    User name mitchell

    Log entry time 18:03:02 on June 27,1998

    Entry number 6062

    keyword=N-det shielding

    Accelerator system checks at 4:30. We took 45 minute access to change
    neutron detector shielding. Added 1 inch of plastic, 4ft by 8 ft sheet
    covers most of the detector. Not enough to get to top two bars, and not wide enough
    by about 10 inches. We shoved it over in order to cover the small angle
    side.