Day Shift Summary 04/02/2012

Shift Crew:

SL: Mostafa Elaasar
TO: Buddhini Waidyawansa
3rd: X
Others: X

Priorities for shift:

Production LH2

Summary of events:

8:15 beam off to fix Hall A beam

8:18 end run 17314

8:19 start run  17315 Pedstall

8:39 start run 17316 production IHWP OUT/IN

9:40 change IHWP to IN/OUT

9:43 start run 17317 production LH2, IN/OUT

9:50 compton HV Alarm. Turned HV back on

10:44 start run 17318

11:17 Beam is of for injector access

11:18 stop run 17318

11:44 start run 17319 pedestal

12:02 The beam is back (tune beam)

12:05 start run 17320, production IHWP IN/Out after injector access

12:24 NL phase is drifting

12:36 NL phase still drifting

12:42  NL phase is not shifting any more

from run 17321 to run 17329 see Rakitha's entry  262353

14:38 MCC, Beam is off for testing

14:39 start run 17330 pedestal

14:50 Beam is back

14:51 start run 17331 production, LH2,  IHWP IN/OUT

15:27 FSD problem, No beam

15:29 stop run 17331

15:30 start run  17332 pedestal

 

Run list:

 

Coulombs acquired:

Typical operating parameters:
17331

I uA 176
Halo 3 rate Hz/uA 14
MDALLBARS width ppm 225
BCM78-ddif width ppm 62.3
A_q width ppm 694
MDALLBARS X-pos sensitivity ppm/mm 996
MDALLBARS Y-pos sensitivity ppm/mm 1079

Problems requiring attention:

X

Analysis:

  1. XXX

Comments: