Main INDEX,
Monthly INDEX,
PREV,
NEXT
Make New Entry,
Make Followup Entry (Advanced)
User name Ramesh
Log entry time 00:15:04 on January 21, 2012
Entry number 249202
keyword=Shift Summary: Swing Shift summary
Swing Shift Summary 01/20/2012
Shift Crew:
SL: Ramesh Subedi
TO: Buddhini Waidyawansa
Priorities for shift:
LH2 production at 180 uA
Summary of events:
- 16:00 Shift starts with the hall in controlled access due to Compton Dipole problem. There's also a heater problem in bcm5,7,8.
- 16:10 Joe, D. Gaskell, John Musson, Keith Cole (and myself) went to the hall. Joe and Dave for Compton Diaple, others for bcm heater.
- 16:30 John Musson and Keith Cole fixed the bcm heater.
- 16:50 Joe and Dave came out of the hall. Asked for beam permit. The problem with the Compton Dipole was a crappy power supply.
- 17:27 Beam looks good (Compt Scint and halo rates), bringing Compt e-det online.
- 15322 the first production run for the shift.
- Runs 15323, 15324, and 15325 have scanner data exercised by Rob and Peiqing.
- 22:23 Trigger supervisor softly rebooted to load Josh's BMod software changes
- 23:40 East arc magnet tripped, beam down for a while.
- 24:00 beam back.
Run list:
- 15322
- 15323
- 15324
- 15325
- 15326 run after trigger supervisor soft reboot
- 15327
- 15328 short run due to east arc magnet trip
- 15329 ongoing run
Coulombs acquired: 3.53
Typical operating parameters:
I | uA | 180 |
Halo 3 rate | Hz/uA | 26 |
MDALLBARS width | ppm | 73 |
BCM12-ddif width | ppm | 62 |
A_q width | ppm | 400 |
MDALLBARS X-pos sensitivity | ppm/mm | |
MDALLBARS Y-pos sensitivity | ppm/mm | |
Problems requiring attention:
Analysis:
Comments: