Difference between revisions of "Compton Meeting, September 21, 2011"

From PolWiki
Jump to navigationJump to search
(New page: == Agenda == === Laser === # Cavity upgrade progress === Photon Detector === # LED system # Cooling system update === Electron Detector === # Analysis update - dependence on dipole B-fi...)
 
Line 14: Line 14:
  
 
=== DAQ ===
 
=== DAQ ===
# BPM/V2F issue (I think Juan Carlos checked it)
+
# BPM/V2F issue: Might be the snake head. After putting a DAC that changes voltage every 1000 helicity windows, the 3P02A Y- remains unchanged.
  
 
=== Simulation ===
 
=== Simulation ===

Revision as of 22:43, 20 September 2011

Agenda

Laser

  1. Cavity upgrade progress

Photon Detector

  1. LED system
  2. Cooling system update

Electron Detector

  1. Analysis update - dependence on dipole B-field knowledge
  2. QWAD work
  3. Installation progress

DAQ

  1. BPM/V2F issue: Might be the snake head. After putting a DAC that changes voltage every 1000 helicity windows, the 3P02A Y- remains unchanged.

Simulation

  1. There is no end in sight to Dave's procrastination

Miscellaneous

  1. New cables pulled - (still) not terminated

Other stuff

  1. Dave G. out of town next week - you're on your own.