Jefferson Lab HALL C Logbook for March 99 - runstarts omitted
Main INDEX
Wednesday
11209 03/31/99 20:54 R. Tieulent BPM medm screen
0 03/31/99 19:35 no_name no_key
11200 03/31/99 16:05 cdaq Beam Time Accounting
11199 03/31/99 15:29 dmckee Dipole trip
11198 03/31/99 15:10 dmckee Q3 trip
11196 03/31/99 14:45 dmckee Background rates and beam position
11194 03/31/99 14:27 dmckee xterms
11193 03/31/99 14:03 dmckee HMS HV
11192 03/31/99 11:54 Dunne Target Temperature
11191 03/31/99 08:06 cdaq Beam Time Accounting
11190 03/31/99 08:03 mmiller Owl Shift Log continued
11187 03/31/99 02:36 mmiller ScanIt, cdaqh1 disk problems
11186 03/31/99 02:30 mmiller Owl Shift Log
11185 03/31/99 00:18 eschulte Swing Shift Summary
11184 03/31/99 00:15 eschulte Swing Shift Log
11183 03/31/99 00:01 cdaq Beam Time Accounting
Tuesday
11182 03/30/99 19:47 eschulte Shower Counter HV in HMS
11181 03/30/99 19:20 eschulte HMS Magnet Cycling Procedures
11180 03/30/99 14:50 hcf SOS Temp Readout
Monday
11179 03/29/99 19:14 ent BPM's cabled downstairs
Friday
11178 03/26/99 16:13 hcf >HV Off
11177 03/26/99 14:39 hcf SOS HV Restore & On
11176 03/26/99 14:08 beaufait don't start run befor reloading this supply!
Thursday
11175 03/25/99 15:18 Johna error in kinematics and online_replay update
Wednesday
11174 03/24/99 16:29 Potterveld SOS magnet/hallprobe calibration
11173 03/24/99 16:24 Potterveld SOS magnet/hallprobe calibration
11172 03/24/99 14:49 Johna HMS and SOS scaler problems.
Tuesday
11171 03/23/99 07:09 meekins Shift summary
11170 03/23/99 06:46 cdaq Beam Time Accounting
11168 03/23/99 05:20 meekins Run 23902. High voltage turns off without a trip
11167 03/23/99 05:16 meekins Run 23901 Stop. SOS HV turned off without a trip
11162 03/23/99 02:56 meekins HMS dipole Trips
11157 03/23/99 01:24 meekins HMS q1 RESET
11156 03/23/99 01:23 meekins change of data disk
11151 03/23/99 00:11 cdaq Beam Time Accounting
11150 03/23/99 00:09 eschulte Swing Shift Summary
Monday
11149 03/22/99 23:58 eschulte Swing Shift Log 16:00-00:00
11146 03/22/99 21:31 gueye BPM screen
11145 03/22/99 21:28 eschulte Final Checklist Scan
11144 03/22/99 21:23 eschulte Shift Checklists Cont.
11143 03/22/99 21:16 eschulte Shift Checklists Cont.
11142 03/22/99 21:10 eschulte Shift Checklists Cont.
11140 03/22/99 20:52 eschulte Shift Checklists
11139 03/22/99 20:44 eschulte Shift Checklists Cont.
11137 03/22/99 20:28 eschulte Shift Checklist Scans cont.
11135 03/22/99 19:53 eschulte Shift Checklists Continued
11134 03/22/99 19:51 eschulte Shift Checklists Cont
11132 03/22/99 19:23 eschulte Shift Checklists Feb/March 1999
11125 03/22/99 15:57 csa HMS Q1 crash
11126 03/22/99 15:57 csa Day shift summary
11124 03/22/99 15:56 cdaq Beam Time Accounting
11122 03/22/99 15:10 csa Quad probe readback is broken
11120 03/22/99 14:11 csa for john More SOS DC multiplicity
11118 03/22/99 13:40 csa SOS DC multiplicity
11117 03/22/99 13:28 csa DAQ is BAQ
11115 03/22/99 12:55 csa DAQ probs
11114 03/22/99 12:41 csa I don't understand SOS DC multiplicity
11113 03/22/99 12:12 csa HMS dipole crash
11111 03/22/99 11:54 csa HMS Q1 PC reboot
11110 03/22/99 11:43 Johna HMS/SOS tracking efficiency.
