Main INDEX,
Monthly INDEX,
PREV,
NEXT
Make New Entry,
Make Followup Entry (Advanced)
User name Armstrong
Log entry time 00:19:05 on November 27, 2011
Entry number 240785
keyword=Shift Summary
Shift Summary - Swing Shift - Nov. 26 2011
Shift Leader: D. Armstrong
Target Operator: J. Birchall
Guests: Michael Gericke, Dave Gaskell, Ramesh Subedi, Jim Dowd, Mark Pitt
16:00 - Shift starts
Present Conditions:
- 150 µA
- Beam Energy = 1157.5 MeV (Tiefenbach); 2-pass beam.
- QTor on at 8900.2 A (as read from DCCT)
- Hall A is off; Hall B on/off
- Raster = 4mm x 4mm
- lH2 Target in; 500 W on High Power Heater; 28.5 Hz fan speed (tach)
- Golden beam positions: H07C (x,y) = (1.22, 2.00), H09B (x,y) = (0.07, 0.04) mm
- Charge Feedback on
- HallC FastFeedback on.
- Beam Modulation Off
- Charge Asymmetry width - 600 ppm
- 3C12x (energy) - doubled-peaked, 0.0362 mm width
- MDallbars width (normalized by BCM1&2): 267 ppm
- Halo 3 normalized rate: 10 Hz/µA
- Halo 4 normalized rate: 41 Hz/µA
- Halo target retracted
- Compton Photon detector and Electron detector on, beam is through chicane; 1573 W in cavity
- Normalized Compton Scintillator rate = 47 Hz/µA
- Photon Detector rate (laser off=590 Hz/µA; laser on =1250 Hz/µA)
- Check DataTracker - up to date
- Online MDALLbar sensitivities large - of order 2000 ppm/mm for both x and y
- IHWP = IN; RWHP = 6479
Major Events
- 18:55 QTor trips. Lose 15 minutes of beam including ramp back up. .
- 22:10 Shift Checklist filled in. Cleaned up food table.
- 23:03 Set IHWP to OUT
- 23:07 Large charge asymmetry at start of run.
- 23:13 Ended run 13874, then CODA problems. End up calling Jeong Han (sorry!).
- 23:44 back to production again
Parity Runs Taken
Run #
13867
13868
13869 QTor trip at end of run
13870
13871
13872
13873
13874 IHWP to OUT; transition run (large charge asymmetry)
13875
Compton Runs Taken
Run #
22649 (junk - laser control error)
22650 (long run - 2 hours... ooops...)
22651
22652
22653
22654
22655
22656