Jefferson Lab HALL C Logbook for October 97 - runstarts omitted

  • Main INDEX

    Friday

  • 504 10/31/97 23:17 csa HMS scintillator check
  • 503 10/31/97 23:16 Mack hms100 field setting program
  • 502 10/31/97 22:20 mack sos WC's
  • 501 10/31/97 22:07 mack sos doors
  • 500 10/31/97 21:55 csa ~cdaq/fpi backup
  • 498 10/31/97 21:44 beaufait sos quad magnet
  • 497 10/31/97 21:36 vulcan gas system
  • 495 10/31/97 19:54 Cdaq SOS DC OK
  • 492 10/31/97 19:11 LMQ, JB, BV SOS gas problem
  • 491 10/31/97 19:08 Pitz HMS cycling
  • 490 10/31/97 19:02 Cdaq sos supply
  • 489 10/31/97 18:33 Vulcan HMS door
  • 488 10/31/97 18:24 bryon Beam Loss monitors
  • 486 10/31/97 17:50 van Westrum SOS Gas Cerenkov positioning and hut cleanup
  • 484 10/31/97 17:36 Mack hms wc windows
  • 483 10/31/97 17:32 LMQ, MJ, KB SOS WC status
  • 482 10/31/97 17:22 Mack hall c walk-thru
  • 481 10/31/97 17:06 Qin SOS wire chambers
  • 479 10/31/97 15:38 van Westrum SOS Gas Cerenkov voltage pressure limit
  • 478 10/31/97 15:00 Dave Mack Cleaned up SOS tk directory
  • 477 10/31/97 14:58 andi klein SOS hodoscopes beaten into submission
  • 476 10/31/97 14:45 abbottd HMS Drift Chambers
  • 475 10/31/97 14:39 Volmer new target parameters for replay
  • 473 10/31/97 13:30 mack Regarding SOS gas Cerenkov pmt's and B-fields
  • 471 10/31/97 12:58 Volmer fixed replay test definition file
  • 468 10/31/97 12:16 Tang SOS Gas Flow/Pressure
  • 463 10/31/97 09:09 saw New hclog commands
  • 461 10/31/97 09:08 saw New hclog commands
  • 453 10/31/97 07:01 mack SOS WC gas problem: email from L. Tang
  • 452 10/31/97 01:55 Derek van We SOS Gas Cerenkov
  • 451 10/31/97 01:43 J Volmer HMS DC HV
  • 450 10/31/97 01:40 J Volmer looked after HMS DC wires
  • Thursday

  • 447 10/30/97 22:26 J Volmer hdc wiremaps
  • 446 10/30/97 22:22 J Volmer HMS DC dead wires cards
  • 445 10/30/97 20:58 Cdaq SOS Gas Cerenkov install
  • 444 10/30/97 19:30 Qin DAQ problem followup
  • 442 10/30/97 19:05 Qin DAQ probelm
  • 441 10/30/97 18:54 Qin WC
  • 435 10/30/97 17:15 andi klein not broken scintillator
  • 433 10/30/97 16:31 andi klein sos scintillators
  • 432 10/30/97 16:29 andi klein another broken y scintillator
  • 428 10/30/97 15:33 Steve Wood DAQ problem fixed
  • 427 10/30/97 15:25 Tang SOS WC gas problem
  • 423 10/30/97 13:10 Cdaq SOS alignment
  • 422 10/30/97 12:10 Liming Qin SOS WC
  • 418 10/30/97 10:45 andi klein more on sos triggers
  • 416 10/30/97 10:36 Jochen Volme hclogscript test
  • 414 10/30/97 10:01 Mack Cryotarget Announcement
  • 410 10/30/97 08:57 Pitz HMS magnet control
  • Wednesday

