Jefferson Lab Hall C Logbook for May 11 - Target

  • Main INDEX

    Tuesday

    
    

    Monday

    
    

    Friday

    
    

    Wednesday

    
    

    Tuesday

  • 233475 05/24/11 15:55 beaufait Target: target camera
  • 233470 05/24/11 10:42 covrig Target: recover from power outage
  • Monday

    
    

    Friday

    
    

    Thursday

    
    

    Wednesday

    
    

    Tuesday

    
    

    Monday

  • 233434 05/16/11 15:38 smithg,Silvi Target: Inerted loop with helium, moved to 4% US Al dummy
  • Sunday

    
    

    Saturday

    
    

    Friday

  • 233421 05/13/11 10:11 smithg Target: checked tgt in hall
  • 233420 05/13/11 10:06 covrig, smit Target: warming up
  • 233408 05/13/11 07:33 manos Target: Raster current alarm
  • 233399 05/13/11 06:27 manos Target: Screenshots
  • Thursday

  • 233247 05/12/11 17:41 smithg Target: last night's power densities
  • 233169 05/12/11 09:26 Jiawei Target: correct attachment
  • 233167 05/12/11 09:19 Jiawei Target: target is out of beam for the moller measurement
  • 233161 05/12/11 08:23 Jiawei Target: Screen shots at the beginning of day shift
  • 233103 05/12/11 00:06 smithg Target: Listen to your alarms. Use your heads!
  • Wednesday

  • 233098 05/11/11 23:33 smithg Target: never EVER put unrastered beam on the LH2 target!
  • 233090 05/11/11 22:54 vardan Target: 5uA unrasterd beam
  • 233088 05/11/11 22:18 vardan Target: low raster current alarm
  • 233083 05/11/11 22:06 vardan Target: correction: not modulation but compensation
  • 233077 05/11/11 21:38 narayan Target: temporarily increased hihi limit on beam current
  • 233056 05/11/11 18:30 vardan Target: beam current limits zeroed
  • 233055 05/11/11 18:27 vardan Target: beam current alarm
  • 233051 05/11/11 18:11 vardan Target: HBH beam modulation enabled
  • 233039 05/11/11 17:25 vardan Target: on the HPH beam compensation on/off procedure
  • 233031 05/11/11 17:01 vardan Target: HPH beam compensation off
  • 233028 05/11/11 16:32 vardan Target: GUI and strip charts screenshots at the start of swing shift
  • 232967 05/11/11 10:24 covrig Target: I, gremlin
  • 232966 05/11/11 10:05 Armstrong Target: someone changed 15 K J/T?
  • 232885 05/11/11 00:01 buddhini Target: Moved to LH2.
  • Tuesday

  • 232879 05/10/11 23:47 buddhini Target: Moved to DS 4% Al target
  • 232868 05/10/11 22:53 buddhini Target: Moved to US 2% Al target
  • 232856 05/10/11 21:59 buddhini Target: late entry: moved to LH2
  • 232834 05/10/11 20:52 buddhini Target: Moved to DS 2% Al target
  • 232827 05/10/11 20:34 buddhini Target: Moved to LH2.
  • 232802 05/10/11 18:48 buddhini Target: Moved to US 2% Al target
  • 232792 05/10/11 18:14 buddhini Target: Moved to DS 4% Al target
  • Monday

  • 232716 05/09/11 22:45 hamlet Target: Move LH2 target out of the beam to home
  • 232708 05/09/11 22:17 hamlet Target: Move Hydrogen target in the beam
  • 232703 05/09/11 21:52 hamlet Target: Target GUI and strip charts screenshots for swing shift
  • 232682 05/09/11 19:05 hamlet Target: Move LH2 target out from the beam to the Home position
  • 232664 05/09/11 13:51 magee Target: Mid-day screenshots
  • 232657 05/09/11 10:34 Armstrong Target: Hall A target cooldown will start in about one hour
  • 232645 05/09/11 07:46 magee Target: Early morning screenshots
  • 232599 05/09/11 00:06 Korkmaz Target: Target GUI and strip charts screenshots at start of owl shift
  • Sunday

  • 232545 05/08/11 17:20 hamlet Target: Move LH2 target in the beam
  • 232532 05/08/11 16:14 hamlet Target: Target GUI and strip charts screenshots at start of swing shift
  • 232528 05/08/11 16:08 hamlet Target: Move LH2 target out from beam to Home position
  • 232493 05/08/11 13:28 magee Target: lunchtime screenshots
  • 232468 05/08/11 08:53 magee Target: Early morning screenshots
  • 232417 05/08/11 00:03 Korkmaz Target: Target GUI and strip charts screenshots at start of owl shift
  • Saturday

  • 232383 05/07/11 19:07 hamlet Target: Change target. Put LH2 target in the Beam. Raster now back to 4.0 x 4.0
  • 232371 05/07/11 18:01 hamlet Target: Change target. Take out LH2, Move in US 1% Al target.
  • 232365 05/07/11 16:58 hamlet Target: Target GUI and strip charts screenshots at start of swing shift
  • 232330 05/07/11 12:29 Korkmaz Target: target issues in the last 45 minutes
  • 232304 05/07/11 07:45 L.Lee Target: Target GUI and strip charts screenshots towards end of owl shift
  • 232276 05/07/11 03:11 L.Lee Target: Target GUI and strip charts screenshots for owl shift
  • 232274 05/07/11 03:06 L.Lee Target: Move target in vertical direction back to nominal position
  • 232257 05/07/11 00:28 L.Lee Target: Move target in vertical direction down by another 0.5 mm, now -1.0 mm relative to nominal position
  • Friday

