Thursday
225781 03/31/11 09:02 pqwang Target: Target moved out to home position, Target Screenshots & Status
225745 03/31/11 05:42 Nuruzzaman Target: Target GUI and strip charts screenshots
225715 03/31/11 00:31 Nuruzzaman Target: Target GUI and strip charts screen shots at the beginning of owl shift.
Wednesday
225703 03/30/11 23:57 buddhini Target: screen shots at the end of swing shift
225651 03/30/11 16:13 buddhini Target: Target screen shots at the begining of the swing shift
225649 03/30/11 16:07 smithg Target: added an alarm for the bellows temp
225603 03/30/11 09:03 rakithab Target: Target GUI and strip charts screen shots
225593 03/30/11 07:28 pqwang Target: Target GUI and strip charts screenshots at the end of owl shift
Tuesday
225545 03/29/11 23:53 jpan Target: Target GUI and strip charts screenshots at the end of swing shift
225520 03/29/11 21:03 jpan Target: With full beam current, sometimes the HPH reserved power less than 100 W.
225485 03/29/11 17:21 jpan Target: Move target from Home=out of beam postion to H2 Cell
225480 03/29/11 17:06 jpan Target: Move target from H2 cell to Home-out of beam position
225464 03/29/11 12:30 narayan Target: mid shift screenshot
Monday
225427 03/28/11 21:54 jpan Target: Another vacuum plot
225422 03/28/11 21:25 rakithab Target: Run 225418 is with LH2 OutOfBeam
225419 03/28/11 21:16 jpan Target: Target moved from HOME=Out-of-Beam to Hydrogen-Cell position
225414 03/28/11 18:47 jpan Target: The DS vacuum status - about 1.4e-5 Torr at this moment
225409 03/28/11 17:44 smithg Target: Target unparked. DS vacuum continues to improve.
225398 03/28/11 16:50 smithg Target: Unparking the tgt now to be ready for 150 uA later tonight
225352 03/28/11 10:45 smithg Target: replaced H2 bottle
225351 03/28/11 10:15 rakithab Target: Beam dump vacuum alarm during venting.
225346 03/28/11 08:55 rakithab Target: Target GUI and strip charts screen shots
225340 03/28/11 07:51 pqwang Target: Target GUI and strip charts screenshots at the end of owl shift
225323 03/28/11 00:14 jpan Target: Target GUI and strip charts screenshots at the end of swing shift
Sunday
225315 03/27/11 12:16 EmmanuelK Target: Target GUI and strip charts screenshots for Day shift
225314 03/27/11 12:14 EmmanuelK Target: Pump current alarm - ro error?
225312 03/27/11 07:13 pqwang Target: Target GUI and strip charts screenshots at the end of owl shift
225307 03/27/11 00:01 jpan Target: Target GUI and strip charts screenshots
Saturday
225290 03/26/11 16:02 EmmanuelK Target: Scattering Chamber vacuum through Day shift
225285 03/26/11 12:19 EmmanuelK Target: Day shift screenshots
225283 03/26/11 07:12 rakithab Target: Target GUI and strip charts screenshots
225282 03/26/11 00:11 rakithab Target: Target GUI and strip charts screenshots
Friday
225280 03/25/11 23:44 jpan Target: Target GUI and strip charts screenshots at the end of swing shift
225257 03/25/11 07:50 pqwang Target: Target GUI and strip charts screenshots at the end of owl shift
Thursday
225255 03/24/11 23:50 jpan Target: Target GUI and strip charts screenshots at the end of swing shift
225210 03/24/11 06:53 pqwang Target: Target GUI and strip charts screenshots at 7 am
Wednesday
225208 03/23/11 22:53 rakithab Target: Target GUI and strip charts screenshots
225193 03/23/11 17:03 covrig Target: 4K status
225189 03/23/11 16:13 rakithab Target: Target GUI and strip charts screenshots