11109 03/22/99 11:34 csa Clarity on HMS fid effic
11108 03/22/99 10:56 fox HMS timing for protons
11107 03/22/99 10:50 fox timing HMS electrons
11106 03/22/99 10:36 Xiaodong Jia run 23844 charge caliberation results.
11105 03/22/99 10:20 Saha HMS Q1 computer
11103 03/22/99 10:15 csa DAQ crash
11102 03/22/99 09:51 fox TOF for electrons in SOSq
11100 03/22/99 09:49 csa Low fid effic from driftmap change?
11098 03/22/99 09:04 csa funny HMS fid effic
11093 03/22/99 08:00 cdaq Beam Time Accounting
11094 03/22/99 07:59 garrow owl shift report
11078 03/22/99 00:04 johna Shift Summary #2
11077 03/22/99 00:01 cdaq Beam Time Accounting
Sunday
11075 03/21/99 23:31 Johna CAEN crate fixed.
11071 03/21/99 20:10 johna Shift Summary #1
11067 03/21/99 18:58 Johna DAQ/Data Analysis shift duties
11066 03/21/99 18:21 fox HMS hut air conditioning failure?
11063 03/21/99 17:36 Johna HMS Driftmap change
11061 03/21/99 16:21 Johna HMS Cerenkov noise test.
11058 03/21/99 16:01 L. Tang Shift summary
11057 03/21/99 16:00 cdaq Beam Time Accounting
11055 03/21/99 15:25 vulcan reset power supply
11044 03/21/99 08:01 Ioana Shift summary
11043 03/21/99 08:00 cdaq Beam Time Accounting
11042 03/21/99 07:31 ioana bpm screen
11028 03/21/99 00:06 cdaq Beam Time Accounting
11027 03/21/99 00:01 johna Shift Summary #2
11026 03/21/99 00:00 Johna Buffered mode test runs.
Saturday
11021 03/20/99 22:03 johna HMS HV dead, calorimeter tripped
11015 03/20/99 21:24 Maurice HOWTO daq recover
11010 03/20/99 19:59 gueye BPM Y-position wrong
11008 03/20/99 19:41 gueye BPM scren
11006 03/20/99 19:21 Johna New tracking efficiency in online_replay
11004 03/20/99 18:33 johna 37 degree data logfiles have wrong momentum.
11003 03/20/99 18:28 johna Shift Summary #1
11001 03/20/99 17:30 nathan success!
10999 03/20/99 16:15 cdaq Beam Time Accounting
10997 03/20/99 15:58 Holt Day shift summary
10996 03/20/99 15:35 vulcan target
10990 03/20/99 11:09 nathan short-term schedule
10989 03/20/99 11:00 vulcan caen died
10986 03/20/99 10:43 nathan change to LH2
10985 03/20/99 10:42 nathan DAQ reboot
10983 03/20/99 09:08 cdaq Beam Time Accounting
10980 03/20/99 08:03 Ioana shift summary
10979 03/20/99 08:02 cdaq Beam Time Accounting
10970 03/20/99 04:53 h. breuer SOS BM02 warnings/beeping
Friday
10953 03/19/99 23:59 cdaq Beam Time Accounting
10952 03/19/99 23:57 johna Shift Report #3
10947 03/19/99 22:18 johna HMS Drift chambers.
10945 03/19/99 21:26 johna Shift Report #2
10939 03/19/99 20:37 gueye BPM screen
10937 03/19/99 20:14 Johna Update HMS thresholds
10936 03/19/99 20:10 Johna HMS kinematics set for 37 degrees (starting at run 23743).
