Difference between revisions of "Electron Detector"
From PolWiki
Jump to navigationJump to searchLine 1: | Line 1: | ||
− | # [[Diamond strip electron detector]] | + | == Standard Running Procedure == |
− | + | === with the previous beam activity ongoing (parasitically) === | |
− | + | * Turn ON High Voltages to the e-detector | |
− | + | ** take a quick run to check DAQ functionality | |
− | + | ** check analyzer functionality | |
− | + | * on any cdaq machine, type '''StripTool''' and pull up strip chart of the epics variables of the 4 Hall-C Chicane BPMs | |
− | + | ** 3P01A (IPM3P01A.XPOS , IPM3PO1A.YPOS) | |
+ | ** 3P02A (IPM3P02A.XPOS , IPM3PO2A.YPOS) | ||
+ | ** 3P02B (IPM3P02B.XPOS , IPM3PO2B.YPOS) | ||
+ | ** 3P03A (IPM3P03A.XPOS , IPM3PO3A.YPOS) | ||
+ | |||
+ | ===Request beam to be set through the chicane and verify the same=== | ||
+ | * Check Chicane view: on any cdaq machine type '''edmmonticello''', from the '''Monticello''' screen | ||
+ | ** open '''Magnets''' -> '''Magnet Commander''' | ||
+ | *** '''3C''' -> '''Compton Combo''' | ||
+ | *** In this '''Hall C Compton Control''' screen, the ''REQUESTED'' and ''ACTUAL'' current readbacks should be ~104 A | ||
+ | ** open '''BPM''' -> '''BPM Overview''' | ||
+ | *** open '''Absolute''' -> on the Hall C column from the left bottom of this screen | ||
+ | *** BPM '''3P01A''', '''3P02A''', '''3P02B''' and '''3P03A''' should have finite non-zero read back | ||
+ | |||
+ | ===Request beam to be taken off, for lowering the e-detector=== | ||
+ | * Lower the e-detector to a position in accordance with current run plan | ||
+ | ** Motion mechanism [[https://hallcweb.jlab.org/polwiki/index.php/E-Detector_Motion_System#Motion_Mechanism_GUI]] | ||
+ | *** begin with the program '''Go Home''' | ||
+ | *** '''jog''' to the intended position | ||
+ | |||
+ | ::::::::::::::::::::::::::::::::::::: courtesy: ''Thanks to Dave Gaskell for the motivation to organize this information'' | ||
+ | |||
+ | === Request beam according to the intended run plan=== | ||
+ | == [[Diamond strip electron detector]] == | ||
+ | |||
+ | |||
+ | == [[Test Box]] == | ||
+ | |||
+ | |||
+ | == [[Shielded Flex Cables]] == | ||
+ | |||
+ | |||
+ | == [[Q-Weak Amplifier Discriminator]] == | ||
+ | |||
+ | |||
+ | == [[Low Voltage Power supply for QWAD]] == | ||
+ | |||
+ | |||
+ | == [[e-Detector Motion System]] == | ||
+ | |||
+ | |||
+ | == [[e-Detector Assembly]] == |
Revision as of 03:03, 19 November 2010
Standard Running Procedure
with the previous beam activity ongoing (parasitically)
- Turn ON High Voltages to the e-detector
- take a quick run to check DAQ functionality
- check analyzer functionality
- on any cdaq machine, type StripTool and pull up strip chart of the epics variables of the 4 Hall-C Chicane BPMs
- 3P01A (IPM3P01A.XPOS , IPM3PO1A.YPOS)
- 3P02A (IPM3P02A.XPOS , IPM3PO2A.YPOS)
- 3P02B (IPM3P02B.XPOS , IPM3PO2B.YPOS)
- 3P03A (IPM3P03A.XPOS , IPM3PO3A.YPOS)
Request beam to be set through the chicane and verify the same
- Check Chicane view: on any cdaq machine type edmmonticello, from the Monticello screen
- open Magnets -> Magnet Commander
- 3C -> Compton Combo
- In this Hall C Compton Control screen, the REQUESTED and ACTUAL current readbacks should be ~104 A
- open BPM -> BPM Overview
- open Absolute -> on the Hall C column from the left bottom of this screen
- BPM 3P01A, 3P02A, 3P02B and 3P03A should have finite non-zero read back
- open Magnets -> Magnet Commander
Request beam to be taken off, for lowering the e-detector
- Lower the e-detector to a position in accordance with current run plan
- Motion mechanism [[1]]
- begin with the program Go Home
- jog to the intended position
- Motion mechanism [[1]]
- courtesy: Thanks to Dave Gaskell for the motivation to organize this information