:50 yez HV of all Cerenkov detectors off
181120 08/23/09 11:50 doi widths of signals from EHODO discriminator
181119 08/23/09 11:46 shichijo
181118 08/23/09 11:33 sho HV of HHODO is operated
181117 08/23/09 10:40 doi EHODO HV on
181116 08/23/09 10:38 yez Analysis: DAQ stop to let Sho fix the problem of the differences of propagation delay inTUL
181114 08/23/09 10:24 chench The threshold of lucite low threshold discriminators are set to 12mv.
181113 08/23/09 10:03 Reinhold To-Do list for Sunday:
181112 08/23/09 09:58 Reinhold Run #74039 (ch) - /home/cdaq/hks09/data/hks09_74039.log: trigger changed to 2/3
181111 08/23/09 09:49 brads Hall in Controlled Access
181109 08/23/09 09:46 Reinhold ADC Gate timing
181108 08/23/09 09:38 Reinhold Trigger status
181107 08/23/09 09:21 Gogami [Gas_check]_23Aug2009
181106 08/23/09 09:17 Reinhold Run #74038 (coin) - /home/cdaq/hks09/data/hks09_74038.log (crashed)
181104 08/23/09 09:09 Reinhold Run #74037 (ch1) - /home/cdaq/hks09/data/hks09_74037.log (Type ch1)
181103 08/23/09 08:59 Reinhold Run #74037 (ch1) - /home/cdaq/hks09/data/hks09_74037.log (crashed)
0 08/23/09 08:13 no_name no_key
181096 08/23/09 07:33 sho The differences of propagation delay inTUL
181092 08/23/09 06:15 Reinhold no_key
181091 08/23/09 04:05 Reinhold HHodo coincidences with tuned beam
181090 08/23/09 03:46 Y.Fujii Reading of ion chamber @ 0.31uA pulsed beam on BeO target
181089 08/23/09 03:09 Reinhold After beam adjustment turn on HHodo HV
181088 08/23/09 03:04 Markowitz Target: bpm for pulsed beam
181087 08/23/09 02:42 Nue Beam: SPL power
181086 08/23/09 02:42 Reinhold Turned all HV individually off; the TURN ALL HV OFF button is not working
181085 08/23/09 02:12 Nue, Maruta Target: Target ladder was moted to the normal position
181084 08/23/09 02:07 Markowitz BeO target is in beam
181083 08/23/09 01:56 Markowitz Access to put in target ladder
181082 08/23/09 01:18 Markowitz Hall access to check splitter readout downstairs
181081 08/23/09 00:55 Nue Beam: DZ PS problem and SPL current inconsistency
181080 08/23/09 00:10 Y. Fujii Told MCC not to modify Splitter current during tuning process
181079 08/23/09 00:07 Reinhold AC Discriminator signal study
181078 08/23/09 00:03 Reinhold EHODO ADC & TDC check by DAQ
Saturday
181077 08/22/09 23:55 maruta All HKS/HES magnets ON
181076 08/22/09 23:47 Gogami EHODO ADC & TDC check by DAQ
181074 08/22/09 23:27 Reinhold HTOF ADC test
181072 08/22/09 23:25 brads Tune-beam only tonight, DZ magnet repair scheduled for 10am Sunday
181070 08/22/09 23:21 Reinhold Bucking coil for WC test result
181062 08/22/09 23:08 Reinhold Initial BPM display
181060 08/22/09 23:06 cdaq Beam Time Accounting
181058 08/22/09 23:02 Reinhold Quick bucking coil test result of WC and LC
181056 08/22/09 22:58 brad Tune beam down to the Dump, but stability problem with DZ magnet
181053 08/22/09 22:55 saw Another BPM display attempt.
181050 08/22/09 22:51 Y. Fujii First beam spot in Hall C (copied from ELOG #1482126 by Mike Spata)
181025 08/22/09 22:08 Nue Beam: Finally we got the first beam
181016 08/22/09 21:47 Y. Fujii MCC told us they are going to deliver pulsed beam into Hall C
181014 08/22/09 21:36 shichijo HTOF ADC test
181002 08/22/09 20:35 Y. Fujii MCC told us they will access Hall to resolve FSD issue
180995 08/22/09 20:03 taniay Bucking coil for WC test result
180992 08/22/09 19:56 kawama LC TDC line should checked!