10934 03/19/99 19:52 cdaq Fields reading in #23743
10933 03/19/99 19:51 johna Shift Report #1
10930 03/19/99 18:56 cdaq Run info in #23739
10921 03/19/99 16:11 vulcan hhigh voltage supply
10920 03/19/99 16:08 cdaq Beam Time Accounting
10919 03/19/99 12:38 holt Day shift summary
10914 03/19/99 08:21 cdaq Beam Time Accounting
10913 03/19/99 08:20 Ioana Nicule shift summary
10897 03/19/99 00:00 cdaq Beam Time Accounting
Thursday
10898 03/18/99 18:58 Beck Shift Log 2
10927 03/18/99 18:40 cdaq Run info on #23739
10890 03/18/99 16:50 johna HMS dipole trip - Change to set by current.
10880 03/18/99 15:59 cdaq Beam Time Accounting
10882 03/18/99 14:34 johna Lower HMS momentum by 3%
10887 03/18/99 14:34 Beck Shift Log 1
10879 03/18/99 14:11 yan moeller raster upgrade
10881 03/18/99 10:06 Holt Day shift summary
10876 03/18/99 08:05 cdaq Beam Time Accounting
10875 03/18/99 07:49 Keppel Shift Summary
10874 03/18/99 02:39 meekins HMS Q2 comm problems
10870 03/18/99 01:18 meekins Not understood PID
10866 03/18/99 00:14 csa shift checklist
10865 03/18/99 00:11 csa bpm screen
10863 03/18/99 00:11 cdaq Beam Time Accounting
10862 03/18/99 00:09 Beck Shift Log 3
Wednesday
10860 03/17/99 23:22 Xiaodong Jia charge caliberation run 23692, plot, and constants.
10858 03/17/99 22:58 Xiaodong Jia charge caliberation run, run 23692
10857 03/17/99 22:38 Johna New HMS shielding (results)
10856 03/17/99 22:37 csa Nonideal target PID behavior
10852 03/17/99 20:47 Beck Shift Log 2
10848 03/17/99 19:56 Beck Shift Log 1
10847 03/17/99 18:29 Johna New hardware scaler signal.
10846 03/17/99 17:36 mack RF histos
10844 03/17/99 16:24 cdaq Beam Time Accounting
10845 03/17/99 16:23 Johna Updated sos thresholds.
10843 03/17/99 16:19 Holt Day shift summary
10842 03/17/99 16:18 Dunne Target Fan Frequency
10841 03/17/99 16:16 mack check RF timing electronics
10839 03/17/99 15:45 meekins SOS bad HV
10838 03/17/99 14:44 Lung Controlled Access
10836 03/17/99 14:38 saw ROC4 (SOS SFI)
10835 03/17/99 14:35 beaufait problems drift chamber 2
10834 03/17/99 12:02 Lung Beam off; reboot HMS mags
10833 03/17/99 10:48 Lung DAQ crashes
10828 03/17/99 09:02 Lung Reboot VMEC2
10827 03/17/99 09:00 Lung MCC checks target viewer
10825 03/17/99 08:07 Keppel Shift Summary
10824 03/17/99 08:07 cdaq Beam Time Accounting
10821 03/17/99 06:37 saw vmec2
10817 03/17/99 03:00 Johna online_replay update.
10812 03/17/99 00:24 csa shift checklist
10810 03/17/99 00:00 csa bpm screens
Tuesday
10809 03/16/99 23:53 Beck Shift Summary
10808 03/16/99 23:49 Beck Shift Log
10807 03/16/99 23:37 Johna DAQ Problem figured out.
10805 03/16/99 23:19 Johna HMS background: 6% radiator vs 2%
10801 03/16/99 22:43 Sarty DAQ Errors found
10796 03/16/99 20:04 Johna HMS Background-continued
10793 03/16/99 18:44 Sarty HMS background
10790 03/16/99 17:01 saw HV GUI watchdog
10788 03/16/99 16:05 cdaq Beam Time Accounting
10787 03/16/99 16:03 cdaq Beam Time Accounting
10786 03/16/99 16:00 Holt Day ShiftSummary
10784 03/16/99 15:52 Lung Run Summary for LH2 6% rad; th=21.37 deg
10782 03/16/99 15:38 zeier daq: hmsonly runtype
10779 03/16/99 15:04 fox BPM Screen
10778 03/16/99 15:00 Lung HMS DC1 hit wires?