  • 401 10/29/97 22:01 Mack suspect camac crate
  • 400 10/29/97 21:57 Mack Oh where, oh where has my window frame gone ...
  • 399 10/29/97 20:57 Bryon nim, fast bus voltages
  • 398 10/29/97 20:55 Bryon crate voltage check
  • 397 10/29/97 20:16 Volmer angles marked on hall floor (not all of them...)
  • 395 10/29/97 17:17 klein more trigger sos
  • 386 10/29/97 12:18 Mack 3C dipole string 300 amp cycling is official
  • 385 10/29/97 12:01 Mack checking crate voltages
  • 384 10/29/97 11:58 Klein more on SOS scintilators and triggers
  • 383 10/29/97 11:58 Mack minor hclog bug
  • 380 10/29/97 11:22 M Jones HMS Scint HV
  • 378 10/29/97 11:11 cdaq Beam Time Accounting
  • 377 10/29/97 10:15 Anklin Corrrection to entry: 376
  • 376 10/29/97 10:00 Anklin UNSER calibration
  • 375 10/29/97 09:58 Mack bizarre pulses pmt 4 on sos gas cerenkov
  • Tuesday

  • 374 10/28/97 17:56 Bryon SOS Cerenkov installation
  • 373 10/28/97 17:27 mack more SOS scint problems
  • 372 10/28/97 17:15 Anklin UNSER calibration
  • 371 10/28/97 15:54 cdaq SOS COSMICS DEBUGGING: SCINTS
  • 369 10/28/97 15:53 cdaq
  • 366 10/28/97 14:56 Volmer replay: variables not registered
  • 365 10/28/97 14:52 Volmer default hadron mass in replay
  • 364 10/28/97 14:49 cdaq error message (#353 again)
  • 363 10/28/97 14:49 cdaq error message (#353 again)
  • 362 10/28/97 14:28 Volmer online kumacs for fpi present on cdaq/fp/paw
  • 358 10/28/97 13:08 mack ~cdaq/coda/runlist
  • 357 10/28/97 10:05 Hamlet SCAL
  • Monday

  • 355 10/27/97 23:34 mack cosmic run ended
  • 354 10/27/97 23:24 mack SOS cosmics run
  • 353 10/27/97 23:05 cdaq ERROR_MESSAGE_ON_ANALYSIS_OF_SOS_COSMIC_RUN
  • 352 10/27/97 23:02 cdaq ERROR_MESSAGE_ON_ANALYSIS_OF_SOS_COSMIC_RUN
  • 350 10/27/97 21:55 mack HMS thermal neutron shielding
  • 349 10/27/97 21:49 mack sos HV mainframes found off
  • 348 10/27/97 18:20 Bryon SOS Cerenkov Installation
  • 347 10/27/97 17:29 Mack HMS WC update
  • 346 10/27/97 17:18 Mack BPM Xterm
  • 345 10/27/97 17:16 Mack WC HV off and misc.
  • 344 10/27/97 15:56 mack HMS WC's hold voltage
  • 340 10/27/97 11:12 Volmer HMS dipole field regulation ok
  • Sunday

  • 333 10/26/97 12:58 mack HMS WC gas and SOS hodo
  • Saturday

  • 332 10/25/97 14:31 mack SOS hodo's on
  • 331 10/25/97 14:25 mack sos WC gas back on
  • 330 10/25/97 14:06 mack walnut is gone!
  • Friday

  • 329 10/24/97 21:23 Volmer SOS BM02 ok
  • 328 10/24/97 21:16 cvxwrks Shift_Checklis
  • 327 10/24/97 17:37 Cdaq chc1q power save mode off
  • 326 10/24/97 17:18 Mack SOS and HMS WC misc.
  • 325 10/24/97 17:01 Volmer SOS BM02 PSU certification
  • 324 10/24/97 16:32 klein continuaation of SOS hodoscopes work
  • 323 10/24/97 15:38 Volmer HMS dipole turned off, certified
  • 322 10/24/97 15:05 mack HMS WC test
  • 321 10/24/97 14:56 Volmer HMS dipole certification
  • Thursday

  • 320 10/23/97 22:20 volmer Use of hclog Preview, Reload
  • 319 10/23/97 22:08 mack test of preview: no problem
  • 318 10/23/97 22:05 mack test of preview
  • 317 10/23/97 21:43 mack SOS WC's working
  • 316 10/23/97 20:28 mack hms1 field program
  • 315 10/23/97 19:00 Volmer HMS quad setting
  • 314 10/23/97 17:25 klein SOS scintillators.
  • 313 10/23/97 17:12 Volmer quota filled up bad for hclog
  • 311 10/23/97 16:51 kross Gas System valve failure
  • 303 10/23/97 16:20 mack hms WC's; 3rd time's the charm
  • 296 10/23/97 16:12 Volmer Image re-entry
  • 295 10/23/97 16:09 Volmer HMS Quad Setting GUI ready
  • Wednesday

