Main INDEX, Monthly INDEX, ,
Make New Entry, Make Followup Entry (Advanced)

User name smithg,covrig

Log entry time 19:48:37 on January 07, 2012

Entry number 246773

Followups:

keyword=Target: cooldown completed

Cooldown completed. Pump at 29.98 Hz (TV). Loop at 32.1 psia (return P, TV). Mat is still setting up the recovery HX, and we'll aim to reduce the 4K flow to ~12 g/s and keep ~ 600 W on the heater with the 15K flow.






Figure 1