Jefferson Lab Hall C Logbook for February 12 - Target

  • Main INDEX

    Wednesday

  • 256223 02/29/12 21:01 jdowd Target: Target screenshots, middle of swing shift
  • 256179 02/29/12 16:00 jdowd Target: Target screenshots, beginning of swing shift
  • 256177 02/29/12 15:41 Arshak Target: target screenshot at the end of day shift
  • 256120 02/29/12 07:59 Arshak Target: target screenshots, beginning of day shift
  • 256118 02/29/12 07:41 fangguo Target: target screenshot at the end of owl shift
  • 256115 02/29/12 04:58 fangguo Target: H2 downstream beamlne vacuum (Torr) low-low alarm
  • Tuesday

  • 256110 02/28/12 23:54 fangguo Target: target screenshots, beginning of owl shift
  • 256109 02/28/12 23:49 jdowd Target: target screenshots, end of swing shift, still no beam
  • 256104 02/28/12 18:35 jdowd Target: Lost connection to target IOC briefly
  • 256098 02/28/12 16:44 jdowd Target: Target screenshots, beginning of swing shift, no beam
  • 256089 02/28/12 15:47 Arshak Target: target screenshot at the end of day shift
  • 256088 02/28/12 14:40 covrig Target: reactivated the alarms for QWT_hphiA and hphoA, and edited the alarm limits file
  • 256082 02/28/12 11:48 Arshak Target: Rebooted target Main Gui
  • 256079 02/28/12 11:22 covrig Target: undo temporary changes to accommodate LS-218#1 connector replacement
  • 256076 02/28/12 09:23 covrig Target: temporary changes to accommodate LS-218#1 connector replacement
  • 256072 02/28/12 08:03 Arshak Target: Target screenshots, beginning of day shift, No Beam
  • 256069 02/28/12 07:48 fangguo Target: target screenshot at the end of owl shift
  • 256016 02/28/12 00:04 fangguo Target: target screenshots, beginning of owl shift
  • Monday

  • 255993 02/27/12 19:48 greg Target: swing shift screenshot
  • 255936 02/27/12 15:00 covrig Target: time estimate to a frozen HX once the LH2 pump stops
  • 255870 02/27/12 07:49 fangguo Target: target screenshot at the end of owl shift
  • Sunday

  • 255783 02/26/12 23:53 fangguo Target: target screenshots, beginning of owl shift
  • 255780 02/26/12 23:36 hamlet Target: target screenshots, end of swing shift
  • 255727 02/26/12 15:38 hamlet Target: Target screenshots, beginning of swing shift
  • 255685 02/26/12 08:21 wsduvall Target: Target GUI bug
  • 255674 02/26/12 07:13 mjmc Target: target screenshot at the end of owl shift
  • Saturday

  • 255631 02/25/12 23:42 hamlet Target: Target screenshots, end of swing shift. Changed HIGH for Qtor current difference from 3.5 to 4.0
  • 255625 02/25/12 23:08 hamlet Target: H2 pump trip, we raset buck to normal
  • 255594 02/25/12 17:56 hamlet Target: Increasing alarm limit for tungstenplugreturn HIGH from 31 to 32
  • 255581 02/25/12 15:40 hamlet Target: Target screenshots, beginning of swing shift
  • 255562 02/25/12 11:19 wsduvall Target: Increasing alarm limit for ion chambers
  • 255532 02/25/12 07:45 fangguo Target: target screenshot at the end of owl shift
  • 255500 02/25/12 01:32 fangguo Target: target screenshots, beginning of owl shift
  • Friday

  • 255495 02/24/12 23:53 smithg Target: readout error on VCG3H09DTr
  • 255480 02/24/12 19:55 smithg Target: mid-shift screenshots. ALso, fixed analog temp readouts.
  • 255462 02/24/12 15:47 Arshak Target: target screenshot at the end of day shift
  • 255461 02/24/12 15:41 smithg Target: Changed Main Tgt GUI to display QWT_moB & QWT_miB
  • 255456 02/24/12 14:31 Arshak Target: QTOR curent difference yellow alarms.
  • 255442 02/24/12 12:06 Arshak Target: Target Cell Output Manifold Temp red alarm.
  • 255437 02/24/12 11:42 covrig Target: miB sensor has become a problem (too)
  • 255384 02/24/12 08:00 Arshak Target: target screenshots, beginning of day shift
  • 255382 02/24/12 07:47 fangguo Target: target screenshot at the end of owl shift
  • Thursday

