Difference between revisions of "Compton Meeting, October 9, 2013"

From PolWiki
Jump to navigationJump to search
 
Line 26: Line 26:
 
* Simulation of 3 planes for accum and scalers [https://qweak.jlab.org/elog/DAQ+%26+Analysis/287 DAQ and Analysis Log 287]
 
* Simulation of 3 planes for accum and scalers [https://qweak.jlab.org/elog/DAQ+%26+Analysis/287 DAQ and Analysis Log 287]
 
** We discussed this last week...
 
** We discussed this last week...
 +
* More plots from run 24310: [https://qweak.jlab.org/elog/Electron+Detector/557 Edet log 557]
 
* Runlet vs. laser-cycle cycle analysis differences.
 
* Runlet vs. laser-cycle cycle analysis differences.
  
 
=== Minutes ===
 
=== Minutes ===

Latest revision as of 14:38, 9 October 2013

1. Dial Toll-Free Number: 866-740-1260 (U.S. & Canada)
2. International participants dial:
Toll Number: 303-248-0285=
Or International Toll-Free Number: http://www.readytalk.com/intl
3. Enter your 7-digit access code, followed by “#”

 --> our access code is 3227471

Agenda

No meeting room. Call in, or come to Dave's office.

General

  • Cool weather is back!

Laser

Photon Detector

  • Power in CH on. Work in tunnel could start week of Nov. 4 - should take advantage of this delay while we can.
  • Simulation updates.

Electron detector

  • Scaler and accumulator rates from c++ analyzer (same as fortran): Edet log 556
  • Simulation of 3 planes for accum and scalers DAQ and Analysis Log 287
    • We discussed this last week...
  • More plots from run 24310: Edet log 557
  • Runlet vs. laser-cycle cycle analysis differences.

Minutes