Main INDEX
Monthly INDEX
PREV
NEXT
User name van Westrum
Log entry time 00:21:35 on November 2,1997
Entry number 558
keyword=Shift Summary
The shift was marred by many problems, and we actually took no data. However, we did leave with more problems fixed than when we started:
1) hms dipole now seems to be regulated at the 10^-5 level. yea!
(that was the net gain)
2) the hms drift chamber crate was replaced (twice) and we had to replace one of the negative high voltage modules.
3) Joe Beaufait fixed the bm01 polarity switch. Normal sos cycling should now be possible, but this hasn't been adequately tested.
0.0 hours of beam taken, but beam was basically available the whole time. Frustrating.