• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT

    User name Lassiter

    Log entry time 15:26:45 on November15,1999

    Entry number 19347

    keyword=HMS Dipole levels

    The problems with the dipole LN2 and helium liquid level control was cured by cycling the cool down permit option. The problem possibly arose due to the communication failure of vmec2.