Difference between revisions of "Electron Detector"

From PolWiki
Jump to navigationJump to search
Line 26: Line 26:
 
*** begin with the program '''Go Home'''
 
*** begin with the program '''Go Home'''
 
*** '''jog''' to the intended position
 
*** '''jog''' to the intended position
 
+
*** Request beam according to the intended run plan
 
===Run Plan ===
 
===Run Plan ===
==== Previous (Nov 17)====
+
==== Nov 17 ====
 
* Form an external coincidence between strip #5 or 6 of all three planes.
 
* Form an external coincidence between strip #5 or 6 of all three planes.
 
** count it on a visual scaler. look at each of the 3 plane signals on a scope to determine a good coincidence window.[this setup is ready]
 
** count it on a visual scaler. look at each of the 3 plane signals on a scope to determine a good coincidence window.[this setup is ready]
Line 35: Line 35:
 
** Try a couple of different trigger coincidence widths in the 100 - 250 ns range.
 
** Try a couple of different trigger coincidence widths in the 100 - 250 ns range.
 
** Take a few long runs with 2/3 and 3/3 trigger at 1.5 cm from the beam, with and without beam, with and without laser
 
** Take a few long runs with 2/3 and 3/3 trigger at 1.5 cm from the beam, with and without beam, with and without laser
==== Upcoming ====
+
==== Nov 22 ====
 
Seek a beam time of 6.5 hrs. Following tasks to be accomplished:
 
Seek a beam time of 6.5 hrs. Following tasks to be accomplished:
 
* With laser turned off for this entire running period resolve the plane-4 HV ambiguity:  (~ 1 hr)
 
* With laser turned off for this entire running period resolve the plane-4 HV ambiguity:  (~ 1 hr)
Line 57: Line 57:
 
**** It might be useful to increase the cut on minimum width in order to look over the excessive noise in the case of single-plane trigger.
 
**** It might be useful to increase the cut on minimum width in order to look over the excessive noise in the case of single-plane trigger.
  
===Backout Procedure===
+
==Backout Procedure==
 
# Turn OFF HV
 
# Turn OFF HV
 
# Retract the detector to position defined as ''Go Home''
 
# Retract the detector to position defined as ''Go Home''
Line 65: Line 65:
  
 
-----------
 
-----------
::::::::::::::::::::::::::: courtesy: ''Thanks to Dave Gaskell for the motivation to organize this information''
+
::::::::::::::::::: courtesy: ''Thanks to Dave Gaskell for the motivation to organize this information''
 
-----------
 
-----------
=== Request beam according to the intended run plan===
 
  
 
==  [[Diamond strip electron detector]] ==
 
==  [[Diamond strip electron detector]] ==

Revision as of 01:39, 26 November 2010

Standard Running Procedure

with the previous beam activity ongoing (parasitically)

  • take a quick CODA run to check DAQ functionality
  • check analyzer functionality
  • from any cdaq machine, from the directory ~/compton execute StripTool edetectorEpics.stp . This pulls up the strip chart of some relevant epics variables for e-detector. If you are unable to locate this file, the following epics variables should be explicitly opened.
    • 4 Hall-C Chicane BPMs
      • 3P01A (IPM3P01A.XPOS , IPM3PO1A.YPOS)
      • 3P02A (IPM3P02A.XPOS , IPM3PO2A.YPOS)
      • 3P02B (IPM3P02B.XPOS , IPM3PO2B.YPOS)
      • 3P03A (IPM3P03A.XPOS , IPM3PO3A.YPOS)
    • Normalized Compton Photon Rates (cComptPhotonRateNorm)

Request beam to be set through the chicane and verify the same

  • Check Chicane view: on any cdaq machine type edmmonticello, from the Monticello screen
    • open Magnets -> Magnet Commander
      • 3C -> Compton Combo
      • In this Hall C Compton Control screen, the REQUESTED and ACTUAL current readbacks should be ~104 A
    • open BPM -> BPM Overview
      • open Absolute -> on the Hall C column from the left bottom of this screen
      • BPM 3P01A, 3P02A, 3P02B and 3P03A should have finite non-zero read back
  • Check compton rates from the photon detector (typically 600 per uA per second)

Request beam to be taken off, for lowering the e-detector

  • Lower the e-detector to a position in accordance with current run plan
    • Motion mechanism [[1]]
      • begin with the program Go Home
      • jog to the intended position
      • Request beam according to the intended run plan

Run Plan

Nov 17

  • Form an external coincidence between strip #5 or 6 of all three planes.
    • count it on a visual scaler. look at each of the 3 plane signals on a scope to determine a good coincidence window.[this setup is ready]
    • record 1/3, 2/3 and 3/3 at 2.8, 2.0 and 1.2 cm from the beam, with and without beam. Collecting statistics for ~ 3-5 minutes
  • Repeat above with the full DAQ. Again 1/3, 2/3 and 3/3 at same distances from the beam, with and without beam.
    • Try a couple of different trigger coincidence widths in the 100 - 250 ns range.
    • Take a few long runs with 2/3 and 3/3 trigger at 1.5 cm from the beam, with and without beam, with and without laser

Nov 22

Seek a beam time of 6.5 hrs. Following tasks to be accomplished:

  • With laser turned off for this entire running period resolve the plane-4 HV ambiguity: (~ 1 hr)
    • look at output from all 3 planes on the scope, triggering on 2-plane coin while turning on HV of only one plane at a time
      • do this for plane-2 and plane-3 first
      • finally turn on p4 (repeat for a few neighboring strips if needed)
      • record scope shots triggered on coincidences
  • with the DAQ, try to observe a shift in the strip pattern as the detector is lowered towards the beam. (~ 3.5 hrs)
    • If the plane-4 ambiguity is resolved then use all 3 active planes for trigger decision
    • If plane-4 is not resolved, turn off the HV input to "plane-1" as well as "plane-4", mask the plane-4 signals and use 2-plane triggers only with plane-2 & plane-3.
    • take quick runs to check if smaller or higher cut on minimum width helps
    • try to find a trade-off between unmasking the strips neighboring the closest active strip and noise rates
    • take 30 min runs with 5 uA, 3 uA and 1 uA beam with the detector at a reasonably close position (say 1.6 cm from beam)
    • Repeat in steps of 1 mm as the detector is moved closer to the beam (~ 3 steps should be sufficient)
  • HV scan for plane 2 only (~2 hr)
    • With the detector at the closest position, and a 3 uA beam scan the HV from 300 - 700V in steps of 100 V taking 10 min runs at each voltage
      • use 2-plane trigger, check to see if the background is different with change in applied HV
      • use a 1-plane trigger, check to see if the background is different with change in applied HV
        • It might be useful to increase the cut on minimum width in order to look over the excessive noise in the case of single-plane trigger.

Backout Procedure

  1. Turn OFF HV
  2. Retract the detector to position defined as Go Home
  3. Retract further to position defined as Garage
  4. make hclog entry to inform completion of the intended studies, with any quick conclusion which are obvious



courtesy: Thanks to Dave Gaskell for the motivation to organize this information

Diamond strip electron detector

Test Box

Shielded Flex Cables

Q-Weak Amplifier Discriminator

Low Voltage Power supply for QWAD

e-Detector Motion System

e-Detector Assembly