225183 03/23/11 14:19 Jiawei Target: abnormal 4k flow fluctuation again
225171 03/23/11 09:56 Jiawei Target: 4K flow was unstable, now is back
225168 03/23/11 07:44 pqwang Target: Target GUI and strip charts screenshots
Tuesday
225163 03/22/11 21:52 Page Target: Operator is still awake :)
225148 03/22/11 16:46 covrig Target: status
225137 03/22/11 15:48 jpan Target: The 15K mass flow was decreased further, right now is about 12 g/s and the HPH power is ~350 W
225136 03/22/11 15:08 jpan Target: Target GUI and strip charts screenshots @ 3:05 pm, pretty quiet so far
225129 03/22/11 11:02 jpan Target: Adjust the QW_FI_15K low limit a little bit (from 14.00 to 13.50) temporarily, will change it back later
225124 03/22/11 10:02 jpan Target: The 15 K mass flow drops during last few minutes
225123 03/22/11 09:54 jpan Target: Cryo called and asked our vacuum status
225118 03/22/11 06:06 pqwang Target: Target GUI and strip charts screenshots at 6 am
Monday
225115 03/21/11 21:23 Page Target: Screen shots - quiet night so far
225108 03/21/11 17:28 Page Target: Target 'parked' at 20 g/s of 15K, 16 g/s 4K
225107 03/21/11 17:00 Page Target: Progress at reducing 15K flow
225101 03/21/11 16:18 Page Target: Screen shot, start of swing shift
225073 03/21/11 06:49 pqwang Target: Target GUI and strip charts screenshots at the end of owl shift
Sunday
225062 03/20/11 21:46 Page Target: target screens, 21:45
225058 03/20/11 17:28 Page Target: scattering chamber vacuum plan for tonight
225057 03/20/11 16:56 Page Target: Scattering chamber vacuum getting worse
225055 03/20/11 15:14 birchall Target: Vacuum in scattering chamber and upstream
225054 03/20/11 14:23 birchall Target: Screenshot at 2:20 pm
225053 03/20/11 07:55 pqwang Target: Screen shot at end of owl shift
Saturday
225024 03/19/11 15:13 jpan Target: Bad downstream vacuum
224966 03/19/11 09:18 jpan Target: Vacuum behaviour during last swing shift
224955 03/19/11 07:59 Nuruzzaman Target: Target GUI and strip charts screen shots, end of OWL shift.
224874 03/19/11 00:22 Nuruzzaman Target: Target GUI and strip charts screen shots, beginning of OWL shift.
Friday
224869 03/18/11 23:36 smithg Target: recommend closing 16" GV during beam off vacuum excursions
224732 03/18/11 15:49 Jiawei Target: late entry: moved to LH2 target
224712 03/18/11 12:58 Jiawei Target: Moved to DS 4% Al target
224661 03/18/11 10:08 Jiawei Target: silent the raster alarm for moller study
224631 03/18/11 09:06 Jiawei Target: Target: move out of beam
224592 03/18/11 08:02 Nuruzzaman Target: Target GUI and strip charts screen shots at end of OWL shift
224550 03/18/11 04:51 Nuruzzaman Target: Target GUI and strip charts screen shots
224459 03/18/11 00:44 Nuruzzaman Target: Target GUI and strip charts screen shots
Thursday
224356 03/17/11 17:52 buddhini Target: Late entry, target was moved home to take tune beam.
224346 03/17/11 15:49 AK Opper Target: Target screen shot
224333 03/17/11 11:19 AK Opper Target: 4K JT
224314 03/17/11 08:39 AK Opper Target: Target change
224294 03/17/11 07:29 Nuruzzaman Target: Target GUI and strip-chart screen shots, end of owl shift.
224225 03/17/11 04:12 Nuruzzaman Target: Changed the Minor and Major Limits for vacuum 3H09D again.
224211 03/17/11 02:08 Nuruzzaman Target: Changed the Minor and Major Limits for vacuum 3H09D again.
224199 03/17/11 00:49 Nuruzzaman Target: Changed the Minor and Major Limits for vacuum 3H09D.