  • 232247 05/06/11 23:20 hamlet Target: Move target in vertical direction down by 0.5 mm relative to nominal position
  • 232239 05/06/11 22:15 hamlet Target: Move target in vertical direction additional +0.5 mm, in total target moved in vertical direction by +1.0mm
  • 232230 05/06/11 21:15 hamlet Target: Move target in vertical direction by +0.5mm
  • 232219 05/06/11 19:59 hamlet Target: Target GUI and strip charts screenshots at start of data taking during swing shift
  • 232212 05/06/11 19:16 hamlet Target: Move Hydrogen target on the beam
  • 232041 05/06/11 00:25 L.Lee Target: Tweaked 15K JT valve
  • 232038 05/06/11 00:09 L.Lee Target: Target GUI and strip charts screenshots at start of owl shift
  • Thursday

  • 231964 05/05/11 14:48 rakithab Target: GUI and strip charts screenshots
  • 231917 05/05/11 11:32 smithg Target: target motion plot
  • 231881 05/05/11 09:43 smithg Target: evaporator ice is gone
  • 231845 05/05/11 05:44 L.Lee Target: Move back to Hydrogen-Cell target
  • 231838 05/05/11 05:27 L.Lee Target: Move to DS-8%-Al
  • 231832 05/05/11 05:05 L.Lee Target: Move to US-Pure-Al
  • 231823 05/05/11 03:59 L.Lee Target: Move to US-1%-Al
  • 231816 05/05/11 03:14 L.Lee Target: Move to US-4%-Al
  • 231812 05/05/11 03:04 L.Lee Target: Move to DS-Centering-Hole
  • 231807 05/05/11 02:50 L.Lee Target: Move to DS-8%-Al
  • 231801 05/05/11 02:37 L.Lee Target: Move to US-2%-Al
  • 231797 05/05/11 02:27 L.Lee Target: Move to DS-2%-Be
  • 231786 05/05/11 00:49 L.Lee Target: Move to DS-4%-Al
  • 231781 05/05/11 00:35 L.Lee Target: Alarm Handler Limits for H2 Downstream beamline vacuum
  • 231778 05/05/11 00:26 L.Lee Target: Target GUI and strip charts screenshots at start of owl shift
  • 231777 05/05/11 00:25 L.Lee Target: Move from LH2 cell to DS-8%-Al target
  • Wednesday

  • 231737 05/04/11 21:24 hamlet Target: Target GUI and strip charts screenshots for Swing shift
  • 231693 05/04/11 18:04 hamlet Target: Target: Put Hydrogen target in
  • 231668 05/04/11 15:57 buddhini Target: Target GUI and strip charts screenshots at the end of day shift
  • 231643 05/04/11 13:48 smithg Target: Please leave ramp rate at 5 uA/s
  • 231642 05/04/11 13:33 buddhini Target: Moved to HOME.
  • 231640 05/04/11 13:24 buddhini Target: Moved to LH2.
  • 231635 05/04/11 12:07 buddhini Target: Tareget screen shots
  • 231634 05/04/11 11:38 buddhini Target: Correction: the beam on DS 0.5% C beam will be rastered (4x4 ) < 30 uA.
  • 231633 05/04/11 11:29 buddhini Target: Target moved to DS 0.5% C target
  • 231622 05/04/11 08:22 buddhini Target: Moved to Home.
  • 231577 05/04/11 00:52 L.Lee Target: Target GUI and strip charts screenshots with beam at 165 uA
  • 231574 05/04/11 00:06 L.Lee Target: Target GUI and strip charts screenshots at start of owl shift
  • Tuesday

  • 231542 05/03/11 20:23 hamlet Target: Target GUI and strip charts screenshots at the beam current 170 uA
  • 231530 05/03/11 18:06 smithg Target: shut off 4K pump bypass
  • 231525 05/03/11 16:41 covrig Target: pid temperature regulation
  • 231517 05/03/11 14:56 Jiawei Target: Dummy window return temperature alarm
  • 231462 05/03/11 01:10 L.Lee Target: Target GUI and strip charts screenshots (again) with beam at 170 uA
  • 231459 05/03/11 00:58 L.Lee Target: Target GUI and strip charts screenshots at start of owl shift
  • Monday

  • 231432 05/02/11 21:10 narayan Target: target stable at 175 uA
  • 231413 05/02/11 19:12 dunne Target: High Power PID issue
  • 231412 05/02/11 19:11 dunne Target: High Power PID issue
  • 231404 05/02/11 18:57 SMITHG Target: striptools of the 3x5 & 5x3 / pump speed scans
  • 231380 05/02/11 18:08 narayan Target: lowered the LO alarm limit on h2 pump head differential pressure
  • 231332 05/02/11 12:10 birchall Target: Moved LH2 target into beam position
  • 231305 05/02/11 08:42 birchall Target: Target moved to out for beam for Moller measurement
  • 231292 05/02/11 07:27 L.Lee Target: Ask MCC to lower ramp rate due to HiPowerHtr alarms on beam recovery
  • 231260 05/02/11 00:15 L.Lee Target: Target GUI and strip charts screenshots at start of owl shift
  • 231258 05/02/11 00:03 narayan Target: beam current increased to 175 uA
  • Sunday

  • 231194 05/01/11 15:59 Pitt Target: End of day shift screenshot
  • 231127 05/01/11 08:05 Pitt Target: Target screenshots - with pictures this time
  • 231126 05/01/11 08:02 Pitt Target: Beginning of day shift screenshots
  • 231094 05/01/11 00:17 L.Lee Target: Target GUI and strip charts screen shots at start of owl shift.