    User name cdaq

    Log entry time 16:09:24 on March 16, 1998

    Entry number 4473

    keyword=Beam Time Accounting
    Hall C

    3/16/98 0800-1600
    Experiment #: E91-003
    Shift Leader: mack
    Shift Workers: gueye,wood,gaskell,avery,anklin,reinhold

    08000900100011001200130014001500Total Time
    Beam available
    and acceptable
    .25 0 0 0 .25 .50 1.0 1.0 3
    Beam available
    but not requested
    0 0.0 0.25 0 .75 0 0 0 1
    Beam not
    available
    .75 1.0 0.75 1.00 0 .50 0 0 4
    Experiment
    ready
    .50 1.0 0.75 1.00 .25 .50 1.0 1.0 6
    Configuration
    Change
    0 0 0 0 0 0 0 0 0
    Experiment
    not Ready
    .50 0 0.25 0 .75 .50 0 0 2
    Data
    Taking
    0.0 0.0 0.0 0.0 .25 .50 1.0 1.02.75
    Hall not
    ready reasons
    Target 0 0 0 0 0 0 0 0 0
    HMS .50 0 .25 0 0 0 0 0 0.75
    SOS 0 0 0 0 0 0 0 0 0
    Data Acq 0 0 0 0 .75 0 0 0 0.75
    Other 0 0 0 0 0 0 0 0 0

    Comments: Beam available at start then HMS dipole trip. At some point around 8:15 energy change for Hall B began without notification. Asked for an access. After hall B energy change Hall A tuning for the Compton began. MCC called us at 10:45 to lock up but our guys were backing out of hms hv work. Locked up at 11:05am. Beam back at 12:10pm. Took a little data then DAQ hung up. Made an entry to power cycle fbhms. Restoration of beam took a bit.

    Data Entry by: mack