== Standard Running Procedure == | == Standard Running Procedure == | ||
=== with the previous beam activity ongoing (parasitically) === | === with the previous beam activity ongoing (parasitically) === | ||
− | + | * take a quick CODA run to check DAQ functionality | |
− | + | * check analyzer functionality | |
− | + | * from any cdaq machine, from the directory ~/compton execute '''StripTool edetectorEpics.stp''' . This pulls up the strip chart of some relevant epics variables for e-detector. If you are unable to locate this file, the following epics variables should be explicitly opened. | |
− | * from any cdaq machine, from the directory ~/compton | ||
** 4 Hall-C Chicane BPMs | ** 4 Hall-C Chicane BPMs | ||
*** 3P01A (IPM3P01A.XPOS , IPM3PO1A.YPOS) | *** 3P01A (IPM3P01A.XPOS , IPM3PO1A.YPOS) | ||
Line 37: | Line 36: | ||
** Take a few long runs with 2/3 and 3/3 trigger at 1.5 cm from the beam, with and without beam, with and without laser | ** Take a few long runs with 2/3 and 3/3 trigger at 1.5 cm from the beam, with and without beam, with and without laser | ||
==== Upcoming ==== | ==== Upcoming ==== | ||
− | Seek a beam time of ~ 5hrs. Following | + | Seek a beam time of ~ 5hrs. Following tasks to be accomplished: |
− | + | * With laser turned off for this entire running period resolve the plane-4 HV ambiguity: (~ 0.5 hrs) | |
− | * | + | **look at output from all 3 planes on the scope, triggering on 2-plane coin while turning on HV of only one plane at a time |
− | **look at output from all 3 planes on the scope, turning on HV of only one plane at a time | + | ***do this for plane-2 and plane-3 first |
− | ***do this for | ||
***finally turn on p4 (repeat for a few neighboring strips if needed) | ***finally turn on p4 (repeat for a few neighboring strips if needed) | ||
− | ***record scope shots | + | ***record scope shots triggered on coincidences |
* with the DAQ, try to observe a shift in the strip pattern as the detector is lowered towards the beam. (~ 3.5 hrs) | * with the DAQ, try to observe a shift in the strip pattern as the detector is lowered towards the beam. (~ 3.5 hrs) | ||
− | **use 3 active planes | + | **If the plane-4 ambiguity is resolved then use all 3 active planes for trigger decision |
− | ** | + | **If plane-4 is not resolved, turn off the HV input to "plane-1" as well as "plane-4", mask the plane-4 signals and use 2-plane triggers only with plane-2 & plane-3. |
− | ** | + | **take quick runs to check if smaller or higher cut on minimum width helps |
− | **take 30 min runs with 5 uA and | + | **try to find a trade-off between unmasking the strips neighboring the closest active strip and noise rates |
+ | **take 30 min runs with 5 uA, 3 uA and 1 uA beam with the detector at a reasonably close position (say 1.6 cm from beam) | ||
**Repeat in steps of 1 mm as the detector is moved closer to the beam (~ 3 steps should be sufficient) | **Repeat in steps of 1 mm as the detector is moved closer to the beam (~ 3 steps should be sufficient) | ||
− | |||
* HV scan for plane 2 only (~1 hr) | * HV scan for plane 2 only (~1 hr) | ||
− | **With the detector at the closest position, and a 3 uA beam scan the HV from | + | **With the detector at the closest position, and a 3 uA beam scan the HV from 300 - 700V in steps of 100 V taking 10 min runs at each voltage |
+ | ***use 2 plane trigger, taking background run for each of the applied HV ( | ||
+ | ***use a single plane trigger, taking background run for each of the applied HV. | ||
+ | **** It might be useful to increase the cut on minimum width in order to get over the excessive noise in the single-plane trigger. | ||
Revision as of 18:57, 19 November 2010
Standard Running Procedure
with the previous beam activity ongoing (parasitically)
- take a quick CODA run to check DAQ functionality
- check analyzer functionality
- from any cdaq machine, from the directory ~/compton execute StripTool edetectorEpics.stp . This pulls up the strip chart of some relevant epics variables for e-detector. If you are unable to locate this file, the following epics variables should be explicitly opened.
