261958 03/31/12 15:38 elaasar Beam: The beam was off
261926 03/31/12 10:55 elaasar Beam: The beam is unstable
261905 03/31/12 07:37 benesch Beam: I don't understand the BMOD archived signals at all
Friday
261777 03/30/12 14:48 Benesch Beam: five minute USLAW modulation was seen 3/25
Thursday
261433 03/29/12 01:30 covrig Beam: coulomb counter q.
Wednesday
261324 03/28/12 09:30 smithg Beam: turned off MD & lumi HV while tune beam is in the hall
261322 03/28/12 09:17 smithg Beam: beam down cuz of cavity problems
261317 03/28/12 08:41 benesch Beam: MOmod was likely bad all night hence double peaks
261282 03/28/12 04:47 jdiefen Beam: Stopped run to wait for recover from beam trip
261255 03/28/12 00:58 jdiefen Beam: 3C12X diff width
261250 03/28/12 00:39 jdiefen Beam: Beam to hall C restored
261248 03/28/12 00:31 jdiefen Beam: No beam for 5 to 10 minutes
Tuesday
261176 03/27/12 13:46 Spayde Beam: CW Beam in Hall
261071 03/27/12 05:47 jdiefen Beam: Lumi asym widths and 3c12x diff width got better
261060 03/27/12 05:27 jdiefen Beam: MCC Sending Tune Beam
261032 03/27/12 02:54 jdiefen Beam: 3c12x diff width happened to be broad before
Monday
260902 03/26/12 06:31 jdiefen Beam: Beam off for about 12 hours
260881 03/26/12 03:20 jdiefen Beam: Charge asym width back to 400ppm
260875 03/26/12 02:58 jdiefen Beam: Asked MCC about charge asymmetry width
260870 03/26/12 02:03 jdiefen Beam: Flipped IHWPs to OUT/OUT
Sunday
260817 03/25/12 19:56 benesch Beam: USLumiAsymWidth is connected to modulation
260781 03/25/12 16:12 benesch Beam: USLumi width modulation?
260763 03/25/12 13:12 Spayde Beam: Changed IHWP State to IN/OUT
260730 03/25/12 08:49 Spayde Beam: Changed IHWP State to OUT/OUT
Saturday
260591 03/24/12 09:33 Spayde Beam: Interesting ELOG Entry on Vacuum Incident
260584 03/24/12 08:22 Spayde Beam: Status
Friday
260485 03/23/12 15:42 Spayde Beam: MCC Running fopt On Our Line
260483 03/23/12 14:51 Spayde Beam: Suggested Removal of Halo Target
260482 03/23/12 14:36 Spayde Beam: MCC Sending Tune Beam
260480 03/23/12 13:22 Spayde Beam: Beam Down for C100 Trip
260479 03/23/12 13:10 Spayde Beam: Beam is Coming Back
260459 03/23/12 09:49 Spayde Beam: Beam Going Away for Hall B 5 Pass Turn-On
260453 03/23/12 09:23 Spayde Beam: MCC Sending Beam
260447 03/23/12 08:23 Spayde Beam: Beam Down for C100 Trip
Thursday
260359 03/22/12 16:17 Spayde Beam: Late Entry: Halo Characterization
260301 03/22/12 09:22 Spayde Beam: Changed Half-Wave plate State to OUT-IN
260262 03/22/12 03:36 Adesh Beam: beam down due to C100 issue
Wednesday
260128 03/21/12 08:24 Spayde Beam: Beam Studies Have Begun
Tuesday
259924 03/20/12 13:45 Spayde Beam: Current Beam State
259891 03/20/12 10:37 Spayde Beam: Switched Half-Wave Plate to OUT-IN
Monday
259755 03/19/12 08:51 jroche Beam: MCC starts the 4 and 5 pass setup for hall B
Sunday
259632 03/18/12 15:24 dalton Beam: halo monitors and uslumi width for 3C12 quad change
259593 03/18/12 10:37 benesch Beam: IPM3H09B died again, 0530 this morning
Saturday
259429 03/17/12 16:13 jroche Beam: BCM1-BCM2 double difference double peaked
259424 03/17/12 15:34 dalton Beam: halo monitors and uslumi width for quad change
259408 03/17/12 14:11 dalton Beam: halo responds to injector quad
259407 03/17/12 13:47 dalton Beam: failed to produce halo with 3C12 quad and C laser phase
259404 03/17/12 13:13 jroche Beam: Trying to create a halo
259399 03/17/12 12:41 mjmchugh Beam: Halo rate spikes
Friday
259243 03/16/12 16:44 benesch Beam: position differences under +-100nm for long runs 16647-16809
259194 03/16/12 08:58 rob Beam: changes to orbit?
