Main INDEX
Monthly INDEX
PREV
NEXT
User name mitchell
Log entry time 23:09:41 on November 9,1999
Entry number 18778
keyword=shift summary
Target group prepared He target, problems with a leak in the isolation vacuum for the 4He coolant of the cryo-compressor. This was overcome by raw pump speed
(roots blower).
Prepared spectrometers for checkout . PHMS -1.576, PSOS -1.260 and both spectrometers at 30 deg.
Swept hall at about 10:00
Beam tuning anticipated to start around 11:30