  • 255349 02/23/12 23:57 fangguo Target: target screenshots, beginning of owl shift
  • 255305 02/23/12 16:56 rakithab Target: Start of swing shift screenshot
  • 255293 02/23/12 15:54 Arshak Target: target screenshot at the end of day shift
  • 255262 02/23/12 12:18 Arshak Target: target moved to LH2
  • 255203 02/23/12 10:12 covrig Target: vacuum status - good so far
  • 255199 02/23/12 09:20 Arshak Target: Target is in Home pos.
  • 255188 02/23/12 08:08 smithg,arsha Target: target screenshots, beginning of day shift
  • 255181 02/23/12 07:42 fangguo Target: target screenshot at the end of owl shift
  • Wednesday

  • 255137 02/22/12 23:53 fangguo Target: target screenshots, beginning of owl shift
  • 255127 02/22/12 22:10 birchall Target: QTOR current difference
  • 255122 02/22/12 21:48 birchall Target: Yellow alarm on QTOR current difference
  • 255108 02/22/12 19:57 birchall Target: Screen shot half way through swing shift
  • 255087 02/22/12 16:00 Arshak Target: target screenshot at the end of day shift
  • 255053 02/22/12 11:32 covrig Target: 4K-JT pid off manual
  • 255044 02/22/12 09:50 covrig Target: temporary PIDs changes
  • 255034 02/22/12 08:04 Arshak Target: target screenshots, beginning of day shift
  • 255028 02/22/12 07:48 fangguo Target: target screenshot at the end of owl shift
  • 254995 02/22/12 03:22 fangguo Target: Several QTOR current difference alarms during QTOR crash
  • Tuesday

  • 254973 02/21/12 23:57 fangguo Target: target screenshots, beginning of owl shift
  • 254972 02/21/12 23:52 rakithab Target: target screenshots, end of swing shift
  • 254920 02/21/12 15:57 rakithab Target: Target screenshots, beginning of swing shift
  • 254901 02/21/12 13:21 birchall Target: Screen shot just to show I'm awake
  • 254853 02/21/12 07:49 fangguo Target: target screenshot at the end of owl shift
  • 254803 02/21/12 00:06 fangguo Target: target screenshots, beginning of owl shift
  • Monday

  • 254794 02/20/12 23:17 smithg Target: Stripcharts show no effects from Hall A magnet filling
  • 254754 02/20/12 16:04 birchall Target: Beam back on at end of day shift: 180 uA
  • 254750 02/20/12 15:29 birchall Target: Moved LH2 target into beam position
  • 254670 02/20/12 08:43 birchall Target: Small oscillations
  • 254668 02/20/12 08:26 birchall Target: Moved target out of beam (home)
  • 254662 02/20/12 07:43 fangguo Target: target screenshot at the end of owl shift
  • 254649 02/20/12 06:21 fangguo Target: Target moved to DS-4% Al
  • 254613 02/20/12 01:44 fangguo Target: Target moved to LH2
  • 254600 02/20/12 00:02 fangguo Target: target screenshots, beginning of owl shift
  • Sunday

  • 254592 02/19/12 23:42 hamlet Target: target screenshots, end of swing shift
  • 254547 02/19/12 20:38 smithg Target: Pump tripped, HX froze solid. Fully recovered now.
  • 254546 02/19/12 20:36 hamlet Target: target screenshots after recovery
  • 254544 02/19/12 20:26 hamlet Target: LH2 are ready for beam
  • 254538 02/19/12 19:29 hamlet Target: Target: Moved 1.6% C target IN.
  • 254532 02/19/12 18:34 hamlet Target: Target problem
  • 254501 02/19/12 15:44 hamlet Target: Target screenshots, beginning of swing shift
  • 254473 02/19/12 13:16 birchall Target: Dump window return temperature
  • 254433 02/19/12 07:55 birchall Target: Screen shot at beginning of day shift
  • 254427 02/19/12 07:16 Chuck Davis Target: Screenshot
  • 254416 02/19/12 06:15 Chuck Davis Target: QTOR Alarm
  • 254405 02/19/12 05:01 Chuck Davis Target: Screenshot
  • 254398 02/19/12 04:22 Chuck Davis Target: More Halo
  • 254396 02/19/12 04:16 Chuck Davis Target: Halo Rates
  • 254382 02/19/12 02:24 Chuck Davis Target: Screenshots
  • 254380 02/19/12 01:43 Chuck Davis Target: Position
  • 254377 02/19/12 01:39 Chuck Davis Target: Move to LH2 IN
  • 254375 02/19/12 01:24 Chuck Davis Target: Screenshots
  • Saturday

