Difference between revisions of "Compton Meeting, September 21, 2011"
From PolWiki
Jump to navigationJump to search (→DAQ) |
|||
(One intermediate revision by one other user not shown) | |||
Line 10: | Line 10: | ||
=== Electron Detector === | === Electron Detector === | ||
# Analysis update - dependence on dipole B-field knowledge | # Analysis update - dependence on dipole B-field knowledge | ||
− | # QWAD | + | # [https://qweak.jlab.org/elog/Electron+Detector/248 QWAD installation update] |
# Installation progress | # Installation progress | ||
=== DAQ === | === DAQ === | ||
− | # BPM/V2F issue: Might be the snake head. After putting a DAC that changes voltage every 1000 helicity windows, the 3P02A Y- remains unchanged. | + | # BPM/V2F issue: Might be the snake head. After putting a DAC that changes voltage every 1000 helicity windows, the 3P02A Y- remains unchanged. Should look like [https://userweb.jlab.org/~cornejo/v2f/run_22120_sca_bpm_3p02bYM.png], but instead looks like [https://userweb.jlab.org/~cornejo/v2f/run_22124_sca_bpm_3p02aYM.png]. |
=== Simulation === | === Simulation === |
Latest revision as of 09:19, 21 September 2011
Agenda
Laser
- Cavity upgrade progress
Photon Detector
- LED system
- Cooling system update
Electron Detector
- Analysis update - dependence on dipole B-field knowledge
- QWAD installation update
- Installation progress
DAQ
- BPM/V2F issue: Might be the snake head. After putting a DAC that changes voltage every 1000 helicity windows, the 3P02A Y- remains unchanged. Should look like [1], but instead looks like [2].
Simulation
- There is no end in sight to Dave's procrastination
Miscellaneous
- New cables pulled - (still) not terminated
Other stuff
- Dave G. out of town next week - you're on your own.