180990 08/22/09 19:49 brads Beam getting closer...
180988 08/22/09 19:43 Errata: In entry 180977, I = 1019.96A
180984 08/22/09 19:18 brads Beam status update
180978 08/22/09 19:00 kawama Exchanged F1TDC in ROC13, slot11
180977 08/22/09 18:59 Nue Beam: SPL field stability
180969 08/22/09 18:02 kawama EH1-1T & 1B HV on, others off
180960 08/22/09 17:25 Y. Fujii Beam preparation for Hall C will begin within 30 min.
180957 08/22/09 17:20 saw Initial BPM display
180955 08/22/09 17:19 shichijo HTOF HV
180953 08/22/09 17:16 Nue Rain leaked in Electronics Room
180950 08/22/09 17:02 shichijo HTOF HV
180949 08/22/09 16:55 chench Quick bucking coil test result of WC and LC
180948 08/22/09 16:48 brads ELOG: Hall C Target water flow bypassed
180947 08/22/09 16:43 Nue Beam: Current Vacuum & ion chamber status around HKS-HES
180946 08/22/09 16:21 Reinhold Quick AC bucking coil test
180945 08/22/09 16:16 Nue Beam: SPL current was set at 1020A
180944 08/22/09 16:13 cdaq Beam Time Accounting
180943 08/22/09 16:11 brads Tentative Plan for Saturday SWING, Sunday OWL
180942 08/22/09 16:10 Reinhold Quick AC bucking coil test
180941 08/22/09 16:05 brads Re: SPL current should be 1020A
180936 08/22/09 15:47 Nue Beam: SPL current should be 1020A
180935 08/22/09 15:47 shichijo discriminator width of HTOF counters
180931 08/22/09 15:07 Gogami Victor and Chunhua and Taniya went to the Hall
180929 08/22/09 14:58 Reinhold All Cherenkov bucking coil test
180928 08/22/09 14:49 Nue Re: He bag
180927 08/22/09 14:46 brads Addeded filter to DZ power supply FSD input, better now.
180926 08/22/09 14:45 Gogami [shichijo and Chunhua go to the hall]==>They came back to CH
180923 08/22/09 14:42 shichijo HTOF discriminator width
180922 08/22/09 14:26 Reinhold MCC status
180921 08/22/09 14:23 Gogami Shichijo and Chunhua go to the hall
180920 08/22/09 12:58 brads Still noise on DZ MPS feed to FSD system preventing CW beam delivery
180919 08/22/09 12:55 Reinhold atus of noise on ADC lines: WC slightly worse
180918 08/22/09 12:46 Tang He gas flow and He bag
180917 08/22/09 12:41 Reinhold tatus of noise on ADC lines: not too bad right now
180916 08/22/09 12:31 Gogami [Gas check]_22Aug2009
180915 08/22/09 12:24 kenyon Good vacuum restored
180914 08/22/09 12:15 Nue He bag gas
180913 08/22/09 12:03 Reinhold Andy in Hall looking at girder vacuum
180910 08/22/09 11:39 sho HV of WC turn on
180903 08/22/09 11:29 vulcan DZ power supply
180902 08/22/09 11:28 shichijo HTOF HV
180899 08/22/09 11:16 shichijo HTOF HV
180898 08/22/09 11:16 kawama End run failed
180897 08/22/09 11:15 Reinhold Status of Cherenkov bucking coils
180894 08/22/09 11:03 Reinhold Bill in hall to work on DZ issue
180893 08/22/09 11:03 Reinhold Bad vacuum in last girder before target; Andie will come in
180892 08/22/09 11:02 shichijo HTOF HV
180891 08/22/09 11:01 Gogami EHODO HV
180886 08/22/09 10:35 EHODO EHODO HV
180883 08/22/09 10:29 Gogami EHODO HV
180880 08/22/09 10:27 shichijo HV for HTOF counters
180877 08/22/09 10:11 cdaq Beam Time Accounting
180876 08/22/09 10:11 Gogami EHODO HV
180873 08/22/09 09:58 chench gate width of all lucite discriminators set to 30ns!