10777 03/16/99 14:53 Fox SOS turned off
10776 03/16/99 14:35 Fox HMS hcal PMT trip
10773 03/16/99 14:10 Mack bcm note
10772 03/16/99 14:05 Lung CORRECTED Run Summary for LD2 6% rad
10769 03/16/99 13:12 Lung Run summary for LD2 6% rad; 21.37 deg
10766 03/16/99 11:59 Lung Choice of BCM for sums
10764 03/16/99 10:49 Potterveld SOS magnet status
10762 03/16/99 09:35 Fox MCC reboots BPM IOC
10760 03/16/99 08:46 lung MCC doing BPM tweaks
10758 03/16/99 07:45 cdaq Beam Time Accounting
10757 03/16/99 07:44 Keppel Shift Summary 6
10752 03/16/99 06:36 Keppel faulty cable
10747 03/16/99 06:01 lgan problems
10743 03/16/99 04:44 gueye Ion Chamber limits
10742 03/16/99 04:28 lgan cryotarget
10735 03/16/99 00:27 Beck Shift Summary
10734 03/16/99 00:09 cdaq Beam Time Accounting
Monday
10727 03/15/99 23:01 Beck DAQ software crash
10723 03/15/99 22:31 csa Rates vs. position on target
10720 03/15/99 22:08 csa A quick check; yes, HMS shutter is out
10719 03/15/99 21:41 csa Strange HMS DC u1
10718 03/15/99 21:36 nathan Q2 trip (twice)
10717 03/15/99 21:26 nathan ionization chamber trip
10707 03/15/99 18:19 csa HMS, SOS settings
10706 03/15/99 17:44 meekins SOS setup for gamma d --> d pi0
10705 03/15/99 16:27 saw HV controls
10704 03/15/99 16:14 Holt Shift summary
10703 03/15/99 16:00 cdaq Beam Time Accounting
10702 03/15/99 14:40 nathan summary of hms work
10700 03/15/99 12:43 nathan summary of work in Hall C
10699 03/15/99 12:23 nathan trigger for E96-003
10698 03/15/99 10:55 lassiter HMS repairs
10697 03/15/99 10:25 Johna HMS/SOS Hodoscope gain matching.
10696 03/15/99 07:43 lgan BPM screen
10695 03/15/99 07:16 h breuer target log 15-mar-99 07:00
10694 03/15/99 06:39 maurice e96003 collimator
10693 03/15/99 06:38 cdaq Beam Time Accounting
10680 03/15/99 00:50 maurice Swing Shift Summary
10679 03/15/99 00:40 cdaq Beam Time Accounting
Sunday
10666 03/14/99 16:31 Potterveld hall probe reset
10664 03/14/99 16:04 cdaq Beam Time Accounting
10662 03/14/99 15:53 holt Day Shift Summary
10661 03/14/99 15:32 eschulte ps3
10660 03/14/99 15:31 gueye Energy measurement (New record !!)
10657 03/14/99 12:40 eschulte Note on run 23567
10656 03/14/99 12:38 eschulte SOS Hall probe
10655 03/14/99 12:36 eschulte Target motion problems
10654 03/14/99 11:31 Potterveld Inconsistent thresholds on replay
10650 03/14/99 08:57 ent shift summary
10648 03/14/99 08:36 cdaq Beam Time Accounting
10640 03/14/99 06:45 ent changes
10624 03/14/99 04:04 dmckee BPM screen
10623 03/14/99 04:00 gueye Beam spot size at the target Ctnd.
10622 03/14/99 03:43 gueye Beam spot size at the target
10621 03/14/99 03:39 gueye Energy measurement
10611 03/14/99 01:18 ent SOS prescale factor 1
10604 03/14/99 00:16 cdaq Beam Time Accounting
10603 03/14/99 00:12 saw Shift summary
Saturday
10593 03/13/99 22:37 Johna Swap 3 HV channels.
