Jefferson Lab HALL C Logbook for June 98 - full listing

  • Main INDEX

    Tuesday

  • 6373 06/30/98 23:59 cdaq Run 20219: LiD N-det data, Q2=1 fast raster 3mm 50mV nom HV
  • 6372 06/30/98 23:58 donal day neutron timing
  • 6370 06/30/98 23:53 cdaq Run 20218: LiD N-det data, Q2=1 fast raster 3mm 50mV nom HV
  • 6371 06/30/98 23:52 saw Test of faster readout lists
  • 6369 06/30/98 23:48 LC Smith NDET studies
  • 6368 06/30/98 23:42 cdaq Run 20217: Test of ROC1 FB sequencer code readout list
  • 6367 06/30/98 23:17 cdaq Run 20216: LiD N-det data, Q2=1 fast raster 3mm 50mV nom HV
  • 6366 06/30/98 22:38 mitchell First Deut's
  • 6365 06/30/98 22:21 cdaq Run 20215: LiD N-det data, Q2=1 fast raster 3mm 50mV nom HV
  • 6364 06/30/98 21:57 cdaq Run 20214: N-det CH data, Q2=1 fast raster 3mm 50mV nom HV
  • 6363 06/30/98 21:50 mitchell current oscillations
  • 6362 06/30/98 21:34 cdaq Run 20213: N-det CH data, Q2=1 fast raster 3mm 50mV nom HV
  • 6361 06/30/98 20:56 cdaq Run 20212: N-det CH data, Q2=1 fast raster 3mm 50mV nom HV
  • 6360 06/30/98 20:12 cdaq Run 20211: Test of DAQ (during system check)
  • 6359 06/30/98 19:50 mitchell dq test, coin trig
  • 6358 06/30/98 19:42 cdaq Run 20210: n-det checkout, fast raster on, 100 nA, ps1=9999999
  • 6357 06/30/98 19:38 cdaq Run 20209: n-det checkout, fast raster on, 100 nA, ps1=10000
  • 6356 06/30/98 19:34 cdaq Run 20208: n-det checkout, fast raster on, 100 nA, ps1=10000
  • 6355 06/30/98 19:28 cdaq Run 20207: n-det checkout, fast raster on, 100 nA, 8 ns out of tdc start
  • 6354 06/30/98 18:49 cdaq Run 20206: Delta and x-tar scan, -4%, x=-1cm below
  • 6353 06/30/98 18:27 cdaq Run 20205: Delta and x-tar scan, -4%, x=1cm above
  • 6352 06/30/98 18:10 cdaq Run 20204: modify nd gate logic
  • 6351 06/30/98 18:05 cdaq Run 20203: Test of faster readout lists. Also modifying ND logic.
  • 6350 06/30/98 17:33 cdaq Run 20201: Delta and x-tar scan, -4%, at nominal position
  • 6349 06/30/98 17:14 cdaq Run 20200: Delta and x-tar scan, -4%, at nominal position
  • 6348 06/30/98 16:54 cdaq Run 20199: Delta and x-tar scan, -4%, at nominal position: continued
  • 6347 06/30/98 16:26 zihlmann cdaqs1 crash
  • 6346 06/30/98 16:15 gwarren Proton Energy Loss in nDet
  • 6345 06/30/98 16:09 cdaq Run 20198: Delta and x-tar scan, -4%, at nominal position
  • 6344 06/30/98 16:03 Zihlmann day shift summary
  • 6343 06/30/98 16:01 cdaq Beam Time Accounting
  • 6342 06/30/98 15:26 cdaq Run 20197: Delta and x-tar scan, -2%, at nominal position
  • 6341 06/30/98 15:16 cdaq Run 20196: Delta and x-tar scan, -2%, at nominal position
  • 6340 06/30/98 15:00 zihlmann HMS Momentum to -3.4712 GeV -2%
  • 6339 06/30/98 14:43 cdaq Run 20195: Delta and x-tar scan, 0%, at 1cm down
  • 6338 06/30/98 14:38 cdaq Run 20194: Delta and x-tar scan, 0%, at nominal position
  • 6337 06/30/98 14:16 cdaq Run 20193: Delta and x-tar scan, 0%, x=-1cm above,
  • 6336 06/30/98 13:17 cdaq Run 20192: Delta and x-tar scan, 0%, x=1cm above,
  • 6335 06/30/98 13:09 cdaq Run 20191: Delta and x-tar scan, 0%, x=1cm above,
  • 6334 06/30/98 12:53 cdaq Run 20190: Delta and x-tar scan, 0%, x=1cm above,
  • 6333 06/30/98 12:51 Rondon N detector, plastic, shielding, PMT currents
  • 6332 06/30/98 12:24 cdaq Run 20189: Delta and x-tar scan, 0%, x=1cm above,
  • 6331 06/30/98 12:21 cdaq Run 20188: Delta and x-tar scan, 0%, x=1cm above,
  • 6330 06/30/98 12:15 cdaq Run 20187: Delta and x-tar scan, 0%, x=1cm above,
  • 6329 06/30/98 12:07 mcfarlan Netscape Composer and hclog
  • 6328 06/30/98 12:01 gwarren keyword=Composer
  • 6327 06/30/98 11:55 gwarren keyword=PMT anode currents
  • 6326 06/30/98 11:36 cdaq Run 20186: Delta and x-tar scan, 0%, at nominal position
  • 6325 06/30/98 11:29 cdaq Run 20185: Delta and x-tar scan, +4%, at nominal position
  • 6324 06/30/98 11:24 mcfarlan PMT anode currents
  • 6323 06/30/98 11:18 cdaq Run 20184: cosmics run, nno beam
  • 6322 06/30/98 10:56 cdaq Run 20182: Delta and x-tar scan, 0%, at nominal position
  • 6321 06/30/98 10:46 zihlmann HMS set to -3.542 GeV
  • 6320 06/30/98 10:23 zihlmann RUN 20178 to 20180 are +2%
  • 6319 06/30/98 10:23 cdaq Run 20181: Delta and x-tar scan, +2%, at nominal position
  • 6318 06/30/98 10:05 cdaq Run 20180: Delta and x-tar scan, +4%, at nominal position
  • 6317 06/30/98 09:56 cdaq Run 20179: Delta and x-tar scan, +4%, at nominal position
  • 6316 06/30/98 09:42 cdaq Run 20178: Delta and x-tar scan, +4%, at nominal position
  • 6315 06/30/98 09:39 cdaq Run 20177: Delta and x-tar scan, +2%, at nominal position, beam position checkout
  • 6314 06/30/98 09:30 muehlbauer Set HMS Momentum to 3.6121GeV
  • 6313 06/30/98 09:14 cdaq Run 20176: Delta and x-tar scan, +4%, at x=1cm below nominal bpm position
  • 6312 06/30/98 09:09 cdaq Beam Time Accounting
  • 6311 06/30/98 09:06 cdaq Run 20175: Delta and x-tar scan, +4%, at x=1cm below nominal bpm position, beam position check out
  • 6310 06/30/98 09:04 muehlbauer Set Vertical Offset to 1cm down
  • 6309 06/30/98 09:02 cdaq Beam Time Accounting
  • 6308 06/30/98 08:53 cdaq Beam Time Accounting
  • 6307 06/30/98 08:52 yan Arc Bdl reproducibility to hysteresis
  • 6306 06/30/98 08:34 cdaq Run 20174: Delta and x-tar scan, +4%, at x=1cm below nominal bpm position, beam position check out
  • 6305 06/30/98 08:29 Zhuhg Owl shift summary
  • 6304 06/30/98 08:17 cdaq Beam Time Accounting
  • 6303 06/30/98 08:04 cdaq Run 20173: Delta and x-tar scan, +4%, at x=1cm above nominal bpm position
  • 6302 06/30/98 07:59 cdaq Run 20172: Delta and x-tar scan, +4%, at x=1, bem position check out
  • 6301 06/30/98 07:58 muehlbauer Changed the Beam Position to +1cm
  • 6300 06/30/98 07:41 cdaq Run 20171: Delta and x-tar scan, +4%, at nominal position
  • 6299 06/30/98 07:12 cdaq Run 20170: Delta and x-tar scan, +4%, at nominal position
  • 6298 06/30/98 07:01 muehlbauer Set HMS Momentum to 3.6837GeV
  • 6297 06/30/98 06:34 cdaq Run 20169: Delta and x-tar scan, +6%, at nominal position
  • 6296 06/30/98 06:33 muehlbauer Change Data Disk to /cdads1/data3
  • 6295 06/30/98 06:19 cdaq Run 20168: Delta and x-tar scan, +6%, at nominal position
  • 6294 06/30/98 06:17 cdaq Run 20167: Delta and x-tar scan, +6%, at nominal position
  • 6293 06/30/98 06:16 muehlbauer Set HMS Momentum to 3.7545GeV
  • 6292 06/30/98 06:08 cdaq Run 20166: Delta and x-tar scan, +6%, reestablish nominal position
  • 6291 06/30/98 05:50 muehlbauer Target moved up to +2mm
  • 6290 06/30/98 05:49 muehlbauer Changed the Beam Position to +1cm
  • 6289 06/30/98 05:42 cdaq Run 20165: Delta and x-tar scan, p=+8% at x=1cm above bpm nominal position
  • 6288 06/30/98 05:36 cdaq Run 20164: Delta and x-tar scan, p=+8% at x=1cm above bpm nominal position, beam position check out
  • 6287 06/30/98 05:20 saw Disk space - /cdaqs1/data3 available
  • 6286 06/30/98 05:10 muehlbauer h
  • 6285 06/30/98 05:09 cdaq Run 20163: Delta and x-tar scan, p=+8% at x=1cm below bpm nominal position
  • 6284 06/30/98 05:05 muehlbauer Still Instable Beam
  • 6283 06/30/98 04:57 Zhuhg Analysis code
  • 6282 06/30/98 04:46 cdaq Run 20162: Delta and x-tar scan, p=+8% at x=1cm below nominal BPM position
  • 6281 06/30/98 04:43 muehlbauer Final Correction of the beam position
  • 6280 06/30/98 04:40 cdaq Run 20161: Delta and x-tar scan, p=+8% at x=-1cm, check BPM position
  • 6279 06/30/98 04:38 cdaq Run 20160: Delta and x-tar scan, p=+8% at x=-1cm, check BPM position
  • 6278 06/30/98 04:33 muehlbauer Still correcting the beam position
  • 6277 06/30/98 04:32 cdaq Run 20159: Delta and x-tar scan, p=+8% at x=-1cm, check BPM position
  • 6275 06/30/98 04:24 cdaq Run 20158: Delta and x-tar scan, p=+8% at x=-1cm, check BPM position
  • 6276 06/30/98 04:24 muehlbauer Corrected Beam Position
  • 6274 06/30/98 04:19 muehlbauer Target moved down to -2mm
  • 6273 06/30/98 04:16 cdaq Run 20157: Delta and x-tar scan, p=+8% at nominal BPM position
  • 6272 06/30/98 04:14 muehlbauer Corrected Beam Position
  • 6271 06/30/98 03:58 muehlbauer Instable Beam
  • 6270 06/30/98 03:23 cdaq Run 20156: Delta and x-tar scan, p=+8% at nominal BPM position
  • 6269 06/30/98 02:56 cdaq Run 20155: Delta and x-tar scan, p=+8% at 1 cm down from nominal BPM position
  • 6268 06/30/98 02:52 muehlbauer Changed beam postion to -1.0cm
  • 6267 06/30/98 02:07 Zhuhg P_mom problem fix
  • 6266 06/30/98 01:16 muehlbauer No Beam
  • 6265 06/30/98 01:06 zhuhg replay only on cdaqs2
  • 6264 06/30/98 00:52 zhuhg nmisc_raw_data init
  • 6263 06/30/98 00:47 cdaq Run 20154: Delta and x-tar scan, p=+8% at nominal BPM position
  • 6262 06/30/98 00:39 cdaq Run 20153: Delta and x-tar scan, p=+8% at nominal BPM position
  • 6261 06/30/98 00:36 zhuhg Target move down by 2mm
  • 6260 06/30/98 00:13 Cdaq NDET studies
  • Monday