224192 03/17/11 00:16 Nuruzzaman Target: Target GUI and strip charts screen shots
Wednesday
224190 03/16/11 23:43 Armstrong Target: Move back to lH2; have about 1950 W
224184 03/16/11 23:16 Armstrong Target: move to DS 2% Be target
224171 03/16/11 21:37 Armstrong Target: set alarm limits on VCG3H09D
224168 03/16/11 21:20 Armstrong Target: horizontal motion problem; go to DS centering hole
224144 03/16/11 19:58 Armstrong Target: move to 0.5% DS C target; checked Fan differential Pressure mask
224135 03/16/11 19:35 Armstrong Target: move to DS centering hole
224121 03/16/11 18:32 Armstrong Target: screen shot with filled target
224120 03/16/11 18:22 Armstrong Target: move out of beam
224119 03/16/11 17:31 smithg,lecke Target: Subcooling now
224107 03/16/11 16:17 smithg,lecke Target: Evaporator seems to be helping cooldown
224096 03/16/11 14:59 smithg,opper Target: Cooldown not working
224084 03/16/11 11:13 smithg/opper Target: cooldown status
224074 03/16/11 09:30 smithg/opper Target: started cooldown
224069 03/16/11 08:50 Smith, Opper Target: Beamline valve
224058 03/16/11 07:50 Nuruzzaman Target: Target GUI and strip charts screen shot at the end of owl shift
224011 03/16/11 03:11 Nuruzzaman Target: Target GUI and strip charts screen shots
223985 03/16/11 00:20 Nuruzzaman Target: Target GUI and strip charts screen shots
Tuesday
223925 03/15/11 21:34 covrig Target: reset the h-motion step counter
223914 03/15/11 21:01 buddhini Target: Moved to DS centering hole
223899 03/15/11 18:04 smithg Target: FIXED! Waa-hoo!
223894 03/15/11 16:22 rakithab Target: Target IOC rebooted
223873 03/15/11 12:01 smithg Target: The mains IS too high!
223837 03/15/11 07:38 Nuruzzaman Target: QWT_DSdmB status for OWL shift.
223830 03/15/11 06:25 Nuruzzaman Target: Target GUI and strip charts screen shots
223816 03/15/11 02:41 Nuruzzaman Target: QWT_DSdmB status after increase in current.
223808 03/15/11 00:36 smithg Target: pump controller mains voltage too high
223807 03/15/11 00:34 Nuruzzaman Target: Target GUI and strip charts screen shots
Monday
223799 03/14/11 23:39 rakithab Target: Moved to DS 4% Al target
223795 03/14/11 22:25 rakithab Target: Target IOC rebooted then power cycled
223793 03/14/11 22:24 smacewan Target: reset target ioc and cycled power
223784 03/14/11 22:04 smithg Target: Pump won't restart
223774 03/14/11 21:22 smithg Target: Refilled loop. Reset valves. Can't restart pump.
223753 03/14/11 20:07 smithg Target: Evacuated target cell. Turned off pump & HPH. Moved to "LH2"=MT cell.
223734 03/14/11 18:44 smithg Target: moved to 1/2% C tgt
223733 03/14/11 18:42 smithg Target: Moved to DS centering hole
223725 03/14/11 18:13 smithg Target: Action plan for running with cell evacuated
223720 03/14/11 17:53 smithg,covri Target: Striptools for 18.1 psia, 68 K dilution msrmnt
223705 03/14/11 16:45 covrig, smit Target: half pressure target loop
223684 03/14/11 14:48 smithg Target: Restrict 15K JT changes to < 1%/min
223682 03/14/11 14:42 smithg,opper Target: Target Screenshots & Status
223674 03/14/11 13:23 smithg,opper Target: target status
223670 03/14/11 13:02 smithg,opper Target: liquid has boiled away
223663 03/14/11 11:51 smithg,opper Target: warmup continuing but slowly
223650 03/14/11 10:43 smithg,opper Target: Deliberate warmup for dilution msrmnts
223642 03/14/11 08:59 AK Opper Target: target change
223628 03/14/11 08:01 Adesh and Al Target: screens shot
223627 03/14/11 08:00 AK Opper Target: target change
223610 03/14/11 06:17 Adesh Target: Moved to Optics 12345 target
223606 03/14/11 05:51 Adesh Target: Moved to Optics 1235 target
223604 03/14/11 05:26 Adesh Target: Moved to Optics 15 target
223601 03/14/11 05:00 Adesh Target: Moved to Optics 3 target
223598 03/14/11 04:32 Adesh Target: Moved to Optics 135 target
223595 03/14/11 04:04 Adesh Target: Moved to US key target
223575 03/14/11 02:52 Adesh Target: Moved to Optics 135 target
223569 03/14/11 02:20 Adesh Target: Moved to US key target
223566 03/14/11 01:52 Adesh Target: Moved to DS 4% Al target
223562 03/14/11 01:12 Adesh Target: Moved to US 1% Al target
223550 03/14/11 00:03 Jiawei Target: End of swing shift screenshot
Sunday
223446 03/13/11 15:55 narayan Target: End of day shift screenshot
223393 03/13/11 12:17 narayan Target: pump alarm and its limits
223358 03/13/11 10:11 narayan Target: recurring "vmec18 unresponsive" message
223349 03/13/11 09:23 narayan Target: "vmec18 unresponsive" message
223338 03/13/11 08:19 Adesh Target: screenshot at the end of owl shift
223302 03/13/11 05:22 Adesh Target: target computer rebooted itself
223261 03/13/11 00:00 Page Target: Noisy pump frequency readback - increased hi limit to 42 from 40 Hz
Saturday
223249 03/12/11 22:39 Page Target: LH2 moved in, etc.
