(New page: <pre> 1. Dial Toll-Free Number: 866-740-1260 (U.S. & Canada) 2. International participants dial: Toll Number: 303-248-0285= Or International Toll-Free Number: http://www.readytalk.com/intl...)
 
 
(One intermediate revision by the same user not shown)
Line 27: Line 27:
 
=== Electron detector ===
 
=== Electron detector ===
 
* Trigger simulation updates.
 
* Trigger simulation updates.
* Runlet vs. lasr-cycle cycle analysis differences.
+
* Runlet vs. laser-cycle cycle analysis differences.
  
 
=== Minutes ===
 
=== Minutes ===
 +
* Work in hall delayed - start date unknown (couple weeks?).
 +
* Mark D. working on Run 1 polarization note. Then on to Run 2. Will come to meeting next week.
 +
* CH racks locked because of new transformer (not hooked up). Should be hooked up tomorrow.
 +
* J.C. working on "optical photon" simulation.
 +
* Trigger simulations so far don't indicate any difference between laser on and off.
 +
** DG will make plots of rates for the different planes.
 +
** A.N. will compare rates from Fortran analyzer and c++ analyzer.

Latest revision as of 15:59, 2 October 2013

1. Dial Toll-Free Number: 866-740-1260 (U.S. & Canada)
2. International participants dial:
Toll Number: 303-248-0285=
Or International Toll-Free Number: http://www.readytalk.com/intl
3. Enter your 7-digit access code, followed by “#”

 --> our access code is 3227471

Agenda

No meeting room. Call in, or come to Dave's office.

General

  • Meeting attendance: lately it seems pretty sparse. Should we switch to a mode where we meet "as needed"?

Laser

  • Laser optics removal complete - thanks to Don for coming down to help.
    • Chiller (and heat sink) still in place. Might need to relocate in hall without breaking plumbing connections.
  • Need to summarize final error on laser polarization for Run 2. Summary elog? Tech note?
  • What about laser polarization for Run 1?

Photon Detector

  • Power feed to CH racks STILL locked out - Joe Beaufait tracking down lock owner.
  • Simulation updates?

Electron detector

  • Trigger simulation updates.
  • Runlet vs. laser-cycle cycle analysis differences.

Minutes

  • Work in hall delayed - start date unknown (couple weeks?).
  • Mark D. working on Run 1 polarization note. Then on to Run 2. Will come to meeting next week.
  • CH racks locked because of new transformer (not hooked up). Should be hooked up tomorrow.
  • J.C. working on "optical photon" simulation.
  • Trigger simulations so far don't indicate any difference between laser on and off.
    • DG will make plots of rates for the different planes.
    • A.N. will compare rates from Fortran analyzer and c++ analyzer.