10592 03/13/99 19:31 saw Update
10591 03/13/99 16:15 Tang shift summary
10590 03/13/99 15:58 cdaq Beam Time Accounting
10587 03/13/99 15:27 eschulte Target Type
10583 03/13/99 15:12 eschulte Fast Raster problems
10572 03/13/99 09:57 ent HMS trigger
10571 03/13/99 09:34 ent long access
10570 03/13/99 08:53 cdaq Beam Time Accounting
10569 03/13/99 08:44 ent HMS Chambers lost HV
10568 03/13/99 05:31 ent target changed to 4cm LH2
10564 03/13/99 03:14 ent Q1 trip
10563 03/13/99 03:08 ent runheader 23499 problems
10560 03/13/99 01:38 ent HMS magnets control
10559 03/13/99 01:19 ent Q3 trip
10557 03/13/99 00:40 ent Q2 trip
10556 03/13/99 00:14 saw Shift Summary
10555 03/13/99 00:10 cdaq Beam Time Accounting
Friday
10553 03/12/99 23:34 saw HMS Dipole trip
10552 03/12/99 22:19 saw Current limitation
10551 03/12/99 22:15 Johna Updated SOS thresholds file.
10608 03/12/99 21:19 cdaq How to insert the optics targets.
10547 03/12/99 21:05 saw Qaud controls
10545 03/12/99 19:35 saw BCM Epics
10549 03/12/99 17:37 saw BPM screen
10542 03/12/99 17:25 Johna SOS PID is in.
10541 03/12/99 16:50 mack bcm calibration: part II
10540 03/12/99 16:39 mack good bcm calibration: part I
10537 03/12/99 15:58 cdaq Beam Time Accounting
10536 03/12/99 15:50 Johna Replay options in online_replay
10534 03/12/99 15:24 eschulte Dipole Polarity Reset
10533 03/12/99 14:37 eschulte Problems with Run 23487
10531 03/12/99 13:36 eschulte Shift Checklists
10530 03/12/99 13:16 mack ready to lock up
10527 03/12/99 12:02 nathan ROC2 reset
10526 03/12/99 11:55 mack access: 2 hour update
10525 03/12/99 11:16 mack hv backup hygiene
10524 03/12/99 10:52 eschulte Changed SOS HV Crate
10523 03/12/99 10:47 Fenker s1y7- repaired
10522 03/12/99 10:32 mack bcm1 electronics
10521 03/12/99 09:44 gueye Ion Chambers
10520 03/12/99 09:27 eschulte Remaining Data Points
10519 03/12/99 09:03 mack go to controlled access
10518 03/12/99 08:47 mack hms rotation to new angle
10517 03/12/99 08:41 cdaq Beam Time Accounting
10516 03/12/99 08:02 dmckee dipole trip
10515 03/12/99 07:19 ent BPM screen 5 am
10513 03/12/99 07:08 ent HMS Q1 trip/SOS HV Lost
10512 03/12/99 06:06 ent roc4 problems
10510 03/12/99 05:52 dmckee CT online replay, cuts
10509 03/12/99 05:41 dmckee online kinematics file
10508 03/12/99 05:15 piercey BPM screen
10506 03/12/99 04:00 ent sos shower counter HV lost
10502 03/12/99 02:16 ent wrong C target used
10499 03/12/99 01:21 meek ROC 4 Dead
10497 03/12/99 00:45 ent HMS dipole trip
10495 03/12/99 00:01 cdaq Beam Time Accounting
Thursday
10494 03/11/99 23:59 saw Shift summary
10492 03/11/99 23:33 saw Beam spot position
10489 03/11/99 23:02 Johna SOS DC thresholds should be 4.0 Volts (4.5 was a typo. oops!).
10488 03/11/99 22:39 a. sarty lost HMS Scint HV
10487 03/11/99 22:38 a. sarty target is now dummy cell
10480 03/11/99 20:10 Johna online_replay & replay_example_latest update
10477 03/11/99 18:30 saw 8LM followup
10474 03/11/99 18:11 saw 8LM problem
10472 03/11/99 18:00 Johna SOS DC inefficiency.