  • 6259 06/29/98 23:49 Cdaq Back to optics
  • 6258 06/29/98 23:38 cdaq Beam Time Accounting
  • 6257 06/29/98 23:26 cdaq Run 20152: bar thresholds 20mV, i around 100 nA, , HV
  • 6256 06/29/98 23:11 cdaq Run 20151: bar thresholds 20mV, i around 100 nA, , HV
  • 6255 06/29/98 22:57 cdaq Run 20150: bar thresholds 20mV, i around 100 nA, , HV
  • 6254 06/29/98 22:40 cdaq Run 20149: bar thresholds 50 mV, i around 150 nA
  • 6253 06/29/98 22:27 Cdaq C/H ratio
  • 6252 06/29/98 22:24 cdaq Run 20148: bar thresholds 50 mV, i around 50 nA,fast raster on
  • 6251 06/29/98 22:18 cdaq Run 20147: bar thresholds 50 mV, i around 50 nA
  • 6250 06/29/98 21:46 cdaq Run 20146: hms_mom 3.35 ndet checkout, bar thresholds 50 mV,
  • 6249 06/29/98 21:34 cdaq Run 20145: hms_mom 3.35 ndet checkout, bar thresholds 50 mV,
  • 6248 06/29/98 21:32 gwarren LeCroy 1881M ADC failure
  • 6247 06/29/98 21:31 gwarren Bad Channels in ndet
  • 6246 06/29/98 21:15 cdaq Run 20144: hms_mom 3.35 ndet checkout, bar thresholds 100 mV,
  • 6245 06/29/98 21:07 cdaq Run 20143: hms_mom 3.35 ndet checkout, bar thresholds 100 mV,
  • 6244 06/29/98 20:54 cdaq Run 20142: ndet singles
  • 6243 06/29/98 20:39 cdaq Run 20141: hms_mom 3.35 ndet checkout
  • 6242 06/29/98 20:21 cdaq Run 20139: hms_mom 3.35 ndet checkout
  • 6241 06/29/98 20:12 Cdaq replay problems
  • 6240 06/29/98 20:04 cdaq Run 20138: hms_mom 3.35 ndet checkout
  • 6239 06/29/98 19:19 cdaq Run 20137: hms_mom 3.35 ndet checkout
  • 6238 06/29/98 18:17 cdaq Run 20136: test
  • 6237 06/29/98 18:13 zihlmann superharp survey data
  • 6236 06/29/98 18:08 zeier DAQ status
  • 6235 06/29/98 16:40 mcfarlan Pulse widths on bars and paddles
  • 6234 06/29/98 16:30 mcfarlan Paddle 33-48 Left
  • 6233 06/29/98 16:09 cdaq Run 20135: hms_mom 3.35 ndet checkout bar threshold 50 mV
  • 6232 06/29/98 15:44 mcfarlan 60Hz hum on ADC inputs
  • 6231 06/29/98 15:32 mcfarlan ND and HMS gates
  • 6230 06/29/98 15:31 mcfarlan Check of gates
  • 6229 06/29/98 15:29 cdaq Run 20132: hms_mom 3.35 ndet checkout nominal HV
  • 6228 06/29/98 15:25 mcfarlan HMS Drift Chamber start (ROC2)
  • 6227 06/29/98 15:14 cdaq Run 20131: hms_mom 3.35 ndet checkout nominal HV
  • 6226 06/29/98 15:06 cdaq Beam Time Accounting
  • 6225 06/29/98 15:01 cdaq Run 20130: adc gates electronics check
  • 6224 06/29/98 14:29 cdaq Run 20129: HMS 3.35Gev coin run Ndet HV nominal
  • 6223 06/29/98 14:26 cdaq Run 20128: MCC does energy program for Chen. Data not useful!
  • 6222 06/29/98 13:54 mitchell HMS to 3.35 GeV central mom
  • 6221 06/29/98 13:43 cdaq Run 20127: test
  • 6220 06/29/98 13:07 cdaq Run 20124: MCC does energy program for Chen. Data not useful!
  • 6219 06/29/98 12:59 mcfarlan HMS S2 and ND time
  • 6218 06/29/98 11:46 cdaq Run 20123: MCC does energy program for Chen. Data not useful!
  • 6217 06/29/98 11:37 cdaq Run 20122: MCC does energy program for Chen. Data not useful!
  • 6216 06/29/98 11:34 cdaq Run 20121: MCC does energy program for Chen. Data not useful!
  • 6215 06/29/98 11:30 cdaq Run 20120: MCC does energy program for Chen. Data not useful!
  • 6214 06/29/98 10:41 cdaq Run 20119: MCC does energy program for Chen. Data not useful!
  • 6213 06/29/98 10:11 cdaq Run 20118: Delta and x-tar scan: field =8%, at nominal BPM position
  • 6212 06/29/98 09:46 gwarren Shift check list for 6/27 and 6/28
  • 6211 06/29/98 09:33 cdaq Run 20117: Delta and x-tar scan: field =8%, at nominal BPM position
  • 6210 06/29/98 09:22 cdaq Run 20116: Delta and x-tar scan: field =8%, at nominal BPM position
  • 6209 06/29/98 09:04 cdaq Run 20115: Delta and x-tar scan: field =8%, at nominal BPM position
  • 6208 06/29/98 08:50 gwarren Time resolution in ndet crate is 50 ps
  • 6207 06/29/98 08:17 zhuhg owl shift summary
  • 6206 06/29/98 08:17 cdaq Run 20114: Delta and x-tar scan: field =8%, at nominal BPM position
  • 6205 06/29/98 07:58 cdaq Beam Time Accounting
  • 6204 06/29/98 07:34 muehlbauer HMS set to 3.8254GeV (Field +8%)
  • 6203 06/29/98 06:45 cdaq Run 20113: Delta and x-tar scan: field =10%, at nominal BPM position
  • 6202 06/29/98 06:43 muehlbauer DAQ restarted
  • 6201 06/29/98 06:39 muehlbauer DAQ problem
  • 6200 06/29/98 06:14 cdaq Run 20112: Delta and x-tar scan: field =10%, at nominal BPM position
  • 6199 06/29/98 06:09 muehlbauer DAQ restarted
  • 6198 06/29/98 06:09 muehlbauer DAQ problems
  • 6197 06/29/98 05:22 cdaq Run 20111: Delta and x-tar scan: field =10%, at nominal BPM position
  • 6196 06/29/98 05:21 muehlbauer changed to /cdaqs1/data2
  • 6195 06/29/98 04:49 muehlbauer DAQ restarted befor Run 20110
  • 6194 06/29/98 04:46 cdaq Run 20110: Delta and x-tar scan: field =10%, at nominal BPM position
  • 6193 06/29/98 04:39 muehlbauer DAQ problems
  • 6192 06/29/98 04:32 zhuhg establish your own analyzer
  • 6191 06/29/98 04:30 cdaq Run 20108: Delta and x-tar scan: field =10%, at nominal BPM position
  • 6190 06/29/98 04:25 muehlbauer Still DAQ problems
  • 6189 06/29/98 04:19 muehlbauer DAQ problems
  • 6188 06/29/98 04:18 muehlbauer DAQ problems
  • 6187 06/29/98 04:15 muehlbauer Beam Position OK
  • 6186 06/29/98 04:13 cdaq Run 20107: Delta and x-tar scan: field =10%, at nominal BPM position
  • 6185 06/29/98 04:10 cdaq Run 20106: Delta and x-tar scan: field =10%, at nominal BPM position
  • 6184 06/29/98 03:51 cdaq Run 20105: Check of the 0,0 beam position after beam tuning
  • 6183 06/29/98 03:49 muehlbauer Reboot
  • 6182 06/29/98 03:44 muehlbauer DAQ Problems
  • 6181 06/29/98 03:36 cdaq Run 20104: Check of the 0,0 beam position after beam tuning
  • 6180 06/29/98 03:23 muehlbauer DAQ problems
  • 6179 06/29/98 03:22 muehlbauer DAQ problems
  • 6178 06/29/98 03:10 cdaq Run 20103: Check of the 0,0 beam position after beam tuning
  • 6177 06/29/98 02:43 cdaq Run 20102: Check of the 0,0 beam position after beam tuning
  • 6176 06/29/98 02:24 muehlbauer HMS set to 3.8962GeV
  • 6175 06/29/98 02:20 muehlbauer ROC reboot
  • 6174 06/29/98 02:05 muehlbauer HMS set to 3.8962GeV
  • 6173 06/29/98 02:04 zhuhg analysis code check
  • 6172 06/29/98 01:58 muehlbauer No Beam
  • 6171 06/29/98 01:52 muehlbauer DAQ problems
  • 6170 06/29/98 01:38 cdaq Run 20101: Delta and x-tar scan : field = +10%, at nominal BPM position
  • 6169 06/29/98 01:32 cdaq Run 20100: Delta and x-tar scan : field = +10%, at nominal BPM position
  • 6168 06/29/98 00:56 muehlbauer Setting HMS to 3.8962GeV
  • 6167 06/29/98 00:17 cdaq Beam Time Accounting
  • 6166 06/29/98 00:05 lcsmith ndet gain matching
  • Sunday

