Difference between revisions of "Compton Meeting, June 2, 2011"
From PolWiki
Jump to navigationJump to search(2 intermediate revisions by the same user not shown) | |||
Line 31: | Line 31: | ||
== Minutes == | == Minutes == | ||
+ | |||
+ | Attendance: Amrendra, Don, Manolis, Juan Carlos, Seth, Mark (chair), Wouter (minutes) | ||
+ | |||
+ | * Introduction Seth, working as REU summer student on LabView controls for laser polarization measurement | ||
+ | |||
+ | * Laser | ||
+ | *# Mark will <b>create atlis</b> for radcon support to break vacuum | ||
+ | *# LabView (Seth) | ||
+ | *#* got used to LabView during first week | ||
+ | *#* laser polarization measurement when light comes out of cavity (rotate polarizer to measure linear polarization) | ||
+ | *#* added pause button, added delay to flipper (get rid of early signal spike) | ||
+ | *#* all channels on same graph, working on error bars now | ||
+ | *# Postpone transfer function measurement until after Qweak collab meeting (June 22--24), now start on June 27, Mark will <b>double-check for conflicts</b> with SAD schedule | ||
+ | *# Measure gain/linewidth/etc precisely for NIM paper on laser cavity | ||
+ | |||
+ | * DAQ | ||
+ | *# Spare CPU board (6100) arrived at W&M, will <b>bring to JLab</b>, will get used in electron test stand | ||
+ | |||
+ | * Photon detector | ||
+ | *# PbWO4 modifications | ||
+ | *#* Big bolt on stand might interfere with thermos, or would have to reposition PLT on thermos | ||
+ | *#* Thermos measurements 12 inch (z) by 10 inch (width) by 9 inch (tall) | ||
+ | *#* Great big styrofoam box, hopefully only for test | ||
+ | *#* No room for lead under detector, lowering stand seems lot of work, room for 1 inch lead, need to find narrow lead, see [[Media:2011-06-02_12-00-52_855_Photon_detector_stand.jpg|picture]]. | ||
+ | *#* Thermal model of thermos: total power of Compton signal, is there a gradient? | ||
+ | *#* Hamlet wants to install fibers only once, Juan Carlos will <b>look up fibers</b> | ||
+ | *#* Gamma beam profiler system: quote on XY translation stage (travel range of 6 inches), needs to be developed during summer, two scintillators with small PMT | ||
+ | *#* Monte Carlo: <b>modify geant3</b> to write events, then throw those into geant4 model of detector | ||
+ | *# Replay | ||
+ | *#* Mark collected info on pedestals, should be accurate enough for replay, Wouter requests table with run range where which pedestal is valid, and divide by number of samples | ||
+ | *#* Kent is interested in also seeing the beam on, laser on/off pedestals, in addition to what is posted in [https://qweak.jlab.org/elog/Photon+Detector/119 elog 119] | ||
+ | *#* Analyzer status: BCMs are working now, combined BCMs in progress, same procedure for BPMs so should be straight-forward porting | ||
+ | |||
+ | * Electron detector | ||
+ | *# Analyzer: added event mode reading, not yet possible to calculate asymmetries | ||
+ | *#* Only Amrendra working on this, Don created some macros | ||
+ | *#* Weighting not done correctly (?), normalization by current | ||
+ | *#* Electron detector meeting Thursday 4pm |
Latest revision as of 11:43, 3 June 2011
Previous Meeting: Compton Meeting, May 23, 2011
Following Meeting:
Agenda
Laser
- Final dates for RadCon support
- Transfer function measurement
- Modifications to the LabView program
DAQ
- Update on summer upgrade plans
Photon detector
- Replay:
- Pedestals
- Analyzer status
- PbWO4:
- Detector modification update
Electron detector
- Analysis
- Update on analysis
Minutes
Attendance: Amrendra, Don, Manolis, Juan Carlos, Seth, Mark (chair), Wouter (minutes)
- Introduction Seth, working as REU summer student on LabView controls for laser polarization measurement
- Laser
- Mark will create atlis for radcon support to break vacuum
- LabView (Seth)
- got used to LabView during first week
- laser polarization measurement when light comes out of cavity (rotate polarizer to measure linear polarization)
- added pause button, added delay to flipper (get rid of early signal spike)
- all channels on same graph, working on error bars now
- Postpone transfer function measurement until after Qweak collab meeting (June 22--24), now start on June 27, Mark will double-check for conflicts with SAD schedule
- Measure gain/linewidth/etc precisely for NIM paper on laser cavity
- DAQ
- Spare CPU board (6100) arrived at W&M, will bring to JLab, will get used in electron test stand
- Photon detector
- PbWO4 modifications
- Big bolt on stand might interfere with thermos, or would have to reposition PLT on thermos
- Thermos measurements 12 inch (z) by 10 inch (width) by 9 inch (tall)
- Great big styrofoam box, hopefully only for test
- No room for lead under detector, lowering stand seems lot of work, room for 1 inch lead, need to find narrow lead, see picture.
- Thermal model of thermos: total power of Compton signal, is there a gradient?
- Hamlet wants to install fibers only once, Juan Carlos will look up fibers
- Gamma beam profiler system: quote on XY translation stage (travel range of 6 inches), needs to be developed during summer, two scintillators with small PMT
- Monte Carlo: modify geant3 to write events, then throw those into geant4 model of detector
- Replay
- Mark collected info on pedestals, should be accurate enough for replay, Wouter requests table with run range where which pedestal is valid, and divide by number of samples
- Kent is interested in also seeing the beam on, laser on/off pedestals, in addition to what is posted in elog 119
- Analyzer status: BCMs are working now, combined BCMs in progress, same procedure for BPMs so should be straight-forward porting
- PbWO4 modifications
- Electron detector
- Analyzer: added event mode reading, not yet possible to calculate asymmetries
- Only Amrendra working on this, Don created some macros
- Weighting not done correctly (?), normalization by current
- Electron detector meeting Thursday 4pm
- Analyzer: added event mode reading, not yet possible to calculate asymmetries