Thursday
Wednesday
258894 03/14/12 17:51 dalton Beam: Please get a halo measurement
258853 03/14/12 14:35 jroche Beam: asked for MoMOD to be turned on
258851 03/14/12 14:26 jroche Beam: asked for MoMOD to be turned on
258834 03/14/12 12:25 jroche Beam: 1/2h more?
258824 03/14/12 10:26 jroche Beam: MCC start checking phases through out the machine
258818 03/14/12 09:42 benesch Beam: linac MO connectors were tightened yesterday, entry wasn't made until this morning
258811 03/14/12 08:58 jroche Beam: no pass change today
258737 03/14/12 00:18 donjones Beam: 3c12x and MOMOD
Tuesday
258726 03/13/12 23:02 dalton Beam: Another miracle
258715 03/13/12 21:42 donjones Beam: Halo too high as seen in upstream lumi widths. Called for dispersion measurment
258704 03/13/12 18:17 smithg Beam: 13 mm halo tgt
258700 03/13/12 17:47 dalton Beam: Does presence of halo target affect us lumi widths?
258695 03/13/12 17:03 benesch Beam: Hwien Saturday morning
258685 03/13/12 13:48 jroche Beam: helicity flipped at 30 Hz for an hour
258653 03/13/12 08:20 jroche Beam: Today's beam study will last "at least 2 hours"
Monday
258518 03/12/12 15:12 benesch Beam: all of the halo is in the horizontal plane
258517 03/12/12 14:37 jroche Beam: halo target centering test
258516 03/12/12 14:36 jroche Beam: halo target centering test
258496 03/12/12 12:29 dalton Beam: Halo decrease also decreases background asymmetries
Sunday
258350 03/11/12 15:43 dalton Beam: Plots of halo rates; is uslumi width a good halo detector?
258340 03/11/12 14:03 AK Opper Beam: Halo 4 rates and halo target
Saturday
258171 03/10/12 13:40 jroche Beam: IHWP changed to (IN,OUT)
258155 03/10/12 11:33 jroche Beam: things are a bit more complicated than hoped for.
258145 03/10/12 09:45 jroche Beam: injector tweaking trying to improve USlumi widths
258139 03/10/12 08:42 jroche Beam: running at 150 uA
258138 03/10/12 08:16 jroche Beam: IHWP changed to (OUt,OUT) before the starting run 16666
258137 03/10/12 08:16 jroche Beam: transmission problem in the injector
Friday
258026 03/09/12 16:29 dalton Beam: Run numbers for first laser phase study
258018 03/09/12 15:37 jroche Beam: starting injector tweaking trying to improve USlumi widths
258015 03/09/12 14:55 jroche Beam: HWP changed to (IN-OUT)
258004 03/09/12 13:47 jroche Beam: HWPs to OUt-OUT
257978 03/09/12 10:40 jroche Beam: Hall C back in Beam permit
257966 03/09/12 09:18 jroche Beam: Escorted access to Compton
257954 03/09/12 08:21 jroche Beam: No beam while MCC is tuning for Hall B
Thursday
257838 03/08/12 16:49 cornejo Beam: Beam coming back to Hall C
257825 03/08/12 15:55 rob Beam: beam gone for a "quick test" by MCC
257811 03/08/12 14:18 rob Beam: 15 minutes down to restore cavities in south linac
257792 03/08/12 12:25 rob Beam: beam continues to be away for radiation monitor problems.
Wednesday
257565 03/07/12 15:17 rob Beam: Beam away for "a little bit"
257557 03/07/12 14:46 rob Beam: phase adjustment is done, beam to return now
257556 03/07/12 14:30 rob Beam: beam to go away for some tuning
257521 03/07/12 09:58 dalton Beam: Regressed results from laser phase study
257505 03/07/12 08:27 rob Beam: beam is returning
Tuesday
257367 03/06/12 14:44 dalton Beam: First results of laser phase study
Monday
Sunday
257011 03/04/12 19:36 benesch Beam: charge asymmetry width was correlated with hall A tune beam for a time
256953 03/04/12 10:57 benesch Beam: my bad re Hall A Moller
256921 03/04/12 07:59 benesch Beam: Hall A Moller results
Saturday
Friday
Thursday
256416 03/01/12 17:00 dalton Beam: Recent history of mdall sensitivities
256394 03/01/12 15:07 dalton Beam: Recent history of US lumi sensitivities
256354 03/01/12 12:29 dalton Beam: Laser phase study: mdall sensitivities
256353 03/01/12 12:29 dalton Beam: Laser phase study: mdall sensitivities
256336 03/01/12 11:01 dalton Beam: Laser phase study: US lumi regressed sensitivities