10471 03/11/99 17:50 gueye Ion Chambers
10465 03/11/99 17:22 saw Spectrometer settings
10464 03/11/99 17:11 Johna Magnet cycling procedures (a summary).
10463 03/11/99 17:06 Johna NEW HALL C LOG BOOK!!!!!
10462 03/11/99 16:55 Ent Beam/HMS/SOS Checks
10461 03/11/99 16:54 Johna Checkout runs
10457 03/11/99 16:29 garrow PMT s1y7- DEAD
10454 03/11/99 16:18 cdaq Beam Time Accounting
10452 03/11/99 16:13 mack moeller raster misc.
10446 03/11/99 15:30 mack beam on target
10445 03/11/99 12:21 Johna Updated PID thresholds.
10444 03/11/99 12:14 mack unser calibration
10443 03/11/99 12:06 Johna SOS Calorimeter timing/trigger problem.
10442 03/11/99 12:01 csa HMS, SOS magnets set
10441 03/11/99 09:48 mack xterm cable screwy
10440 03/11/99 09:34 mack unser checkout
10438 03/11/99 09:15 mack day shift begins
10437 03/11/99 07:41 eschulte Owl Shift Summary
10436 03/11/99 02:39 dmckee field99 program
10435 03/11/99 02:26 dmckee field99 program
10434 03/11/99 01:58 dmckee Solid targets. Thicknesses. Correction.
Wednesday
10433 03/10/99 23:18 garrow Cryo Target Thickness
10431 03/10/99 19:54 ent hall c status
10430 03/10/99 18:12 zeier HV events
10429 03/10/99 16:52 Johna Fast Raster readout change.
10428 03/10/99 16:04 Grames BPM and BCM Electronics Re-installed in 3C line
Tuesday
Monday
10423 03/08/99 12:09 Lassiter HMS magnets keyed off
Sunday
10422 03/07/99 18:28 zihlmann moller shutdown
10421 03/07/99 18:07 zihlmann cryo target out of beam: radiator out
Saturday
10397 03/06/99 21:15 mitchell raster on vs raster off
10394 03/06/99 20:14 R. Michaels statistical checks of 45 degree data
10388 03/06/99 17:45 R. Michaels Summary of 45 Degree Data
10385 03/06/99 16:41 gueye Beam energy measurement (energy festival)
10384 03/06/99 16:11 cdaq Beam Time Accounting
10380 03/06/99 14:19 csa More Grames data
10374 03/06/99 09:53 cdaq Beam Time Accounting
10370 03/06/99 08:23 csa Incorrect theta in runinfo for runs 23384-23388
10359 03/06/99 01:51 cdaq Beam Time Accounting
Friday
10348 03/05/99 15:43 cdaq Beam Time Accounting
10346 03/05/99 15:40 cdaq Beam Time Accounting
10333 03/05/99 05:05 zihlmann epics spcript change for moller
10324 03/05/99 00:58 beaufait moller raster
10323 03/05/99 00:12 cdaq Beam Time Accounting
Thursday
10322 03/04/99 23:22 csa Joe Grames data
10321 03/04/99 22:49 Williamson q2 control system crash
10320 03/04/99 22:47 Williamson dipole control system crash
10310 03/04/99 18:14 csa No BCM3 prob
10305 03/04/99 16:27 cdaq Beam Time Accounting
10304 03/04/99 16:21 zeier Day shift summary
10303 03/04/99 16:02 csa gtarget parameters
10302 03/04/99 15:22 Wood Hall C Beam Current Display
10300 03/04/99 14:36 dmckee Solid targets. Thicknesses, and position on ladder.
10297 03/04/99 14:09 yan Moller raster setting
10290 03/04/99 11:56 zeier moller analyzer problems
10282 03/04/99 10:45 Johna HMS Dipole trip.
