keyword=RC Report, we will have low current beam soon

Small pump was started. Set alarm at 140F for water line. Expert believes
its temperature shows real-time change of the dump temperature.
We will start beam 5kW energy on dump (about 2uA).
At first, check the beam position on BeO and switch the target to H2O.

After receiving the parts for large pump, re-assembly and test of spare
pump will be done on Monday to replace the broken pump on Tuesday.
(Expert said that he will try but not guarantee...)

Discussed a possibility of performing C50 commission on Monday rather
than Tuesday to minimize the down time. Hall A has no reason to object it.