  • 254356 02/18/12 23:34 hamlet Target: target screenshots, end of swing shift
  • 254307 02/18/12 15:52 hamlet Target: Target screenshots, beginning of swing shift
  • 254261 02/18/12 10:45 wsduvall Target: Target moved to 4% DS Al
  • 254257 02/18/12 10:27 smithg Target: Vacuum history this month
  • 254236 02/18/12 07:05 Chuck Davis Target: QTOR trip
  • 254233 02/18/12 07:01 Chuck Davis Target: Screenshot
  • 254213 02/18/12 04:23 Chuck Davis Target: Screenshot
  • 254192 02/18/12 01:33 Chuck Davis Target: Screenshots
  • 254189 02/18/12 01:05 smithg Target: target vacuum crisis has been successfully dealt with: late entry
  • 254178 02/18/12 00:01 Chuck Davis Target: Screenshot
  • Friday

  • 254143 02/17/12 17:34 birchall Target: Gate valve alarm
  • 254138 02/17/12 17:23 covrig Target: location of the target chamber gate valves controller
  • 254127 02/17/12 16:53 Target: Online target status page is UP now.
  • 254124 02/17/12 16:49 carlin Target: poltarcc time issue
  • 254113 02/17/12 15:59 fangguo Target: Target screenshots, end of day shift
  • 254112 02/17/12 15:56 rob Target: poltarcc comes back with 5-hour time offset after crash
  • 254110 02/17/12 15:48 vanoers Target: Target alarm followed by a target computer crash
  • 254109 02/17/12 15:40 fangguo Target: Gate valve is closed & target computer dead
  • 254048 02/17/12 07:57 fagguo Target: Target screenshots, beginning of day shift
  • 254047 02/17/12 07:48 Chuck Davis Target: The promised screen shots
  • 254046 02/17/12 07:42 Chuck Davis Target: Screenshots
  • 254044 02/17/12 07:31 Chuck Davis Target: Back to LH2
  • 254039 02/17/12 06:38 Chuck Davis Target: Screenshot with solid target (DS 4% Al) IN
  • 254025 02/17/12 05:24 Chuck Davis Target: Screenshot with solid target (DS 4% Al) IN
  • 254012 02/17/12 04:20 Chuck Davis Target: Screenshot with solid target (DS 4% Al) IN
  • 254004 02/17/12 03:19 Chuck Davis Target: Screenshots with solid target (DS 4% Al) IN
  • 253999 02/17/12 02:58 Chuck Davis Target: Change Targte
  • 253994 02/17/12 02:15 Chuck Davis Target: Screenshots
  • Thursday

  • 253913 02/16/12 17:58 smithg Target: cold u-tube
  • 253909 02/16/12 17:34 Nuruzzaman Target: Target: Online target status page is UP now.
  • 253906 02/16/12 17:02 Arshak Target: Late entry about opening the 15K and 4K JT valves
  • 253883 02/16/12 11:34 covrig Target: jittery vacuum in the target chamber and surge tank
  • 253875 02/16/12 09:28 Arshak Target: Moved to HOME
  • 253873 02/16/12 09:10 Arshak Target: Target computer time.
  • 253872 02/16/12 08:54 Arshak Target: Target screenshots, beginning of day shift
  • 253870 02/16/12 08:46 Arshak Target: Target screenshots, beginning of day shift, and POLTARCC was rebooted
  • 253867 02/16/12 07:42 Chuck Davis Target: 4K supply fluctuation
  • 253866 02/16/12 07:24 Chuck Davis Target: Region Vacuum
  • 253863 02/16/12 06:28 Chuck Davis Target: Screenshots
  • 253856 02/16/12 04:13 Chuck Davis Target: Chamber & Beamline vacuum
  • 253855 02/16/12 04:00 Chuck Davis Target: Screenshots & Chamber vacuum problems
  • 253848 02/16/12 01:01 Chuck Davis Target: Screenshot
  • Wednesday

  • 253843 02/15/12 17:01 birchall Target: Reduced 15K coolant flow
  • 253837 02/15/12 15:53 smithg Target: parking the tgt
  • 253812 02/15/12 07:59 Arshak Target: Target screenshots, beginning of day shift
  • 253809 02/15/12 07:39 Chuck Davis Target: Screenshot
  • 253791 02/15/12 04:51 Chuck Davis Target: Screenshot
  • Tuesday