  • 6165 06/28/98 23:49 cdaq Run 20099: Bar test, coins only, ND all HV on
  • 6164 06/28/98 23:35 cdaq Run 20098: Bar test, coins only, ND all HV on beam off
  • 6163 06/28/98 23:34 mack bcm1 was not calculated correctly in scaler reports
  • 6162 06/28/98 23:18 cdaq Run 20097: Bar test, coins only, ND all HV on BAR and VETO,
  • 6161 06/28/98 23:16 saw DAQ problem notes
  • 6160 06/28/98 22:50 cdaq Run 20096: Bar test, coins only, ND all HV on BAR and VETO,
  • 6159 06/28/98 22:49 saw HMS wire chamber start change
  • 6158 06/28/98 22:30 cdaq Run 20095: Bar test, coins only, ND all HV on BAR and VETO,
  • 6157 06/28/98 21:56 cdaq Run 20094: Bar test, coins only, ND all HV on BAR and VETO,
  • 6156 06/28/98 21:07 zihlmann DAC PROBLEM
  • 6155 06/28/98 21:02 cdaq Run 20093: Bar test, coins only, ND all HV on BAR and VETO,
  • 6154 06/28/98 20:51 cdaq Run 20092: Bar test, coins only, ND all HV on BAR and VETO,
  • 6153 06/28/98 20:12 zihlmann daq probems 63 extra events in slot 3 roc1
  • 6152 06/28/98 19:44 zihlmann Slow Raster parameters from Chen Yan
  • 6151 06/28/98 18:54 cdaq Run 20091: Bar test, coins only, ND all HV on BAR and VETO,
  • 6150 06/28/98 17:40 cdaq Run 20090: Bar test, coins only, ND all HV on BAR and VETO,
  • 6149 06/28/98 17:18 cdaq Run 20089: Bar test, coins only, HV on bar 14 plane 3,
  • 6148 06/28/98 17:12 cdaq Run 20088: Daq test , 50 nA
  • 6147 06/28/98 17:08 cdaq Run 20087: Daq test after restart, 50 nA
  • 6146 06/28/98 16:54 mitchell Summary of day
  • 6145 06/28/98 16:42 cdaq Run 20086: Daq test , 50 nA
  • 6144 06/28/98 16:35 cdaq Run 20085: Daq test , 50 nA
  • 6143 06/28/98 16:24 cdaq Run 20084: Daq test , 50 nA
  • 6142 06/28/98 16:18 cdaq Run 20083: Daq test , 50 nA
  • 6141 06/28/98 16:01 cdaq Run 20082: Daq test , 50 nA
  • 6140 06/28/98 15:43 cdaq Run 20081: Daq test , 50 nA
  • 6139 06/28/98 15:30 gwarren TOF Cross link - cdaq analyzer change request
  • 6138 06/28/98 15:27 cdaq Run 20080: Daq test , 50 nA
  • 6137 06/28/98 15:24 gwarren Time resolution for TDC slot 19 in HMS crate
  • 6136 06/28/98 15:03 cdaq Beam Time Accounting
  • 6135 06/28/98 14:25 cdaq Run 20079: CH2 target fast raster on 1 mm : Nominal BPM pos
  • 6134 06/28/98 13:52 cdaq Run 20078: Daq test
  • 6133 06/28/98 13:46 cdaq Run 20077: CH2 target fast raster on 1 mm : Nominal BPM pos
  • 6132 06/28/98 11:54 cdaq Run 20074: Test
  • 6131 06/28/98 11:26 cdaq Run 20073: CH2 target fast raster on 1 mm : Nominal BPM pos
  • 6130 06/28/98 11:15 cdaq Run 20072: Daq test
  • 6129 06/28/98 11:08 Mitchell Daq and electronics hell
  • 6128 06/28/98 11:02 cdaq Run 20071: CH2 target slow raster on 2 cm : Nominal BPM pos
  • 6127 06/28/98 10:51 cdaq Run 20070: CH2 target slow raster on 2 cm : Nominal BPM pos
  • 6126 06/28/98 10:34 cdaq Run 20069: Daq test -- change width of HMS wire chambers
  • 6125 06/28/98 10:12 cdaq Run 20068: Daq test
  • 6124 06/28/98 10:09 cdaq Beam Time Accounting
  • 6123 06/28/98 09:48 cdaq Run 20067: Daq test
  • 6122 06/28/98 09:44 cdaq Run 20066: CH2 target slow raster on 2.0 cm : Nominal BPM pos
  • 6121 06/28/98 09:28 cdaq Run 20065: CH2 target slow raster on 1.5 cm : Nominal BPM pos
  • 6120 06/28/98 09:13 cdaq Run 20064: CH2 target slow raster on 1 cm : Nominal BPM pos
  • 6119 06/28/98 08:50 zhuhg DAQ problem need to check out
  • 6118 06/28/98 08:42 zhuhg owl shift summary
  • 6117 06/28/98 08:25 Muehlbauer HMS check out
  • 6116 06/28/98 07:33 cdaq Run 20063: both rasters off, with seive slit in, checkout HMS
  • 6115 06/28/98 07:10 cdaq Run 20062: both rasters off, HMS chechout
  • 6112 06/28/98 06:35 zhuhg faster raster on, run 20059, look at centroid
  • 6111 06/28/98 06:23 zhuhg slow raster on, run 20058, look centroid
  • 6110 06/28/98 06:19 cdaq Run 20059: CH2 target fast raster on, +/- 2mm spot: quest for 0,0 position coins + hms singles
  • 6109 06/28/98 05:57 zhuhg with fast raster on, look at centroid
  • 6108 06/28/98 05:51 cdaq Run 20058: CH2 target slow raster on: quest for 0,0 position
  • 6107 06/28/98 05:43 zhuhg run 20055, 20056 miss SEM strip pattern
  • 6106 06/28/98 05:28 cdaq Run 20057: CH2 target fast raster on with spot size of +/- 2 mm, coin-hms trigger, find centroid
  • 6105 06/28/98 05:14 cdaq Run 20056: CH2 target slow raster on: quest for 0,0 position
  • 6104 06/28/98 04:30 cdaq Run 20055: CH2 target slow raster on: quest for 0,0 position
  • 6103 06/28/98 04:12 cdaq Run 20054: test
  • 6102 06/28/98 01:53 cdaq Run 20052: CH2 target slow raster on: quest for 0,0 position
  • 6101 06/28/98 01:48 cdaq Run 20052: CH2 target slow raster on: quest for 0,0 position
  • 6100 06/28/98 01:38 cdaq Run 20052: CH2 target slow raster on: quest for 0,0 position
  • 6099 06/28/98 01:23 cdaq Run 20051: CH2 target slow raster on: quest for 0,0 position
  • 6098 06/28/98 01:14 zhuhg plot of W for run 20049
  • 6097 06/28/98 01:11 zhuhg found center of slow raster on tbpm
  • 6096 06/28/98 01:03 cdaq Run 20050: CH2 target slow raster off, quest for 0,0 position
  • 6095 06/28/98 00:55 cdaq Run 20049: CH2 target slow raster on: quest for 0,0 position
  • 6094 06/28/98 00:43 cdaq Run 20048: CH2 target slow raster on: quest for 0,0 position
  • 6093 06/28/98 00:40 cdaq Run 20047: CH2 target slow raster on: quest for 0,0 position
  • 6092 06/28/98 00:00 cdaq Run 20046: CH2 target slow raster on: quest for 0,0 position
  • Saturday

