Difference between revisions of "Compton Meeting, August 18, 2011"

From PolWiki
Jump to navigationJump to search
(New page: == Agenda == DIFFERENT ROOM just for this week: 10 am Room F226 === Laser === # Laser polarization analysis update (Dalton) # Cavity upgrade progress === Photon Detector === # LED syst...)
 
 
(2 intermediate revisions by one other user not shown)
Line 8: Line 8:
 
# Laser polarization analysis update (Dalton)
 
# Laser polarization analysis update (Dalton)
 
# Cavity upgrade progress
 
# Cavity upgrade progress
 +
# Interlock beacon fixed
  
 
=== Photon Detector ===
 
=== Photon Detector ===
# LED system
+
# LED system [https://qweak.jlab.org/elog/Photon+Detector/132]
 
# mini-scanner update
 
# mini-scanner update
 
# Cooling system update
 
# Cooling system update
Line 17: Line 18:
 
# Analysis update
 
# Analysis update
 
# Anything new on QWADs?
 
# Anything new on QWADs?
 +
# Fiducialization preparation status
  
 
=== Analysis ===
 
=== Analysis ===

Latest revision as of 08:47, 18 August 2011

Agenda

DIFFERENT ROOM just for this week:

10 am Room F226

Laser

  1. Laser polarization analysis update (Dalton)
  2. Cavity upgrade progress
  3. Interlock beacon fixed

Photon Detector

  1. LED system [1]
  2. mini-scanner update
  3. Cooling system update

Electron Detector

  1. Analysis update
  2. Anything new on QWADs?
  3. Fiducialization preparation status

Analysis

  1. BPM/V2F issue (we still need to fix this)

Simulation

  1. Dave is STILL goofing off

Miscellaneous

  1. Compton area cleanup in tunnel --> remove unused stuff, etc.
  2. Asked for 16 more cables from patch near e-det - pull this week