Jefferson Lab Hall C Logbook for October 09 - Beam
Main INDEX
Saturday
Friday
Thursday
Wednesday
193159 10/28/09 05:35 yez Beam: MCC called -> Beam may be ready in two hours
Tuesday
193124 10/27/09 19:53 Nue Beam: Accelerator is waiting for pump
Monday
192864 10/26/09 05:44 yez Beam: Called MCC and they are trying to re-lock the BPMs
Sunday
192535 10/25/09 00:42 Nue Beam: IOC was rebooted successfully. Hall goes to beam permit
Saturday
Friday
192212 10/23/09 17:46 Nue Beam: Beam position was checked with BeO with Raster 3x1
192178 10/23/09 14:46 Nue Beam: Photon position was checked by YAG
192163 10/23/09 13:01 saw Beam: Feedback now on
Thursday
191989 10/22/09 18:31 Nue Beam: Beamline magnets setting after beam tune
191986 10/22/09 18:19 Nue Beam: Screenshot of New BPMs and other monitors
191961 10/22/09 16:42 Nue Beam: Reference BPM positions were changed after beam outage
191839 10/22/09 06:18 Nue Beam: Beamline magnets setting after the power outage
191788 10/22/09 00:03 Petkovic Beam: Swing Shift Summary
Wednesday
191784 10/21/09 23:01 Petkovic Beam: 10:55 BeO positioned as the target for beam pulse tuning by the MCR
191781 10/21/09 22:19 Petkovic Beam: 10:10 Beam Expectation to Hall C
191772 10/21/09 20:49 Petkovic Beam: 20:40 Controlled Access mode by the MCR (to check valves)
191768 10/21/09 19:42 Petkovic Beam: 19:20 Shift Crew of the MCR requested to open Beam Pipe (two valves) in the Hall C
191764 10/21/09 17:37 Petkovic Beam: 17:30 Dialogue with the MCR about Beam Recovery
191758 10/21/09 16:18 Petkovic Beam: 16:15 No beam. Running Cosmics data in Coin-mode
191717 10/21/09 02:44 yez Beam: Current Status
Tuesday
191610 10/20/09 12:08 chench Beam: end the run since MCC reboot the SLI
Monday
191440 10/19/09 15:53 Petkovic Beam: 15:40 Beam back with 7.5 uA on 52Cr. Started Run # 76692
191438 10/19/09 15:49 Petkovic Beam: 15:40 Beam back with 7.5 uA on 52Cr. Started Run # 76692
191434 10/19/09 15:31 Petkovic Beam: 15:25 MCR reported Beam off (cca 05 hour) due to troubles with one magnet
191410 10/19/09 13:07 Petkovic Beam: 13:00 MCR reported lost ot the IOC: Beam off expected for the half of an hour
Sunday
191262 10/18/09 20:17 Gogami Beam: Beam is back. now 7.5[uA] on 52Cr.
191257 10/18/09 20:07 Gogami Beam: Beam is stopped and will be back in 10 minutes.
191136 10/18/09 11:31 Petkovic Beam: 10:55 - 11:10 MCR disabled beam due to the IOC problem.
191122 10/18/09 10:32 Petkovic Beam: Restricted Access Mode (MMCR) due to Hall C Ion Ch. issue; Reseted HES-D magnet
Saturday
190998 10/17/09 18:09 lgan Beam: BPM IOC crashed
190935 10/17/09 08:46 Petkovic Beam: 8:35 - 8: 40 Rebooting Beam Contol System (ABU) by the MCR
Friday
190781 10/16/09 09:21 Petkovic Beam: Plan to use Beam for the CH2 Calibration (several next runs)
Thursday
190246 10/15/09 07:32 Petkovic Beam: Beam coming --> postponed to 8:00, due to the RF problems on 2 magnets (MCR)
190243 10/15/09 06:41 Petkovic Beam: TIMING (Properties) of the Run # 76373
190239 10/15/09 05:34 Petkovic Beam: Beam off for about 1 hour --> to fix only one QM in the Beam line (MCR)
Wednesday
Tuesday
Monday
189609 10/12/09 17:16 Gogami Beam: Beam is back !
189608 10/12/09 17:03 Gogami Beam: Still optimizing the beam injector , beam will be back one or two hours later.
Sunday
Saturday
189350 10/10/09 18:58 frw Beam: no beam
189332 10/10/09 15:18 Hari Beam: Beam unstable
Friday
189181 10/09/09 16:00 Petkovic Beam: Beam current expectation - for the Swing Shift
189174 10/09/09 11:53 Petkovic Beam: Controlled Access Mode - Hall C (11:50)
189170 10/09/09 10:45 Gogami Beam: To open windows of BPM and BCM
189154 10/09/09 09:06 Raffaele De Beam: Beam Off
189102 10/09/09 02:07 Mostafa Elaa Beam: Current beam status
189100 10/09/09 02:00 Mostafa Elaa Beam: The beam is back 45uA
189099 10/09/09 01:55 Mostafa Elaa Beam: Current beam status
189098 10/09/09 01:55 Mostafa Elaa Beam: Current beam status
189090 10/09/09 01:06 Mostafa Elaa Beam: SLI Screen
Thursday
189027 10/08/09 15:09 T. Petkovic Beam: Injector Problem_Beam Expectation to Hall C
189023 10/08/09 13:40 F. Garbaldi Beam: Poblem with injector
188992 10/08/09 07:25 Mostafa Elaa Beam: The beam is unstable
Wednesday
Tuesday
188778 10/06/09 20:19 Hari Beam: Mcc rebooting ISO -20
Monday
188554 10/05/09 16:16 Nue Beam: BCM calibration plan
188547 10/05/09 15:58 kohlm Beam: beam is back on
188544 10/05/09 15:29 kohlm Beam: MCR accessing HallC
188521 10/05/09 12:16 kohlm Beam: increased current from 35muA to 40muA after 76075
188505 10/05/09 10:22 kohlm Beam: energy spread improved
Sunday
188386 10/04/09 16:25 Nue Beam: Beam spot on the carbon target is extraordinary bright
Saturday
Friday
188010 10/02/09 05:09 Gogami Beam: Call from MCC. They have some problems. beam is stopped.
187971 10/02/09 01:02 Gogami Beam: Call from MCC , Beem was stopped for a few minutes . now beem's back.
Thursday
187839 10/01/09 00:50 Darko Beam: Beam cca 8uA