180872 08/22/09 09:25 brads re: 9th Dipole NMR
180871 08/22/09 09:11 Nue 9th Dipole NMR
180870 08/22/09 09:01 Gogami Beam: DZ magent MPS repairment
180869 08/22/09 08:46 Nue Target LED power
180868 08/22/09 08:23 Nue HTF, EHODO HV on
180867 08/22/09 06:08 Markowitz MCC calls to say beam tuning is resuming
180865 08/22/09 02:23 maruta Slow control monitor
180864 08/22/09 00:36 Reinhold Earth is leaking. Should we be concerned ;-)
180863 08/22/09 00:00 cdaq Beam Time Accounting
Friday
180858 08/21/09 23:46 sho Today's TUL
180843 08/21/09 23:07 brads DZ magent problem, link to ELOG entry
180842 08/21/09 23:01 brads Beam Update & Issue with magnet supply in Hall C
180835 08/21/09 21:45 kawama KTOF self trigger timing using TUL
180832 08/21/09 21:43 Reinhold lucte TDC missing channel test!!
180828 08/21/09 21:40 chench Lucite HV LC6B and LC7B has switched in perl script
180823 08/21/09 21:30 chench lucte TDC missing channel test!!
180822 08/21/09 21:17 Nue SPL NMR check
180817 08/21/09 20:53 Reinhold change WC discriminator
180815 08/21/09 20:47 Nue Beam: Shutter in truck ramp cannot be closed
180810 08/21/09 20:31 Y.Fujii All items checked
180807 08/21/09 20:24 brads Please check these items before beam
180806 08/21/09 20:08 brads Beam update
180803 08/21/09 19:42 yuan RF signals for HKS and FFD
180802 08/21/09 19:23 shichijo HTOF discriminator channel was changed
180799 08/21/09 19:22 Nue, Shichij Target: Target Plate #1 was intalled, how to change the target plate
180794 08/21/09 18:56 Y.Fujii Hall C will be sweeped in 15 min.
180793 08/21/09 18:46 taniya change WC discriminator
180788 08/21/09 17:46 Chiba EHODO ADC lines
180787 08/21/09 17:43 Reinhold PD Call: problem in one arc; ~1-2hrs delay
180786 08/21/09 17:39 brads Tentative Plan for Friday SWING, Saturday OWL
180785 08/21/09 17:39 Nue SPL magnet main power was On and set back to remote mode
180783 08/21/09 17:37 Nue Target: Recovery from the target accident
180778 08/21/09 17:24 Reinhold tatus of noise on ADC lines: back to bad after clean power restored
180771 08/21/09 17:07 saw Hard Drive replaced in cdaql6
180770 08/21/09 16:46 Reinhold Turned ON flow for ethane; DC HV still disconnected
180763 08/21/09 16:15 Tang Experiment Planner document
180762 08/21/09 16:14 Tang Experiment Planner document
180761 08/21/09 16:09 brads Chamber Ethane mix re-authorized for this weekend, gas flow can be re-enabled by an expert
180760 08/21/09 16:08 Tang General requirement to the beam in the document submitted to MCC
180757 08/21/09 15:24 chench LUCITE BUCKING COIL TEST DONE!
180731 08/21/09 13:28 Tang Wire chamber gas issue
180728 08/21/09 13:22 kawama cdaql6 down
180727 08/21/09 12:27 M Jones E02017 daq status
180726 08/21/09 12:21 M Jones Reprogramming ROC6 (sfich3) used for e02017
180725 08/21/09 11:42 nois on EHODO TDC line
180724 08/21/09 11:38 sho The test of TUL's ROM is over
180723 08/21/09 11:26 sho the power of TUL is turned off
180722 08/21/09 11:13 Gogami the nois on EHODO TDC line
180721 08/21/09 10:53 saw Wiki and web changes
180720 08/21/09 10:35 suhring HCLIST COMMENT ON Hall C Target ladder repair and realignment
180719 08/21/09 10:33 Reinhold Status of noise on ADC lines: back to bad after clean power restored
180718 08/21/09 09:26 gaskell Fast raster setting
180717 08/21/09 08:59 gaskell magnet controls
180716 08/21/09 07:34 Markowitz Work begins on target
180714 08/21/09 02:11 Nue UPS at MSP3H04M was power cycled
180709 08/21/09 01:27 Nue, Shichij Target: Target Plate #1 is ready
180708 08/21/09 01:19 sho Today's TUL
180704 08/21/09 01:12 Nue Target: Re: Re: Target ladder moved and water pipes were bent
