Difference between revisions of "Compton Meeting, October 2, 2013"
From PolWiki
Jump to navigationJump to search (New page: <pre> 1. Dial Toll-Free Number: 866-740-1260 (U.S. & Canada) 2. International participants dial: Toll Number: 303-248-0285= Or International Toll-Free Number: http://www.readytalk.com/intl...) |
|||
(One intermediate revision by the same user not shown) | |||
Line 27: | Line 27: | ||
=== Electron detector === | === Electron detector === | ||
* Trigger simulation updates. | * Trigger simulation updates. | ||
− | * Runlet vs. | + | * Runlet vs. laser-cycle cycle analysis differences. |
=== Minutes === | === Minutes === | ||
+ | * Work in hall delayed - start date unknown (couple weeks?). | ||
+ | * Mark D. working on Run 1 polarization note. Then on to Run 2. Will come to meeting next week. | ||
+ | * CH racks locked because of new transformer (not hooked up). Should be hooked up tomorrow. | ||
+ | * J.C. working on "optical photon" simulation. | ||
+ | * Trigger simulations so far don't indicate any difference between laser on and off. | ||
+ | ** DG will make plots of rates for the different planes. | ||
+ | ** A.N. will compare rates from Fortran analyzer and c++ analyzer. |
Latest revision as of 15:59, 2 October 2013
1. Dial Toll-Free Number: 866-740-1260 (U.S. & Canada) 2. International participants dial: Toll Number: 303-248-0285= Or International Toll-Free Number: http://www.readytalk.com/intl 3. Enter your 7-digit access code, followed by “#” --> our access code is 3227471
Agenda
No meeting room. Call in, or come to Dave's office.
General
- Meeting attendance: lately it seems pretty sparse. Should we switch to a mode where we meet "as needed"?
Laser
- Laser optics removal complete - thanks to Don for coming down to help.
- Chiller (and heat sink) still in place. Might need to relocate in hall without breaking plumbing connections.
- Need to summarize final error on laser polarization for Run 2. Summary elog? Tech note?
- What about laser polarization for Run 1?
Photon Detector
- Power feed to CH racks STILL locked out - Joe Beaufait tracking down lock owner.
- Simulation updates?
Electron detector
- Trigger simulation updates.
- Runlet vs. laser-cycle cycle analysis differences.
Minutes
- Work in hall delayed - start date unknown (couple weeks?).
- Mark D. working on Run 1 polarization note. Then on to Run 2. Will come to meeting next week.
- CH racks locked because of new transformer (not hooked up). Should be hooked up tomorrow.
- J.C. working on "optical photon" simulation.
- Trigger simulations so far don't indicate any difference between laser on and off.
- DG will make plots of rates for the different planes.
- A.N. will compare rates from Fortran analyzer and c++ analyzer.