- 4 Hall-C Chicane BPMs
- 3P01A (IPM3P01A.XPOS , IPM3PO1A.YPOS)
- 3P02A (IPM3P02A.XPOS , IPM3PO2A.YPOS)
- 3P02B (IPM3P02B.XPOS , IPM3PO2B.YPOS)
- 3P03A (IPM3P03A.XPOS , IPM3PO3A.YPOS)
- Normalized Compton Photon Rates (cComptPhotonRateNorm)
- 4 Hall-C Chicane BPMs
Request beam to be set through the chicane and verify the same
- Check Chicane view: on any cdaq machine type edmmonticello, from the Monticello screen
- open Magnets -> Magnet Commander
- 3C -> Compton Combo
- In this Hall C Compton Control screen, the REQUESTED and ACTUAL current readbacks should be ~104 A
- open BPM -> BPM Overview
- open Absolute -> on the Hall C column from the left bottom of this screen
- BPM 3P01A, 3P02A, 3P02B and 3P03A should have finite non-zero read back
- open Magnets -> Magnet Commander
- Check compton rates from the photon detector (typically 600 per uA per second)
Request beam to be taken off, for lowering the e-detector
- Lower the e-detector to a position in accordance with current run plan
- Motion mechanism [[1]]
- begin with the program Go Home
- jog to the intended position
- Motion mechanism [[1]]
Run Plan
Previous (Nov 17)
- Form an external coincidence between strip #5 or 6 of all three planes.
- count it on a visual scaler. look at each of the 3 plane signals on a scope to determine a good coincidence window.[this setup is ready]
- record 1/3, 2/3 and 3/3 at 2.8, 2.0 and 1.2 cm from the beam, with and without beam. Collecting statistics for ~ 3-5 minutes
- Repeat above with the full DAQ. Again 1/3, 2/3 and 3/3 at same distances from the beam, with and without beam.
- Try a couple of different trigger coincidence widths in the 100 - 250 ns range.
- Take a few long runs with 2/3 and 3/3 trigger at 1.5 cm from the beam, with and without beam, with and without laser
Upcoming
Seek a beam time of ~ 5hrs. Following tasks to be accomplished:
- With laser turned off for this entire running period resolve the plane-4 HV ambiguity: (~ 0.5 hrs)
- look at output from all 3 planes on the scope, triggering on 2-plane coin while turning on HV of only one plane at a time
- do this for plane-2 and plane-3 first
- finally turn on p4 (repeat for a few neighboring strips if needed)
- record scope shots triggered on coincidences
- look at output from all 3 planes on the scope, triggering on 2-plane coin while turning on HV of only one plane at a time
- with the DAQ, try to observe a shift in the strip pattern as the detector is lowered towards the beam. (~ 3.5 hrs)
- If the plane-4 ambiguity is resolved then use all 3 active planes for trigger decision
- If plane-4 is not resolved, turn off the HV input to "plane-1" as well as "plane-4", mask the plane-4 signals and use 2-plane triggers only with plane-2 & plane-3.
- take quick runs to check if smaller or higher cut on minimum width helps
- try to find a trade-off between unmasking the strips neighboring the closest active strip and noise rates
- take 30 min runs with 5 uA, 3 uA and 1 uA beam with the detector at a reasonably close position (say 1.6 cm from beam)
- Repeat in steps of 1 mm as the detector is moved closer to the beam (~ 3 steps should be sufficient)
- HV scan for plane 2 only (~1 hr)
- With the detector at the closest position, and a 3 uA beam scan the HV from 300 - 700V in steps of 100 V taking 10 min runs at each voltage
- use 2 plane trigger, taking background run for each of the applied HV (
- use a single plane trigger, taking background run for each of the applied HV.
- It might be useful to increase the cut on minimum width in order to get over the excessive noise in the single-plane trigger.
- With the detector at the closest position, and a 3 uA beam scan the HV from 300 - 700V in steps of 100 V taking 10 min runs at each voltage
Backout Procedure
- Turn OFF HV
- Retract the detector to position defined as Go Home
- Retract further to position defined as Garage
- make hclog entry to inform completion of the intended studies, with any quick conclusion which are obvious
- courtesy: Thanks to Dave Gaskell for the motivation to organize this information