  • 6091 06/27/98 23:58 Cdaq disk change after run 20045
  • 6090 06/27/98 23:46 zhuhg p_mom=0 problem in n_timezero.f subroutine
  • 6089 06/27/98 23:41 Zihlmann Target Mass in replay gives reasonable W
  • 6088 06/27/98 23:33 Zihlmann kinematics parameter set to correct values
  • 6087 06/27/98 23:32 Zihlmann ntuple fix
  • 6086 06/27/98 23:25 cdaq Run 20045: CH test run for ndet I =100 nA BPM 3H00B = 0,0
  • 6085 06/27/98 23:14 cdaq Run 20044: beam off; laser on
  • 6084 06/27/98 23:06 cdaq Beam Time Accounting
  • 6083 06/27/98 22:45 cdaq Run 20043: CH test run for ndet I =100 nA BPM 3H00B = 0,0
  • 6081 06/27/98 22:38 cdaq Run 20042: CH test run for ndet I =100 nA BPM 3H00B = 0,0
  • 6082 06/27/98 22:38 cmh7k anode current measurement summary
  • 6080 06/27/98 22:31 cdaq Run 20041: Laser pulser run; beam off
  • 6079 06/27/98 22:20 cowley anode currents on neutron detectors at nominal luminosity
  • 6078 06/27/98 21:59 mcfarlan Beam off for Hall A
  • 6077 06/27/98 21:42 mcfarlan Trigger logic changes
  • 6076 06/27/98 21:38 cdaq Run 20038: CH test run for ndet I =100 nA BPM 3H00B = 0,0
  • 6075 06/27/98 21:32 mcfarlan Runs 20032-37
  • 6074 06/27/98 21:24 cdaq Run 20037: CH test run for ndet I =100 nA BPM 3H00B = 0,0
  • 6073 06/27/98 20:59 cdaq Run 20036: CH test run for ndet I =100 nA BPM 3H00B = 0,0
  • 6072 06/27/98 20:43 cdaq Run 20035: CH test run for ndet I =100 nA BPM 3H00B = 0,0
  • 6071 06/27/98 20:35 cdaq Run 20034: checkout electronics
  • 6070 06/27/98 20:31 cdaq Run 20033: CH test run for ndet I =100 nA BPM 3H00B = 0,0
  • 6069 06/27/98 20:07 cdaq Run 20032: CH test run for ndet I =100 nA BPM 3H00B = 0,0
  • 6068 06/27/98 20:06 cowley beam loss monitors
  • 6067 06/27/98 20:01 zihlmann new analysis code subroutines
  • 6066 06/27/98 19:46 cdaq Run 20031: CH test run for ndet I =100 nA BPM 3H00B = 0,0
  • 6065 06/27/98 19:01 cdaq Run 20030: CH test run for ndet I =100 nA BPM 3H00B = 0,0
  • 6064 06/27/98 19:00 mitchell 3h00A dead, ask for cater
  • 6063 06/27/98 18:37 mitchell anode currents at nominal lum
  • 6062 06/27/98 18:03 mitchell N-det shielding
  • 6061 06/27/98 17:59 cdaq Beam Time Accounting
  • 6060 06/27/98 16:20 cdaq Run 20029: CH test run for ndet I =80 nA BPM 3H00B = -0.5, +1.5,
  • 6059 06/27/98 15:32 gwarren Change in map filename
  • 6058 06/27/98 14:43 cdaq Run 20028: CH test run for ndet I =80 nA BPM 3H00B = -0.5, +1.5,
  • 6057 06/27/98 14:29 donal neutron electronics discriminator
  • 6056 06/27/98 14:07 cdaq Run 20027: CH test run for HMS, I =80 nA BPM 3H00B = -0.5, +1.5,
  • 6055 06/27/98 13:51 gwarren Floating Point Error in cdaq Analyzer
  • 6054 06/27/98 13:29 cdaq Run 20026: ndet checkout. all planes on
  • 6053 06/27/98 13:19 cdaq Run 20025: CH test run for HMS, I =80 nA BPM 3H00B = -0.5, +1.5
  • 6052 06/27/98 13:07 cdaq Run 20024: CH test run for ndet I =80 nA BPM 3H00B = -0.5, +1.5
  • 6051 06/27/98 12:58 cdaq Run 20023: CH test run for ndet I =80 nA BPM 3H00B = -0.5, +1.5
  • 6050 06/27/98 12:52 cdaq Run 20022: Very short test
  • 6049 06/27/98 12:15 Mitchell messed up elog
  • 6048 06/27/98 12:04 cdaq Run 20019: CH test run for HMS, I =80 nA BPM 3H00B = -0.5, +1.5
  • 6047 06/27/98 11:59 Mitchell current jump
  • 6046 06/27/98 11:55 cdaq Run 20018: CH test run for HMS, I = 100 nA BPM 3H00B = -0.2, 0
  • 6045 06/27/98 11:47 mcfarlane Delays for different kinematics
  • 6044 06/27/98 11:36 mcfarlane Gates and triggers
  • 6043 06/27/98 11:20 saw BCM and BLM display
  • 6042 06/27/98 10:51 Mitchell HMS rates
  • 6041 06/27/98 10:49 Mitchell N detector stuff
  • 6040 06/27/98 10:29 cdaq Run 20017: CH test run for HMS, I = 50 nA BPM 3H00B = -1, 0
  • 6039 06/27/98 08:31 zhuhg Owl shift summary
  • 6038 06/27/98 08:14 cdaq Run 20016: test
  • 6037 06/27/98 07:55 cdaq Beam Time Accounting
  • 6036 06/27/98 07:18 cdaq Run 20015: beam position final adjustment
  • 6035 06/27/98 06:57 cdaq Run 20014: test
  • 6034 06/27/98 06:45 cdaq Run 20013: test
  • 6033 06/27/98 06:29 cdaq Run 20012: test
  • 6032 06/27/98 06:21 cdaq Run 20011: test
  • 6031 06/27/98 06:07 cdaq Run 20010: test
  • 6030 06/27/98 05:57 cdaq Run 20009: test
  • 6029 06/27/98 05:44 cdaq Run 20008: test
  • 6028 06/27/98 05:32 cdaq Run 20007: test
  • 6027 06/27/98 05:09 cdaq Run 20006: test
  • 6026 06/27/98 04:29 cdaq Run 20005: test
  • 6025 06/27/98 04:18 cdaq Run 20004: Establish 0,0,0
  • 6024 06/27/98 03:45 mack bcm scaler indices
  • 6023 06/27/98 03:16 cdaq Run 20003: reconnected bcm scaler connector at sos crate. lost in scaler index space.
  • 6022 06/27/98 03:12 mack changed run name in REPLAY.PARM
  • 6021 06/27/98 03:04 cdaq Run 20002: removed bcm scaler connector at sos crate. lost in scaler index space.
  • 6020 06/27/98 02:39 mack working on bcm scaler indices
  • 6019 06/27/98 01:20 mack beware the loss of synch problem
  • 6018 06/27/98 01:06 Danagoulian Superharp scanning...
  • 6017 06/27/98 00:46 cdaq Run 20001: test
  • 6016 06/27/98 00:41 zeier data discs, new filename, run numbering
  • 6015 06/27/98 00:06 zeier DAQ status
  • Friday

