Difference between revisions of "Shift crew procedures"
Line 1: | Line 1: | ||
− | '''Compton Procedures Sheet (short version for shift workers)''' | + | '''Compton Procedures Sheet (short version for shift workers)'''<br> |
− | + | <br> | |
General Compton running:<br> | General Compton running:<br> | ||
1.At least once every hour restart a new CODA run. CODA should be open on one of the desktops of ccomptl1.<br> | 1.At least once every hour restart a new CODA run. CODA should be open on one of the desktops of ccomptl1.<br> | ||
− | 2.At least once every hour check the status of the HV. If a trip occurred, see below. | + | 2.At least once every hour check the status of the HV. If a trip occurred, see below. <br> |
− | 3.Check whether the laser is still flipping (EPICS channel cComptCavityPower). This should be obvious from the camera as well. If not flipping, call an expert. This EPICS PV should be visible on the desktop of Striptools on ccomptl1. | + | 3.Check whether the laser is still flipping (EPICS channel cComptCavityPower).<br> |
− | + | --> This should be obvious from the camera as well. If not flipping, call an expert. This EPICS PV should be visible on the desktop of Striptools on ccomptl1.<br> | |
− | After a photon detector HV trip: | + | <br> |
− | 1.Check that the normalized rate on the background scintillator (EPICS channel cComptScintRateNorm, or manually normalize hcrate14) is still below 150 Hz/uA (200 Hz/uA is tolerable, <150 Hz/uA is "good"). This EPICS PV should be visible on the desktop of Striptools on ccomptl1. If not, call an expert. | + | <br> |
− | 2.Wait 5 minutes after the trip and turn on the HV on the photon detector to 1600 V (channel PhotonDet_6). The HV controls should be open on one of the ccomptl1 desktops. If not log on to cdaql4 as cvxwrks and cd to $EPSHV/tk then run /HV_compton.tcl and turn on PhotonDet_6. | + | After a photon detector HV trip:<br> |
− | 3.If the photon detector HV trips again within 15 minutes, call an expert. | + | 1.Check that the normalized rate on the background scintillator (EPICS channel cComptScintRateNorm, or manually normalize hcrate14) is still below 150 Hz/uA (200 Hz/uA is tolerable, <150 Hz/uA is "good").<br> |
− | + | --> This EPICS PV should be visible on the desktop of Striptools on ccomptl1. If not, call an expert.<br> | |
− | + | 2.Wait 5 minutes after the trip and turn on the HV on the photon detector to 1600 V (channel PhotonDet_6).<br> | |
− | Experts on call | + | --> The HV controls should be open on one of the ccomptl1 desktops. If not log on to cdaql4 as cvxwrks and cd to $EPSHV/tk then run /HV_compton.tcl and turn on PhotonDet_6.<br> |
− | + | 3.If the photon detector HV trips again within 15 minutes, call an expert.<br> | |
− | Experts: | + | <br> |
− | Dave Gaskell, pager gaskelld-page@jlab.org, cell 719-5482 | + | <br> |
− | Don Jones, cell 768-1148 | + | '''Experts on call'''<br> |
− | Amrendra Narayan, cell 952-6126 | + | <br> |
− | Wouter Deconinck, pager 238-4235, cell 927-2413 | + | Experts:<br> |
− | + | Dave Gaskell, pager gaskelld-page@jlab.org, cell 719-5482<br> | |
− | Schedule: | + | Don Jones, cell 768-1148 <br> |
− | January 12 - January 19: Don Jones | + | Amrendra Narayan, cell 952-6126 <br> |
− | January 20 - January 26: Dave Gaskell | + | Wouter Deconinck, pager 238-4235, cell 927-2413 <br> |
− | January 27 - February 3: Amrendra Narayan | + | <br> |
+ | Schedule:<br> | ||
+ | January 12 - January 19: Don Jones<br> | ||
+ | January 20 - January 26: Dave Gaskell<br> | ||
+ | January 27 - February 3: Amrendra Narayan<br> |
Revision as of 17:48, 21 January 2011
Compton Procedures Sheet (short version for shift workers)
General Compton running:
1.At least once every hour restart a new CODA run. CODA should be open on one of the desktops of ccomptl1.
2.At least once every hour check the status of the HV. If a trip occurred, see below.
3.Check whether the laser is still flipping (EPICS channel cComptCavityPower).
--> This should be obvious from the camera as well. If not flipping, call an expert. This EPICS PV should be visible on the desktop of Striptools on ccomptl1.
After a photon detector HV trip:
1.Check that the normalized rate on the background scintillator (EPICS channel cComptScintRateNorm, or manually normalize hcrate14) is still below 150 Hz/uA (200 Hz/uA is tolerable, <150 Hz/uA is "good").
--> This EPICS PV should be visible on the desktop of Striptools on ccomptl1. If not, call an expert.
2.Wait 5 minutes after the trip and turn on the HV on the photon detector to 1600 V (channel PhotonDet_6).
--> The HV controls should be open on one of the ccomptl1 desktops. If not log on to cdaql4 as cvxwrks and cd to $EPSHV/tk then run /HV_compton.tcl and turn on PhotonDet_6.
3.If the photon detector HV trips again within 15 minutes, call an expert.
Experts on call
Experts:
Dave Gaskell, pager gaskelld-page@jlab.org, cell 719-5482
Don Jones, cell 768-1148
Amrendra Narayan, cell 952-6126
Wouter Deconinck, pager 238-4235, cell 927-2413
Schedule:
January 12 - January 19: Don Jones
January 20 - January 26: Dave Gaskell
January 27 - February 3: Amrendra Narayan