Difference between revisions of "Compton Meeting, September 21, 2011"
From PolWiki
Jump to navigationJump to search (New page: == Agenda == === Laser === # Cavity upgrade progress === Photon Detector === # LED system # Cooling system update === Electron Detector === # Analysis update - dependence on dipole B-fi...) |
|||
Line 14: | Line 14: | ||
=== DAQ === | === DAQ === | ||
− | # BPM/V2F issue | + | # BPM/V2F issue: Might be the snake head. After putting a DAC that changes voltage every 1000 helicity windows, the 3P02A Y- remains unchanged. |
=== Simulation === | === Simulation === |
Revision as of 22:43, 20 September 2011
Agenda
Laser
- Cavity upgrade progress
Photon Detector
- LED system
- Cooling system update
Electron Detector
- Analysis update - dependence on dipole B-field knowledge
- QWAD work
- Installation progress
DAQ
- BPM/V2F issue: Might be the snake head. After putting a DAC that changes voltage every 1000 helicity windows, the 3P02A Y- remains unchanged.
Simulation
- There is no end in sight to Dave's procrastination
Miscellaneous
- New cables pulled - (still) not terminated
Other stuff
- Dave G. out of town next week - you're on your own.