  • 6014 06/26/98 23:26 zihlmann analysis code modified
  • 6013 06/26/98 22:42 cdaq Run 718: test
  • 6012 06/26/98 22:40 cdaq Run 717: test
  • 6011 06/26/98 22:32 cdaq Run 716: test
  • 6010 06/26/98 21:59 cdaq Run 715: test
  • 6009 06/26/98 21:46 cdaq Run 714: cosmics run with pulsed beam on, unbuffered
  • 6008 06/26/98 20:43 cdaq Run 713: cosmics run in buffered mode, only neutron detector is on
  • 6007 06/26/98 20:26 cdaq Run 712: test
  • 6006 06/26/98 19:58 cdaq Run 711: test
  • 6005 06/26/98 19:51 cdaq Run 710: test
  • 6004 06/26/98 19:47 cmh7k target encoder positions
  • 6003 06/26/98 19:30 cdaq Run 708: test
  • 6002 06/26/98 18:50 Mitchell Instrumentation Survey
  • 6001 06/26/98 18:44 cowley neutron delays
  • 6000 06/26/98 18:32 cdaq Run 707: test
  • 5999 06/26/98 17:21 cdaq Run 706: test
  • 5998 06/26/98 16:53 Anklin/Joche HMS Quad cycling procedure
  • 5997 06/26/98 16:48 cowley beam spill monitors
  • 5996 06/26/98 16:40 cdaq Run 705: test
  • 5995 06/26/98 16:38 Anklin/Joche HMS Quads degaussed
  • 5994 06/26/98 16:25 Volmer/Ankli HMS Q1 at >500 Amps
  • 5993 06/26/98 16:16 cdaq Run 704: test
  • 5992 06/26/98 15:41 cdaq Run 703: test
  • 5991 06/26/98 15:11 zihlmann bar4 plane4 left dead adc channel
  • 5990 06/26/98 15:09 cdaq Run 702: test
  • 5989 06/26/98 14:45 cowley beam spill monitors
  • 5988 06/26/98 14:26 yan FR2 & SR2 under EPICS control
  • 5987 06/26/98 13:54 Rondon hclog, AIX
  • 5986 06/26/98 12:24 cdaq Run 701: test
  • 5985 06/26/98 11:30 gwarren Minor changes in ndet HV
  • 5984 06/26/98 10:26 saw Beam current in EPICS
  • 5983 06/26/98 09:52 Zhuhg ND pedestal calc in analyzer
  • 5982 06/26/98 09:00 gwarren Spot Checked ndet map file
  • 5981 06/26/98 01:43 mcfarlan HMS and ND gates, scalers
  • 5980 06/26/98 01:00 mack preliminary bcm calibrations for epics
  • Thursday

