• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT

    User name cdaq

    Log entry time 16:25:19 on October 5, 1999

    Entry number 18062

    keyword=Beam Time Accounting
    Hall C

    10/5/1999 0800-1600
    Experiment #: E97-006
    Shift Leader: mack
    Shift Workers: crowder,vulcan,mckee

    08000900100011001200130014001500Total Time
    Acceptable Beam
    in Use
    0 0 1.000 0 0 0 0 0 1
    Beam Available
    but Not in Use
    1 1 0 0 0 0 0 0 2
    Beam Not Available
    or Unacceptable
    0 0 0 1 1 1 1 1 5
    Accelerator Con-
    figuration Chage
    0 0 0 0 0 0 0 0 0
    Experiment
    Ready
    0 0 1.000 1 1 1 1 1 6
    Planned Config-
    uration Change
    1 1 0 0 0 0 0 0 2
    Unplanned
    Experiment Down
    0 0 0 0 0 0 0 00
    Hall not
    ready reasons
    Target 0 0 0 0 0 0 0 0 0
    HMS 0 0 0 0 0 0 0 0 0
    SOS 0 0 0 0 0 0 0 0 0
    Data Acq 0 0 0 0 0 0 0 0 0
    Other 0 0 0 0 0 0 0 0 0

    Comments: Switch over to R experiment: changed magnets, angles, checked fast raster, checked intrinsic beam spot size, checked target parameters. The only hour of ABU was for spot size checks and confirming that the MPS would let us run at 60+ microA. made an opportunistic entry during injector resteering.

    Data Entry by: mack