Difference between revisions of "Electron Detector"
From PolWiki
Jump to navigationJump to searchLine 4: | Line 4: | ||
** take a quick run to check DAQ functionality | ** take a quick run to check DAQ functionality | ||
** check analyzer functionality | ** check analyzer functionality | ||
− | * | + | * from any cdaq machine, from the directory ~/compton open the strip chart by '''StripTool edetectorEpics.stp''' . This pulls up the strip chart of some relevant epics variables for e-detector. If you are unable to locate this file, the following epics variables should be explicitly opened. |
− | ** 3P01A (IPM3P01A.XPOS , IPM3PO1A.YPOS) | + | ** 4 Hall-C Chicane BPMs |
− | ** 3P02A (IPM3P02A.XPOS , IPM3PO2A.YPOS) | + | *** 3P01A (IPM3P01A.XPOS , IPM3PO1A.YPOS) |
− | ** 3P02B (IPM3P02B.XPOS , IPM3PO2B.YPOS) | + | *** 3P02A (IPM3P02A.XPOS , IPM3PO2A.YPOS) |
− | ** 3P03A (IPM3P03A.XPOS , IPM3PO3A.YPOS) | + | *** 3P02B (IPM3P02B.XPOS , IPM3PO2B.YPOS) |
+ | *** 3P03A (IPM3P03A.XPOS , IPM3PO3A.YPOS) | ||
+ | ** Normalized Compton Photon Rates (cComptPhotonRateNorm) | ||
===Request beam to be set through the chicane and verify the same=== | ===Request beam to be set through the chicane and verify the same=== |
Revision as of 03:52, 19 November 2010
Standard Running Procedure
with the previous beam activity ongoing (parasitically)
- Turn ON High Voltages to the e-detector
- take a quick run to check DAQ functionality
- check analyzer functionality
- from any cdaq machine, from the directory ~/compton open the strip chart by StripTool edetectorEpics.stp . This pulls up the strip chart of some relevant epics variables for e-detector. If you are unable to locate this file, the following epics variables should be explicitly opened.
- 4 Hall-C Chicane BPMs
- 3P01A (IPM3P01A.XPOS , IPM3PO1A.YPOS)
- 3P02A (IPM3P02A.XPOS , IPM3PO2A.YPOS)
- 3P02B (IPM3P02B.XPOS , IPM3PO2B.YPOS)
- 3P03A (IPM3P03A.XPOS , IPM3PO3A.YPOS)
- Normalized Compton Photon Rates (cComptPhotonRateNorm)
- 4 Hall-C Chicane BPMs
Request beam to be set through the chicane and verify the same
- Check Chicane view: on any cdaq machine type edmmonticello, from the Monticello screen
- open Magnets -> Magnet Commander
- 3C -> Compton Combo
- In this Hall C Compton Control screen, the REQUESTED and ACTUAL current readbacks should be ~104 A
- open BPM -> BPM Overview
- open Absolute -> on the Hall C column from the left bottom of this screen
- BPM 3P01A, 3P02A, 3P02B and 3P03A should have finite non-zero read back
- open Magnets -> Magnet Commander
- Check compton rates from the photon detector (typically 600 per uA per second)
Request beam to be taken off, for lowering the e-detector
- Lower the e-detector to a position in accordance with current run plan
- Motion mechanism [[1]]
- begin with the program Go Home
- jog to the intended position
- Motion mechanism [[1]]
Current Run Plan
Backout Procedure
- Turn OFF HV
- Retract the detector to position defined as Go Home
- Retract further to position defined as Garage
- make hclog entry to inform completion of the intended studies, with any quick conclusion which are obvious
- courtesy: Thanks to Dave Gaskell for the motivation to organize this information