  • 5979 06/25/98 22:47 cdaq Run 700: cosmics run to check map file. Upper and lower scintillators are on, along with a few other random ones
  • 5978 06/25/98 22:27 gwarren Cosmics Rates and Livetime
  • 5977 06/25/98 22:12 cdaq Run 699: cosmics run to check rates. nominal HV of Tom.
  • 5976 06/25/98 22:11 cdaq Run 698: cosmics runs with nominal HV of Tom to check rates.
  • 5975 06/25/98 22:02 cdaq Run 697: cosmics run with HV 100 V higher than Tom's settings. Forgot to check rates--- gaw
  • 5974 06/25/98 21:55 mack Yes, no hclog on ibm machines
  • 5973 06/25/98 20:54 cdaq Run 696: cosmics run: HV +100V in magnitude compared to run 693
  • 5972 06/25/98 20:52 cdaq Run 695: cosmics run: HV increased in magnitude by 100V compared to run 693
  • 5971 06/25/98 20:40 cdaq Run 694: cosmics run: HV increased in magnitude by 100V
  • 5970 06/25/98 20:29 mitchell BPMs and Raster
  • 5969 06/25/98 20:18 mitchell HMS gas
  • 5968 06/25/98 19:40 zeier Struck scaler readout
  • 5966 06/25/98 18:52 cdaq Run 693: cosmics run
  • 5967 06/25/98 18:52 Rondon hclog, AIX, jlaba1
  • 5965 06/25/98 18:32 Anklin nominal beam positions in TBPM (SEM)
  • 5964 06/25/98 18:13 cdaq Run 691: cosmics run
  • 5963 06/25/98 17:24 cdaq Run 690: test
  • 5962 06/25/98 09:38 cdaq Run 686: test
  • Wednesday

  • 5961 06/24/98 18:05 DONAL optics, target, survey
  • 5960 06/24/98 17:47 Donal optics, target, survey
  • 5959 06/24/98 16:50 Zhuhg answer Joe's question about analyzer float point exception
  • 5958 06/24/98 15:46 Zhuhg zero time calculation in analysis code
  • 5957 06/24/98 15:25 cdaq Run 678: cosmicsrun
  • 5956 06/24/98 15:02 gwarren Increased ndet HV by 100 V
  • 5955 06/24/98 13:33 cdaq Run 677: test
  • 5954 06/24/98 11:45 mcfarlan Tome-coded helicity
  • 5953 06/24/98 10:06 Zhuhg analysis code input changes
  • 5952 06/24/98 09:42 cdaq Run 675: test
  • Tuesday

  • 5951 06/23/98 21:57 mitchell end cosmics
  • 5950 06/23/98 20:23 mitchell cosmic rates and deadtime
  • 5949 06/23/98 19:57 cdaq Run 674: taking cosmics data, HV of all bars lowered by 100 V
  • 5948 06/23/98 19:53 cdaq Run 673: test
  • 5947 06/23/98 19:49 cdaq Run 672: test
  • 5946 06/23/98 19:47 cdaq Run 671: test
  • 5945 06/23/98 17:36 cdaq Run 643: test
  • 5944 06/23/98 17:34 cdaq Run 642: test
  • 5943 06/23/98 17:32 cdaq Run 641: test
  • 5942 06/23/98 17:31 cdaq Run 640: test
  • 5941 06/23/98 17:29 cdaq Run 639: test
  • 5940 06/23/98 17:28 cdaq Run 638: test
  • 5939 06/23/98 17:26 cdaq Run 637: test
  • 5938 06/23/98 17:16 cdaq Run 636: test
  • 5937 06/23/98 17:13 cdaq Run 635: test
  • 5936 06/23/98 16:56 cdaq Run 634: test
  • 5935 06/23/98 16:54 cdaq Run 633: test
  • 5934 06/23/98 12:49 cdaq Run 632: test
  • 5933 06/23/98 12:37 cdaq Run 631: test
  • 5932 06/23/98 12:35 cdaq Run 630: test
  • 5931 06/23/98 12:33 cdaq Run 629: test
  • 5930 06/23/98 12:31 cdaq Run 628: test
  • 5929 06/23/98 12:28 cdaq Run 627: test
  • 5928 06/23/98 12:26 cdaq Run 626: test
  • 5927 06/23/98 12:15 cdaq Run 624: test
  • 5926 06/23/98 12:12 cdaq Run 623: test
  • 5925 06/23/98 12:10 cdaq Run 622: test
  • 5924 06/23/98 12:09 cdaq Run 621: test
  • 5923 06/23/98 12:08 cdaq Run 620: test
  • 5922 06/23/98 12:06 cdaq Run 619: test
  • 5921 06/23/98 12:04 cdaq Run 618: test
  • 5920 06/23/98 11:57 cdaq Run 617: test
  • 5919 06/23/98 11:48 cdaq Run 616: test
  • 5918 06/23/98 11:43 cdaq Run 615: test
  • 5917 06/23/98 11:40 cdaq Run 614: test
  • 5916 06/23/98 11:30 cdaq Run 613: test
  • 5915 06/23/98 11:00 cdaq Run 612: test
  • 5914 06/23/98 10:53 cdaq Run 611: test
  • 5913 06/23/98 10:36 cdaq Run 610: test
  • 5912 06/23/98 09:17 cdaq Run 609: test buffered node
  • Monday

