User name mitchell
Log entry time 18:03:02 on June 27,1998
Entry number 6062
keyword=N-det shielding
Accelerator system checks at 4:30. We took 45 minute access to change
neutron detector shielding. Added 1 inch of plastic, 4ft by 8 ft sheet
covers most of the detector. Not enough to get to top two bars, and not wide enough
by about 10 inches. We shoved it over in order to cover the small angle
side.