180700 08/21/09 01:00 Reinhold discriminator threshold of HKS TOF counters
180693 08/21/09 00:50 shichijo discriminator threshold of HKS TOF counters
180682 08/21/09 00:29 Reinhold Re: Target: Target ladder moved and water pipes were bent
180679 08/21/09 00:23 shichijo target mount
180670 08/21/09 00:05 Nue Target: Target ladder moved and water pipes were bent
180668 08/21/09 00:04 Gogami nois on EHODO TDC line
180666 08/21/09 00:03 Gogami nois on EHODO TDC line
Thursday
180664 08/20/09 23:57 Reinhold DZ polarity wrong
180658 08/20/09 23:35 maruta SPL hallprobe indicates -0.38255T @ 994.76A
180649 08/20/09 22:54 Gogami LED light for target
180627 08/20/09 19:27 Gogami EHODO ADC gate and signal
180624 08/20/09 19:17 maruta Add one more hall probe for splitter and change HKS-Q2 hp controller
180623 08/20/09 19:15 doi LED for target viewer
180615 08/20/09 19:03 Xiyu Keep the Fission Chamber High Voltage OFF
180613 08/20/09 18:54 shichijo HKS TOF counter timing
180610 08/20/09 18:35 taniya Bucking coil for WC
180608 08/20/09 18:24 brads RUN PLAN: Thursday OWL --> Friday SWING
180607 08/20/09 18:23 brads RUN PLAN: Thursday OWL --> Friday SWING
180604 08/20/09 17:59 saw Beam: Beam current limits set at MCC
180598 08/20/09 16:55 taniya WC timing
180597 08/20/09 15:45 vmaxwell chc/25 power surge
180596 08/20/09 14:53 maruta HES Sieve Slit controller fault
180588 08/20/09 12:47 vmaxwell AC3-6D patch panel connection
180587 08/20/09 12:17 taniya checking WC timing
180585 08/20/09 12:09 Reinhold Delayed Entry: cycled turbo pumps to check for noise
180584 08/20/09 12:04 Reinhold Disabled HV to wire chambers
180583 08/20/09 11:58 Gogami EHODO TDC timing
180582 08/20/09 11:49 chench The gas checklist after ethan was turned off.
180581 08/20/09 11:23 Ethan flow stopped to wire chambers
180580 08/20/09 10:53 Reinhold Re: Status of noise on ADC lines: back to bad after clean power restored
180579 08/20/09 10:29 Reinhold Status of noise on ADC lines: better now with clean power off
180578 08/20/09 09:29 Reinhold VESDA Fire Alarm
180577 08/20/09 09:11 Reinhold Bucking coil for WC test
180569 08/20/09 02:44 taniya Bucking coil for WC test
180568 08/20/09 01:23 sho The attention of TUL-input
Wednesday
180559 08/19/09 23:08 Reinhold Electronics Module Data Sheets
180556 08/19/09 22:57 Gogami [Noise on HKS and HES ADC line] channel
180553 08/19/09 22:48 Gogami [Noise on HKS and HES ADC line]==>Picture
180552 08/19/09 22:43 Gogami Noise on HKS and HES ADC line
180539 08/19/09 21:27 Gogami EHODO ADC line signal check
180534 08/19/09 19:26 Reinhold Re; Suddenly noise on HKS ADC lines: EHODO as well
180525 08/19/09 17:49 cdaq Run Query:No Database Selected: ADC,TDC test 1X-allOR trigger
180524 08/19/09 17:37 doi EHODO TDC lines
180523 08/19/09 16:31 Tang Lucite timing variation fixed
180522 08/19/09 16:24 Tang He flow started for the He bag (between HDC1 and HDC2)
180521 08/19/09 15:49 kawama EHODO 2nd discriminator
180520 08/19/09 14:46 saw More scalers in vmec14
180519 08/19/09 14:34 M jones Hooked up the Beam dithering signal from Hall A into latched trigger inputs of Trigger supervisor
180518 08/19/09 14:16 brads Beam dithering signal description from Hall A
180517 08/19/09 12:20 Arshak HKS H1X7B(K24 cable)
180515 08/19/09 11:57 M Jones Put back the ROC14 tdc gate
180514 08/19/09 11:55 doi EHODO TDC delay
180513 08/19/09 11:48 saw vmec14 data not being read
180512 08/19/09 11:37 saw Scalers in ROC13 and ROC14 now in CODA
180511 08/19/09 11:31 Reinhold Re: Suddenly noise on HKS ADC lines
180510 08/19/09 11:24 Reinhold Suddenly noise on HKS ADC lines
180507 08/19/09 10:45 chench The electronic oscillation of EDC2 has been fixed, and the HV is on.
