• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT

    User name mack

    Log entry time 16:13:41 on February 13,1998

    Entry number 3371

    keyword=bpm stuff

    Well, Tom Powers looked at the BPM's offline and confirmed what we suspected:
    that there was a cable swapped. He says H00B X+ and X- are swapped. When the hall is open for at least 1 hour contact the mcc and tell them we would like AES to resolve the problem. Omar Garza (supervisor) is aware of the job and says he has a Rad2 qualified tech coming in swing shift the next few days. (The cables that need to be swapped are on the girder before the target.) I don't know that Rad2 is actually necessary but let Omar worry about it. Call them in anytime of the day or nite.