  • 5911 06/22/98 19:10 cdaq Run 608: test
  • 5910 06/22/98 19:03 zeier problem with getruninfo
  • 5909 06/22/98 18:57 cdaq Run 607: test
  • 5908 06/22/98 18:56 cdaq Run 606: test
  • 5907 06/22/98 18:54 cdaq Run 606: test
  • 5906 06/22/98 18:54 cdaq Run 606: test
  • 5905 06/22/98 18:51 cdaq Run 606: test
  • 5904 06/22/98 18:43 cdaq Run 606: test
  • 5903 06/22/98 17:30 cdaq Run 604: test
  • 5902 06/22/98 16:35 cdaq Run 603: I = 120 na, horiz. y_tar tripple, bpms nominal,pion collim.
  • 5901 06/22/98 16:21 cdaq Run 602: I = 120 na, horiz. y_tar tripple, bpms nominal,pion collim.
  • 5900 06/22/98 04:30 mitchell Owl shift stuff
  • 5899 06/22/98 04:29 cdaq Beam Time Accounting
  • 5898 06/22/98 04:11 cdaq Run 601: I = 120 na, horiz. y_tar tripple, bpms nominal,pion collim.
  • 5897 06/22/98 03:43 cdaq Run 600: I = 120 na, horiz. (x) strips, bpms nominal,pion collim.
  • 5896 06/22/98 03:27 cdaq Run 599: I = 120 na, horiz. (x) strips, bpms nominal,pion collim.
  • 5895 06/22/98 03:16 cdaq Run 598: I = 120 na, horiz. (x) strips, bpms nominal,pion collim.
  • 5894 06/22/98 03:10 cdaq Run 597: I = 120 na, horiz. (x) strips, bpms nominal,pion collim.
  • 5893 06/22/98 03:00 cdaq Run 596: I = 120 na, horiz. (x) strips, bpms nominal,pion collim.
  • 5892 06/22/98 02:35 Cvxwrks Ndet in DAQ
  • 5891 06/22/98 02:22 cdaq Run 595: I =50 na, horiz. (x) strips, bpms nominal,pion collim.
  • 5890 06/22/98 02:05 cdaq Run 594: I =50 na, horiz. (x) strips, bpms nominal,pion collim.
  • 5889 06/22/98 01:54 cdaq Run 593: I =200 na, horiz. (x) strips, bpms nominal,pion collim.
  • 5888 06/22/98 01:41 mcfarlan N detector rates
  • 5887 06/22/98 01:39 mcfarlan N detector paddle (veto) rates
  • 5886 06/22/98 01:34 mcfarlan N detector bar rates, PMT currents
  • 5885 06/22/98 01:21 Abdellah optics saga on 6/21 swing shift
  • 5884 06/22/98 01:12 cdaq Beam Time Accounting
  • 5883 06/22/98 01:05 cdaq Run 592: I =50 na, horiz. (x) strips, bpms nominal,pion collim.
  • 5882 06/22/98 01:01 cdaq Run 591: I =50 na, horiz. (x) strips, bpms nominal,pion collim.
  • 5880 06/22/98 00:21 cdaq Run 590: I =200 na, horiz. (x) strips, bpms nominal,pion collim.
  • 5881 06/22/98 00:20 mitchell replay --floating point exceptions
  • 5879 06/22/98 00:16 mitchell Coda woes--Deadtime
  • 5878 06/22/98 00:13 cdaq Run 589: I =200 na, horiz. (x) strips, bpms nominal,pion collim.
  • Sunday

  • 5877 06/21/98 23:56 cdaq Run 588: I =200 na, horiz. (x) strips, bpms nominal,pion collim.
  • 5876 06/21/98 23:45 mitchell Raster change
  • 5875 06/21/98 23:44 mack bcm scalers and 1 MHz clock plugged in
  • 5874 06/21/98 23:12 cdaq Run 587: I =200 na, horiz. (x) strips, bpms nominal,pion collim.
  • 5873 06/21/98 23:03 cdaq Run 586: I =200 na, horiz. (x) strips, bpms nominal,pion collim.
  • 5872 06/21/98 22:56 cdaq Run 585: I =200 na, horiz. (x) strips, bpms nominal,pion collim.
  • 5871 06/21/98 22:40 mitchell slow raster change
  • 5870 06/21/98 22:22 cdaq Run 584: I =200 na, horiz. (x) strips, bpms nominal,sieve
  • 5869 06/21/98 22:12 cdaq Run 583: I =200 na, horiz. (x) strips, bpms nominal,sieve
  • 5868 06/21/98 22:00 cdaq Run 582: I =200 na, horiz. (x) strips, bpms nominal,sieve
  • 5867 06/21/98 21:49 cdaq Run 581: I =200 na, horiz. (x) strips, bpms nominal,sieve
  • 5866 06/21/98 21:43 cdaq Run 580: I =200 na, horiz. (x) strips, bpms nominal,sieve
  • 5865 06/21/98 21:41 cdaq Run 579: I =200 na, horiz. (x) strips, bpms nominal,sieve
  • 5864 06/21/98 21:34 cdaq Run 578: I =200 na, horiz. (x) strips, bpms nominal,sieve
  • 5863 06/21/98 21:14 cdaq Run 577: I =200 na, horiz. (x) strips, bpms nominal,sieve
  • 5862 06/21/98 21:11 cdaq Run 576: I =200 na, horiz. (x) strips, bpms nominal,sieve
  • 5861 06/21/98 21:07 cdaq Run 575: I =200 na, horiz. (x) strips, bpms nominal,sieve
  • 5860 06/21/98 21:00 cdaq Run 574: I =200 na, horiz. (x) strips, bpms nominal,sieve
  • 5859 06/21/98 20:58 cdaq Run 573: I =200 na, horiz. (x) strips, bpms nominal,sieve
  • 5858 06/21/98 19:42 zhuhg hodoscope dead channel
  • 5857 06/21/98 19:39 cdaq Run 572: I =200 na, horiz. (x) strips, bpms nominal,sieve
  • 5856 06/21/98 19:14 cdaq Run 571: I =200 na, horiz. (x) strips, bpms nominal,sieve
  • 5855 06/21/98 18:57 cdaq Run 570: I =200 na, horiz. (x) strips, bpms nominal,sieve
  • 5854 06/21/98 18:56 cdaq Run 569: I =200 na, horiz. (x) strips, bpms nominal,sieve
  • 5853 06/21/98 18:40 cdaq Run 568: I =200 na, horiz. (x) strips, bpms nominal,sieve
  • 5852 06/21/98 18:32 cdaq Run 567: I =200 na, horiz. (x) strips, bpms nominal,sieve
  • 5851 06/21/98 18:27 cdaq Run 566: I =200 na, horiz. (x) strips, bpms nominal,sieve
  • 5850 06/21/98 18:10 cdaq Run 565: I =200 na, horiz. (x) strips, bpms nominal,sieve
  • 5849 06/21/98 17:31 cdaq Run 563: I =200 na, horiz. (x) strips, bpms nominal,sieve
  • 5848 06/21/98 16:54 Danagoulian Shift summary
  • 5847 06/21/98 16:53 cdaq Run 562: I =200 na, horiz. (x) strips, bpms nominal,sieve
  • 5846 06/21/98 16:15 cdaq Beam Time Accounting
  • 5845 06/21/98 16:08 cdaq Run 561: I =200 na, horiz. (x) strips, bpms nominal,sieve
  • 5844 06/21/98 15:28 cdaq Run 560: I =200 na, horiz. (x) strips, bpms nominal,sieve
  • 5843 06/21/98 14:53 cdaq Run 559: I =200 na, horiz. (x) strips, bpms nominal,sieve
  • 5842 06/21/98 13:43 cdaq Run 558: I =200 na, double z target, bpms nominal,sieve
  • 5841 06/21/98 13:34 cdaq Run 557: I =200 na, double z target, bpms nominal, pion
  • 5840 06/21/98 13:29 cdaq Run 556: I =200 na, double z target, bpms nominal, pion
  • 5839 06/21/98 13:17 cdaq Run 555: I = 100 na, triple z target, bpms nominal, pion
  • 5838 06/21/98 13:08 cdaq Run 553: I = 100 na, triple z target, bpms nominal, pion
  • 5837 06/21/98 12:49 cowley neutron detectors threshold
  • 5836 06/21/98 12:43 cdaq Run 552: I = 100 na, triple z target, bpms nominal, sieve
  • 5835 06/21/98 12:25 cdaq Run 551: I = 50 na, triple z target, bpms nominal, sieve
  • 5834 06/21/98 12:03 cdaq Run 550: I = 50 na, triple z target, bpms nominal
  • 5833 06/21/98 11:49 saw Ytar scan
  • 5832 06/21/98 11:35 Yan, Danagou Beam energy correction measurement
  • 5831 06/21/98 11:22 cdaq Run 549: Continuation of last run YTAR, beam at -2,.5
  • 5830 06/21/98 11:04 cowley neutron bar HV and thresholds
  • 5829 06/21/98 10:23 mcfarlan Neutron discriminator thresholds
  • 5828 06/21/98 09:53 mitchell target encoders
  • 5826 06/21/98 09:12 saw Run 548 and energy measurement
  • 5825 06/21/98 08:42 cdaq Run : Ytar (horizontal bars) Beam at -2.0mm, 0.5mm (V)
  • 5824 06/21/98 08:02 cdaq Beam Time Accounting
  • 5823 06/21/98 07:57 zeier xtar scan continued
  • 5822 06/21/98 07:52 zihlmann Vertical beam scan TBPM position
  • 5821 06/21/98 07:30 anklin REMAINING measurements at 1Pass
  • 5820 06/21/98 05:47 zihlmann helium for downstream beam embarassement
  • 5819 06/21/98 05:29 zihlmann Beam position in hms ntuple
  • 5818 06/21/98 05:13 zihlmann diskwatch script
  • 5817 06/21/98 04:24 anklin y_target reconstruction
  • 5816 06/21/98 01:20 zihlmann Ntuple
  • 5815 06/21/98 00:32 cdaq Beam Time Accounting
  • 5814 06/21/98 00:25 Abdellah xtar scan
  • Saturday

