Difference between revisions of "Hardware changes"

From PolWiki
Jump to navigationJump to search
Line 1: Line 1:
 
==Hardware, configuration changes during Q-Weak running==
 
==Hardware, configuration changes during Q-Weak running==
 +
 +
November 19, 2010: Mark added 1 mm of lead in front of the photon detector: ([https://hallcweb.jlab.org/hclog/1011_archive/101119165813.html log entry]).
  
 
November 29, 2010: Busted laser safety box: ([https://hallcweb.jlab.org/hclog/1012_archive/101208141812.html log entry]).
 
November 29, 2010: Busted laser safety box: ([https://hallcweb.jlab.org/hclog/1012_archive/101208141812.html log entry]).
  
Decemebr 7, 2010: Replaced Arshak's paddle with Moller scint. ([https://hallcweb.jlab.org/hclog/1012_archive/101207223030.html log entry]). I believe a second scintillator was hooked up to channel 11 at the same time.
+
December 7, 2010: Replaced Arshak's paddle with Moller scint. ([https://hallcweb.jlab.org/hclog/1012_archive/101207223030.html log entry]). I believe a second scintillator was hooked up to channel 11 at the same time.
  
Decemebr 8, 2010: Locked cavity in opposite laser helicity ([https://hallcweb.jlab.org/hclog/1012_archive/101208141812.html log]). Can't find log entry about restoration of original helicity - I'm pretty sure it was the next day.
+
December 8, 2010: Locked cavity in opposite laser helicity ([https://hallcweb.jlab.org/hclog/1012_archive/101208141812.html log]). Can't find log entry about restoration of original helicity - I'm pretty sure it was the next day.
  
 
December 9, 2010: Removed gamma-det. HV from patch ([https://hallcweb.jlab.org/hclog/1012_archive/101209154450.html log entry])
 
December 9, 2010: Removed gamma-det. HV from patch ([https://hallcweb.jlab.org/hclog/1012_archive/101209154450.html log entry])

Revision as of 10:46, 26 January 2011

Hardware, configuration changes during Q-Weak running

November 19, 2010: Mark added 1 mm of lead in front of the photon detector: (log entry).

November 29, 2010: Busted laser safety box: (log entry).

December 7, 2010: Replaced Arshak's paddle with Moller scint. (log entry). I believe a second scintillator was hooked up to channel 11 at the same time.

December 8, 2010: Locked cavity in opposite laser helicity (log). Can't find log entry about restoration of original helicity - I'm pretty sure it was the next day.

December 9, 2010: Removed gamma-det. HV from patch (log entry)