180506 08/19/09 10:33 sho HV logger is worked
180505 08/19/09 10:10 sho TUL output of WC is fixed
180501 08/19/09 09:57 Reinhold Problem with two HHodo (TOF) discriminator signals
180500 08/19/09 09:55 chench Lucite TDC timing difference has been solved!
180499 08/19/09 09:45 saw Beam: Beam current monitoring
180498 08/19/09 09:45 Reinhold Problem with two HHodo (TOF) discriminator signals
180496 08/19/09 09:13 Reinhold Turned OFF HV to H2Y plane (was ON)
180495 08/19/09 09:11 Reinhold Turned OFF HV to H2X plane (was ON)
180494 08/19/09 09:05 Reinhold Turned ON HV to H1XT
180493 08/19/09 08:58 Reinhold Turned ON HV to AC1T adn LC4T
180491 08/19/09 08:44 Reinhold Re: Dead channel of EHODO2 discri
180490 08/19/09 08:41 spata Minutes from weekly HKS coordination meeting August 18, 2009
180488 08/19/09 01:49 Gogami Fix the timing difference of EHODO TDC line signals
180487 08/19/09 01:36 Gogami EHODO signals timing of TDC line
180486 08/19/09 01:34 Reinhold Selftrigger status
180484 08/19/09 01:14 Reinhold Lucite (LC) tob and bottom adc cables where swapped at splitter
180483 08/19/09 01:00 maruta HES-Q2 MPS stability
Tuesday
180475 08/18/09 23:48 vmaxwell ac ribbon cables
180473 08/18/09 23:27 kawama Add 1 F1TDC in ROC14
180472 08/18/09 22:47 Reinhold Trigger Supervisor Level 1 accept signal scope shot
180457 08/18/09 19:35 doi EHODO TDC line timing check table
180456 08/18/09 19:18 shichijo TUL grouping summary
180454 08/18/09 19:05 Nue NMR probe cannot be found
180453 08/18/09 18:56 Gogami Dead channel of EHODO2 discri
180452 08/18/09 18:43 Nue Targets Preparation Status
180448 08/18/09 18:34 maruta HKS-Q1 and HES-D PSs are fault
180446 08/18/09 18:13 Gogami EHODO TDC line timing check
180444 08/18/09 17:21 kawama EDC1 was sparking
180442 08/18/09 15:06 Arshak HKS Lucite TOP
180438 08/18/09 12:09 brads Beam: Beam dithering signal /cables/ located, signals not set up yet
180437 08/18/09 11:52 Nue BI, GI curves for HKS, HES, SPL
180436 08/18/09 11:48 M Jones SFI for E02-017 ( Lifetime experiment)
180428 08/18/09 00:18 Reinhold Status of self trigger setup
Monday
180422 08/17/09 23:04 Reinhold Set coda flags to laser (LED/self trigger)
180421 08/17/09 22:09 Gogami EHODO TDC line timing difference
180414 08/17/09 19:30 Nue Map TOF in jpg file
180413 08/17/09 19:24 Nue Hall Probe was tilted and SPL field should be OK
180408 08/17/09 18:26 Nue #1 probe with extention cable and multiplexer
180407 08/17/09 17:44 Arshak HKS TOF map before ADC.
180406 08/17/09 17:36 saw Run start in logbook
180405 08/17/09 17:31 bono ac1 ac2 ac3
180401 08/17/09 17:09 Arshak Entry #180398, is hard to understand.
180400 08/17/09 17:09 Arshak Entry #180398, is hard to understand.
180399 08/17/09 17:04 M Jones Modified ts2_old_style.crl to get trigger latch pattern
180398 08/17/09 17:04 Arshak HKS TOF map before ADC.
