Jefferson Lab Hall C Logbook for May 12 - Compton
Main INDEX
Thursday
Wednesday
Tuesday
271226 05/29/12 15:40 donjones Compton: Delta signal decreased by replacing OD=1.0 filter with OD=1.3
Monday
Sunday
Saturday
271184 05/26/12 18:13 donjones Compton: Delta LED filter change
Friday
271161 05/25/12 18:17 donjones Compton: Compton area as found survey complete (moved lead in front of photon detector)
Thursday
271139 05/24/12 20:41 donjones Compton: this runs still had DAC unplugged upstairs by mistake
Wednesday
Tuesday
Monday
Sunday
Saturday
Friday
270889 05/18/12 12:14 donjones Compton: Laser transmitted power for laser power scan
270887 05/18/12 11:32 donjones Compton: Laser power supply dead again
270874 05/18/12 10:24 donjones Compton: Laser off
270873 05/18/12 09:49 donjones Compton: Laser transmitted power for laser power scan
270865 05/18/12 08:33 narayan Compton: relaxed and rested
Thursday
270804 05/17/12 23:28 dalton Compton: Laser is off
270758 05/17/12 18:58 narayan Compton: edet @ 8.7890
270717 05/17/12 17:23 dalton Compton: laser reverted to its higest power setting
270618 05/17/12 07:57 narayan Compton: orbit lock was off since yesterday's energy measurement
270562 05/17/12 03:59 narayan Compton: e-detector was moved to Position-1
Wednesday
270451 05/16/12 18:24 narayan Compton: e-Det in Garage, ph-Det turned off
270441 05/16/12 17:36 narayan Compton: scintillator rates during run 25526
270425 05/16/12 16:51 narayan Compton: ph-det turned on to 1750
270409 05/16/12 14:37 donjones Compton: Laser polarization vs power scan
270407 05/16/12 14:12 narayan Compton: added a mollex-BNC cable on plane-4 beam left QWAD
270405 05/16/12 14:06 cornejo Compton: Backed out of LED setup
270404 05/16/12 14:05 cornejo Compton: This run had tune beam in it
270402 05/16/12 13:39 cornejo Compton: LED runs for May 16, 2012
270390 05/16/12 10:38 donjones Compton: Transmitted beam positions during laser power scan
270389 05/16/12 10:37 donjones Compton: Transmitted beam positions during laser power scan
270380 05/16/12 09:18 cornejo Compton: Turning on PhDet HV and setting up for LED tests
Tuesday
Monday
270126 05/14/12 22:58 donjones Compton: Laser power scan
270091 05/14/12 18:20 wdconinc Compton: xcefdmp shows edet-triggered snapshots at noffset=-220
270080 05/14/12 17:54 narayan Compton: edet plane 4 mask changed
270046 05/14/12 10:59 narayan Compton: [late] cable for analog signal put in plane 4, BR QWAD
Sunday
269904 05/13/12 16:31 cornejo Compton: Backed off eDet photon snapshot triggers
269893 05/13/12 15:09 cornejo Compton: This run is not a valid PhDet snapshot run
269840 05/13/12 07:43 dunne Compton: Compton DAQ hung up on end run. Restarted CODA
Saturday
Friday
269512 05/11/12 11:26 donjones Compton: edet moved to position 1
269494 05/11/12 08:45 smacewan Compton: Edet to garage for tuning
Thursday
269383 05/10/12 20:48 donjones Compton: attempted to time in Edet triggered snapshots
269354 05/10/12 19:41 Dutta Compton: Electron detector to Pos 1
Wednesday
269192 05/09/12 23:32 narayan Compton: edet at Pos-1 and ph-det turned On
269191 05/09/12 23:29 narayan Compton: iochc10 rebooted
269171 05/09/12 19:57 cornejo Compton: Backed off LED setup
269168 05/09/12 18:05 donjones Compton: Don and Juan went into hall and disconnected fibers from photon detector.
269166 05/09/12 17:56 dalton Compton: Laser state now Left Circular
269133 05/09/12 12:05 gaskell Compton: retracted electron detector for beam studies
Tuesday
268990 05/08/12 16:28 narayan Compton: ph-det off, e-det garaged
268988 05/08/12 16:24 narayan Compton: rebooting the IOCHC10
268934 05/08/12 10:14 cornejo Compton: PhDet HV tripped during this run
268929 05/08/12 09:36 cornejo Compton: LED Linearity runlist
268924 05/08/12 09:25 cornejo Compton: Backed off LED setup
Monday
268806 05/07/12 17:19 cornejo Compton: Moved eDet to position 1
268785 05/07/12 16:22 cornejo Compton: MCC will do heavy tunning, moved eDet out
268744 05/07/12 12:35 cornejo Compton: Backed off LED setup
268733 05/07/12 11:47 cornejo Compton: Might have left LED delta firing last 12 hours
268730 05/07/12 11:43 cornejo Compton: Setting up for LED Linearity @ 60uA
Sunday
268628 05/06/12 23:22 narayan Compton: edet moved to position-1
268627 05/06/12 23:19 narayan Compton: edet GUI frozen, iochc10 rebooted
268606 05/06/12 20:57 narayan Compton: turned off photon detector
268600 05/06/12 20:25 cornejo Compton: Turning on PhDet HV
268585 05/06/12 18:12 cornejo Compton: LED runlist for May 05-06, 2012
268583 05/06/12 18:09 cornejo Compton: Turned off PhDet HV for return to High Current mode
268492 05/06/12 12:53 cornejo Compton: Run 25321 was an LED linearity run
Saturday
268040 05/05/12 09:51 cornejo/jone Compton: Installed LED system back in the he tunnel
268010 05/05/12 07:47 gaskell Compton: More good runs for Compton low current running
268008 05/05/12 07:41 gaskell Compton: setting up straight-through beam for tracking
268001 05/05/12 06:43 gaskell Compton: Moller finished early, more Compton data
267986 05/05/12 05:34 gaskell Compton: Runlist for Moller cross-calibration
267962 05/05/12 04:02 narayan Compton: giving way to Moller
Friday
267863 05/04/12 15:34 gaskell Compton: updated compton.eflags
267859 05/04/12 15:14 gaskell Compton: running current for cross calibration = 4.5 uA
267787 05/04/12 09:43 cornejo Compton: LED runlist for May 03, 2012
Thursday
267709 05/03/12 21:33 cornejo Compton: Backed off LED setup
267689 05/03/12 18:47 donjones Compton: run 25268 junk.
267685 05/03/12 18:25 cornejo Compton: No beam before this run, hence why there is no data besides LED
267679 05/03/12 18:15 donjones Compton: Resolution to LED firing with AC disconnected
267642 05/03/12 13:13 cornejo Compton: Turned off PhDet downstairs HV
267641 05/03/12 13:05 cornejo Compton: Will leave LED setup for a few more hours to run some tests
267621 05/03/12 10:34 dalton Compton: Backout of LED testing
267566 05/03/12 02:49 narayan Compton: e-detector moved to Pos-1
267565 05/03/12 02:45 narayan Compton: rebooted iochc10
267554 05/03/12 00:45 narayan Compton: turned on detectors HV
Wednesday
267521 05/02/12 16:21 cornejo Compton: LED runlist for May 02, 2012
Tuesday
267299 05/01/12 19:49 cornejo/jone Compton: LED runlist for May 1, 2012
267284 05/01/12 18:40 donjones Compton: Laser brought back up