  • 289 10/22/97 17:58 Vansyoc SOS Hodoscopes
  • 288 10/22/97 17:17 Cdaq HMS chambers
  • 287 10/22/97 16:45 mack S2Y recabling
  • 285 10/22/97 15:36 cdaq Run 16425
  • 284 10/22/97 15:05 Cdaq HMS chambers
  • 283 10/22/97 12:48 Mack FR checkout: die unendliche geschichte
  • 282 10/22/97 09:15 cdaq Run start: 16424
  • 279 10/22/97 09:08 cdaq Run start information
  • Tuesday

  • 278 10/21/97 17:32 mack aerogel removal: late entry
  • 277 10/21/97 16:23 Mack FR update
  • 276 10/21/97 15:57 Volmer now hclog AND ScanIt!
  • 275 10/21/97 15:53 Volmer SOS standalone PS control program
  • 274 10/21/97 15:34 mack,csa sos detector aerogel removal
  • 273 10/21/97 13:33 Mack FR checkout
  • 272 10/21/97 12:32 Cdaq HMS power supply
  • 271 10/21/97 12:00 Hamlet SCAL.hv
  • Monday

  • 270 10/20/97 22:53 volmer Entering files into hclog
  • 269 10/20/97 22:40 mack SOS 2500 volt check complete
  • 268 10/20/97 22:33 mack FR: still trying to get it on...
  • 267 10/20/97 21:55 mack FR update and SOS HV
  • 266 10/20/97 21:39 mack chen yan's response re FR
  • 265 10/20/97 17:28 mack counting house puttering
  • 264 10/20/97 17:18 mack all crates on
  • 263 10/20/97 17:09 volmer ScanIt from within hclogentry
  • 262 10/20/97 09:42 Mack hall c power consumption
  • Saturday

  • 261 10/18/97 11:09 Hamlet HMS.calorimeter
  • Thursday

  • 258 10/16/97 17:07 Anklin BCM1 UPGRADE
  • Wednesday

  • 257 10/15/97 15:27 cdaq Beam Time Accounting
  • 246 10/15/97 13:51 cdaq Beamtime
  • 242 10/15/97 11:55 cdaq no_key
  • Tuesday

  • 232 10/14/97 17:37 mack hms shower counter
  • 231 10/14/97 16:53 Lassiter HMS Dipole PSU pol switch
  • 230 10/14/97 16:04 mack preliminary hv backup files
  • 229 10/14/97 12:19 Mack addendum to hms hv entry
  • 228 10/14/97 12:05 Cvxwrks HMS Hodoscope HV
  • Monday

  • 227 10/13/97 17:09 mack LEAVE WC HV OFF!
  • 226 10/13/97 17:08 mack hms hv communications
  • Friday

  • 225 10/10/97 16:44 Lassiter HMS quad's power supplies
  • 224 10/10/97 16:38 Lassiter Q3 current readback adjustment
  • 223 10/10/97 16:28 Lassiter HMS Dipole
  • 222 10/10/97 13:49 Lassiter Dipole Transformer Rapair
  • 221 10/10/97 13:23 Vansyoc HMS HV
  • Thursday

  • 220 10/09/97 22:59 volmer test from home
  • Wednesday

  • 219 10/08/97 16:43 Vansyoc HMS HV
  • 218 10/08/97 14:36 Mack figure with last entry
  • 217 10/08/97 14:34 Mack preliminary look at s1x versus delta
  • Tuesday

  • 216 10/07/97 19:24 Volmer DO NOT MOVE HMS SLITS!
  • Monday

  • 215 10/06/97 15:41 Meekins HMS Gate Vlave
  • Friday

  • 214 10/03/97 21:54 Volmer Q3 residual plots
  • 213 10/03/97 19:21 Volmer hysteresis study on Q2 and Q3
  • 212 10/03/97 16:04 Vansyoc HMS HV
  • Thursday

  • 211 10/02/97 17:27 Mack misc. work
  • 210 10/02/97 15:59 Vansyoc HMS HV
  • Wednesday

  • 209 10/01/97 17:11 Vansyoc HMS HV
  • 208 10/01/97 12:14 Volmer on-site only access to hclog