Jump to navigationJump to searchLine 28: | Line 28: | ||
*** '''jog''' to the intended position | *** '''jog''' to the intended position | ||
− | ===Run Plan | + | ===Run Plan === |
+ | ==== Previous (Nov 17)==== | ||
* Form an external coincidence between strip #5 or 6 of all three planes. | * Form an external coincidence between strip #5 or 6 of all three planes. | ||
** count it on a visual scaler. look at each of the 3 plane signals on a scope to determine a good coincidence window.[this setup is ready] | ** count it on a visual scaler. look at each of the 3 plane signals on a scope to determine a good coincidence window.[this setup is ready] | ||
Line 35: | Line 36: | ||
** Try a couple of different trigger coincidence widths in the 100 - 250 ns range. | ** Try a couple of different trigger coincidence widths in the 100 - 250 ns range. | ||
** Take a few long runs with 2/3 and 3/3 trigger at 1.5 cm from the beam, with and without beam, with and without laser | ** Take a few long runs with 2/3 and 3/3 trigger at 1.5 cm from the beam, with and without beam, with and without laser | ||
+ | ==== Upcoming ==== | ||
+ | Seek a beam time of ~ 5hrs. Following is what is intended: | ||
+ | |||
+ | * Resolve the plane-4 HV ambiguity: (~ 0.5 hrs) | ||
+ | **look at output from all 3 planes on the scope, turning on HV of only one plane at a time | ||
+ | ***do this for p2 and p3 first | ||
+ | ***finally turn on p4 (repeat for a few neighboring strips if needed) | ||
+ | ***record scope shots including coincidences. | ||
+ | |||
+ | * with the DAQ, try to observe a shift in the strip pattern as the detector is lowered towards the beam. (~ 3.5 hrs) | ||
+ | **use 3 active planes if HV ambiguity is resolved, use 3-plane trigger if possible | ||
+ | **use smaller min. width rejection if needed. | ||
+ | **unmask the strips neighboring the closest active strip | ||
+ | **take 30 min runs with 5 uA and 3 uA beam with the detector at a reasonably close position (say 1.6 cm from beam) | ||
+ | **Repeat in steps of 1 mm as the detector is moved closer to the beam (~ 3 steps should be sufficient) | ||
+ | **a 30 min no beam run when the detector is at its closest proximity to beam. | ||
+ | |||
+ | * HV scan for plane 2 only (~1 hr) | ||
+ | **With the detector at the closest position, and a 3 uA beam scan the HV from 350 - 700V in steps of 50 V taking short 5-10 min runs at each voltage | ||
+ | |||
===Backout Procedure=== | ===Backout Procedure=== |
Revision as of 16:23, 19 November 2010
Standard Running Procedure
with the previous beam activity ongoing (parasitically)
- Turn ON High Voltages to the e-detector
- take a quick run to check DAQ functionality
- check analyzer functionality
- from any cdaq machine, from the directory ~/compton open the strip chart by StripTool edetectorEpics.stp . This pulls up the strip chart of some relevant epics variables for e-detector. If you are unable to locate this file, the following epics variables should be explicitly opened.
- 4 Hall-C Chicane BPMs
- 3P01A (IPM3P01A.XPOS , IPM3PO1A.YPOS)
- 3P02A (IPM3P02A.XPOS , IPM3PO2A.YPOS)
- 3P02B (IPM3P02B.XPOS , IPM3PO2B.YPOS)
- 3P03A (IPM3P03A.XPOS , IPM3PO3A.YPOS)
- Normalized Compton Photon Rates (cComptPhotonRateNorm)
- 4 Hall-C Chicane BPMs
Request beam to be set through the chicane and verify the same
- Check Chicane view: on any cdaq machine type edmmonticello, from the Monticello screen
- open Magnets -> Magnet Commander
- 3C -> Compton Combo
- In this Hall C Compton Control screen, the REQUESTED and ACTUAL current readbacks should be ~104 A
- open BPM -> BPM Overview
- open Absolute -> on the Hall C column from the left bottom of this screen
- BPM 3P01A, 3P02A, 3P02B and 3P03A should have finite non-zero read back
- open Magnets -> Magnet Commander
- Check compton rates from the photon detector (typically 600 per uA per second)
Request beam to be taken off, for lowering the e-detector
- Lower the e-detector to a position in accordance with current run plan
- Motion mechanism [[1]]
- begin with the program Go Home
- jog to the intended position
- Motion mechanism [[1]]
Run Plan
Previous (Nov 17)
- Form an external coincidence between strip #5 or 6 of all three planes.
- count it on a visual scaler. look at each of the 3 plane signals on a scope to determine a good coincidence window.[this setup is ready]
- record 1/3, 2/3 and 3/3 at 2.8, 2.0 and 1.2 cm from the beam, with and without beam. Collecting statistics for ~ 3-5 minutes
- Repeat above with the full DAQ. Again 1/3, 2/3 and 3/3 at same distances from the beam, with and without beam.
- Try a couple of different trigger coincidence widths in the 100 - 250 ns range.
- Take a few long runs with 2/3 and 3/3 trigger at 1.5 cm from the beam, with and without beam, with and without laser
Upcoming
Seek a beam time of ~ 5hrs. Following is what is intended:
- Resolve the plane-4 HV ambiguity: (~ 0.5 hrs)
- look at output from all 3 planes on the scope, turning on HV of only one plane at a time
- do this for p2 and p3 first
- finally turn on p4 (repeat for a few neighboring strips if needed)
- record scope shots including coincidences.
- look at output from all 3 planes on the scope, turning on HV of only one plane at a time
- with the DAQ, try to observe a shift in the strip pattern as the detector is lowered towards the beam. (~ 3.5 hrs)
- use 3 active planes if HV ambiguity is resolved, use 3-plane trigger if possible
- use smaller min. width rejection if needed.
- unmask the strips neighboring the closest active strip
- take 30 min runs with 5 uA and 3 uA beam with the detector at a reasonably close position (say 1.6 cm from beam)
- Repeat in steps of 1 mm as the detector is moved closer to the beam (~ 3 steps should be sufficient)
- a 30 min no beam run when the detector is at its closest proximity to beam.
- HV scan for plane 2 only (~1 hr)
- With the detector at the closest position, and a 3 uA beam scan the HV from 350 - 700V in steps of 50 V taking short 5-10 min runs at each voltage
Backout Procedure
- Turn OFF HV
- Retract the detector to position defined as Go Home
- Retract further to position defined as Garage
- make hclog entry to inform completion of the intended studies, with any quick conclusion which are obvious
- courtesy: Thanks to Dave Gaskell for the motivation to organize this information