  • 253779 02/14/12 23:55 Chuck Davis Target: Screenshot
  • 253752 02/14/12 16:02 birchall Target: Screen shot at beginning of swing shift
  • 253745 02/14/12 14:31 smithg,arsha Target: rebalanced 4K loads
  • 253728 02/14/12 07:58 Arshak Target: Target screenshots, beginning of day shift
  • 253723 02/14/12 06:59 Chuck Davis Target: Screenshot
  • 253718 02/14/12 06:02 Chuck Davis Target: HPH iA & oA (especially) jump from false low values to false higher values.
  • 253706 02/14/12 03:44 Chuck Davis Target: Screenshot
  • 253703 02/14/12 02:29 Chuck Davis Target: More QWT_miA drop-out glitches.
  • 253700 02/14/12 01:49 Chuck Davis Target: Numerous low T readings for Cell Inlet Temperature.
  • 253697 02/14/12 00:45 Chuck Davis Target: Screenshot
  • Monday

  • 253615 02/13/12 17:01 smithg Target: Screenshots. Show a bad 4K blip ~ 16:10.
  • 253586 02/13/12 11:34 covrig Target: RRHX suction probably caused the 4K flow glitch
  • 253584 02/13/12 10:50 rakithab Target: Sudden drop in 4k Flow but recovered
  • 253573 02/13/12 08:08 rakithab Target: screenshots, beginning of day shift
  • 253569 02/13/12 06:23 Chuck Davis Target: Screenshot
  • 253549 02/13/12 00:20 Chuck Davis Target: Screenshots
  • Sunday

  • 253535 02/12/12 16:04 hamlet Target: Target screenshots, beginning of swing shift
  • 253530 02/12/12 15:33 Chuck Davis Target: Screenshot
  • 253519 02/12/12 11:40 Chuck Davis Target: 15 K supply pressure variation
  • 253515 02/12/12 07:42 Chuck Davis Target: Screenshots
  • Saturday

  • 253488 02/11/12 23:20 hamlet Target: target screenshots, end of swing shift
  • 253468 02/11/12 20:03 hamlet Target: target screenshots, after access to reset Surge tank turbopomp
  • 253466 02/11/12 20:00 hamlet Target: Target: Surge tank turbopomp is ON again !
  • 253450 02/11/12 18:16 hamlet Target: Target: Scattering chamber vacuum getting worse
  • 253430 02/11/12 15:50 hamlet Target: Target screenshots, beginning of swing shift
  • 253424 02/11/12 15:01 Chuck Davis Target: Screenshot
  • 253418 02/11/12 14:03 Chuck Davis Target: Screenshot
  • 253410 02/11/12 13:13 Chuck Davis Target: Screenshots
  • 253403 02/11/12 12:44 Chuck Davis Target: Temperatures Rising
  • 253399 02/11/12 12:11 Chuck Davis Target: Screenshot
  • 253387 02/11/12 11:11 Chuck Davis Target: Screenshot
  • 253378 02/11/12 10:11 Chuck Davis Target: Screenshot
  • 253368 02/11/12 09:12 Chuck Davis Target: Screenshot
  • 253362 02/11/12 08:11 Chuck Davis Target: Screen Shot
  • 253354 02/11/12 07:11 alee Target: owl shift screenshot
  • 253319 02/11/12 01:02 alee Target: Owl shift Target screenshot
  • 253318 02/11/12 00:37 Nuruzzaman Target: Online target status page is UP now.
  • Friday

  • 253310 02/10/12 23:52 Chuck Davis Target: Screenshot
  • 253304 02/10/12 23:01 Chuck Davis Target: Screenshots
  • 253253 02/10/12 17:01 Chuck Davis Target: Screenshots of Target
  • 253229 02/10/12 14:12 Arshak Target: The exit window return Temp yellow alarm
  • 253174 02/10/12 08:18 Arshak Target: Target screens at beginning of day shift
  • 253160 02/10/12 07:04 alee Target: target screens at end of owl shift
  • 253115 02/10/12 00:13 alee Target: start of owl shift target screenshot
  • Thursday

