• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT

    User name dmckee

    Log entry time 15:55:50 on February 12,1998

    Entry number 3267

    keyword=sos hodo PMT intermitent

    Dave Mack and I inspected the bases on two hodoscope PMTs. Both channels were attenuated.

    s2y7+ had cracked soder joints on both the anone and the diode. I resodered.
    s2y2+ showed no obvious problems, but the anode joint was dirty. I cleaned-up and thickened that joint.