Difference between revisions of "Compton Meeting, August 4, 2011"
From PolWiki
Jump to navigationJump to search (→Agenda) |
|||
Line 13: | Line 13: | ||
# [https://qweak.jlab.org/elog/Electron+Detector/240 Detector, QWAD update] | # [https://qweak.jlab.org/elog/Electron+Detector/240 Detector, QWAD update] | ||
# [https://qweak.jlab.org/elog/DAQ+%26+Analysis/221 Analysis updates] | # [https://qweak.jlab.org/elog/DAQ+%26+Analysis/221 Analysis updates] | ||
+ | # e-detector motion Encoder status | ||
=== Analysis === | === Analysis === | ||
Line 18: | Line 19: | ||
=== Simulation === | === Simulation === | ||
+ | ... | ||
+ | === Miscellaneous === | ||
+ | # Where do we stand on our Summer down plan ? | ||
+ | # We need (at least) 4 more cables pulled between CH patch panel and tunnel |
Latest revision as of 07:26, 4 August 2011
Agenda
10 am Room F227
Laser
- Transfer function update, short term plan
Photon Detector
- LED system
- cooling system
Electron Detector
- Detector, QWAD update
- Analysis updates
- e-detector motion Encoder status
Analysis
- BPM/V2F issue
Simulation
...
Miscellaneous
- Where do we stand on our Summer down plan ?
- We need (at least) 4 more cables pulled between CH patch panel and tunnel