0800 | 0900 | 1000 | 1100 | 1200 | 1300 | 1400 | 1500 | Total Time | |
---|---|---|---|---|---|---|---|---|---|
Acceptable Beam in Use | 0 | 0 | 1.000 | 0 | 0 | 0 | 0 | 0 | 1 |
Beam Available but Not in Use | 1 | 1 | 0 | 0 | 0 | 0 | 0 | 0 | 2 |
Beam Not Available or Unacceptable | 0 | 0 | 0 | 1 | 1 | 1 | 1 | 1 | 5 |
Accelerator Con- figuration Chage | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
Experiment Ready | 0 | 0 | 1.000 | 1 | 1 | 1 | 1 | 1 | 6 |
Planned Config- uration Change | 1 | 1 | 0 | 0 | 0 | 0 | 0 | 0 | 2 |
Unplanned Experiment Down | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
Hall not ready reasons | |||||||||
Target | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
HMS | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
SOS | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
Data Acq | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
Other | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
Comments: Switch over to R experiment: changed magnets, angles, checked fast raster, checked intrinsic beam spot size, checked target parameters. The only hour of ABU was for spot size checks and confirming that the MPS would let us run at 60+ microA. made an opportunistic entry during injector resteering.
Data Entry by: mack