• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT

    User name cdaq

    Log entry time 23:29:12 on July 26, 1999

    Entry number 14755

    keyword=Run 25792: e94-110 production LH2 target (W2, Q2, eps = 3.37, 3.53, 0.63)

    Run #25792 (coin) - /cdaqs1/data2/daq99_25792.log

    Beam Energy (MeV) 55105498
    HMS Momentum (GeV/c) -2.611-2.611
    HMS Angle 30.4930.5
    SOS Momentum (GeV/c) -1.569-1.569
    SOS Angle 42.5242.52
    Target NUMBER 1313
    HMS Q1 Set Current 300.200300.12
    HMS Q2 Set Current -304.563-238.58
    HMS Q3 Set Current 117.481117.25
    HMS Q1 B Field (G) 4120.90004120.9000
    HMS Q2 B Field (G) -4854.2000-4854.2000
    HMS Q3 B Field (G) 2361.50002361.5000
    HMS D Current Readback -705.270-705.270
    HMS B_true -0.6335018-0.6335018
    SOS Q Set Current 620.39620.39
    SOS Q Field -9906.00-9906.00
    SOS B1 Set Current 811.62811.62
    SOS B1 Hall Probe -17881.00-17881.00
    SOS B2 Set Current 654.62654.62
    SOS B2 Hall Probe 18205.0018205.00

    e94-110 production LH2 target (W2, Q2, eps = 3.37, 3.53, 0.63)
    beam current= 60uA
    HMS 3/4 electron + prescaled pions (A+B)
    SOS 3/4 electron + prescaled pions (A+B)

    ps1=1
    ps2=1
    ps3 = 99999

    sos is negative, sieve slit is in place; -1.569 GeV



    echmsq1i_set_s300.2
    echmsq2i_set_s-304.563
    echmsq3i_set_s117.481
    echmsdimeas2_s-705.27
    echmsdb_true_s-0.633288
    Rast_TargWidth
    EHCRT_IXPEAK24.038
    EHCRT_IYPEAK11.662
    EHCRT_ENGERY
    EHCRT_INITENGERY
    EHCRT_INITILIMIT60