Main INDEX
Monthly INDEX
PREV
NEXT
User name Lassiter
Log entry time 15:26:45 on November15,1999
Entry number 19347
keyword=HMS Dipole levels
The problems with the dipole LN2 and helium liquid level control was cured by cycling the cool down permit option. The problem possibly arose due to the communication failure of vmec2.