223222 03/12/11 21:00 Page Target: White alarms, due to VME15 reboot
223219 03/12/11 20:42 Page Target: Pump frequency readback got noiser when target moved to HOME
223217 03/12/11 20:37 Page Target: Raised yellow alarm for QWT_phytron A by 1 K - temporary
223215 03/12/11 20:32 Page Target: Moved LH2 out of beam - note Ypot value drifting
223173 03/12/11 17:27 Page Target: Screenshot, 10 nA tracking run in progress
223118 03/12/11 13:18 smithg Target: EV6814 was also closed a little
223110 03/12/11 12:43 smithg Target: Quenched the irksome flow oscillations!
223105 03/12/11 12:29 rakithab Target: Less cryo and temperature oscillations
223095 03/12/11 12:12 rakithab Target: Moved to LH2 target
223077 03/12/11 09:52 rakithab Target: Moved target to Out Of Beam position - HOME
223043 03/12/11 08:09 Adesh Target: Target GUI and strip charts screenshot at the end of owl shift
222957 03/12/11 05:06 Adesh Target: Moved to DS 8% Al target
222947 03/12/11 04:31 Adesh Target: Moved to US 4% Al target
222943 03/12/11 04:16 Adesh Target: Moved to US pure Al target
222937 03/12/11 03:49 Adesh Target: Moved to US 1% Al target
222931 03/12/11 03:32 Adesh Target: Moved to US 4% Al target
222925 03/12/11 03:22 Adesh Target: Moved to DS 8% Al target, 4K mass flow & 4K Inlet temperature readout have white screen
222918 03/12/11 02:51 Adesh Target: Moved to DS 4% Al target
222914 03/12/11 02:43 Adesh Target: late entry Moved to DS 8% Al target
222899 03/12/11 01:47 Adesh Target: Moved to US 2% Al target
222893 03/12/11 01:14 Adesh Target: Moved to DS 4% Al target
222871 03/12/11 00:21 Adesh Target: moved to 8% DS Al tgt
Friday
222864 03/11/11 23:25 Page Target: Moved to US centering target
222860 03/11/11 23:05 Page Target: moved to DS centering target
222859 03/11/11 23:03 Page Target: Target 'parked' (sort of)
222851 03/11/11 21:39 smithg Target: mea culpa
222848 03/11/11 20:40 Page Target: Pump head back, sort of ...
222846 03/11/11 20:15 Page Target: Target is NOT ok ....
222837 03/11/11 18:39 smithg Target: vacuum looking just fabulous!
222836 03/11/11 18:30 smithg Target: We have liquid.
222825 03/11/11 17:45 smithg Target: condensing at a nice clip
222821 03/11/11 16:58 smithg Target: started condensing
222784 03/11/11 14:38 smithg Target: IV status
222770 03/11/11 11:18 covrig Target: started opening the 4K JT
222755 03/11/11 09:26 Jiawei Target: start to open the 15K JT valve to cool down the target
222752 03/11/11 09:01 smithg,Jiawe Target: started cooldown
Thursday
222730 03/10/11 17:13 smithg Target: pumped/purged H2 bollte line after sample was drawn
Wednesday
222554 03/09/11 16:44 covrig Target: closed 4K JT valve
Tuesday
Monday
222401 03/07/11 18:11 smithg Target: tgt was moved in, then out to home again
222343 03/07/11 12:53 smithg Target: closed mv41
Sunday
Saturday
Friday
Thursday
Wednesday
222184 03/02/11 15:50 leacock Target: opened 4K JT valve from 0% to 100%
Tuesday