  • 5813 06/20/98 23:51 mack scanning the beam position
  • 5812 06/20/98 23:49 mack beam current available on console scope
  • 5811 06/20/98 22:30 mack couldn't hclog BPM screen
  • 5810 06/20/98 22:23 mack fixed hclog on cdaqh1
  • 5809 06/20/98 20:30 mitchell Run 520 x = 0 by SEM
  • 5808 06/20/98 20:25 mitchell optics confusion
  • 5807 06/20/98 18:33 mitchell run 517
  • 5806 06/20/98 18:28 mitchell run 515
  • 5805 06/20/98 17:15 zhuhg analysis code
  • 5804 06/20/98 17:10 sawafta new run
  • 5803 06/20/98 15:55 cdaq Beam Time Accounting
  • 5802 06/20/98 12:06 saw Analysis software - scalers
  • 5801 06/20/98 09:42 mcfarlan HMS trigger delay
  • 5800 06/20/98 09:24 mcfarlan Neutron Detector rates
  • 5799 06/20/98 09:07 sawafta new run
  • 5798 06/20/98 09:02 cdaq Beam Time Accounting
  • 5797 06/20/98 08:59 michael+beni TBPM and RASTER and software
  • 5796 06/20/98 07:04 anklin run 500 sieve slit
  • 5795 06/20/98 07:03 anklin run 499 sieve slit on carbon
  • 5794 06/20/98 06:25 mcfarlan Neutron detector PMT current
  • 5793 06/20/98 06:23 zeier electronics problem and daq
  • 5792 06/20/98 06:14 bernet HMS channels checkout
  • 5791 06/20/98 05:51 anklin target verification
  • 5790 06/20/98 03:45 Danagoulian, Superharp scanning
  • 5789 06/20/98 03:08 bernet target encoder survey
  • 5788 06/20/98 00:36 mack more bcm progress
  • Friday

  • 5787 06/19/98 23:53 cdaq Beam Time Accounting
  • 5786 06/19/98 22:34 anklin encoder positions for carbon target
  • 5785 06/19/98 22:14 anklin carbon target
  • 5784 06/19/98 19:20 gwarren Mapping neutron detector
  • 5783 06/19/98 17:09 saw Analysis fixes
  • 5782 06/19/98 16:39 mack small BCM progress
  • 5781 06/19/98 16:29 mack hclog does not yet work on cdaqh1
  • 5780 06/19/98 16:27 sawafta Shift Summary
  • 5779 06/19/98 16:02 cdaq Beam Time Accounting
  • 5778 06/19/98 15:56 cdaq Beam Time Accounting
  • 5777 06/19/98 15:27 mcfarlan HMS missing S2 TDC data
  • 5776 06/19/98 14:29 sawafta Cosmic data
  • 5775 06/19/98 10:51 sawafta cosmic run
  • 5774 06/19/98 10:29 mcfarlan HMS scintillator TDC
  • 5773 06/19/98 10:27 mcfarlan HMS trigger delay
  • 5772 06/19/98 10:23 yan harp 00 and 00A fixed
  • 5771 06/19/98 07:02 cdaq Beam Time Accounting
  • 5770 06/19/98 07:00 Marko TBPM and HMS checkout
  • 5769 06/19/98 03:06 Abdellah HMS quads and dipole setting
  • 5768 06/19/98 00:23 Steinacher Mapping neutron detector
  • Thursday

  • 5767 06/18/98 20:38 yan raster system protection
  • 5766 06/18/98 16:53 mitchell encoder calibration-tgt lifter
  • 5765 06/18/98 16:27 cdaq Beam Time Accounting
  • 5764 06/18/98 15:15 zihlmann HV Neutron Detector
  • 5763 06/18/98 14:57 ZIHLMANN RASTER fast and slow
  • 5762 06/18/98 11:19 Volmer hclog back up
  • 5761 06/18/98 11:06 mcfarlan HVs off during pulsed beam
  • 5760 06/18/98 11:06 mcfarlan HVs and pulsed beam
  • 5759 06/18/98 09:56 Volmer hclog on HP's and Sun's
  • 5758 06/18/98 07:07 Mitchell HV problems
  • 5757 06/18/98 06:45 Mitchell all done
  • 5756 06/18/98 06:43 Mitchell HV woes
  • 5755 06/18/98 03:39 Anklin fast raster FSD trip
  • 5754 06/18/98 03:23 Anklin fast raster ok
  • 5753 06/18/98 03:00 Anklin hall access
  • 5752 06/18/98 02:30 Anklin fast raster
  • 5751 06/18/98 00:40 cdaq Beam Time Accounting
  • 5750 06/18/98 00:26 cvxwrks Target Shift Checklist
  • Wednesday

  • 5749 06/17/98 21:21 Abdellah HMS HVs
  • 5748 06/17/98 20:51 Abdellah HMS HV
  • 5747 06/17/98 18:09 Volmer hclog usage for now
  • 5746 06/17/98 17:51 mcfarlan Logic, trigger supervisor, 8LM
  • 5745 06/17/98 17:47 Volmer hclogentry.sun functional with screengrab
  • 5744 06/17/98 17:32 Cdaq test
  • 5743 06/17/98 17:24 Volmer sun test partly successful
  • 5742 06/17/98 17:21 Volmer hclogentry test from sun
  • 5741 06/17/98 16:51 Lassiter HMS Magnets ready
  • Tuesday

  • 5740 06/16/98 13:51 cdaq Target Shift Checklist
  • 5739 06/16/98 13:45 Volmer hclog temporarily unavailable
  • Friday

  • 5738 06/12/98 17:37 cdaq tosp for neutron detector
  • 5737 06/12/98 17:32 cdaq neutron detector positioning
  • 5736 06/12/98 16:27 cdaq neutron detector cabling
  • Saturday

  • 5735 06/06/98 17:48 Cdaq 8LM and Trigger Supervisor mods
  • Friday

  • 5734 06/05/98 16:06 Cdaq Trigger Supervisor change

  • This file generated by /net/fs1/home/cdaq/hclog/src/hclogscript version HC1.4
    If you have any comments or problems, please contact:
    Jochen Volmer
    volmer@cebaf.gov
    (757) 269-5195