180354 08/17/09 15:10 shichijo HTOF2Y
180345 08/17/09 14:56 kawama Cables for rebootpanel
180336 08/17/09 14:23 doi Signal check about EHODO ADC line
180333 08/17/09 13:35 bono re: problem with patch
180300 08/17/09 12:14 Gogami 400ns Delay for EHODO
180235 08/17/09 10:24 Reinhold Please log all run information
180234 08/17/09 10:17 bono ribbon cable
180233 08/17/09 10:16 Reinhold No run start entries in the log book?
180232 08/17/09 10:11 bono problem with patch
180231 08/17/09 10:02 Reinhold Re: 1X-TOP rate is little bit high
180230 08/17/09 09:54 Re: HKS DC rate graph
180229 08/17/09 09:43 Reinhold /* Enable FEB Timer. What is this?*/: not using any external FEB right now
180228 08/17/09 02:39 Reinhold Re: The delay time of HKTOF were checked: need to make a decision
180227 08/17/09 02:24 Reinhold Re: ADC 400ns delay problem
180226 08/17/09 02:20 Reinhold Re: ADC of WC's onephoton
180225 08/17/09 01:05 Gogami Delay for EHODO ADC line
180224 08/17/09 01:00 taniya ADC of WC's onephoton
Sunday
180196 08/16/09 22:00 chench Lucite ADC missing channel test has done!
180195 08/16/09 21:39 yez HKS DC rate graph
180193 08/16/09 20:50 saw High voltage logged in CODA
180192 08/16/09 20:44 kawama 1X-TOP rate is little bit high
180191 08/16/09 20:40 saw HES Q1 and HKS Q2 controls status
180190 08/16/09 20:25 Reinhold Trigger Supervisor Level 1 Accept delay
180188 08/16/09 20:21 Reinhold Cross talk on ADC signals (black coax flat cables?)
180180 08/16/09 19:33 Nue #1 NMR probe was finally read
180170 08/16/09 17:37 kawama ADC 400ns delay problem
180166 08/16/09 15:14 Reinhold Re: The delay time of HKTOF were checked: compare two spare 30 ft cables
180165 08/16/09 15:12 Reinhold Re: The delay time of HKTOF were checked
180162 08/16/09 14:37 Reinhold Re: The delay time of HKTOF were checked: READ this before any further action
180156 08/16/09 13:20 kawama Brief howto about analysis
180155 08/16/09 12:11 Nue #1 NMR probe does not work
180154 08/16/09 12:01 Reinhold /* Enable FEB Timer. What is this?*/
180152 08/16/09 01:07 Gogami EHODO ADC line connection
Saturday
180143 08/15/09 22:18 Reinhold Trigger supervisor GO and EN1 (enable) logic
180142 08/15/09 22:11 Reinhold Trigger supervisor GO and EN1 (enable) logic
180137 08/15/09 18:06 kawama How-to document about CODA
180132 08/15/09 17:32 saw Logging high voltage in CODA
180128 08/15/09 16:38 Reinhold Replaced a cable in the pedestal generator
180126 08/15/09 14:43 chench No bubling downstairs for EDC2, then I turn off the HV of EDC 2
180120 08/15/09 12:09 Nue No further leak from EQ1 PS
180119 08/15/09 11:58 Nue HTF, EHOD, WC check procedure
180118 08/15/09 11:01 Nue DC Gas flow stopped
180117 08/15/09 10:46 Nue Re: TDC HTF2X
180116 08/15/09 08:09 Kanda Logging stopped
180114 08/15/09 01:47 Reinhold Re: 2X TDC
180113 08/15/09 01:41 Reinhold Re: The delay time of HKTOF were checked
180112 08/15/09 01:32 Reinhold Re: EHODO Discriminator at Counting house
180111 08/15/09 01:05 shichijo 2X TDC
Friday
180110 08/14/09 23:58 Reinhold Re: SPL NMR is deadly wrong
180109 08/14/09 23:25 Nue SPL NMR is deadly wrong
180108 08/14/09 23:03 saw HKS and HES scintillator rate displays
180104 08/14/09 22:20 kawama Attach picture again
180103 08/14/09 22:18 kawama,Nue HES Q1 power supply has water leak!
180102 08/14/09 22:17 kawama,Nue HES Q1 power supply has water leak!
180100 08/14/09 20:44 Kanda Two black flat cables came alive again
180098 08/14/09 20:20 Nue Further NMR study (KD, ED)
180097 08/14/09 20:16 Arshak HKS Cabeling.
