Tested both PMTs on MD7 and MD1. Time per bar (both PMTs) is about 60 minutes.
Finishing for today. Will have a look at the data as it becomes available. LEDs are cabled to also do md3 and m5 before re-entering the hall.
Leaving the hall in this state:
* md1 signals teed to voltmeter, scope * accelerator MPS * DAQ off * HV on