Jefferson Lab Hall C Logbook for April 12 - Beam

  • Main INDEX

    Monday

    
    

    Sunday

  • 266988 04/29/12 22:51 narayan Beam: Status: CHL up, North Linac RF up, South Linac in progress
  • 266981 04/29/12 20:43 narayan Beam: Status: CHL pumping down, should be ready soon
  • Saturday

  • 266855 04/28/12 18:50 benesch Beam: beam is much bigger due to lack of Moller quads
  • 266835 04/28/12 14:55 dalton Beam: Settings for transverse running
  • 266830 04/28/12 13:52 benesch Beam: halo is very low - small hole is not insane
  • Friday

    
    

    Thursday

    
    

    Wednesday

  • 266436 04/25/12 08:56 dalton Beam: Settings for transverse running
  • Tuesday

    
    

    Monday

    
    

    Sunday

    
    

    Saturday

  • 265903 04/21/12 21:39 benesch Beam: 3C12A harp may be stuck in the beam pipe
  • 265901 04/21/12 19:31 benesch Beam: vertical dispersion corrected
  • 265890 04/21/12 14:53 narayan Beam: Status: waiting for our turn after hall B
  • 265862 04/21/12 11:26 narayan Beam: Status: going to Beam Permit
  • 265848 04/21/12 10:33 narayan Beam: Status: controlled access to prepare for current mode
  • Friday

  • 265682 04/20/12 19:34 benesch Beam: couldn't get above 65uA due to 3C12 BLM trips
  • Thursday

    
    

    Wednesday

    
    

    Tuesday

    
    

    Monday

  • 264893 04/16/12 07:58 Adesh Beam: MCC taking beam away for ~ 10 minutes
  • Sunday

    
    

    Saturday

    
    

    Friday

    
    

    Thursday

    
    

    Wednesday

    
    

    Tuesday

    
    

    Monday

  • 263389 04/09/12 08:41 AK Opper Beam: Beam off
  • Sunday

  • 263254 04/08/12 13:21 AK Opper Beam: Changed IHWP state to (IN, OUT)
  • 263233 04/08/12 09:21 AK Opper Beam: Change IHWP to (out,IN) and run FlipPCValues
  • Saturday

  • 263060 04/07/12 12:12 AK Opper Beam: bad first 100k
  • 263048 04/07/12 09:49 AK Opper Beam: Changed IHWP state to (IN, OUT)
  • Friday

  • 262912 04/06/12 15:56 AK Opper Beam: Change IHWP
  • Thursday

    
    

    Wednesday

    
    

    Tuesday

  • 262469 04/03/12 15:11 tiefen Beam: South Linac C100 phase adjustment for reduced energy jitter (late link)
  • Monday

  • 262363 04/02/12 16:40 cornejo Beam: Beam back in hall
  • 262355 04/02/12 15:47 elaasar Beam: beam is off 15:27
  • 262263 04/02/12 08:29 benesch Beam: "beam loading" may have been a result of bunch length
  • Sunday

  • 262092 04/01/12 08:32 elaasar Beam: No beam