10281 03/04/99 10:33 meekins Radaitor,
10280 03/04/99 07:54 cdaq Beam Time Accounting
10278 03/04/99 04:02 zihlmann beam position modulation due to bump a and b
10274 03/04/99 00:03 csa BCM3 amplifier box problem?
Wednesday
10273 03/03/99 23:24 csa gscaler problem
10272 03/03/99 20:34 csa Protons-R-Us
10271 03/03/99 17:06 zeier beam current
10270 03/03/99 16:57 zeier Day shift Summary
10260 03/03/99 13:57 zeier rf out during runs 23301-23303
10256 03/03/99 13:24 zeier electronics problems
10250 03/03/99 12:30 zeier run 23296 erratum
10246 03/03/99 11:16 zeier run 23294 useless
10245 03/03/99 11:15 zeier run 23292: erratum
10229 03/03/99 07:30 Johna HMS/SOS Calibration.
10228 03/03/99 07:02 Johna SDC Threshold scan
10227 03/03/99 04:04 Johna HMS HV turned off.
10226 03/03/99 03:49 meekins Cryogenics, Cryotarget, Moller
10225 03/03/99 02:19 Johna Run 23200 was NOT elastics.
10224 03/03/99 01:04 zeier moller status
10223 03/03/99 00:42 zeier Swing shift summary
Tuesday
10211 03/02/99 21:23 zeier Helicity flip rate changed to 1 Hz
10210 03/02/99 21:20 zeier run 23267 erratum
10197 03/02/99 17:15 cdaq Beam Time Accounting
10196 03/02/99 17:13 cdaq Beam Time Accounting
10195 03/02/99 17:10 keppel Day shift summary
10172 03/02/99 11:21 csa Run 23200 problems
10171 03/02/99 09:04 gueye HMS magnets at 0A
10170 03/02/99 08:59 gueye HMS Rotation-Q2 tripped
10169 03/02/99 08:36 Lassiter Alarms on HMS
10168 03/02/99 08:22 Lassiter Carriage rotation
10167 03/02/99 07:39 cdaq Beam Time Accounting
10166 03/02/99 06:06 eschulte Helium Bottle
10165 03/02/99 05:23 cdaq Beam Time Accounting
10164 03/02/99 05:15 garrow Owl shift summary
10154 03/02/99 02:36 zeier swing shift summary
Monday
10137 03/01/99 22:30 Potterveld HMS Q1 repair
10131 03/01/99 21:58 cvxwrks
10126 03/01/99 19:45 zeier hms momentum in run 23200 was 1.626 and not 2.723
10123 03/01/99 17:45 Lassiter HMS Q2 PC locked up
10122 03/01/99 17:44 Lassiter HMS Q1 repaired
10121 03/01/99 17:33 Johna SOS Cerenkov timing problem.
10120 03/01/99 16:57 grames Unser electronics removed.
10119 03/01/99 16:16 Potterveld (B) shift report 01-MAR-99
10118 03/01/99 15:54 cdaq Beam Time Accounting
10117 03/01/99 15:34 Potterveld hms repairs to resume
10114 03/01/99 13:38 Potterveld HMS hall probe data
10113 03/01/99 13:06 Potterveld HMS Q2 hall probe
10112 03/01/99 12:44 Potterveld SOS magnet checkout data
10111 03/01/99 11:45 Potterveld HMS Q2 crash button
10110 03/01/99 10:48 Potterveld HMS Q2 hall probe
10109 03/01/99 10:41 Potterveld Hall C access
10108 03/01/99 07:18 eschulte Cryotarget Rotation
10107 03/01/99 06:43 cdaq Beam Time Accounting
10106 03/01/99 06:26 Garrow HMS Q3
10099 03/01/99 05:17 eschulte Q3 Trip
10093 03/01/99 02:02 cdaq Run :
10092 03/01/99 01:55 cdaq Run :
10091 03/01/99 00:23 Johna SOS PID problem.
10090 03/01/99 00:20 Potterveld Shift report C-28-FEB-1999
10089 03/01/99 00:13 cdaq Beam Time Accounting
10088 03/01/99 00:10 Potterveld SOS angle TV-view error