  • 253113 02/09/12 23:36 birchall Target: 4K mass flow
  • 253057 02/09/12 17:12 covrig Target: another attempt by Cryo to lower the 15 K coolant supply temperature
  • 253043 02/09/12 16:13 birchall Target: 4k typo: make that ~3:30 pm when 4k flow was increased
  • 253042 02/09/12 16:08 birchall Target: 4k flow
  • 253038 02/09/12 15:51 Arshak Target: target screens at end of day shift
  • 253020 02/09/12 13:22 Arshak Target: LH2 target moved back in to beam position
  • 253009 02/09/12 12:44 Arshak Target: Screen shot of target
  • 252979 02/09/12 10:40 covrig Target: Cryo will work on the 15 K coolant supply temperature during Moller measurement
  • 252961 02/09/12 08:07 Arshak Target: Target screens at beginning of day shift
  • 252953 02/09/12 07:03 alee Target: end of owl shift screenshots
  • 252892 02/09/12 01:05 alee Target: start of owl shift target screenshot
  • Wednesday

  • 252863 02/08/12 21:01 smithg Target: Raised 4K flow ~ 1g/s
  • 252836 02/08/12 17:44 birchall Target: Recovery from short HPH alarm state after beam back on
  • 252835 02/08/12 17:41 birchall Target: HPH alarms as beam returns
  • 252814 02/08/12 16:04 birchall Target: Screen shot at beginning of swing shift
  • 252810 02/08/12 15:53 Arshak Target: target screens at end of day shift
  • 252804 02/08/12 15:06 smithg Target: inspection in the hall for ice and other trouble
  • 252790 02/08/12 13:57 Arshak Target: StripTools screenshot
  • 252781 02/08/12 13:05 Arshak Target: Target moved to LH2
  • 252754 02/08/12 08:02 Arshak Target: target screeny at beginning of day shift
  • 252742 02/08/12 07:02 alee Target: end of owl shift screenshots
  • 252700 02/08/12 01:14 alee Target: start of owl shift target screenshot
  • Tuesday

  • 252633 02/07/12 17:28 birchall Target: Back to nominal conditions under RHX
  • 252628 02/07/12 16:22 birchall Target: Screen shot at beginning of swing shift
  • 252625 02/07/12 16:06 Arshak Target: target screenshots, end of day shift
  • 252598 02/07/12 12:55 covrig Target: 4K flow adjustment bumps the target hard
  • 252591 02/07/12 12:01 covrig Target: 4K coolant flow to target will be adjusted to "normal" running
  • 252585 02/07/12 11:09 covrig Target: RRHX cool-down started (and bumped the target hard)
  • 252580 02/07/12 10:54 AK Opper Target: changing targets LH2 --> 4% DS Al
  • 252579 02/07/12 10:54 Arshak Target: Target moved to 4% DS Al
  • 252578 02/07/12 10:49 Arshak Target: Screenshot of StripTools of the Target.
  • 252553 02/07/12 08:10 Arshak Target: target screens at beginning of day shift
  • 252543 02/07/12 07:04 alee Target: end of owl shift snapshot
  • 252500 02/07/12 00:42 alee Target: owl shift snapshots
  • Monday

  • 252486 02/06/12 22:35 smithg Target: 15K supply temp erratic
  • 252479 02/06/12 21:29 smithg Target: mid-shift screenshots, & newly modified cryo display
  • 252445 02/06/12 18:03 smithg Target: icing evaporator without the RHX
  • 252404 02/06/12 13:44 smithg Target: RHX recovery tentative schedule
  • 252400 02/06/12 13:32 smithg Target: trying to lower 4K supply temp
  • 252381 02/06/12 11:16 covrig Target: Cryo is force-flowing warm He through the RHX
  • 252351 02/06/12 07:13 alee Target: Owl shift screenshots
  • 252339 02/06/12 05:54 alee Target: Yet another exit window temp diff alarm
  • 252338 02/06/12 05:34 alee Target: a slightly longer exit window temperature diff alarm
  • 252332 02/06/12 05:05 alee Target: third exit window temp difference alarm
  • 252308 02/06/12 01:33 alee Target: Owl shifts target screenshots
  • Sunday

  • 252291 02/05/12 23:30 hamlet Target: target screenshots, end of swing shift
  • 252238 02/05/12 16:04 hamlet Target: Target screenshots, beginning of swing shift
  • 252215 02/05/12 13:18 smithg Target: mid-shift screenshots
  • 252192 02/05/12 10:09 smithg Target: restored ramp rate to 4.5 uA/s
  • 252183 02/05/12 08:56 smithg Target: starting to try and reduce 4K flow to something more reasonable
  • 252176 02/05/12 07:33 alee Target: end of target screenshots: owl shift
  • 252157 02/05/12 06:16 alee Target: tungsten plug water temp rising again, as is dump window return temp
  • 252149 02/05/12 05:45 alee Target: 4K flow drop, tungsten plug water temp and dump window temp alarming
  • 252129 02/05/12 00:50 alee Target: start of owl shift target screenshot
  • Saturday

