User name Reinhold

Log entry time 08:48:33 on September 10, 2009

Entry number 184616

keyword=RC Report: Dayshift Plan

The hall will go to restricted access as soon as possible. Plan to lock
up at 6 pm for scheduled beam restore at 8 pm. So far the planned work
list is:

* Exchange some more hoses on the Big Bite power supply (Joe)
* Work on horizontal drift chamber in HES (formerly known as HDC2) (H.U.)
* If possible exchange an amplifier on Fission Chamber (H.U.; needs
RadCon and Hall C Staff support)
* Trouble shoot communication with HKS dipole PS (Tomo, Nue)

Accelerator work related to Hall:
* NMW in witness magnet (9th dipole) busted
* IHA3C05 preamp check
* IPM3C02 RF module swap
* IOCSE20 trouble shooting