180089 08/14/09 18:25 sho EDC-HV logger was made
180087 08/14/09 16:37 kawama Condition of this run
180086 08/14/09 16:31 kawama Analyzer bug fixed & today's pedestal
180085 08/14/09 16:28 Nue Beam: Fringe Field Measurement along post beam, with All Spectrometer Magnets ON (Set Values)
180082 08/14/09 13:26 nagao The delay time of HKTOF were checked
180081 08/14/09 12:23 kawama Add tsStatus.o in Makefile
180079 08/14/09 11:57 Reinhold Wire chamber gas LOW PSI alarm. Eventually reset
180078 08/14/09 11:13 Nue HES Q2 PS is unstable
180077 08/14/09 11:08 Nue SPL NMR flange was opened
180076 08/14/09 10:37 Reinhold Wire chamber gas LOW PSI alarm. cannot reset
180075 08/14/09 10:22 sho BAD Cables were checked
180074 08/14/09 09:54 Gogami EHODO Discriminator at Counting house
180072 08/14/09 00:50 Nue SPL NMR problem
180071 08/14/09 00:15 kawama ROC14 is not enable now
Thursday
180056 08/13/09 22:20 Nue KD's NMR works, but not SPL's
180055 08/13/09 21:14 Kanda Pin assignment of LeCroy 1881M (Fastbus ADC)
180054 08/13/09 21:07 Gogami EHODO TDC line connection
180053 08/13/09 20:58 Kanda Pin assignment of the patch panel
180048 08/13/09 17:44 taniya noise level for HKTOF
180047 08/13/09 17:00 taniya noise level for HKTOF
180046 08/13/09 16:55 Kanda Noise and pedestal
180045 08/13/09 16:19 Kanda labels on cables
180044 08/13/09 15:40 Reinhold How to save screen images from the oscilloscopes
180043 08/13/09 15:21 Reinhold Correct polarity for 16 times flat coax cables
180040 08/13/09 13:42 Kanda Swapping was tested
180039 08/13/09 13:40 bono daq runs
180037 08/13/09 13:04 shichijo ADC signal of HTOF1X
180036 08/13/09 11:40 Nue KQ1, KQ2, EQ1, EQ2 Hall Probe readout and polarity
180035 08/13/09 11:09 Nue Did you swap the amp-discri cards?
180034 08/13/09 09:55 Reinhold Figure of 1X pedestals: this looks like noise
180032 08/13/09 01:32 Nue KD, SPL NMRs are not working
Wednesday
180031 08/12/09 23:27 kawama Some of EDC1 channels are strange
180030 08/12/09 23:19 kawama Figure of 1X pedestals
180025 08/12/09 22:08 kawama Strange cables removed
180024 08/12/09 22:08 kawama Strange cables removed
180023 08/12/09 21:04 kawama Some strange ADC cable
180020 08/12/09 19:13 Reinhold Splitter Magnet flashing sign
180019 08/12/09 16:29 Reinhold HES Fastbus crate need covers over power leads
179966 08/12/09 13:09 yuan update HKS HV GUI
179947 08/12/09 12:15 kawama sfihks stop signal cable
179945 08/12/09 12:13 Reinhold Set HKS & HES dipoles to local
179939 08/12/09 12:01 Gogami Rebooted HV Crate34
179938 08/12/09 11:49 taniya AMP for WC is changed
179937 08/12/09 11:41 taniya bad channel in hall C patch
179914 08/12/09 10:23 saw Missing ADC channels
Tuesday
179912 08/11/09 20:19 Kanda HV channel assignment was corrected
179911 08/11/09 20:12 kawama Some ADC channel is strange
179908 08/11/09 19:35 Kanda HV channels were added to HV.hvc
179899 08/11/09 18:25 Gogami Dead channel of EHODO Discri
179898 08/11/09 18:23 shichijo bad channel in Hall C patch
179897 08/11/09 18:06 beaufait magnet update
179874 08/11/09 13:30 Gogami Discriminator for EHODO
179863 08/11/09 11:12 M Jones Test the rocs with blaster program
179862 08/11/09 10:54 M JOnes Borrowed 5 1877 tdcs from Hall A
Monday
179861 08/10/09 23:50 kawama Change "hkshes" into "coin"
179849 08/10/09 20:50 kawama ROC1 crl file
179839 08/10/09 19:24 taniya PMT amp for Water Cherenkov
179838 08/10/09 19:21 Gogami EHODO signal check
179831 08/10/09 18:50 Gogami EHODO HV cable line
179814 08/10/09 16:14 kawama All TDC channel in ROC11 is working
179806 08/10/09 15:08 kawama Slot5 in ROC11 is exchanged
179781 08/10/09 12:27 shichijo Target: Flow test of water cell target
Sunday
179769 08/09/09 19:13 Gogami EHODO signal check
179768 08/09/09 19:13 Gogami EHODO signal check
179763 08/09/09 15:33 Kanda Status strings are now correct
179762 08/09/09 15:33 Kanda Status strings are now correct
179761 08/09/09 15:23 saw HES ROC11 slot 5 possible problem
Saturday
179737 08/08/09 20:10 Kanda Strange status strings in hv.tcl
179732 08/08/09 19:38 kawama ROC1 gets enable!