  • 252125 02/04/12 23:34 smithg Target: no 4K dropouts since we raised the flow
  • 252124 02/04/12 23:22 hamlet Target: target screenshots, end of swing shift
  • 252087 02/04/12 18:00 hamlet Target: Changed 4k flow HIGH and HIHI limits, and gradually closed JT valve by ~3-5%
  • 252076 02/04/12 16:21 hamlet Target: target 4K flow more than 28%
  • 252070 02/04/12 15:59 rajotte Target: End of Day shift screenshot
  • 252054 02/04/12 13:42 rajotte Target: 4K high limit raised to 28g/s
  • 252053 02/04/12 13:36 rajotte Target: 4K flow now "steady " in red alarm (set to 28 g/s)
  • 252052 02/04/12 13:25 smithg Target: made small adjustments to 4K- didn't stop the blips
  • 252050 02/04/12 13:11 rajotte Target: Big oscillations of 4K IN
  • 252026 02/04/12 10:35 smithg Target: 4K return temp will continue to rise
  • 252013 02/04/12 08:21 rajotte Target: target screen at beginning of day shift
  • 252005 02/04/12 07:52 alee Target: terminal for when cdaql6 failed to launch target screens
  • 252004 02/04/12 07:51 alee Target: terminal for when cdaql6 failed to launch target screens
  • 252003 02/04/12 07:19 alee Target: end of owl shift target screens
  • 251995 02/04/12 06:51 alee Target: 7th 4K flow drop, same behavior
  • 251994 02/04/12 06:48 alee Target: ESR 4K coolant return temperature steadily rising over night
  • 251988 02/04/12 05:30 alee Target: fourth 4K flow drop, peaking at over 27 g/s when recovering
  • 251987 02/04/12 05:25 alee Target: screens for poltarcc blacked out
  • 251974 02/04/12 04:07 alee Target: Higher heater power after 4K flow drop
  • 251969 02/04/12 03:53 alee Target: A third 4K flow drop, recovered peaking to over 27 g/s
  • 251951 02/04/12 00:44 alee Target: start of owl shift target screenshot
  • 251949 02/04/12 00:24 alee Target: 4K flow dip, recovered a little high
  • Friday

  • 251936 02/03/12 23:10 smithg Target: 1st trip at 180 uA ok. And MD width 226 ppm.
  • 251932 02/03/12 22:38 smithg Target: Just barely OK at 180 uA
  • 251925 02/03/12 22:11 smithg Target: Moved to LH2. fighting the Moller
  • 251922 02/03/12 22:05 smithg Target: effect of lower pump speed should be negligible
  • 251917 02/03/12 21:40 smithg Target: Target ready
  • 251896 02/03/12 18:25 smithg Target: ESR recovered. Almost back to where we can resume LH2 production.
  • 251879 02/03/12 17:36 smithg Target: target roller coaster ride. Opened warm return.
  • 251872 02/03/12 16:08 covrig Target: ESR shut down due to contamination
  • 251869 02/03/12 16:02 covrig Target: ESR event
  • 251848 02/03/12 13:10 covrig Target: RHX isolation in progress
  • 251827 02/03/12 11:01 covrig Target: RXH warm-up will start today
  • 251753 02/03/12 07:55 wsduvall Target: target screens at end of owl shift
  • 251735 02/03/12 05:37 wsduvall Target: Camera fixed
  • 251723 02/03/12 03:41 wsduvall Target: Camera control is totally broken
  • Thursday

  • 251695 02/02/12 23:46 Adesh Target: End of swing shift screenshot
  • 251524 02/02/12 07:52 wsduvall Target: target screens at end of owl shift
  • 251496 02/02/12 01:56 wsduvall Target: Target 4K flow issue temporarily solved
  • 251495 02/02/12 01:33 wsduvall Target: target screenshots from owl shift
  • Wednesday

  • 251481 02/01/12 23:54 Adesh Target: End of swing shift screenshot
  • 251480 02/01/12 23:36 Adesh Target: 4K supply excursions for past 40 minutes
  • 251363 02/01/12 11:48 covrig Target: 4K heater "problems" caused by temperature sensor failures
  • 251346 02/01/12 08:37 dalton Target: Vacuum excursions correlated with 4K loop
  • 251294 02/01/12 00:36 wsduvall Target: target screenshots at beginning of owl shift