Main INDEX, Monthly INDEX, ,
Make New Entry, Make Followup Entry (Advanced)

User name cdaq

Log entry time 02:40:56 on April 25, 2012

Entry number 266402

keyword=Run 18135: DIS LH2 production @ 180 uA, 3.349 GeV, OUT-IN

Experiment qweak

Run #18135 - /net/cdaq/scratch2/qweak/rawdata/inj_parity_18135.dat.0

HV used HV.2010-12-02-09:50:00.hvcHV.2010-12-02-09:50:00.hvc
PS1 0 0
PS2 16777215 16777215
PS3 16777215 16777215
PS4 16777215 16777215
PS5 65535 65535
PS6 65535 65535
PS7 65535 65535
PS8 65535 65535
Beam Energy (MeV) 3352.413352.41
Beam Current BCM1 (uA) nullnull
Beam Current BCM2 (uA) 0.008465120.00846512
Half Wave Plate OUTOUT
Passive IHWP setting (0=IN,1=OUT) 00
Passive IHWP reading (13056=IN,8960=OUT) 1305613056
Raster (width) X mm 44
Raster (height) Y mm 44
Qweak Target HYDROGEN-CELLHYDROGEN-CELL
All pmts fine? ..
Number of sick pmts ..

DIS LH2 parity production
I = 180 uA
Half Wave Plate(1-2) = OUT-IN
Energy = 3.349 GeV
QTor current = 9000 A
Raster = 4x4 mm2