179726 08/08/09 19:28 kawama ROC1 is not enable
179722 08/08/09 19:11 Gogami EH2-13T cable for EHODO
179717 08/08/09 18:59 Gogami EHODO signal check
179701 08/08/09 18:19 sho we decide signal number on MAPPING-file
179697 08/08/09 18:08 taniya PMT amp for Water Cherenkov
179673 08/08/09 12:42 kawama Some channel in ROC11 is dead?
179671 08/08/09 01:53 Nue KQ1, KQ2, EQ2 Hall Probe readout and polarity, SPL excitation
Friday
179670 08/07/09 22:42 kawama Status of ROC11 is not improved!
179669 08/07/09 21:57 kawama,shich First TUL trial
179668 08/07/09 21:53 kawama Status of ROC11
179667 08/07/09 19:58 maruta All motors work now
179666 08/07/09 18:47 Gogami EHODO signal check
179665 08/07/09 17:24 beaufait magnet test
179639 08/07/09 13:15 shichijo Cable assignment of HKS TOF counters
179633 08/07/09 12:14 kawama ROC11 is unstable
Thursday
179619 08/06/09 19:44 kawama Solved F1TD issue
179614 08/06/09 18:09 shichijo dead HV channel of HKS local HV patch
179613 08/06/09 18:04 Arshak HKS hodo.
179612 08/06/09 18:00 Gogami EHODO HV cable
179611 08/06/09 17:36 taniya Water Cherenkov
179609 08/06/09 16:42 Victor M. Ro AC1 High Voltage Testing
179596 08/06/09 11:09 Reinhold Chnaged order in high voltage map
179595 08/06/09 10:28 Reinhold Gas system interlock: low PSI
Wednesday
179593 08/05/09 22:53 saw sfihks status
179592 08/05/09 18:51 kawama EDC1 turned on
179590 08/05/09 16:05 Nue Typical EDC1 Current in 2005 runs
179589 08/05/09 15:01 Reinhold Aerogel HV map (from Pete Markowitz dated 7/18/09 12:43 PM)
179588 08/05/09 13:59 bono Data acquisition ac 2
179575 08/05/09 12:02 kawama EDC1 HV value
179565 08/05/09 10:10 bono data acquisition aerogel
179560 08/05/09 09:41 spata Minutes from weekly HKS coordination meeting August 4, 2009
Tuesday
179557 08/04/09 22:57 maruta stepping motor status update
179556 08/04/09 20:58 chench HV for HDC1&2!
179552 08/04/09 19:53 kawama Status of ROC7 and ROC11
179548 08/04/09 19:31 shichijo Missing channels in Hall-C Patch
179536 08/04/09 12:54 reinhold Found H1x9t HV on; turned it off
179524 08/04/09 11:19 kawama Status of ROC7
179522 08/04/09 11:08 Reinhold Gave a CAMAC discriminator LRS 2313 to Beni (Hall D)
179521 08/04/09 10:28 vmaxwell Runs 73322 - 73330 HV scan for aerogel AC2
Monday
179520 08/03/09 23:55 Reinhold Runs 73321 - 73327 ???
179513 08/03/09 18:23 reinhold run73319 is junk
179506 08/03/09 14:38 maruta Stepping motors for HKS SS and Target look dead
Saturday
179503 08/01/09 19:11 kawama Playing with F1TDC